1. Compute the partial and multifactor productivity measure for each of the week’s shown. What
do the productivity figures suggest? The standard price is Br. 140 per unit. Assume 40-hour
weeks and an hourly wage of Br. 12. Overhead is 1.5 times weekly labor cost. Material cost is
Br. 6 per pound. (Hint: use raw materials, labor and overhead cost in your calculation by
Required: Identify the best locations for the locations working for upto
production level of 4500, 9000 and above 9000 units
3. Determine average flow time, average tardiness and average number of jobs in the system
by the sequence of processing according to FCFS, SPT, DDATE, LCFS, and STR rules.
Job(in order of Processing Due date (days
arrival) Time(days) Hence)
A 3 5
B 4 6
C 2 7
D 6 9
E 1 2
F 5 0
G 7 11
A B 0.2
B E 0.2
C D 0.8
D F 0.6
E F 0.3
F G 1.0
G H 0.4
H End 0.3