You are on page 1of 2

No.

Tanggal Pekerjaan Waktu Mulai Waktu Selesai

installation
1 6/22/2019 submersible pump at 17.00 19.00
bore site

installation
2 6/22/2019 submersible pump at 17.00 19.00
bore site

installation transfer
3 7/2/2019 17.00 18.00
pump at bore site

4 7/2/2019 installation transfer 17.00 18.00


pump at bore site

modify transfer
5 7/3/2019 17.00 18.30
pump configuration

modify transfer
6 7/3/2019 17.00 18.30
pump configuration

demolish clogging
7 7/8/2019 17.00 23.00
mixer

8 7/8/2019 demolish clogging 17.00 23.00


mixer

re-install
9 7/15/2019 17.00 23.00
submersible pump

re-install
10 7/15/2019 17.00 23.00
submersible pump
Total Jam jenis lembur PIC Approval

2 hari kerja Dedek Kurniawan

2 hari kerja Bagas Mahendra

1 hari kerja Dedek Kurniawan

1 hari kerja Bagas Mahendra

1.5 hari kerja Dedek Kurniawan

1.5 hari kerja Bagas Mahendra

6 hari kerja Bagas Mahendra

6 hari kerja Dedek Kurniawan

6 hari kerja Bagas Mahendra

6 hari kerja Dedek Kurniawan