DAFTAR HARGA SATUAN UPAH, BAHAN DAN ALAT

HARGA
NO URAIAN SATUAN SATUAN KET.
(Rp.)

UPAH
1 P e k e r j a / Knek Jam 25,000.00 175,000.00 /hari
2 Tukang Jam 25,800.00 180,600.00 /hari
3 Kepala Tukang Jam 28,600.00 200,200.00 /hari
4 M a n d o r / Pengawas Jam 30,000.00 210,000.00 /hari

BAHAN
PASIR DAN BATU
1 Pasir urug darat (pasir laut) M3 250,000.00
2 Pasir pasang M3 360,000.00
3 Pasir beton M3 360,000.00
4 Sirtu M3 270,000.00
5 Split M3 360,000.00
6 Tanah merah M3 250,000.00
7 Batu pecah/split ukuran 1-2 cm M3 360,000.00
8 Batu pecah/split ukuran 2-3 cm M3 360,000.00
9 Macadam 5 - 7 cm M3 350,000.00
10 Batu kali belah M3 300,000.00
11 Abu batu 5 mm M3 350,000.00
12 Agregat A M3 360,000.00
13 Agregat B M3 330,000.00
14 Limestone M3 320,000.00

BESI DAN KAWAT


1 Paku Kg 22,000.00
2 Kawat beton kg 25,000.00
3 Besi beton bulat kg 12,500.00
4 Besi Wiremesh M6 M2 44,000.00
HARGA
NO URAIAN SATUAN SATUAN KET.
(Rp.)

SEMEN & KAPUR


1 Semen Pc (50 Kg) Kg 1,400.00
2 Floor Hardener Kg 20,000.00

BETON READYMIX
1 Readymix K. B0 Non Fly Ash (NFA) M3 800,000.00
2 Readymix K. 175 Non Fly Ash (NFA) M3 1,000,000.00
3 Readymix K. 225 Non Fly Ash (NFA) M3 1,100,000.00
4 Readymix K. 250 Non Fly Ash (NFA) M3 1,200,000.00
5 Readymix K. 300 Non Fly Ash (NFA) M3 1,250,000.00
6 Readymix K. 350 Non Fly Ash (NFA) M3 1,300,000.00

BAHAN KAYU
1 Kaso 5/7x400 kayu Meranti M3 2,500,000.00
2 Kayu Balok M3 3,300,000.00
3 Papan 2/20 M3 3,500,000.00
4 Plywood tebal 9 mm lbr 150,000.00
5 Dolken dia. 8-10 cm Btg 40,000.00

CONBLOCK / INTERBLOCK
Paving Block tebal 6 cm uk. 10 x 20 cm,
1 M2 160,000.00
warna abu-abu, K-300
Paving Block tebal 8 cm uk. 10 x 20 cm,
2 M2 180,000.00
warna abu-abu, K-300
Kansteen Precast Uk. 12/15-30-40 cm K-
3 Buah 46,950.00
300
Kansteen Precast Uk. 18/22-25-60 cm K-
4 M' 90,300.00
300
Kansteen Batu Andesit Uk. 12/15-30-40 cm
5 Buah 426,550.00
K-300
Kansteen Batu Andesit Uk. 18/22-25-60 cm
6 Buah 426,550.00
K-300
Kansteen Mulut Air Precast Uk. 12/15-30-40
7 Buah 36,950.00
cm K-300
Kansteen Mulut Air Precast Uk. 18/22-25-60
8 Buah 75,300.00
cm K-300
Kansteen Mulut Air Batu Andesit Uk. 12/15-
9 Buah 286,560.00
30-40 cm K-300

HARGA
NO URAIAN SATUAN SATUAN KET.
(Rp.)

Kansteen Mulut Air Batu Andesit Uk. 18/22-


10 Buah 426,550.00
25-60 cm K-300
Kotak Mulut Air Beton Precast K-300 +
11 Unit 499,550.00
Tutup Besi, Uk. 40x21x25 cm
Kotak Mulut Air Beton Precast K-300 +
12 Unit 593,000.00
Tutup Besi, Uk. 54x40x25 cm
Kotak Mulut Air Batu Andesit + Tutup Besi,
13 Unit 429,550.00
Uk. 40x21x25 cm
Kotak Mulut Air Batu Andesit + Tutup Besi,
14 Unit
Uk. 54x40x25 cm
Kotak Mulut Air Beton Precast K-300 +
15 Unit 231,250.00
Tutup Beton Precast, Uk. 40x21x25 cm
Kotak Mulut Air Beton Precast K-300 +
16 Unit 368,900.00
Tutup Beton Precast, Uk. 54x40x25 cm

BAHAN BATU ALAM & BETON PRECAST


1 Homogenous Tile Teb. Min. 1 cm M2 325,000.00
2 Batu Alam Andesit Teb. Min. 3 cm M2 565,000.00
3 Batu Alam Granit Teb. Min. 2 cm M2 1,230,000.00
Batu Poles (Potongan Batu kali / Granit /
4 M2 257,500.00
campuran basal hitam / Kerikil
Batu Sikat (Batu koral / Kerikil hitam /
5 M2 129,000.00
warna
6 Batu Precast Min. K300 tebal min. 5 cm M2 470,000.00
7 Gutter Beton Precast Uk. 21x40 cm M' 96,000.00
8 Gutter Batu Andesit Uk. 21x40 cm Buah 428,550.00

LAIN-LAIN
1 Stamp Concrete M2 98,000.00
2 Stamp Concrete (Full Depth Pigmen) M2 392,000.00
3 Flowing Mortar M3 1,082,000.00
4 Fiber Semen Precast M2 1,058,000.00
5 Pipa PVC dia. 2 inchi Btg 140,000.00
6 Pipa PVC dia. 4 inchi Btg
7 Pipa PVC dia. 6 inchi Btg 990,000.00
8 Pipa PVC dia. 8 inchi Btg 1,650,000.00
9 Pipa PVC dia. 10 inchi Btg 2,580,000.00

HARGA
NO URAIAN SATUAN SATUAN KET.
(Rp.)

10 Olie Gemuk Liter 40,000.00


11 Karung Plastik Lbr 4,000.00
12 Tali rapia/plastik M' 800.00
13 Coating (Finishing) M2 50,000.00

PERALATAN
1 Concrete Vibrator Jam 65,000.00
2 Concrete Cutter Jam 85,000.00
3 Concrete Mixer Jam 70,000.00
4 Sewa Dump Truck (3-4 M3) Jam 350,000.00
5 Sewa Truck Crane Jam 300,000.00
6 Excavator Jam 520,000.00
7 Jack Hammer Jam 70,000.00
8 Wheel Loader Jam 376,000.00
9 Tandem Roller Jam 245,000.00
10 Vibro Roller Jam 448,000.00
11 Motor Grader Jam 410,000.00
12 Dump Truck ( 8 Ton) Jam 465,000.00
13 Water Tanker Jam 255,000.00
14 Compressor 4000-65000 L/M Jam 220,000.00
15 Stamper Jam 85,000.00

Jakarta, 31 Oktober 2022


PT. GOARTHA ABADI

HOLMAN BOIMAN PARDEDE


Direktur
11.34
44,091.71 wire mesh M6 Uk. 210x540
120,000.00 140,000.00

130,000.00 150,000.00

52,000.00 86,666.67 46,950.00 Bh

70,000.00 116,666.67 90,300.00 Bh

426,550.00
-

499,550.00

593,000.00

130,000.00 156,000.00

270,000.00 324,000.00

325,000.00
565,000.00
883,000.00

257,500.00

129,000.00

470,000.00
80,000.00 96,000.00

98,000.00
392,000.00

128,100.00 118,770.00 123,435.00


967,700.00 881,340.00 924,520.00
1,623,500.00 1,504,050.00 1,563,775.00
2,510,200.00 2,326,449.00 2,418,324.50
ANALISA HARGA SATUAN

Item Pekerjaan : Galian Tanah


Satuan Pembayaran : M3

JUMLAH HARGA
PERKIRAAN HARGA SATUAN
NO. KOMPONEN SATUAN
KUANTITAS ( Rp. )
( Rp. )

A. UPAH

1. Pekerja Jam 4.0000 25,000.00 100,000.00


2. Mandor Jam 0.2667 30,000.00 8,001.00

JUMLAH HARGA TENAGA 108,001.00

B. BAHAN

JUMLAH HARGA BAHAN

C. ALAT

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 108,001.00


E. OVERHEAD & PROFIT 15% x D 16,200.15
F. HARGA SATUAN PEKERJAAN ( D + E ) 124,201.15

Jakarta, 31 Oktober 2022


PT. GOARTHA ABADI

HOLMAN BOIMAN PARDEDE


Direktur
ANALISA HARGA SATUAN

Item Pekerjaan : Angkutan Dump Truck kap. 4-5 m3 jarak s.d. 20 km


Satuan Pembayaran : M3

JUMLAH HARGA
PERKIRAAN HARGA SATUAN
NO. KOMPONEN SATUAN
KUANTITAS ( Rp. )
( Rp. )

A. UPAH

1. Pekerja Hari 0.2550 175,000.00 44,625.00


2. Mandor Hari 0.0637 210,000.00 13,377.00

JUMLAH HARGA TENAGA 58,002.00

B. BAHAN

JUMLAH HARGA BAHAN

C. ALAT

1. Sewa Dump Truck Jam 0.4462 350,000.00 156,170.00

JUMLAH HARGA PERALATAN 156,170.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 214,172.00


E. OVERHEAD & PROFIT 15% x D 32,125.80
F. HARGA SATUAN PEKERJAAN ( D + E ) 246,297.80

Jakarta, 31 Oktober 2022


PT. GOARTHA ABADI

HOLMAN BOIMAN PARDEDE


Direktur
ITEM PEMBAYARAN NO. :2.4.11
JENIS PEKERJAAN : Angkutan Dump Truck kap. 4-5 m3 jarak s.d. 20 km
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

I. ASUMSI
1 Jam kerja efektif per-hari Tk 7.00 jam
2 Jarak angkut L 20.00

II. URUTAN KERJA


1 Mobilisasi dump truk dan personil
2 Sekelompok pekerja menaikan karung berisi lumpur ke dalam
dump truk
3 Dump truk membuang hasil galian/kurasan ke lokasi (dumping site)

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. ALAT
DUMP TRUCK (E08)
Kapasitas bak V 4.50 m3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 30.00 KM/Jam
Kecepatan rata-rata kosong v2 60.00 KM/Jam
Waktu siklus Ts1 menit
- Muat T1 30.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 40.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 20.00 menit
- Lain-lain T4 10.00 menit
Ts1 100.00 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q1 2.24 M3 / Jam


Ts1

Koefisien Alat / m3 = 1 : Q1 (E08) 0.4462 Jam


2. TENAGA
Tenaga Angkutan
Produksi menentukan : Q1 2.24 m3/jam
Produksi (Qt) = Tk x Q1 15.69 m3/hari

Kebutuhan tenaga :
- Pekerja P 4.00 org
- Mandor M 1.00 org

Koefisien tenaga
- Pekerja = (Tk x P) 1.7849 jam
Qt 0.2550 hari
- Mandor = (Tk x M) 0.4462 jam
Qt 0.0637 hari

Berlanjut ke halaman berikut


ANALISA HARGA SATUAN

Item Pekerjaan : Pemadatan Tanah


Satuan Pembayaran : M2

JUMLAH HARGA
PERKIRAAN HARGA SATUAN
NO. KOMPONEN SATUAN
KUANTITAS ( Rp. )
( Rp. )

A. UPAH

1. Pekerja Jam 0.0723 25,000.00 1,807.50


2. Mandor Jam 0.0181 30,000.00 543.00

JUMLAH HARGA TENAGA 2,350.50

B. BAHAN

JUMLAH HARGA BAHAN

C. ALAT

1. Stamper Jam 0.0181 85,000.00 1,538.50

JUMLAH HARGA PERALATAN 1,538.50

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 3,889.00


E. OVERHEAD & PROFIT 15% x D 583.35
F. HARGA SATUAN PEKERJAAN ( D + E ) 4,472.35

Jakarta, 31 Oktober 2022


PT. GOARTHA ABADI

HOLMAN BOIMAN PARDEDE


Direktur
ANALISA HARGA SATUAN

Item Pekerjaan : Lapisan Pasir


Satuan Pembayaran : M3

JUMLAH HARGA
PERKIRAAN HARGA SATUAN
NO. KOMPONEN SATUAN
KUANTITAS ( Rp. )
( Rp. )

A. UPAH
1. Pekerja Jam 1.4456 25,000.00 36,140.00
2. Mandor Jam 0.1428 30,000.00 4,284.00

JUMLAH HARGA TENAGA 40,424.00

B. BAHAN
1. Pasir Beton/Pasang M3 1.2000 360,000.00 432,000.00

JUMLAH HARGA BAHAN 432,000.00

C. ALAT

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 472,424.00


E. OVERHEAD & PROFIT 15% x D 70,863.60
F. HARGA SATUAN PEKERJAAN ( D + E ) 543,287.60

Jakarta, 31 Oktober 2022


PT. GOARTHA ABADI

HOLMAN BOIMAN PARDEDE


Direktur
ANALISA HARGA SATUAN

Item Pekerjaan : BETON K-B0 (LANTAI KERJA)


Satuan Pembayaran : M3

JUMLAH HARGA
PERKIRAAN HARGA SATUAN
NO. KOMPONEN SATUAN
KUANTITAS ( Rp. )
( Rp. )

A. UPAH
1. Pekerja Jam 0.9638 25,000.00 24,095.00
2. Tukang Jam 1.2048 25,800.00 31,083.84
3. Mandor Jam 0.1204 30,000.00 3,612.00

JUMLAH HARGA TENAGA 58,790.84

B. BAHAN
1. Beton K-B0 M3 1.0500 800,000.00 840,000.00

JUMLAH HARGA BAHAN 840,000.00

C. ALAT
1. Concrete Vibrator Jam 0.4010 65,000.00 26,065.00

JUMLAH HARGA PERALATAN 26,065.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 924,855.84


E. OVERHEAD & PROFIT 15% x D 138,728.37
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,063,584.21

Jakarta, 31 Oktober 2022


PT. GOARTHA ABADI

HOLMAN BOIMAN PARDEDE


Direktur
ANALISA HARGA SATUAN

JENIS PEKERJAAN : BETON K-250 TERPASANG


SATUAN PEMBAYARAN : M3

JUMLAH HARGA
PERKIRAAN HARGA SATUAN
NO. KOMPONEN SATUAN
KUANTITAS ( Rp. )
( Rp. )

A. UPAH
1. Pekerja Jam 0.9638 25,000.00 24,095.00
2. Tukang Jam 1.2048 25,800.00 31,083.84
3. Mandor Jam 0.1204 30,000.00 3,612.00

JUMLAH HARGA TENAGA 58,790.84

B. BAHAN
1. Beton K-250 M3 1.0500 1,200,000.00 1,260,000.00

JUMLAH HARGA BAHAN 1,260,000.00

C. ALAT
1. Concrete Vibrator Jam 0.4010 65,000.00 26,065.00

JUMLAH HARGA PERALATAN 26,065.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,344,855.84


E. OVERHEAD & PROFIT 15% x D 201,728.37
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,546,584.21

Jakarta, 31 Oktober 2022


PT. GOARTHA ABADI

HOLMAN BOIMAN PARDEDE


Direktur
ANALISA HARGA SATUAN

Item Pekerjaan : Pekerjaan Trotoar dengan Homogenous Tile


Satuan Pembayaran : M2

JUMLAH HARGA
PERKIRAAN HARGA SATUAN
NO. KOMPONEN SATUAN
KUANTITAS ( Rp. )
( Rp. )

A. UPAH

1. Pekerja Jam 1.7500 25,000.00 43,750.00


2. Tukang Jam 0.8750 25,800.00 22,575.00
3. Kepala Tukang Jam 0.0910 28,600.00 2,602.60
4. Mandor Jam 0.0910 30,000.00 2,730.00

JUMLAH HARGA TENAGA 71,657.60

B. BAHAN

1. Batu Alam Andesit M2 1.0500 1,230,000.00 1,291,500.00


2. Semen Kg 25.0000 1,400.00 35,000.00
3. Wire Mesh M.6 M2 1.0000 44,000.00 44,000.00

JUMLAH HARGA BAHAN 1,370,500.00

C. ALAT

1. Alat Bantu Ls 1.0000 5,000.00 5,000.00

JUMLAH HARGA PERALATAN 5,000.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,447,157.60


E. OVERHEAD & PROFIT 15% x D 217,073.64
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,664,231.24

Jakarta, 31 Oktober 2022


PT. GOARTHA ABADI

HOLMAN BOIMAN PARDEDE


Direktur
REKAPITULASI ANALISA HARGA SATUAN

ITEM PEKERJAAN : Pekerjaan Trotoar dengan Batu Alam Granit


SATUAN PEMBAYARAN : M2

KOEF/ HARGA SATUAN JUMLAH HARGA


NO. URAIAN SATUAN KET
KUANTITAS (Rp.) (Rp.)

1. Galian Tanah / Bongkaran Tebal 20 cm M3 0.2000 124,201.15 24,840.23


2. Buangan Tanah bekas galian / bongkaran M3 0.2000 246,297.80 49,259.56
3. Pemadatan Tanah Dasar M2 1.0000 4,472.35 4,472.35
4. Lapisan Pasir Tebal 5 cm M3 0.0500 543,287.60 27,164.38
5. Lantai Kerja K-B0 Tebal 5 cm M3 0.0500 1,063,584.21 53,179.21
6. Beton K-250 Tebal 10 cm M3 0.1000 1,546,584.21 154,658.42
7. Pemasangan Homogenous Tile M2 1.0000 1,664,231.24 1,664,231.24

Jumlah Harga ( A ) 1,977,805.39


PPN 11% X ( A ) 217,558.59
Total 2,195,363.98
Dibulatkan Tanpa Sen 2,195,000.00

Jakarta, 31 Oktober 2022


PT. GOARTHA ABADI

HOLMAN BOIMAN PARDEDE


Direktur
ANALISA HARGA SATUAN

Item Pekerjaan : Lapisan Siru


Satuan Pembayaran : M3

JUMLAH HARGA
PERKIRAAN HARGA SATUAN
NO. KOMPONEN SATUAN
KUANTITAS ( Rp. )
( Rp. )

A. UPAH

1. Pekerja Jam 1.4458 25,000.00 36,145.00


2. Mandor Jam 0.1446 30,000.00 4,338.00

JUMLAH HARGA TENAGA 40,483.00

B. BAHAN

1. Sirtu M3 1.2000 270,000.00 324,000.00

JUMLAH HARGA BAHAN 324,000.00

C. ALAT

1. Stamper Jam 0.2410 85,000.00 20,485.00

JUMLAH HARGA PERALATAN 20,485.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 384,968.00


E. OVERHEAD & PROFIT 15% x D 57,745.20
F. HARGA SATUAN PEKERJAAN ( D + E ) 442,713.20

Jakarta, 31 Oktober 2022


PT. GOARTHA ABADI

HOLMAN BOIMAN PARDEDE


Direktur
ANALISA HARGA SATUAN

Item Pekerjaan : Lapisan Abu Batu


Satuan Pembayaran : M3

JUMLAH HARGA
PERKIRAAN HARGA SATUAN
NO. KOMPONEN SATUAN
KUANTITAS ( Rp. )
( Rp. )

A. UPAH

1. Pekerja Jam 1.4456 25,000.00 36,140.00


2. Mandor Jam 0.1428 30,000.00 4,284.00

JUMLAH HARGA TENAGA 40,424.00

B. BAHAN

1. Abu Batu/Pasir M3 1.2000 350,000.00 420,000.00

JUMLAH HARGA BAHAN 420,000.00

C. ALAT

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 460,424.00


E. OVERHEAD & PROFIT 15% x D 69,063.60
F. HARGA SATUAN PEKERJAAN ( D + E ) 529,487.60

Jakarta, 31 Oktober 2022


PT. GOARTHA ABADI

HOLMAN BOIMAN PARDEDE


Direktur
SUB KATEGORI JALAN BETON TERPASANG

1. Nama Produk : Pekerjaan Trotoar dengan Batu Alam Granit


2. Merek : Tanpa Merek
3. No. Produk Penyedia : 05 - TROTOAR
4. Unit Pengukuran : M2
5. Jenis Produk : PDN
6. Kode KBKI : 1513003000 OK 3754001003
7. Nilai TKDN (%) : Tidak Ada
8. Nilai BMP (%) : -
9. Nilai TKDN (%) + Nilai BMP (%) : -
10. Masa berlaku Produk : 05 Oktober 2025
11. NIB : 0109220026921
12. Nomor KBLI : 42101 (Konstruksi Bangunan Sipil Jalan)
13. Nomor SBUJK : 5182/C.31/31.75/-1.785.56/2018
14. Ketebalan Batu Granit : Tebal Min. 3 cm
Grade : Grade B
Daya Serap Air : Memiliki daya serap air ≤ 0,5%
Kuat Patah : Kuat patah ≥ 3000 N
R Rating : R rating min. R11
Nilai PEI : Nilai PEI min. 4

15. Tebal Lapisan Pasir : 5 cm


16. Tebal Lantai Kerja : 5 cm
17. Besi Wiremesh : Wiremesh M6, tebal 6 mm
18. Mutu Beton : Beton K-250
19. Tebal Beton : 10 cm
20. Tebal Flowing Mortar : Mortar khusus untuk Granit dengan tebal min. 2 cm
21. Coating Finishing : Coating (Finishing) - Tersedia

18 Lingkup Pekerjaan : 1. Bongkaran : Ya


2. Galian : Ya
3. Pemadatan Tanah Dasar : Ya
4. Timbunan Tanah : Ya
5. Lapisan Pasir Teb. 5 cm : Ya
6. Lapisan Lantai Kerja Teb. 5 cm : Ya
7. Besi Wiremesh M.6 : Ya
8. Lapisan Beton K-250 Teb. 10 cm : Ya
9. Flowing Mortar Teb. 2 cm : Ya
10. Pemasangan Batu Alam Granit: Ya
11. Perapihan : Ya

19 Jenis Kualifikasi Usaha : Usaha Kecil


20 Masa Pemeliharaan :
24 (dua puluh empat) bulan terhitung sejak pekerjaan dinyatakan selesai dan
dilakukan penyerahan pertama pekerjaan yang dituangkan dalam BAST.
21 Gambar Teknis :
22 Nomor Surat Perjanjian Distributor : 1. Perjanjian Kerjasama antara PT. GOARTHA ABADI dengan PT. MULTI ANUGRAH
SWADAYA Nomor 221298/SPK/GA-MAS/Katalog- Beton/IX/2022

2. Surat Perjanjian Kerjasama antara PT. GOARTHA ABADI dengan PT. ADHIMIX
RMC INDONESIA Nomor RMC-HO/O/SAR-EKS/10-2022/724

3. Surat Perjanjian Kerjasama antara PT. GOARTHA ABADI dengan PT. WATUMAS
KREASI GRAHA No. 013/GOA-WKG/Katalog-Trotoar/X/2022

4. Surat Perjanjian Kerjasama antara PT. GOARTHA ABADI dengan PT. ADHIMIX
RMC INDONESIA Nomor RMC-HO/O/SAR-EKS/09-2022/691

23 Masa Berlaku Surat Perjanjian : Selama Etalase Trotoar Provinsi DKI Jakarta Tayang pada Katalog Elektronik
Penyediaan Material

24 Sertifikat SMK3L dan Mutu : -

25 Pengalaman Kerja : Memiliki Pengalaman

26 Peralatan Kerja Utama : 1. Concrete Vibrator, tersedia, 1 (satu) unit, Sewa


2. Dump Truck, tersedia, 2 (dua) unit, Sewa
3. Concrete Cutter, tersedia, 1 (satu) unit, Sewa
4. Concrete Vibrator, tersedia, 2 (dua) unit, Sewa
5. Excavator , tersedia (satu) unit, Sewa
6. Genset , tersedia (satu) unit, Sewa

27 Kualifikasi Tenaga Ahli/Personil Teknik : Usaha Kecil, 1 orang Ahli Teknik Jalan, Pengalaman 4 Tahun
Jalan

25. Personil / Petugas Keselamatan : Resiko Kecil, 1 Orang Petugas Keselamatan Konstruksi, Pengalaman 3 Tahun
Konstruksi / Ahli K3 Konstruksi / Ahli
Keselamatan Konstruksi

26. Kualifikasi Tenaga Pendamping : a. 1 Orang Pelaksana Pekerjaan Jalan, Lulusan Diploma (DIII)
b. 1 Orang Juru Ukur, Lulusan STM
c. 1 Orang Juru Gambar/Draftman, Lulusan SMA

27. Metode Pelaksanaan Pekerjaan : -

28. Dokumen Rencana Keselamatan : Tersedia


Konstruksi (RKK)

29. Syarat dan Ketentuan Lainnya : • Bersedia untuk dilakukan peninjauan lokasi, mock up (jika diperlukan)
• Bersedia untuk dilakukan verifikasi kelengkapan dokumen, spesifikasi teknis, as
built drawing dan back up volume pekerjaan
• Bersedia untuk menyampaikan Analisa Harga Satuan/Struktur Pembentuk Harga
• Bersedia untuk melakukan pembahasan kesepakatan metode pembayaran, serta
hal-hal lainnya.
TEBAL goartha DS Varas HPM
2,195,000.00 2,150,000.00 2,206,000.00 1,279,057.00

You might also like