Professional Documents
Culture Documents
A B C D E F G H X1 X2
5500 4690 2590 2805 5410 2195 5660 6518 6255
(VARIOUS)
28850
16
5 Opening in inside tank
300x300x300 for tank drain
A -7.60m
Sump pit-02
S.S.L
A
A-302 17
1500x1500x2000mm depth
Opening in B2 slab 06 A-301
in B2 slab UNDER GROUND 300x300x400 for No. DESCRIPTION. DATE. DRWN. CHKD.
Sump pit-01 PUMP ROOM UNDER GROUND
valve chamber
6290
1500x1500x1500mm depth
SIZE = 6.6 X 11.30 X 2.5 m WATER TANK-2
28545
in pump room
6 26 LIFT LOBBY SD
Channel grating for
pump room to be
04
LIFT
-6.85m
01
27 connected to sand trap
F.F.L
OWNER
19 catch basin with built-in
sand trap
FIRAS LUAY SHAREEF
5445
-6.60m
SD
FHC
S.S.L
01
03 PROJECT
20 25 SD
01 Channel grating at
B PROPOSED RESIDENTIAL
BUILDING.
7 -7.60m
ramp
A-302
RAMP UP TO
21 24
2B+G+11+ROOF 2B+G+11+ROOF
LOCATION PLOT No.
-6.60m
S.S.L AL JADAF 3260878
6350
01 PRINCIPAL CONSULTANT
22 23
catch basin with built-in
sand trap
8 DWG TITLE:
C DRAWING TYPE
Mohamed salah
Abdel menam
A-303 Architecture. Mahmoud Galal
A B C D E F G H X1 X2
5500 4690 2590 2805 5410 2195 5660 6518 6255
(VARIOUS)
28850
09
3
SD 15
-4.40m 01
14
B 08
2855
CORRIDOR
07 A-201
2610
16
5
A -4.40m A
A-302 17
S.S.L
06 A-301 No. DESCRIPTION. DATE. DRWN. CHKD.
6290
28545
2
AL
<<< SIKKA >>>
04
18 05
A-202
FIRE
LIFT
6 23
LIFT LOBBY
-3.80m SD
04
LIFT
F.F.L
01
24
OWNER
19
FIRAS LUAY SHAREEF
5445
-3.40m
S.S.L
FHC
03 PROJECT
20 SD
01
-3.30m
F.F.L
B PROPOSED RESIDENTIAL
BUILDING.
7 A-302
RAMP UP TO
2B+G+11+ROOF 2B+G+11+ROOF
21
THE BASEMENT-2
RAMP DOWN TO
-4.40m
S.S.L 01 PRINCIPAL CONSULTANT
22
8 DWG TITLE:
C DRAWING TYPE
Mohamed salah
Abdel menam
A-303 Architecture. Mahmoud Galal
A B C D E F G H X1 X2
5500 4690 2590 2805 5410 2195 5660 6518 6255
(VARIOUS)
28850
BRACHING INLET
RECYCLE AREA
500x500mm opening in 01
GF slab for drainage
gully trap
3 GARBAGE ROOM
FHC
04 03 02
B
2855
ENTRY
05
5
GATE BARRIER
±0.00m
A A
-1.20m S.S.L
S.S.L
EXIT
A-302 06 A-301 No. DESCRIPTION. DATE. DRWN. CHKD.
6290
28545
2
<<< SIKKA >>>
AW
RAMP
AL 07 06
SLOPE 8%
A-202 04 FIRE
LIFT
+0.45m
6
F.F.L
13 14 15
SLOPE 8%
RAMP
FLOWER BOX
LIFT LOBBY
12 LIFT
OWNER
08 16
FIRAS LUAY SHAREEF
5445
WD
01 FHC
PROJECT
09 WD
01 B PROPOSED RESIDENTIAL
BUILDING.
7 A-302
DESIGN HIGHT CONSTRUCTION
THE BASEMENT-1
RAMP DOWN TO
2B+G+11+ROOF 2B+G+11+ROOF
10 LOCATION
-1.20m ENTRANCE HALL PLOT No.
S.S.L +0.45m SD AL JADAF 3260878
F.F.L 02
6350
MAIN ENTRANCE
+0.45m PRINCIPAL CONSULTANT
11 F.F.L
8 DWG TITLE:
C DRAWING TYPE
Mohamed salah
Abdel menam
A-303 Architecture. Mahmoud Galal
04
C WD
04
F.R.L. = FINISH ROAD LEVEL
F.P.L. = FOOT PATH LEVEL
A-303 WD AW
04 TERRACE F.G.L. = FINISH GROUND LEVEL
05
BEDROOM-1
+4.55
F.F.L. = FINISH FLOOR LEVEL
BATH C.L. = CONCRETE LEVEL
2 WD
05
1st. SS.LVL.
SD
04
03
B
02
2855
A-201
04
WD WD
04
2610
FHC
WD
5 +4.55
1st. SS.LVL.
KITCHEN 07
WC WD
05 BALCONY
A A
WD LIVING/DINING
BALCONY LIVING/DINING 04 SD
04
TERRACE
1BR
WD
02
02
A-302 A-301
SD WD
1BR
04
03 02
TERRACE No. DESCRIPTION. DATE. DRWN. CHKD.
WD WD +4.55
6290
STU
05 02
01
WC
1st. SS.LVL.
28545
SD
WC
2
03 WD
<<< SIKKA >>>
05
WD STUDIO
BALCONY
BALCONY 05
WD
TERRACE SD
A-202 1BR
05
LIVING/DINING 02 04
LIFT PANTRY
6 +4.55
1st. SS.LVL.
WD
KITCHEN
BATH BATH
04
BEDROOM LIFT
WD OWNER
AW 05 WD
02 06 BEDROOM-2
BATH WD SW
FIRAS LUAY SHAREEF
5445
LAUN. 05 01
AW
05 WD
01
WD
PROJECT
- - - CORRIDOR 1.80m WIDE- - -
OTS 04
AW
AW
05 WD
04
B PROPOSED RESIDENTIAL
BUILDING.
7 BATH LAUN. 05
LAUN.
WD
05
A-302
WD WD BEDROOM-1 DESIGN HIGHT CONSTRUCTION
AW WD 06 WD 06 SW
FHC
01 05 WC 01
07
BEDROOM
WD 2B+G+11+ROOF 2B+G+11+ROOF
05
WD
04
KITCHEN TERRACE LOCATION PLOT No.
WD BATH
TERRACE +4.55 AL JADAF 3260878
2BR
02
07
WD
6350
1st. SS.LVL.
04
+4.55 WD PRINCIPAL CONSULTANT
SD
WD WD TEL. 04
1st. SS.LVL. 03
1BR
03
06
02 BALCONY
LIVING/DINING WD WD LIVING/DINING
BALCONY 03 03 OPEN KITCHEN SD
WD 04
05 WATER ELECTRICAL
WC
8 DWG TITLE:
C DRAWING TYPE
Mohamed salah
Abdel menam
A-303 Architecture. Mahmoud Galal
04
C WD
04
F.R.L. = FINISH ROAD LEVEL
TERRACE F.P.L. = FOOT PATH LEVEL
A-303 WD AW
04 +4.55
F.G.L. = FINISH GROUND LEVEL
05
BEDROOM-1
1st. SS.LVL. F.F.L. = FINISH FLOOR LEVEL
BATH C.L. = CONCRETE LEVEL
2 WD
05
SD
04
2BR
WD
03
B
02
2855
01
4
WD
1st. SS.LVL.
05 WD
06 WD
A-201
04
WD
WD
2610
WD
04
FHC
WD
5
STORE 07
WD WC WD
05 05 BALCONY
TERRACE
TERRACE
A SD
03
BEDROOM-1
BATH
LOBBY
LIVING/DINING
SD
04 A
1BR
WD +4.55
02
02
A-302
WD LAUN.
06 1st. SS.LVL.
A-301 No. DESCRIPTION. DATE. DRWN. CHKD.
BALCONY WD
WC
6290
STU
02
01
28545
SD WD
2
05
<<< SIKKA >>>
03
WD STUDIO
BALCONY
05
TERRACE
WD
2BR
04 SD
A-202 02 FIRE
LIVING/DINING PANTRY 04
LIFT
6 KITCHEN
BATH BATH
LIFT
LAUN.
OWNER
BATH
+4.55 AW BEDROOM-2 WD
01 BEDROOM-2
WD 06
WD SW
FIRAS LUAY SHAREEF
5445
1st. SS.LVL. 05 01
AW 05
05 WD
01
WD
PROJECT
- - - CORRIDOR 1.80m WIDE- - -
OTS 04
WD
04
AW
AW
05 WD
04
B PROPOSED RESIDENTIAL
BUILDING.
7 WD
05
WD A-302
LOBBY
05 LAUN. 05
WD BEDROOM-1 DESIGN HIGHT CONSTRUCTION
AW BEDROOM-1 06 SW
WD
FHC
07 WC 01
BATH 07
2B+G+11+ROOF 2B+G+11+ROOF
TERRACE
WD
+4.55
1st. SS.LVL.
05
KITCHEN TERRACE LOCATION PLOT No.
WD BATH
+4.55 AL JADAF 3260878
2BR
02
06
WD
6350
1st. SS.LVL.
04
WD PRINCIPAL CONSULTANT
SD
WD WD TEL. 04
03
2BR
03
05
02 BALCONY
LIVING/DINING WD WD LIVING/DINING
BALCONY 03 03 OPEN KITCHEN SD
04
WD
05 WATER ELECTRICAL
WC
8 DWG TITLE:
C DRAWING TYPE
Mohamed salah
Abdel menam
A-303 Architecture. Mahmoud Galal
TOP LVL.
C.L. = CONCRETE LEVEL
+46.45
TERRACE 600 x 600 GYPSUM TILES
C02 PVC LAMINATED
+4.55
1st. SS.LVL.
CEILING LEVEL
+46.35 FROM F.F.L.
R. SS.LVL. CEILING TYPE
+46.35 GARBAGE CHUTE
R.FF.LVL.
C02 +2.70
EXHAUST SYSTEM
R. SS.LVL.
SAUNA C02 +2.70
STEAM NOTE :
+46.45
LOCKERS
C03 +2.7
1st. SS.LVL.
C02 +2.70 C02 +2.70 C02 +2.70 ALL CEILING HEIGHT IS +2.50 M FROM
+46.35 UP POD FLOOR FINISHED LINE UNLESS OTHERWISE NOTED
R. SS.LVL.
TERRACE POOL TOILET
MECHANICAL AREA C02 +2.70
FHC
C03 +2.7
TERRACE No. DESCRIPTION. DATE. DRWN. CHKD.
+4.55
1st. SS.LVL.
C01 +3.00
+46.45 C01 +3.00
R.FF.LVL.
GYMNASIUM
<<< SIKKA >>>
POOL
LIFT
SWIMMING POOL MECHANICAL AREA
LIFT LOBBY 2.4m WIDE
LIFT
FIRAS LUAY SHAREEF
TERRACE
FHC
+4.55 PROJECT
R.FF.LVL.
1st. SS.LVL.
PROPOSED RESIDENTIAL
+46.45
+46.35
R. SS.LVL. BUILDING.
+46.35
R. SS.LVL. DESIGN HIGHT CONSTRUCTION
2B+G+11+ROOF 2B+G+11+ROOF
TOP LVL.
DWG TITLE:
ROOF PLAN
( CEILING LAYOUT)
<<< NEIGHBOR PLOT >>> SCALE 1 : 100 @ A1 DATE JULY. - 2022
Asst./Draft Emad Sameer
Mohamed salah
DRAWING TYPE Abdel menam
Architecture. Mahmoud Galal
PROJECT No. DWG No. Se. No.
TOP LVL.
F.P.L. = FOOT PATH LEVEL
A-303
+46.45
F.G.L. = FINISH GROUND LEVEL
TERRACE F.F.L. = FINISH FLOOR LEVEL
C.L. = CONCRETE LEVEL
2 +46.35
+4.55
1st. SS.LVL.
R. SS.LVL.
<<< NEIGHBOR PLOT >>>
4995
+46.35
3 R. SS.LVL.
+46.35
B
2855
R. SS.LVL. +50.15
A-302
+4.55
1
1st. SS.LVL.
4
A-201
2610
+48.85 UP
DECK.FF.LVL.
5
TERRACE
+50.15
T.R. SS.LVL.
A TERRACE
+4.55
A
A-302 1st. SS.LVL.
A-301 No. DESCRIPTION. DATE. DRWN. CHKD.
6290
28545
2
<<< SIKKA >>>
6
TERRACE OWNER
FHC
+4.55
FIRAS LUAY SHAREEF
5445
1st. SS.LVL.
+46.35
R. SS.LVL.
+48.85 PROJECT
B
DECK.FF.LVL. Open Open +50.15
Shower Shower
T.R. SS.LVL. PROPOSED RESIDENTIAL
BUILDING.
7 A-302
TOP LVL.
2B+G+11+ROOF 2B+G+11+ROOF
TERRACE
LOCATION PLOT No.
+4.55
AL JADAF 3260878
1st. SS.LVL.
6350
+46.35
PRINCIPAL CONSULTANT
TERRACE R. SS.LVL.
+4.55
1st. SS.LVL.
8 DWG TITLE:
C DRAWING TYPE
Mohamed salah
Abdel menam
A-303 Architecture. Mahmoud Galal