You are on page 1of 4

Reference List

Journals

Li, C. Z., Xue, F., Li, X., Hong, J., & Shen, G. Q. (2018). An Internet of Things-enabled BIM
platform for on-site assembly services in prefabricated construction. Automation in
construction, 89, 146-161. Retrieved from:
https://drive.google.com/file/d/1svgvbyO_pWxyxOYGQjFaXcgSRnvBQ0h2/view
[Retrieved on:03.06.2022]

Oseghale, G. E., Adetooto, J. D., & Oseghale, B. (2021). Evaluation of Material Management
Methods in Selected Building Construction Sites in Abuja and Lagos State, Nigeria.
American Journal of Mechanical and Materials Engineering, 5(1), 11-17 Retrieved from:
https://www.researchgate.net/profile/Johnson-Adetooto/publication/
350038461_Evaluation_of_Material_Management_Methods_in_Selected_Building_Cons
truction_Sites_in_Abuja_and_Lagos_State/links/604cab7992851c2b23c727a6/
Evaluation-of-Material-Management-Methods-in-Selected-Building-Construction-Sites-
in-Abuja-and-Lagos-State.pdf [Retrieved on:03.06.2022]

Umar, T. (2018). Causes of delay in construction projects in Oman. Middle East Journal of
Management, 5(2), 121-136. Retrieved
from:https://eprints.kingston.ac.uk/id/eprint/48233/11/Umar-T-48233-AAM-1.pdf
[Retrieved on:03.06.2022]

Wong, J. H., Rashidi, A., & Arashpour, M. (2020). Evaluating the impact of building
information modeling on the labor productivity of construction projects in Malaysia.
Buildings, 10(4), 66. Retrieved from: https://www./buildings-10-00066-v3.pdf [Retrieved
on:03.06.2022]
del Carmen Pardo-Ferreira, M., Rubio-Romero, J. C., Gibb, A., & Calero-Castro, S. (2020).
Using functional resonance analysis method to understand construction activities for
concrete structures. Safety Science, 128, 104771. Retrieved from:
https://d1wqtxts1xzle7.cloudfront.net/64765007/10.1016_j.ssci.2020.104771_-with-
cover-page-v2.pdf?
Expires=1655121194&Signature=TSmpybyS37lZyUMFCBI5wzXMclPTm2CI00CRbJO
tfX6CVhMYyx~VcacXBOQszuI2Fq0Ay2RFn6lcxU8Ca6DClhKjc9mJP4-
YzZwsmhTSnaRedPtsXMoaxvHLwDJpuoKkrZhkeYDthGq0fXCYxDbnjX1b5Na4tSaE
~fdWelVvSIYPNJQ2cxT7xd3ZipDQcsB3qmMopDar~pEseczqoAMr5Hn2fQYAcWWi1
X7sa-
yCdaTTD9rpY0nBu5pEBNdTIKoB8ppE31BIFd3II5tDUJUUsdKoGOSWhFdbs77~zpY
FJA9RqAOjmz95FEeqjlfN9s6wDnWBn4eEY8PxdhJ5zgQIfw__&Key-Pair-
Id=APKAJLOHF5GGSLRBV4ZA [Retrieved on:03.06.2022]

Williams, O. S., Hamid, R. A., & Misnan, M. S. (2018). Accident causal factors on the building
construction sites: A review. International Journal of Built Environment and
Sustainability, 5(1). Retrieved from:
https://d1wqtxts1xzle7.cloudfront.net/74105258/248-Article_Text-652-1-10-20180111-
with-cover-page-v2.pdf?Expires=1655121220&Signature=LK6AWX-
XOpJ3anSwFLKNpNhjUMF7SCW9A57J07tq611Ca2Uz69LSJNpP8TvjpOcHmqzMAk
VY9am1NF-
M4d6pPK8H7kxxcjCL7LYjuqEX4HIiv~5zMHvfIAzhUt8LhhXC6xJQ2KZ9Uyasw-
uJ6GAc0bIhIR34Wnn3hMKkjEgrN4wIljO42pV6nFjJtWpFh0Lbi-
rVZUblUYME6whxxHrrWK5DzbiptGnYA1RK5Z3ET43jS5FgBJUP0jF7K5yr-
fhPCbl6TXD5koBYeT47oRnvL1bTThTrLYYcbEgUiGipXxMuludkP8G08GWwjJtgcyi
Aa9dx5Qs5Gx-T4kEg3oNgZg__&Key-Pair-Id=APKAJLOHF5GGSLRBV4ZA 
[Retrieved on:03.06.2022]
Ofori, G., Zhang, Z., & Ling, F. Y. (2020). Key barriers to increase construction productivity:
The Singapore case. International Journal of Construction Management, 1-12. Retrieved
from:https://www.goldenlightpublish.com/dosyalar/baski/JCEMI_2020_197.pdf 
[Retrieved on:03.06.2022]

Calvetti, D., Mêda, P., Chichorro Gonçalves, M., & Sousa, H. (2020). Worker 4.0: The future of
sensors construction sites. Buildings, 10(10), 169 Retrieved from:
https://www./buildings-10-00169-v3.pdf  [Retrieved on:03.06.2022]

Regona, M., Yigitcanlar, T., Xia, B., & Li, R. Y. M. (2022). Opportunities and adoption
challenges of AI in the construction industry: a PRISMA review. Journal of Open
Innovation: Technology, Market, and Complexity, 8(1), 45. Retrieved from:
https://www.JOItmC-08-00045.pdf  [Retrieved on:03.06.2022]

Nadi, E. (2019). Construction Labor Productivity Benchmarking: A Comparison Between On-


Site Construction and Prefabrication (Doctoral dissertation, Marquette
University).Retrieved from: https://epublications.marquette.edu/cgi/viewcontent.cgi?
article=1895&context=dissertations_mu  [Retrieved on:03.06.2022]

Bajjou, M. S., & Chafi, A. (2020). Identifying and managing critical waste factors for lean
construction projects. Engineering Management Journal, 32(1), 2-13. Retrieved from:
https://www.researchgate.net/profile/Mohamed-Saad-Bajjou/publication/
335960006_Identifying_and_Managing_Critical_Waste_Factors_for_Lean_Construction
_Projects/links/5d863c4792851ceb79250ac2/Identifying-and-Managing-Critical-Waste-
Factors-for-Lean-Construction-Projects.pdf  [Retrieved on:03.06.2022]
Ho, K. M., Lam, J. P., & Max, S. (2018). Pre-fabricated pre-finished volumetric construction
(PPVC) for residential projects. Threesixty Cost Management Pte Ltd.: Bukit Merah,
Singapore.Retrieved from: https://surbanajurong.com/wp-content/uploads/2018/08/1.-
PPVC-Final-_18Sep18.pdf   [Retrieved on:03.06.2022]
Karthik, D., & Rao, C. B. K. (2019). The analysis of essential factors responsible for loss of
labour productivity in building construction projects in India. Engineering Journal, 23(2),
55-70. Retrieved from: http://www.engj.org/   [Retrieved on:03.06.2022]

Whitman, J., Deshpande, A., Zech, W., & Perez, M. (2021). Construction site utilization
planning: a process based upon industry best practices. CivilEng, 2(2), 309-324.
Retrieved from: https:// doi.org/10.3390/civileng2020017 [Retrieved on:03.06.2022]

Koseoglu, O., Sakin, M., & Arayici, Y. (2018). Exploring the BIM and lean synergies in the
Istanbul Grand Airport construction project. Engineering, construction and architectural
management. Retrieved from:
https://www.researchgate.net/profile/Mehmet-Sakin/publication/326921992_Exploring_t
he_BIM_and_lean_synergies_in_the_Istanbul_Grand_Airport_construction_project/
links/5bb1b942a6fdccd3cb80a48f/Exploring-the-BIM-and-lean-synergies-in-the-
Istanbul-Grand-Airport-construction-project.pdf [Retrieved on:03.06.2022]

You might also like