Professional Documents
Culture Documents
LOA BREADTH
(m) (m)
26-Απρ-22 VIOLANDO
2/4/2022 VIOLANDO
3-Απρ-22 VIOLANDO
10/4/2022 VIOLANDO
2/5/2022 ERMOUPOLIS
9/5/2022 VIOLANDO
7/5/2022 ERMOUPOLIS
18/5/2022 ERMOUPOLIS
27/5/2022 VIOLANDO
30/5/2022 VIOLANDO
4980.07 18/6/22
23-24/06/22 ERMOUPOLIS
1 ST OF AUGUST ERMOUPOLIS
9913.00 UNKNOWN AFLOAT
CONTAINER X
ROUMANIA
TANKER 2007
BULK CARRIER JAPAN 2012
ONLY Propeller
RUDDER BLADE
REMOVAL
ONLY PROPELLER
ONLY PROPELLER
Χ (SKF)
Χ (ONLY PROPELLER
X FOR DAMAGED
BLADES REPAIRS)
Χ X
X ONLY PROPELLER
X X (?)
Χ (SKF)
X X (?)
X X
X (Bonding only)
Steering gear
overhauling & rudder
blade removal - bushing
renewal
MEASUREMENTS,
SEALS VULKAN AND
JACK UP
X X
Χ
X X
X X
X (only propeler
X
removal)
X (only propeler
removal)
X (only propeler
removal)
X X?
X X?
MEASUREMENTS,
SEALS VULKAN AND
JACK UP. PROPELER
DAMAGE REPAIR IN
PLACE?
X(?)
X(?)
X
CARGO HOLDS
WBT TREATMENT
TREATMENT
X (HPFW)
X (Subcontractor
arranged by owner)
X (Subcontractor
arranged by owner)
1000bar, 2FC paint
Sandblasting iwo stiffeners
of C/H No 3.
X (HPFW)
X (HPFW)
X (HPFW) BY
SUBCONTRACTOR
X (20% SA2, 15% SA1,
65% sweeping)
X (HPFW)
X (HPFW)
X (HPFW)
X (600-800bar to remove
flash rust only)
BY
SUBCONTRACTOR
ON OWNER'S
ACCOUNT
X
X (Only sandblasting
behind stiffeners)
X (HPFW)
X (Spot treatment)
X (Vessel's subcontractor)
X (minor treatment)
X
X
X (20% SA2, 15% SA1,
65% sweeping)
MAIN EXPECTED WORKS
MAIN DECK
STEEL WORK
TREATMENT
Rails, stanchions,
PIPEWORK
E/R pipes
E/R pipes
E/R pipes
E/R pipes plus BWTS upgrade
Various pipes.
E/R pipes
Standard works
Standard works
Standard works
Standard DD works
Valves, coolers/heaters.
Valves, coolers/heaters.
Standard DD works
BOW HATCH COVER
BWTS
THRUSTER WORKS
X (Only rubber)
X (Rubbers &
X
steel work)
X X (removal)
BWTS ready
X (Owner's
X
subcontractor)
X
X (Rubbers &
X
steel work)
X (PERFORMED
BY OWNER'S Rubber packing
SUBCONTRACT renewall
OR)
X (100%
sweeping)
X (Owner's
X
subcontractor)
X (by shipyard
appointed
subcontractor)
Packing renewal
X
X (Removal &
X
blasting)
Treatment &
rubber packing
renewall
X (Removal &
X
blasting) ????
X
X X X
X (upgrade)
X
X
X
TOTAL REPAIR PERIOD
VARIOUS WORKS (EXCLUDING SHIFTINGS)
22
19
Motors TBA
TBA
TBA
TBA
TBA
Crane tests and inspection. Accomodation
12
ladders repairs.
10
TBA
Crane and lifeboat load tests. TBA
TBA
10
TBA
TBA
TBA
M/E blowers, E/R fans (4pcs), various
electic motors, MSB & ESB cleaning,
26
Main & emergency transformers (2 & 2
pcs).
TBA
8
HULL:Extensive sandblasting work. Flat
100% SA2, Vertical 50% SA2, Bottopping
50%SA2 & Topside 50% SA2 (Total area
TBA
8470m2) CARGO HOLDS: 50%
SA2 (Total area 10865m2) C/H COVERS:
C/H
40%Areas
SA2 No1 4160, No 2&4 4621, No 3
TBA
4650, No 5 4250 m2 (Total area 22303m2)
8 ONLY DD WORKS
TBA
TBA ONLY DD WORKS
3 ONLY DD WORKS
TBA DD WORKS
8 Full SA2 iwo of sea chests
TBA
5 Standard DD works
0
Detailed workscope to be discussed on the
spot
8 Standard DD works
8 Standard DD works
8 Standard DD works
TBA Standard DD works.