Professional Documents
Culture Documents
A.JOHN
E-Mail: johnbe26v@gmail.com
Mobile: 9047760389
MECHANICAL TECHNICIAN
OBJECTIVE:
To become competent professional through consistent updating of skills,
contributingsignificantly to the organization and to serve the organization with almost
commitment andDedication.
ACADEMIC QUALIFICATION:
WORK
EXPERIENCE – 5+ YEARS EXP IN OIL & GAS ( 2 YEARS GULF)
ROTATING EQUIPMENTS:
Centrifugal Pumps:
Worked with Single stage & multistage centrifugal pumps.
Overhauling and Assembling experience in Centrifugal pumps. (Single/Multi Stage)
Good Experience in installation, maintenance and troubleshooting of pumps.
Having experience in Pump alignment (Rim and Face ,Reverse Indicator & Laser)
Centrifugal compressor:
Replacing and repairing the Thrust Bearings, Journal Bearings, Labyrinth Seal, Dry
Gas Seal, Tertiary Seal and Honey Comb Seals and Checking its Clearance.
Dismantling and assembling and troubleshooting experience on single and multistage
centrifugal compressors. Split & Barrel type.
Gear Boxes:
Involved in prevents maintenance and Bearing changing, inspection its parts Gears
and Bearing, Pinions, Seals, Gaskets and Cases.
To maintain the Shaft sleeve, Breathers, Lubrication, Temperature Backlash and Shaft
endplay.
Gas Turbine:
Worked with Fuel Nozzles, Combustion Liners/Baskets, Flow Sleeves, Shroud Blocks,
Coupling Bolts, Doweling, Seals, Lock Plates.
Replacing and Repairing Liquid Bypass/Throttle Valves, Gas Control/Throttle Valves,
Y strainers, Flow Dividers, Check Valves and Flexible Pig Tails.
Maintenance works, System Pipe work and components are checked for signs of leaks,
All Gauges and Lubricating levels in the tank are assessed as a guide to component
condition, A running check of the operation of the DC Lube Oil pump may be
performed, Batteries should be boost charged.
Experience in Installation, Troubleshooting, Maintenance and Shutdown activities.
Fin Fan:
To take the various measurements Blade Angle, Bearing Thrust allowance, fit of fan
hub and Sheaves with Shaft, Alignment of Belt Drive.
Do the Drive arrange methods Direct Couple with Motor Shaft and Belt Drive.
Taking the Preventive Maintenance works Periodic Vibration Measurement,
Lubrication of Fan Bearings, Checking Belt Connections and measuring any Noisy
Operation.
Piping:
Good knowledge in piping Isometric and P & ID Diagrams.
Knowledge in Spool installation, hydro test, Reinstatement and Final Torque works.
Valves:
Servicing, Pressure testing of various types of valves such as Gate valve, Globe
valve, Ball valve, Needle valve, Butterfly valve, Safety relief valve, pressure
relief valve and steam traps.
Worked in overhauling & calibration of safety relief valves, general valves (Gate
valve, globe valve, ball valve, check valve etc.
Heat Exchangers:
Involved maintenance activities of fixed, floating head type and U type bundle
heat exchangers.
Hydro testing of shell test, tube test and doom test.
Tube plugging and replacement, Hydro testing.
Safety Device:
H2S Safety, Fire safety, using crow can gas tester (CH 4, H2S), fire Extinguisher (Foam,
DCP & CO2 ;) using in fire classification, fusible plug operation, deluge valve operation,
fire-water pump operation. Breathing apparatus.
PERSONAL PROFILE:
DECLARATION
I hereby declare that the above written particulars are true to the best of my knowledge and
belief. I assure to be responsible, self-motivated individual, devoted to the improvement of
the organization.
Certificate ID 98173639966
Beneficiary Details
Beneficiary Name / uaw6oTm6flul6on Oluurj John
Age 6JwgI 22
Vaccination Details
cOVISHIELD
Vaccine Name/ 56yuileT GlLuj
Vaccine Type /56uy au6m COVID-19 vaccine, non-replicating viral vector
Next Due Date/6s5Bgoas 85$ Between 25 Nov 2021 and 23 Dec 2021
LD60T6n5lujL6OT
Together, India will defeat
cOVID-19
In case of any adverse events, kindly contact the nearest Public Health Center/
Healthcare Worker/District Immunization Office/State Helpline No. 1075