PIC TITANIUM OSBL PROJECT

COMMENTS RESPONSE SHEET (CRS)

.
Date: 7-Mar-22
CRS No: TOSP-P038-EXE-DEC-6335-PIP-TDS-0014_B-CRS
Rev No: B

Drawing / Document Number, Title and Revision: Transmittal Document Purpose:


Doc. No. TOSP-P038-EXE-DEC-6335-PIP-TDS-0014 Title: DATA SHEET FOR SAFETY VALVES FOR SCOPE 2 X CODE 2, ACCEPTED WITH COMMENTS
Rev. No. B
Transmittal No TOSP-P038-EXE-DEC-PRPCUF-TRM-0907

No. Comments Confirmation / Explanation by Contractor

PIP: Valve sizes shall be identified by Project. Vendor will base on our sizes requirements. Applicable to all the
1 remaining datasheets.

CONTRACTOR cannot simply remove datasheet. The design of the PSV has to be correct to ensure this final
2 element that is last defense in the overall Layer of Protection Apparatus provides the correct functionality

000000Open
PIC TITANIUM OSBL PROJECT
COMMENTS RESPONSE SHEET (CRS)

.
Date: 7-Mar-22
CRS No: TOSP-P038-EXE-DEC-6335-PIP-TDS-0014_B-CRS
Rev No: B

Drawing / Document Number, Title and Revision: Transmittal Document Purpose:


Doc. No. TOSP-P038-EXE-DEC-6335-PIP-TDS-0014 Title: DATA SHEET FOR SAFETY VALVES FOR SCOPE 2 X CODE 2, ACCEPTED WITH COMMENTS
Rev. No. B
Transmittal No TOSP-P038-EXE-DEC-PRPCUF-TRM-0907

No. Comments Confirmation / Explanation by Contractor

3 Disagree. Change to bar and design it accurately, as the PSV design is normally in barg.

Prepared by: Approved by:

Name: NADIA HASHIM Name: KHAIRUL ANWAR B IDRIS