Date: 7-Mar-22
CRS No: TOSP-P038-EXE-DEC-6335-PIP-TDS-0014_B-CRS
Rev No: B
PIP: Valve sizes shall be identified by Project. Vendor will base on our sizes requirements. Applicable to all the
1 remaining datasheets.
CONTRACTOR cannot simply remove datasheet. The design of the PSV has to be correct to ensure this final
2 element that is last defense in the overall Layer of Protection Apparatus provides the correct functionality
000000Open
PIC TITANIUM OSBL PROJECT
COMMENTS RESPONSE SHEET (CRS)
.
Date: 7-Mar-22
CRS No: TOSP-P038-EXE-DEC-6335-PIP-TDS-0014_B-CRS
Rev No: B
3 Disagree. Change to bar and design it accurately, as the PSV design is normally in barg.
000000Open