ETP Technology Vendor:
Revision: A
PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION AND
COMMISSIONING OF TITANIUM NBL OUTSIDE BATTERY LIMIT (N-
OSBL) FACILITY PROJECT FOR PENGERANG INTEGRATED COMPLEX Page : 1 of 16
DOCUMENT : X
REVIEW CLASS
Issued for
0 29-04-22 VB BQ LLK
Review
Prepared Reviewed Approved Reviewed Endorsed Approved
Rev Date Description By By By by by by
CONTRACTOR OWNER
© [2021] PETROLIAM NASIONAL BERHAD (PETRONAS). All rights reserved. No part of this document may be reproduced, stored in a retrieval system or
transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
Open
OWNER Doc No.:
EPCC OF TITANIUM NBL OUTSIDE TOSP-P038-EXE-DEC-6335-PIP-RPT-
BATTERY LIMIT (N-OSBL) FACILITY 0001
PROJECT FOR PENGERANG ETP Technology Vendor:
INTEGRATED COMPLEX
Revision: A
STRESS ANALYSIS REPORT (PIPING) FOR SCOPE 2 Page : 2 of 16
AMENDMENT LIST
Open
OWNER Doc No.:
EPCC OF TITANIUM NBL OUTSIDE TOSP-P038-EXE-DEC-6335-PIP-RPT-
BATTERY LIMIT (N-OSBL) FACILITY 0001
PROJECT FOR PENGERANG ETP Technology Vendor:
INTEGRATED COMPLEX
Revision: A
STRESS ANALYSIS REPORT (PIPING) FOR SCOPE 2 Page : 3 of 16
HOLD LIST
Open
OWNER Doc No.:
EPCC OF TITANIUM NBL OUTSIDE TOSP-P038-EXE-DEC-6335-PIP-RPT-
BATTERY LIMIT (N-OSBL) FACILITY 0001
PROJECT FOR PENGERANG ETP Technology Vendor:
INTEGRATED COMPLEX
Revision: A
STRESS ANALYSIS REPORT (PIPING) FOR SCOPE 2 Page : 4 of 16
TABLE OF CONTENT
Open
OWNER Doc No.:
EPCC OF TITANIUM NBL OUTSIDE TOSP-P038-EXE-DEC-6335-PIP-RPT-
BATTERY LIMIT (N-OSBL) FACILITY 0001
PROJECT FOR PENGERANG ETP Technology Vendor:
INTEGRATED COMPLEX
Revision: A
STRESS ANALYSIS REPORT (PIPING) FOR SCOPE 2 Page : 5 of 16
Open
OWNER Doc No.:
EPCC OF TITANIUM NBL OUTSIDE TOSP-P038-EXE-DEC-6335-PIP-RPT-
BATTERY LIMIT (N-OSBL) FACILITY 0001
PROJECT FOR PENGERANG ETP Technology Vendor:
INTEGRATED COMPLEX
Revision: A
STRESS ANALYSIS REPORT (PIPING) FOR SCOPE 2 Page : 6 of 16
PETRONAS Chemicals Group Berhad (PCGB) has embarked into a growth project
called “TITANIUM” by selectively diversifying portfolio into derivatives, specialty
chemicals and solutions to support the PCGSB’s vision in becoming the “Preferred
Chemicals Company providing innovative customer solutions”.
One of the project under the Titanium projects is the NUTMEG project which is to
build a 200ktPA Nitrile Butadiene latex (NBL) plant.
PRPC is the PIC park developer and will undertake the development of infrastructure,
offsite/utilities, interconnecting facility (OSBL) to support the Outside Battery Limit
scope required by Nitrile Butadiene Latex (NBL) Plant for operation. This OSBL
development is called N-OSBL project and the project was awarded to Dialog E&C
Sdn Bhd on 22nd July 2021.
Dialog E&C Sdn Bhd (CONTRACTOR) was awarded as an Engineering, Procurement,
Construction and Commissioning (EPCC) contractor for this project. This project
comprises of 2 main work scopes namely Scope 1: All Interconnecting Works to NBL
Plant and Scope 2: New Effluent Treatment Plant Unit 6335.
Scope 1:
All interconnecting works
1. Offsite facility – Flare pipeline from NBL battery limit to existing Petchem flare
tie-in provision.
2. Utilities Supply Piping Network.
3. Feedstock Pipeline – Butadiene Line from Cracker Tank Farm and Acrylonitrile
Line from Pengerang Deepwater Terminal (PDT2)
4. Effluent Pipeline – Process wastewater, ACC Line and Utility Effluent Line.
5. Electrical power system
6. Instrument & Telecom system
7. Fire Water Line to NBL Plant
8. New piperack extension (same size and dimension) from the existing
piperack area 3900 to the new NBL plant.
Scope 2:
Development of new ETP. The process treatment consist as follows as a minimum:
1. Pre-Collection
2. FEED Tank & Off spec Tank
3. Cooler and 1st Stage Biological Treatment
4. Chemical Oxidation System
5. Stripping / Scrubbing
6. 2nd Stage Biological System
7. Filtration
8. Vapor Recovery Treatment
9. Sludge Treatment System
10. Associate facility (i.e. piping, structure, instrument, electrical, etc.) to support
the operation of this new ETP (Unit 6335).
Open
OWNER Doc No.:
EPCC OF TITANIUM NBL OUTSIDE TOSP-P038-EXE-DEC-6335-PIP-RPT-
BATTERY LIMIT (N-OSBL) FACILITY 0001
PROJECT FOR PENGERANG ETP Technology Vendor:
INTEGRATED COMPLEX
Revision: A
STRESS ANALYSIS REPORT (PIPING) FOR SCOPE 2 Page : 7 of 16
2.0 PURPOSE
The purpose of this document is to demonstrate that the piping arrangement of PIC
TITANIUM OSBL PROJECT Scope 2 in Pengerang Integrated Complex as required by
the relevant codes, standards, and project specifications, has inherent flexibility to
accommodate displacements due to design conditions, without imposing any
excessive loads on pipe supports. Furthermore, the piping stress levels to satisfy the
designated code. This document also defines the scope, definitions, and reference
documents, for calculation and documentation for the stress analysis of metallic
piping.
The document assumes that the reader will have general understanding of piping
stress analysis, pipe supporting and CAESAR II software.
The PIPING involved is designed in accordance with ASME B31.3 2016 and PROJECT
Specification/Drawings. All PROJECT Engineering Documents, Drawings and otherwise,
including generic CLIENT Procedures.
Open
OWNER Doc No.:
EPCC OF TITANIUM NBL OUTSIDE TOSP-P038-EXE-DEC-6335-PIP-RPT-
BATTERY LIMIT (N-OSBL) FACILITY 0001
PROJECT FOR PENGERANG ETP Technology Vendor:
INTEGRATED COMPLEX
Revision: A
STRESS ANALYSIS REPORT (PIPING) FOR SCOPE 2 Page : 8 of 16
The reference documents listed below form an integral part of this General
Specification. Unless otherwise stipulated, the applicable version of these documents,
including relevant appendices and supplements, is the latest revision published at the
Effective Date of Contract.
Open
OWNER Doc No.:
EPCC OF TITANIUM NBL OUTSIDE TOSP-P038-EXE-DEC-6335-PIP-RPT-
BATTERY LIMIT (N-OSBL) FACILITY 0001
PROJECT FOR PENGERANG ETP Technology Vendor:
INTEGRATED COMPLEX
Revision: A
STRESS ANALYSIS REPORT (PIPING) FOR SCOPE 2 Page : 9 of 16
8.0 UNITS
9.0 ANALYSIS
9.1 GENERAL
Detailed analysis by computer program shall be applied for Level-3 and simplified
analysis by computer program shall be applied for Level-2 as per TOSP-P038-EXE-
DEC-
0001-PIP-SPN-0005 “Specification for Stress Analysis”.
The coordinate system for piping stress analysis shall be as follows:
Open
OWNER Doc No.:
EPCC OF TITANIUM NBL OUTSIDE TOSP-P038-EXE-DEC-6335-PIP-RPT-
BATTERY LIMIT (N-OSBL) FACILITY 0001
PROJECT FOR PENGERANG ETP Technology Vendor:
INTEGRATED COMPLEX
Revision: A
STRESS ANALYSIS REPORT (PIPING) FOR SCOPE 2 Page : 10 of 16
CAESAR-II (produced by Intergraph.), the piping stress analysis program, shall be used
for the Category-3 and Category-2 (if required). Version 2019 shall be used.
The applied lines are marked in Attached stress critical line list. The boundary of
calculation and calculation number are indicated.
The Operating and the design condition of the critical lines are considered as
below
Product CHILLED WATER
Pipework Material A 106 GR B
Pipe density 7833 kg/m3
Fluid density(WATER) 995 kg/m3 (from LINELIST)
Ambient/Installation Temperature 20°C (as per spec)
Design Temperature (Max) 75°C
Maximum Operating temperature 10°C (from LINELIST)
Design Pressure 0.75 / 8.25 Bar(g) (from LINELIST)
1.125/ 12.375 Bar (g) (1.5 *
Test Pressure
Design Pressure)
Max. Wind Speeds As per Spec, refer section 11
Uniform Acceleration Design As per Spec, refer section 10
Corrosion Allowance 3 mm
Insulation Material Code / Density C / 40 kg/m3
Insulation Thickness 30 mm
Design temperature and pressure shall be used for stress analysis of piping.
Design pressure will normally be used for all load cases except for a hydro test
where the hydro test pressure is used.
The maximum design temperature range shall be considered between piping
and connected items. The design temperature may be applied for the
calculation of the loads on the supports.
Piping material, diameter, wall thickness, type of fittings, flanges and valves,
corrosion allowance shall be as per Piping Material Specification.
Open
OWNER Doc No.:
EPCC OF TITANIUM NBL OUTSIDE TOSP-P038-EXE-DEC-6335-PIP-RPT-
BATTERY LIMIT (N-OSBL) FACILITY 0001
PROJECT FOR PENGERANG ETP Technology Vendor:
INTEGRATED COMPLEX
Revision: A
STRESS ANALYSIS REPORT (PIPING) FOR SCOPE 2 Page : 11 of 16
Open
OWNER Doc No.:
EPCC OF TITANIUM NBL OUTSIDE TOSP-P038-EXE-DEC-6335-PIP-RPT-
BATTERY LIMIT (N-OSBL) FACILITY 0001
PROJECT FOR PENGERANG ETP Technology Vendor:
INTEGRATED COMPLEX
Revision: A
STRESS ANALYSIS REPORT (PIPING) FOR SCOPE 2 Page : 12 of 16
The Wind Shape Factor is considered as 0.7 for this project. Wind pressure in terms of
the wind velocity (m/s) is considered in the analysis is as per below table.
The weight of the pipe shall be taken automatically from the Caesar-II material
properties database. The density of pipe flow medium shall be taken based on the
flowing medium parameters (considered conservative SG as 1).
Depending on the data availability, all in-line component weights e.g. static
mixer, valves, strainers, meters, instruments and special piping items are
considered from vendor data, Vendor drawings (refer APP-5), CAESAR II
Database etc.
Open
OWNER Doc No.:
EPCC OF TITANIUM NBL OUTSIDE TOSP-P038-EXE-DEC-6335-PIP-RPT-
BATTERY LIMIT (N-OSBL) FACILITY 0001
PROJECT FOR PENGERANG ETP Technology Vendor:
INTEGRATED COMPLEX
Revision: A
STRESS ANALYSIS REPORT (PIPING) FOR SCOPE 2 Page : 13 of 16
14.0 FRICTION
The following friction coefficients can be used if more accurate data is not available:
Piping will be transversely (non-axial) fully restrained with correctly positioned line
stops and guides allowing sufficient flexibility for thermal expansion.
Pump nozzle loads are assumed as more relevant information from vendor is awaited.
17.0 INSULATION
Load Description
W Normal Operating Weight with Contents
WNC Weight without Contents
WW Water Filled Weight
P1 Design Pressure
HP Hydraulic Test Pressure
H Spring Load
F1 Dynamic Load with DLF implemented
F2 Dynamic Load with DLF implemented
WIN1 Wind Load [+X Direction]
Open
OWNER Doc No.:
EPCC OF TITANIUM NBL OUTSIDE TOSP-P038-EXE-DEC-6335-PIP-RPT-
BATTERY LIMIT (N-OSBL) FACILITY 0001
PROJECT FOR PENGERANG ETP Technology Vendor:
INTEGRATED COMPLEX
Revision: A
STRESS ANALYSIS REPORT (PIPING) FOR SCOPE 2 Page : 14 of 16
COMBINAT
STRESS
SL. NO. LOAD CASES ION
TYPE
METHOD
L1 WW+HP HYD
L2 W+T1+P1 OPE
L3 W+P1 SUS
L4 W+T2+P1 OPE
L5 W+P1 SUS
L6 W+T3+P1 OPE
L7 W+P1 SUS
L8 W+T4+P1 OPE
L9 W+P1 SUS
L10 WNC SUS
L11 W+P1 SUS
L12 W+T1+P1+WIN1 OPE
L13 W+T1+P1+WIN2 OPE
L14 W+T1+P1+WIN3 OPE
L15 W+T1+P1+WIN4 OPE
L16 W+T1+P1+U1 OPE
L17 W+T1+P1+U2 OPE
L18 W+T1+P1+U3 OPE
L19 W+T1+P1-U1 OPE
Open
OWNER Doc No.:
EPCC OF TITANIUM NBL OUTSIDE TOSP-P038-EXE-DEC-6335-PIP-RPT-
BATTERY LIMIT (N-OSBL) FACILITY 0001
PROJECT FOR PENGERANG ETP Technology Vendor:
INTEGRATED COMPLEX
Revision: A
STRESS ANALYSIS REPORT (PIPING) FOR SCOPE 2 Page : 15 of 16
COMBINAT
STRESS
SL. NO. LOAD CASES ION
TYPE
METHOD
L20 W+T1+P1-U2 OPE
L21 W+T1+P1-U3 OPE
L22 W+T2+P1+WIN1 OPE
L23 W+T2+P1+WIN2 OPE
L24 W+T2+P1+WIN3 OPE
L25 W+T2+P1+WIN4 OPE
L26 W+T2+P1+U1 OPE
L27 W+T2+P1+U2 OPE
L28 W+T2+P1+U3 OPE
L29 W+T2+P1-U1 OPE
L30 W+T2+P1-U2 OPE
L31 W+T2+P1-U3 OPE
L32 W+T3+P1+WIN1 OPE
L33 W+T3+P1+WIN2 OPE
L34 W+T3+P1+WIN3 OPE
L35 W+T3+P1+WIN4 OPE
L36 W+T3+P1+U1 OPE
L37 W+T3+P1+U2 OPE
L38 W+T3+P1+U3 OPE
L39 W+T3+P1-U1 OPE
L40 W+T3+P1-U2 OPE
L41 W+T3+P1-U3 OPE
L42 W+T4+P1+WIN1 OPE
L43 W+T4+P1+WIN2 OPE
L44 W+T4+P1+WIN3 OPE
L45 W+T4+P1+WIN4 OPE
L46 W+T4+P1+U1 OPE
L47 W+T4+P1+U2 OPE
L48 W+T4+P1+U3 OPE
L49 W+T4+P1-U1 OPE
L50 W+T4+P1-U2 OPE
L51 W+T4+P1-U3 OPE
L52 L2-L11 EXP Algebraic
L53 L4-L11 EXP Algebraic
Open
OWNER Doc No.:
EPCC OF TITANIUM NBL OUTSIDE TOSP-P038-EXE-DEC-6335-PIP-RPT-
BATTERY LIMIT (N-OSBL) FACILITY 0001
PROJECT FOR PENGERANG ETP Technology Vendor:
INTEGRATED COMPLEX
Revision: A
STRESS ANALYSIS REPORT (PIPING) FOR SCOPE 2 Page : 16 of 16
COMBINAT
STRESS
SL. NO. LOAD CASES ION
TYPE
METHOD
L54 L6-L11 EXP Algebraic
L55 L8-L11 EXP Algebraic
L56 L4-L2 EXP Algebraic
L57 L12-L2 OCC Algebraic
L58 L13-L2 OCC Algebraic
L59 L14-L2 OCC Algebraic
L60 L15-L2 OCC Algebraic
L61 L16-L2 OCC Algebraic
L62 L17-L2 OCC Algebraic
L63 L18-L2 OCC Algebraic
L64 L19-L2 OCC Algebraic
L65 L20-L2 OCC Algebraic
L66 L21-L2 OCC Algebraic
L67 L61+L62+L63 OCC SRSS
L68 L64+L65+L66 OCC SRSS
L69 L61+L62 OCC Scalar
L70 L61+L65 OCC Scalar
L71 L62+L63 OCC Scalar
L72 L63+L65 OCC Scalar
L73 L62+L64 OCC Scalar
L74 L64+L65 OCC Scalar
L75 L62+L66 OCC Scalar
L76 L65+L66 OCC Scalar
L77 L11+L57 OCC Scalar
L78 L11+L58 OCC Scalar
L79 L11+L59 OCC Scalar
L80 L11+L60 OCC Scalar
L81 L11+L61 OCC Scalar
L82 L11+L62 OCC Scalar
L83 L11+L63 OCC Scalar
L84 L11+L64 OCC Scalar
L85 L11+L65 OCC Scalar
L86 L11+L66 OCC Scalar
L87 L11+L67 OCC Scalar
Open
OWNER Doc No.:
EPCC OF TITANIUM NBL OUTSIDE TOSP-P038-EXE-DEC-6335-PIP-RPT-
BATTERY LIMIT (N-OSBL) FACILITY 0001
PROJECT FOR PENGERANG ETP Technology Vendor:
INTEGRATED COMPLEX
Revision: A
STRESS ANALYSIS REPORT (PIPING) FOR SCOPE 2 Page : 17 of 16
COMBINAT
STRESS
SL. NO. LOAD CASES ION
TYPE
METHOD
L88 L11+L68 OCC Scalar
L89 L11+L69 OCC Scalar
L90 L11+L70 OCC Scalar
L91 L11+L71 OCC Scalar
L92 L11+L72 OCC Scalar
L93 L11+L73 OCC Scalar
L94 L11+L74 OCC Scalar
L95 L11+L75 OCC Scalar
L96 L11+L76 OCC Scalar
L97 L2,L4,L6,L8 OPE Max
L12,L13,L14,L15,L16,L17,L18,L19,L20,L21,L22,L23,
L98 L24,L25,L26,L27,L28,L29,L30,L31,L32,L33,L34,L35, OPE Max
L36,L37,L38,L39,L40,L41
L99 L42,L43,L44,L45,L46,L47,L48,L49,L50,L51 OPE Max
L100 L52,L53,L54,L55,L56 EXP Max
L57,L58,L59,L60,L61,L62,L63,L64,L65,L66,L67,L68,
L101 OCC Max
L69,L70,L71,L72,L73,L74,L75,L76
L102 L77,L78,L79,L80,L81,L82,L83,L84,L85,L86,L87,L88 OCC Max
L103 L89,L90,L91,L92,L93,L94,L95,L96 OCC Max
Design pressure, Pipe Weight, fluid weight, Insulation weight, weight of rigid
components such as flange, valves, and special components such as strainers etc.
For the hydrostatic test, the test pressure shall be taken from the Process Line List .If
this information is not available, 1.5 times the MAWP shall be taken into account.
Open
OWNER Doc No.:
EPCC OF TITANIUM NBL OUTSIDE TOSP-P038-EXE-DEC-6335-PIP-RPT-
BATTERY LIMIT (N-OSBL) FACILITY 0001
PROJECT FOR PENGERANG ETP Technology Vendor:
INTEGRATED COMPLEX
Revision: A
STRESS ANALYSIS REPORT (PIPING) FOR SCOPE 2 Page : 18 of 16
This case covers the operational displacement of piping system and load exerted on
any attaching equipment’s.
This case covers the operational displacement of piping system and load exerted on
equipment’s with occasional cases like Wind, earthquake and PSV pop off.
Stress and Strain analysis shall be done in compliance with ASME B31.3.
For thermal Case, Calculated displacement stress range, SE will be limited to the
allowable displacement stress tangent, As per para 302.3.5 (d) by Equation (1a) of
ASME B31.3, Considering the equivalent no. of cycles full displacement cycle as 7000.
In addition to the Sustained, Thermal and Occasional loads, the following are also
considered in the analysis
Pressure Loading
Earth Quake
Equipment loading
20.0 ATTACHMENTS