You are on page 1of 10

HARGA

No. Uraian Pekerjaan Volume

1 PEKERJAAN ARSITEKTUR
A PEKERJAAN LANTAI
- Lantai 1
1 Lantai kerja 1:3:5, T = 5 cm
2 Urugan pasir bawah lantai, T=5 cm 43.06
3 Lantai Granit uk. 60 x 60 cm 775.82
4 Pasang Plint lantai uk. 10 x 60 cm 618.00
5 Lantai rabat beton keliling bangunan 87.84
6 Keramik KM/WC 30 x 30 Antislip 85.47
7 Keramik Dinding KM/WC 30 x 60 292.46
8 Pasang Step nosing ( Area anak tangga ) 84.60
- Lantai 2
1 Urugan pasir bawah lantai, T=5 cm 43.06
2 Lantai Granit uk. 60 x 60 cm 690.32
3 Pasang Plint lantai uk. 10 x 60 cm 618.00
4 Keramik KM/WC 30 x 30 85.47
5 Keramik Dinding KM/WC 30 x 60 292.46
6 Pasang Step nosing ( Area anak tangga ) 84.60
B PEKERJAAN DINDING
- Lantai 1
1 Pas. Bata Ringan/hebel/Selcon beton 1,807.48
2 Plesteran & acian tebal 1,5 cm ad. 1 : 4 3,614.97
3 Acian beton ekspose kolom,balok,canopy 447.04
4 opening pintu dan jendela 451.04
- Lantai 2
1 Pas. Bata Ringan/hebel/Selcon beton 1,807.48
2 Plesteran & acian tebal 1,5 cm ad. 1 : 4 3,614.97
3 Acian beton ekspose kolom,balok,canopy 447.04
4 opening pintu dan jendela 451.04
C PEKERJAAN PLAFOND
- Lantai 1
1 Plafond gypsum 9 mm + rangka plafond grid 60 x 60 (rangka hollow 647.14
2 Plafond gypsum 9 mm + rangka plafond Drop Ceilling 50 cm 448.62
3 Plafond gypsum 9 mm + rangka plafond Drop Ceilling 35 cm 56.00
4 List Plafond Gypsum 827.70
- Lantai 2
1 Plafond gypsum 9 mm + rangka plafond grid 60 x 60 (rangka hollow 647.14
2 Plafond gypsum 9 mm + rangka plafond Drop Ceilling 50 cm 448.62
3 Plafond gypsum 9 mm + rangka plafond Drop Ceilling 35 cm 56.00
4 List Plafond Gypsum 827.70
- Lantai 3
1 Plafond gypsum 9 mm + rangka plafond grid 60 x 60 (rangka hollow 112.00
2 List Plafond Gypsum 44.00
D PEKERJAAN KUSEN, DAUN PINTU DAN DAUN JENDELA
- Lantai 1
1 Pintu Masuk Utama Type ( P1 ) Automatic Door 2.00
2 Pintu Masuk Kamar Asrama Type ( P2 ) Acces Door 24.00
3 Pintu Darurat Type ( P3 ) 2.00
4 Pintu Balkon Type ( P4 ) 24.00
5 Pintu KM/WC Type ( P5) 24.00
6 Jendela Type J1 4.00
7 Jendela Type J2 4.00
8 Jendela Type J3 24.00
9 Jendela Type BV 24.00
- Lantai 2
1 Pintu Masuk Kamar Asrama Type ( P2 ) Acces Door 24.00
2 Pintu Darurat Type ( P3 ) 2.00
3 Pintu Type ( P4 ) 24.00
4 Pintu KM/WC Type ( P5) 24.00
5 Jendela Type J1 4.00
6 Jendela Type J2 4.00
7 Jendela Type J3 24.00
8 Jendela Type BV 24.00
- Lantai 3
1 Pintu Type ( P4 ) 2.00
2 Jendela Type BV 6.00
E PEKERJAAN PENGECATAN
- Lantai 1
1 Pengecatan Dinding Interior 2,439.43
2 Pengecatan Dinding Exterior 666.44
3 Pengecatan Kolom dan Balok beton 447.04
4 Cat Plafond 1,883.02
- Lantai 2
1 Pengecatan Dinding Interior 2,439.43
2 Pengecatan Dinding Exterior 666.44
3 Pengecatan Kolom dan Balok beton 447.04
4 Cat Plafond 1,883.02
- Lantai 3
1 Pengecatan Dinding Interior 285.52
2 Pengecatan Dinding Exterior 444.11
3 Pengecatan Kolom dan Balok beton 100.00
4 Cat Plafond 224.00
F PEKERJAAN ATAP
1 Kuda - Kuda WF 2,198.53
2 Canal C 100 x 50 x 20 x 2,3 1,382.67
3 Penutup Atap Alderon
4 Penutup Atap Spandek Pasir 306.00
5 Nok Atap Alderon -
6 Nok Atap Spandek Pasir 34.00
7 Base Plate t = 12 mm 169.56
8 Plat Kopel t = 8 mm 190.91
9 Plat Stifner t = 8 mm 32.58
10 Angkur Baja M 16 x 10 x 40 80.00
11 Bolt M12 x 50 + Ring M12 Untuk Plat Kopel 480.00
12 Bolt M10 x 35 + Ring M10 Untuk Ring Balk 192.00
13 Bolt M8 x 35 + Ring M8 Untuk Canal 100.00
14 Sigroud Besi Ø 10 mm 138.13
15 Kupingan Tali Angin Plat 8 mm 74.08
16 Span Screw M12 64.00
17 Tali Angin Besi Ø 12 mm 102.34
5 Water Profing Type Coating 352.00

F PEKERJAAN FINISHING FASAD


- Lantai 1
1 Allumunium Composite Panel (ACP) Outdoor PVDF 4 mm + Rangk 342.72
2 ACP Cutting Laser 55.44
- Lantai 2
1 Allumunium Composite Panel (ACP) Outdoor PVDF 4 mm + Rangk 342.72
2 ACP Cutting Laser 55.44
3 PEKERJAAN MEKANIKAL
A SISTEM PENYEDIAAN AIR BERSIH
1 Pompa Booster 2.00
2 WLC Electrode + Kabel NYM 3 x 2,5 mm 2.00
3 Tangki air kapasitas 5000 Liter 2.00
4 Bio Septictank Communal BCX 5 ( Kapasitas 25 Orang/Hari ) 4.00
- Instalasi perpipaan Lantai 1
1 Inst. Air bersih ( PVC 1 1/4" ) + accesories 4.50
2 Inst. Air bersih ( PVC 1/2" ) + accesories 220.50
3 Inst. Air bersih ( PVC 1" ) + accesories 150.00
4 Inst. Air bersih ( PVC 3/4" ) + accesories 232.00
- Instalasi perpipaan Lantai 2
1 Inst. Air bersih ( PVC 1 1/4" ) + accesories 4.50
2 Inst. Air bersih ( PVC 1/2" ) + accesories 220.50
3 Inst. Air bersih ( PVC 1" ) + accesories 150.00
4 Inst. Air bersih ( PVC 3/4" ) + accesories 232.00
- Instalasi perpipaan Lantai Atap
1 Inst. Air bersih ( PVC 1 1/2" ) + accesories 23.00
2 Inst. Air bersih ( PVC 1 1/4" ) + accessories 29.00
- Plumbing fixture Lantai 1
1 Pasang Closed Duduk TOTO 24.00
2 Pasang Jet washer 24.00
3 Pasang Shower 24.00
4 Pasang Kran Dinding 24.00
5 Pasang Floor Drain 24.00
- Plumbing fixture Lantai 2
1 Pasang Closed Duduk setara TOTO 24.00
2 Pasang Jet washer 24.00
3 Pasang Shower 24.00
4 Pasang Kran Dinding 24.00
5 Pasang Floor Drain 24.00
SISTEM PENYALURAN BUANGAN AIR KOTOR DAN PADAT
- Instalasi air bekas
- Lantai 1
Instalasi air bekas ( PVC 4" ) + Acc. 84.00
Instalasi air bekas ( PVC 2" ) + Acc. 168.00
Instalasi air bekas ( PVC 1 1/2" ) + Acc. 54.00
- Lantai 2
Instalasi air bekas ( PVC 4" ) + Acc. 84.00
Instalasi air bekas ( PVC 2" ) + Acc. 168.00
Instalasi air bekas ( PVC 1 1/2" ) + Acc. 54.00
- Lantai 1
Instalasi air padat ( PVC 4" ) + lengkap Acc. 125.00
Instalasi air padat ( PVC 6" ) + lengkap Acc. 6.00
- Lantai 2
Instalasi air padat ( PVC 4" ) + lengkap Acc. 125.00
Instalasi air padat ( PVC 6" ) + lengkap Acc. 6.00
- PEKERJAAN SISTEM DRAINASE U-DITCH
Galian Tanah Biasa 30.40
Urugan Pasir Bawah U-Ditch 3.04
Lantai Kerja 1:2:5 3.04
U-Ditch 500 x 500 x 1000 mm 152.00
Tutup U-Ditch Heavy Duty 152.00
- PEKERJAAN ITEM BARU
1 Pembuatan Pos 1.00
Jumlah Total
Harga Satuan Jumlah Harga
Sat.
( Rp. ) ( Rp. )

m3
m3 107,000 4,607,420
m2 37,200 28,860,504
m1 12,500 7,725,000
m2 32,200 2,828,448
m2 33,400 2,854,698
m2 35,600 10,411,576
m1 14,200 1,201,320

m3 107,000 4,607,420
m2 37,200 25,679,904
m1 12,500 7,725,000
m2 33,400 2,854,698
m2 35,600 10,411,576
m1 14,200 1,201,320

-
m2 32,400 58,562,352
m2 46,800 169,180,596
m2 30,100 13,455,904
m1 37,100 16,733,584

m2 29,700 53,682,156
m2 37,200 134,476,884
m2 30,100 13,455,904
m1 37,100 16,733,584

m2 37,500 24,267,750
m1 42,100 18,886,902
m1 42,100 2,357,600
m1 12,000 9,932,400
m2 37,500 24,267,750
m1 42,100 18,886,902
m1 42,100 2,357,600
m1 12,000 9,932,400

m2 37,500 4,200,000
m1 12,000 528,000

unit 250,000 500,000


unit 145,000 3,480,000
unit 145,000 290,000
unit 145,000 3,480,000
unit 135,000 3,240,000
unit 120,000 480,000
unit 120,000 480,000
unit 120,000 2,880,000
unit 105,000 2,520,000

unit 145,000 3,480,000


unit 145,000 290,000
unit 145,000 3,480,000
unit 135,000 3,240,000
unit 120,000 480,000
unit 120,000 480,000
unit 120,000 2,880,000
unit 105,000 2,520,000

unit 145,000 290,000


unit 105,000 630,000

m2 16,300 39,762,709
m2 18,700 12,462,428
m2 16,300 7,286,752
m2 16,300 30,693,291

m2 16,300 39,762,709
m2 18,700 12,462,428
m2 16,300 7,286,752
m2 16,300 30,693,291

m2 16,300 4,653,976
m2 18,700 8,304,857
m2 16,300 1,630,000
m2 16,300 3,651,200

kg 3,200 7,035,296
kg 3,200 4,424,528
m2 -
m2
m1
m1
kg
kg
kg
bh
bh
bh
bh
kg
kg
bh
kg
m2 22,200 7,814,400

m2
m2

m2
m2

unit
unit
bh
unit

m1
m1
m1
m1

m1
m1
m1
m1

m1
m1

unit 175,000 4,200,000


bh 155,000 3,720,000
bh 150,000 3,600,000
bh 22,000 528,000
bh 17,000 408,000

unit 175,000 4,200,000


bh 155,000 3,720,000
bh 150,000 3,600,000
bh 22,000 528,000
bh 17,000 408,000

m1 17,600 1,478,400
m1 15,200 2,553,600
m1 15,200 820,800

m1 17,600 1,478,400
m1 15,200 2,553,600
m1 15,200 820,800

m1 19,500 2,437,500
m1 21,200 127,200

m1 19,500 2,437,500
m1 21,200 127,200

m3 87,500 2,660,000
m3 107,000 325,280
m3 32,200 97,888
m1 80,000 12,160,000
m1 23,400 3,556,800

ls
Jumlah Total 1,014,458,737

You might also like