The First External Safety, Health & Environment (SHE) compliance Audit was conducted at
Afcons-Sam India Consortium site of UPMRCL Project UPMRC/AGCC-02 during 16,17
August, 2022 to verify the present compliance status of the Contractor with the Client’s
Requirements and requirements of Building and other Construction Workers Act, Rules &
Regulations. Site visit, interview with concerned personnel and review of existing
documentation, records etc. was done by the Auditor as part of the Audit to verify the
implementation status. During Site visit, various personnel were interviewed to know their
understanding of the SHE systems and how they are implementing the same. There were 39
P1 and 20 P2 non-conformities observed. Apart from the P1 and P2 non-conformities, a
few photographs have been taken to inform the contractor about the negligence in
implementation of BOCWA and Client requirements.
Scope of Audit
Criteria of Audit
Methodology of Audit
The following methodology was adopted by auditors in auditing, to fulfill the above objectives
Review of documents being implemented at site such as SHE plans, Aspect Impact
Analysis/ Risk Assessment, Emergency Preparedness, Operational Control
Procedures, Improvement Management Programmed, Legal Register etc.
Inspection of site
System Issues
NC
Cl. No. Observations STATUS
TYPE
System Issues
Implementation Issues
NC Compliance Status
Type
Sr.No Observation Safety P1/P2 Location
Agra College/Agra Complied.
1 Color codification not followed in Hydra hook P2 Fort
2 Power of grinder not made off during idle hours P1 Agra College Complied.
3 Tag line not used in shifting of material P1 Agra College Complied.
4 Unsafe cover over water tank P1 Agra Fort Complied.
Steps not provided for safe access to Complied.
5 reinforcement P1 Agra Fort
6 Oil leakage from Crane P1 Agra Fort Complied.
7 Tractor trolley in use inside the project P1 Agra Fort Complied.
8 Rebars missing from wheel wash cover gap P1 Agra Fort Complied.
9 Big gap in project site gate P1 Agra Fort Complied.
10 Damaged side railing for water tank P1 Agra Fort Complied.
11 Wire rope slings not kept safely P1 Agra Fort Store Complied.
12 Dip tray not provided for all drums P1 Agra Fort Store Complied.
13 Oil leaked in store racks P1 Agra Fort Store Complied.
14 Scrap yard not maintained P2 Agra Fort Complied.
15 Material load on barricade boards P1 Agra Fort Complied.
Level not maintained in wheel wash and Complied.
16 approach road P2 Cross Over
17 DB door not closed P1 Cross Over Complied.
18 Live cable crossing the road P1 Raja Ki Mandi Complied.
19 Hard barricading not provided for excavation P1 RBS College Complied.
Proper stopper not provided to prevent roll Complied.
20 back of pipes P1 RBS College
RBS College/Agra Complied.
21 Damaged slings not removed from site P1 Fort
22 Excavated area not barricaded P1 RBS College Complied.
23 Electrical cable passing through water P1 Casting Yard Complied.
24 Drainage system not developed in the area P2 Casting Yard Complied.
25 Multiple connections from single connector P1 Casting Yard Complied.
Cement bags stack height is more than Complied.
26 prescribed P2 Batching Plant M1
27 Lightening arrester to be provide P1 Batching Plant M1 Will be comply within 30-10-
Environment Issues