DIMENSIONS

LOA BREADTH
(m) (m)

M/V BENJAMIN CONFIDENCE 179.97 30.00

M/V SEA MOON 170.00 27.00

M/V LADY AILAR 169.37 27.20

M/V APOLLO.GR 199.99 32.25

M/V LAAX 228.99 32.26

M/T HELLAS TATIANNA 182.99 32.24

M/T BYZANTION 182.55 27.34

M/V ANDROMEDA 182.55 27.34

M/T GAZ REDSEA 119.97 19.00


M/V TAIBO 179.88 28.85

M/V EQUINOX VOYAGER 190.00 32.24

M/V OLYMPUS 141.7  23.5 

M/V NYMPHI 169.37 27.20

M/V SEA BRAVE 176.63 26.00

M/V LPG STRIDENT 117.09 19.60

SHIPREP MV BC PARITY 189.99 28.50


TON HIL II 190.00 32.25

ATALANTI 96.99  31.46 

GAZ FIDELITY 119.84 18.20

M/V EAGLE TRADER 178.43 26.06

M/V BELLA JUDY 180.00 30.04

M/V LILA 177.26 26.00

M/V WESTERN BOHEME 187.00 28.60


M/T JANE 182.00 32.00

M/V YOGA 199.98 32.24

M/T ETERNAL SUNSHINE 179.88 32.20

M/T SEA HELIOS 179.88 32.23

M/V ASCANIOS 225.00 32.26

M/V EQUINOX STAR 197.00 32.26


M/V SAN NICOLAS 196.00 32.26

M/V SOFIA R 186.40 27.80

M/V ACHILLE 225.00 32.26

JOYCE 182.50 32.20

STADION II 178.70 28.05

M/V EQUINOX FASA 189.99 32.26


M/V PANGEO 189.99 32.26

CORINTHIAN SPIRE 177.13 28.40

ATLANTIC EXPRESS 147.80 23.40

OKYROE 228.20 32.20

M/V PGC TAORMINA 117.09 19.60

CALYPSO.GR 179.97 29.80

NORIENT SATURN 180.00 32.20


IOANNIS S 169.37 27.30

M/V VALSAMITIS 179.90 28.40

M/V TIBERIUS 177.85 28.60

M/T SEA HERMES 179.88 32.23

DYLAN 179.90 32.20

RES COGITANS 228.20 32.20

M/V RADIUS 177.85 28.60


SUN VIL II 189.99 32.25
NSIONS

LIGHTSHIP ΕΤΑ FLOATING DOCK

7741.00 13/3/2022 ERMOUPOLIS

6334.48 15/3/2022 ERMOUPOLIS

26-Απρ-22 VIOLANDO

2/4/2022 VIOLANDO

3-Απρ-22 VIOLANDO

Begging OF JUNE ERMOUPOLIS

8699.00 15-25/52022 ERMOUPOLIS

8942.00 JULY VIOLANDO

10/4/2022 VIOLANDO
2/5/2022 ERMOUPOLIS

9/5/2022 VIOLANDO

7/5/2022 ERMOUPOLIS

6552.00 18/5/2022 VIOLANDO

18/5/2022 ERMOUPOLIS

3870.00 22-Μαϊ-22 VIOLANDO

27/5/2022 VIOLANDO
30/5/2022 VIOLANDO

4980.07 18/6/22

23-24/06/22 ERMOUPOLIS

BEG. OF JUNE VIOLANDO

5TH OF JULY VIOLANDO

10TH OF JULY ERMOUPOLIS

1 ST OF AUGUST ERMOUPOLIS
9913.00 UNKNOWN AFLOAT

16-18TH OF JULY VIOLANDO

8865.00 5th of July ERMOUPOLIS

8832.00 11th OF AUGUST ERMOUPOLIS

3-5 OF AUGUST VIOLANDO

End JULY 2022 VIOLANDO


11117.00 MIDDLE OF AUGUST VIOLANDO

11th of August VIOLANDO

BEGGING OF OCTOBER VIOLANDO

8918.00 25th of August ERMOUPOLIS

AUGUST 2022 VIOLANDO

AUGUST 2022 VIOLANDO


3-4th OF AUGUST VIOLANDO

3-5 September ERMOUPOLIS

21st September ERMOUPOLIS

3-5 September VIOLANDO

3870.00 30 TH of September VIOLANDO

18th of October AFLOAT

27th of October VIOLANDO


31st of October ERMOUPOLIS

END OF OCTOBER VIOLANDO

8399.00 MID OCTOBER ERMOUPOLIS

8901.00 12th of November ERMOUPOLIS

8808.00 22th of October ERMOUPOLIS

28th of October VIOLANDO

8399.00 MID NOVEMBER ERMOUPOLIS


Sept 2022 VIOLANDO
COUNTRY HULL TREATMENT
VESSEL TYPE
YEAR BUILD (SANDBLASTING)

BULK CARRIER JAPAN 2017 X

BULK CARRIER JAPAN 2002

BULK CARRIER 2010 X

BULK CARRIER JAPAN 2016 X

BULK CARRIER JAPAN 2012

OIL CHEMICAL KOREA 2017


TANKER X

OIL CHEMICAL KOREA 2007


TANKER X

OIL PRODUCT TANKER KOREA 2007 X

LPG JAPAN 2002 Χ


BULK CARRIER CHINA 2011

BULK CARRIER CROATIA 2002 X

Ro-Ro/Passenger Ship Cyprus 

BULK CARRIER JAPAN 2012

BULK CARRIER JAPAN 2004

LPG JAPAN 6/1999 X

BULK CARRIER 2012 CHINA


BULK CARRIER JAPAN 2014 X

Cable Layer CHINA 2008

LPG JAPAN 2002 Χ

BULK CARRIER CHINA 2004

BULK CARRIER KOREA 2012

BULK CARRIER JAPAN 2003

BULK CARRIER KOREA 2012 X (FULL SA 2 & DD


CLEANING)
PRODUCT TANKER KOREA 2008

BULK CARRIER JAPAN 6/2017 X

PRODUCT TANKER JAPAN 2004

Oil Products Tanker JAPAN 2004 X

BULK CARRIER JAPAN 2004

BULK CARRIER CHINA 2011 X


BULK CARRIER KOREA 2010 Χ

BULK CARRIER KOREA 2012

BULK CARRIER JAPAN 2004

TANKER JAPAN 2007 X

BULK CARRIER JAPAN 2012 X

BULK CARRIER CHINA 2006 X


BULK CARRIER CHINA 2009

BULK CARRIER JAPAN 2009 X?

CONTAINER X

TANKER KOREA 2004 X

LPG JAPAN 6/1999

BULK CARRIER JAPAN 2017

ROUMANIA
TANKER 2007
BULK CARRIER JAPAN 2012

BULK CARRIER CHINA X

BULK CARRIER JAPAN 2012 X(?)

Oil Products Tanker JAPAN 2004 X

TANKER JAPAN 2004 X(?)

TANKER KOREA 2004 X(?)

BULK CARRIER JAPAN 2012 X(?)


BULK CARRIER JAPAN 2013 X
HULL TREATMENT
TAILSHAFT/RUDDER
(HYDROBLASTING)

ONLY Propeller

RUDDER BLADE
REMOVAL

ONLY PROPELLER

ONLY PROPELLER

Χ (SKF)
Χ (ONLY PROPELLER
X FOR DAMAGED
BLADES REPAIRS)

ONLY CAP FIN (PCBF)

Χ X

X ONLY PROPELLER

X X (?)
Χ (SKF)

Rudder blade removal


X
and bushes renewal

X X (?)

X X

X (Bonding only)
Steering gear
overhauling & rudder
blade removal - bushing
renewal

MEASUREMENTS,
SEALS VULKAN AND
JACK UP

X X
Χ

X X

X X
X (only propeler
X
removal)

X (only propeler
removal)

X seal bonding &


Tailshaft hub
overhauling

X (only propeler
removal)

X X?
X X?

MEASUREMENTS,
SEALS VULKAN AND
JACK UP. PROPELER
DAMAGE REPAIR IN
PLACE?

X(?)

X(?)

X
CARGO HOLDS
WBT TREATMENT
TREATMENT

X (HPFW)

X (Subcontractor
arranged by owner)

X (Subcontractor
arranged by owner)
1000bar, 2FC paint
Sandblasting iwo stiffeners
of C/H No 3.

X (HPFW)

X (HPFW)

X (HPFW) BY
SUBCONTRACTOR
X (20% SA2, 15% SA1,
65% sweeping)

X (HPFW)

X (HPFW)

X (HPFW)

X (600-800bar to remove
flash rust only)
BY
SUBCONTRACTOR
ON OWNER'S
ACCOUNT

X
X (Only sandblasting
behind stiffeners)

X (HPFW)

X (20% SA2, 15% SA1,


65% sweeping)

X (Spot treatment)
X (Vessel's subcontractor)

X (minor treatment)
X

X
X (20% SA2, 15% SA1,
65% sweeping)
MAIN EXPECTED WORKS

MAIN DECK
STEEL WORK
TREATMENT

Minor steel work iwo of C/H cover channels

5-10 tones. Bow and side dents. (MATERIALS


TO BE ORDERED)

Minor steel work

Minor steel work


Installation of 4 pcs 53T fairleads including
stiffeners at stern side. Stbd cofferdam steel
plateMain plating & structural
(5000x1000mm) steel iworenewal.
plus brackets hull
5000Kgs.
Anchor Softguide
cable steel and
(supports,ladders,rails,
lifter repositioning.
etc) iwo hull
Pittings 20 pcs.
rebuilding iwoMain
WBT plating & structural
bell mouths and
steeltank.
residual iwo deck
Spark2000Kgs.
arrestrorsSoft steel
fabrication.
(supports,ladders,rails,
Anchor
Maintransportation toetc) iwo
workshop
plating & structural deck
steel for300
iwo pcs.
repairs.
hull
Main plating
2000Kgs. Soft&steel
structural steel iwo tanks &
(supports,ladders,rails,
voids
etc) iwo hull 20 1000Kgs.
pcs. Main Soft steel
plating & structural
(supports,ladders,rails, etc) iwo tanks
steel iwo deck 2000Kgs. Soft steel & voids
hull 50etc)
(supports,ladders,rails, pcs.iwo deck 300 pcs.
Main plating & structural steel iwo tanks &
voids 3000Kgs. Soft steel
(supports,ladders,rails, etc) iwo tanks & voids
hull 50 pcs.
Rails, stanchions,
MINOR STEEL WORK ON MANHOUR BASE

Minor steel work iwo of HFO Tk and steel bars


for staways iwo of rudder trank

Minor steel work

Minor steel work, One piece shell plate, rubber


channels.

Steelwork iwo BHT bottom plate side shell.


Soft steel iwo deck: brackets, gratings
supports, winch rear protection plates, ladder
steps, motor covers, rails, manholes, small
platforms, etc.

MINOR STEEL WORK


Steel bars for staways iwo of rudder trank. No
5 C/H protective tubes fitting welding.

Rails, stanchions,

Anchor chains exchange


Soft steel iwo deck and accomodation

Increased structural and soft steel on deck.


HYDROBLASTING Steel inside WBT will be performed by
2200bars or Owner's subcontractor on Owner's
1000bars account. Gratings removal and blasting -
painting.

Minor steel work


Minor steel work

Steel work iwo WBT's of app. 11 tonnes.


Soft steel iwo deck.
Welding build up, various soft steel,C/H rubber
HPFW ? packing channels, funnel exhaust pipe
renewal, vent heads repairs, chain studs,

C/H cover's steel pads, deck soft steel.

Cargo cranes cabins exchange

Steel work iwo WBT's of app. 10 tonnes.


Soft steel iwo deck of app. 5 tonnes.

Soft steel iwo deck: brackets, gratings


supports, winch rear protection plates, ladder
steps, motor covers, rails, manholes, small
platforms, etc.

Side shell steel work (4500*1000*20 DH36


with 2 stiffeners)

Chain lockers steel work


Soft steel i.w.o. lifeboats davits

Increased structural and soft steel on deck.


HYDROBLASTING
Steel inside WBT will be performed by
2200bars or
shipyard Gratings removal and blasting -
1000bars
painting.

Steel work iwo WBT's of app. 40 tonnes.


Soft steel iwo deck of app. 5 tonnes.

Steel work iwo WBT's. Soft steel iwo deck.


TED WORKS

PIPEWORK

Various pipe works

Heating coil pipes iwo tunnel, E/R


pipes

Deck hydraulic pipes, sea chest


filter fabrication, E/R pipes,

Various pipe works (15 pcs) and


Air seal

Minor pipe work

Sea chest filter fabrication. E/R


Bilge holding
pipes. Tk heating
Deck lines pressurepipe
test.
DN40
WBT 8mtr.
bell E/R
mouthvarious pipes.
removal.
FW line on deck DN65 100mtr .
Hydraulic line 20mtr. Main and
return steamline DN150 30mtr.
Steam branches pipes on deck
50mtr
Deck and E/R various pipes

Cargo lines pressure test, SW


spray line pipes, various pipes
MINOR E/R PIPES AND BWTS
OVERBOARD

BWTS few supports & E/R pipes

Minor pipe work

E/R pipes, duct keel pipes, deck


pipes

E/R various pipes.Various small


deck pipes. Cargo lines pressure
tests.

Deck pipes & E/R pipes


E/R pipes

Cargo lines pressure test, SW


spray line pipes, various pipes

E/R pipes

E/R pipes

E/R pipes
E/R pipes plus BWTS upgrade

Pressure tests, various pipes iwo


deck & E/R (100 pieces), plus
cascade heating coils.

SW and other Piping renewals


(mainly in E-R)
Minor pipework

SW and other Piping renewals


(mainly in E-R)
Air seal, supports of all pipes iwo
C/H

Various deck pipes.

Main Deck piping works,


around 500 m of various piping
to be replaced.

E/R various pipes.Various small


deck pipes. Cargo lines pressure
tests.

BWMP upgrade. 2 flow control


valves and 2 pressure switches
installation plus 24 pipe pieces
renewal

Various pipes.
E/R pipes

Pressure tests, various pipes iwo


deck & E/R (100 pieces), plus
cascade heating coils.

E/R & Main Deck piping works.

E/R & Main Deck piping works.


MECHANICAL DEPARTMENT WORKS

Valves, M/E A/C

C/H cover hydraulic cylinders, valves, M/E A/C,


pumps.
C/H cover control valves, brake linings, fans, M/E
A/C,valves,condenser, hatch covers hydraulic
cylinders

Valves, M/E A/C

Valves, M/E A/C


Anchor windlass overhauling. M/E fuel pumps, A/C
& blowers overhauling. Pumps, heaters, P/V and
various safety valves. Steering gear actuator
seaqls renewal. FW generator overhauling. Crane
hydraulic cylinders overhauling (2 pcs). Crane
hydraulic hoses renewal. Cargo and ballast valves
M/E bearings for inspection (main, crankpin,
overhauling (DN200-300 40 pcs)
crosshead) M/E A/C, auxiliary and I/G blowers, P/V

M/E bearings for inspection (main, crankpin,


crosshead) M/E A/C, auxiliary and I/G blowers, P/V,
Crane hydraulic cylinders.

Shafting, brake linings, Pr & Temp gauge


calibration assistance, safety valves, valves,pumps,
heaters, blowers, fans
STANDARD DD WORKS

Valves, M/E A/C, boiler valves, heaters, condenser.


Grabs (4 pcs) to be landed and transported to your
machinery workshop for operation test and
adjustments/ repairs

Valves, M/E A/C

C/H cover hydraulic cylinders, valves, M/E A/C,


pumps, C/H bilge valves. HATCH COVER’S
PINS/HINGES. RUDDER BLADE REMOVAL &
RUDDER STOCK BUSH RENEWAL

Valves, M/E A/C, M/E bearings for inspection,boiler


valves, heaters, condenser, safety valves.

STANDARD DD WORKS, slewing bearings iwo


provision cranes
Valves, M/E A/C and Fuel pump assistance to S/E,
boiler valves, heaters, condenser, grabs

Shafting, brake linings, Pr & Temp gauge


calibration assistance, safety valves, valves,pumps,
heaters, blowers, fans

Standard works

Standard works

Standard works

Standard works, SW and boiler valves. CARGO


CRANE SHEAVES RENEWAL
Standard docking worksm M/E A/C.

Extensive M/E works, M/E A/C, Boilers valves,


Hose handling crane cylinder, D/G's coolers, D/G
overhauling 2 pcs, I/G blowers & valves, Cargo
pumps overhauling 4 pcs, P/V valves, Various
valves appr. 100 pcs. Heaters cleaning.

E/R sea valves, boiler safety valves.


Rudder pintle bush removal, M/E fuel pumps plus
standard DD works

M/E bearings for inspection, valves

E/R sea valves, boiler safety valves.

Main Engine Inspection - Units Overhauling


Windlass Inspection - Overhauling
E/R valves, boiler valves, studs renewal, steering
gear vAne motor assistance to S/E, various pumps,
M/E A/C, heaters, M/E bearings for
inspection,windlass brake linimngs, C/H hydraulic
cylinders, lifeboat davit hydraulic cylinders. Anodes,
ICCP, MGPS.

Standard DD works, all C/H cover hydraulic


cylinders remove refit only

Cargo cranes cabins exchange

Overhauling of both (PORT & STBD) Anchor


Windlass (Shafts, Bushes, etc.). Valves,
coolers/heaters.

Valves, M/E A/C, M/E bearings for inspection,boiler


valves, heaters, condenser, safety valves.

M/E A/C, Atmospheric condenser, boiler valves

Various mechanical works


Standard DD works, ICCP renewal, freefall davit
winches, free fall davit removal. Hawse pipe guide
roller pin renewal.

Standard DD works

Extensive M/E works, M/E A/C, Boilers valves,


Hose handling crane cylinder, D/G's coolers, D/G
overhauling 2 pcs, I/G blowers & valves, Cargo
pumps overhauling 4 pcs, P/V valves, Various
valves appr. 100 pcs. Heaters cleaning.

Valves, coolers/heaters.

Valves, coolers/heaters.

Standard DD works
BOW HATCH COVER
BWTS
THRUSTER WORKS

X (Only rubber)

X (Rubbers &
X
steel work)

X X (removal)

BWTS ready

X (Owner's
X
subcontractor)
X

X (Rubbers &
X
steel work)

X (PERFORMED
BY OWNER'S Rubber packing
SUBCONTRACT renewall
OR)
X (100%
sweeping)

X (Owner's
X
subcontractor)

X (by shipyard
appointed
subcontractor)

Packing renewal
X

X (Removal &
X
blasting)
Treatment &
rubber packing
renewall

X (Removal &
X
blasting) ????

X
X X X

X (upgrade)

X
X
X
TOTAL REPAIR PERIOD
VARIOUS WORKS (EXCLUDING SHIFTINGS)

22

19

Motors TBA

TBA

TBA

MSB & ESB cleaning and ACB testing.


Distribution & starting panels cleaning /
26
tightening. E/R fans (4pcs) and motors
(20pcs) overhauling. Alternators cleaning.
Main, auxiliary and emergeny
switchboards cleaning and testing, motors 32
overhauling 20pcs

Main, auxiliary and emergeny


switchboards cleaning and testing, motors 36
overhauling 20pcs

Alternators cleaning TBA


TBA

Crane tests and inspection. Main,


auxiliary and emergeny switchboards TBA
cleaning and testing.

TBA

E/R fans, Electric motors, crane tests 19

Electric motors, crane tests 16

TBA
Crane tests and inspection. Accomodation
12
ladders repairs.

Alternators cleaning TBA


Lifeboats, load tests, motors 8 pcs, fans.
Main, auxiliary and emergeny
32
switchboards cleaning and testing.
Alternators cleaning.

10

TBA
Crane and lifeboat load tests. TBA

TBA

10

TBA

TBA

TBA
M/E blowers, E/R fans (4pcs), various
electic motors, MSB & ESB cleaning,
26
Main & emergency transformers (2 & 2
pcs).

TBA

Cargo cranes cabins exchange

Cleaning of HFO Storage Tank with


capacity of 525.8 m3. Motors.

Electric motors, crane tests 10

Load tests lifeboats, davits, embarkation


5
means
Provision and rescue boat motor repair. 12

Various load tests (cranes, ladders,


lifeboats).Renewal of Hatch cover
12
rubber packings O/S materials and
readjustment of H/C resting pads.

Lifeboats, load tests, motors 8 pcs, fans.


Main, auxiliary and emergeny
32
switchboards cleaning and testing.
Alternators cleaning.

Various load tests (cranes, ladders,


lifeboats).Renewal of Hatch cover rubber
10
packings O/S materials and readjustment
of H/C resting pads
TBA
COMMENTS
DRYDOCK
PERIOD

8 C/H cover rubbers

8
HULL:Extensive sandblasting work. Flat
100% SA2, Vertical 50% SA2, Bottopping
50%SA2 & Topside 50% SA2 (Total area
TBA
8470m2) CARGO HOLDS: 50%
SA2 (Total area 10865m2) C/H COVERS:
C/H
40%Areas
SA2 No1 4160, No 2&4 4621, No 3
TBA
4650, No 5 4250 m2 (Total area 22303m2)

8 ONLY DD WORKS

BWTS to be installed afloat. No DD


8
required. Specification will follow.

TBA
TBA ONLY DD WORKS

Cherry picker supply upon arrival for crane


jibs inspection. Staging to be erected iwo
8
Funnel, lifeboat davit and Rescue boat
davit.

3 ONLY DD WORKS

TBA DD WORKS
8 Full SA2 iwo of sea chests

TBA

Standard DD works + paint scheme


change, C/H rubber packing renewal,
Cargo crane sheaves replacement.
BWTS to be installed afloat. No DD
required. Specification will follow.

Standard docking works (1st special)

8 Standard DD works only

Standard DD works plus C/H treatment


TBA and C/H cover removal, treatment. (Same
work scope as Orenda).
TBA

8 Standard DD works only

TBA Standard DD works and WBT's steel work.

TBA Standard DD works.

TBA Standard DD works.


Although he initially requested
sandblasting for hull treatment, C/H
10
treatment and H/C treatment he is
considering HPFW washing.
Critical aspect of repair is coordination
of work iwo c/h's (i.e C/H treatment by
subcontractor, rubber channel
TBA
treatment by subcontractor, steel
renewals, rubber packing renewal, pipe
supports iwo C/H).
Silicon paint application, Hatch covers
offlanding, Bow thruster overhauling,
Tailshaft hub overhauling & General DD
works (overboard sea valves, boiler
valves etc.)

5 Standard DD works

0
Detailed workscope to be discussed on the
spot

8 Standard DD works

8 Standard DD works

8 Standard DD works
TBA Standard DD works.