1. For areas subject to vehicular traffic such as streets, highways, roads, alleys,
driveways and parking, the minimum cover (distance from the top surface of the
finished grade to the top surface of the buried conductor or raceway) shall not be
less than _________ mm / __________ inches?
2. Where conductors carrying alternating current are installed in metal enclosures or
metal raceways, all phase conductors, neutral and ground conductors shall be
bundled or group together to avoid ____________________ caused by skin
effect?
3. What is the minimum copper conductor size permitted by Code, comprising of
each phase, neutral and ground, to be connected in parallel or electrically joined
at both ends?
4. What are the other five (5) conditions required for the paralleled conductors of
each phase, neutral and ground?
a. _______________ d. _______________
b. _______________ e. _______________
c. _______________
5. Permanently installed solid dielectric conductors operated above 2kV are to have
ozone-resistant insulation and are required to be shielded with a grounded
metallic sheath.
page-1
a. ___________________________________________________________
b. ___________________________________________________________
c. ___________________________________________________________
d. ___________________________________________________________
e. ___________________________________________________________
f. ___________________________________________________________
15. What is the Code definition of places of assembly? Give examples of places of
assembly.
16. Conductors shall be permitted to be tapped, without overcurrent protection at
the tap, to a feeder as long as it complies with the following conditions for taps
not over 7.5 meters long?
a. ___________________________________________________________
b. ___________________________________________________________
c. ___________________________________________________________
17. Where the Code specifies that one equipment shall be within sight of another
equipment, the specified equipment is to be visible from the other equipment, and
not more than __________ meters or __________ feet distant from the other?
18. For a straight-pull two-way pullbox, the length of the box shall not be less than
_____ times the trade diameter size of the largest conduit?
19. The sum of the cross-sectional area of all contained conductors at any cross
section of the wireway shall not exceed _____ % (percentage fill) of the interior
cross-sectional area of the wireway.
20. Derating factors for contained current carrying conductors inside wireway shall
only apply if the quantity of conductors exceeds _____.
Prepared by :
MANNY M. DE GUZMAN
R. A. Mojica and Partners
page-2
9127 LA BANDA STREET , GUADALUPE NUEVO , CITY OF MAKATI 1212 , PHILIPPINES
Tel. +63.2.8822775 7284005 E-mail add: ramp@ramojicapartners.com , mmd.eng@ramojicapartners.com Fax. +63.2.8822776 7284006