:: Tamil Nadu Transmission Corporation Ltd ::

LD1 Report Date : 12-Oct-20 Day : Monday


Sl. Details Installed Available Lighting Minimum Morning Consum-
No. Capacity capacity Peak Load Peak ption
MW MW MW MW MW MU
Date 12-Oct-20 11-Oct-20 12-Oct-20 12-Oct-20 11-Oct-20
Time in Hrs. Hrs. 18:40 4:05 7:55
Frequency in HZ. HZ. 50.03 49.98 50.04
1 TNEB
a) Hydro MW 2321.9 800 841 603 622 15.910
(i) Kadamparai Generation MW 100 0 0 0.325
(ii) others MW 741 603 622 15.585
b) Thermal MW 4320.0 1100 1260 1115 1140 27.276
c) Gas 516.1 240 247 249 251 5.956
2 Independent Power Plant 633.3 40 38 38 38 0.931
(i) PP Nallur. 330.5 0 0 0 0 0.000
(ii) TAQA 250 0 0 0 0 0.000
(iii) Pioneer 52.8 40 0 0 0 0.000
0 38 38 38 0.931
3 Captive Power Plant (Intra state) 600 636 646 649
(i) CPP (Purchase) 0 0 0 0 0
(ii) CPP (Wheeling) + Third Party *895.00 895.00 600 636 646 649
4 Non-Conventional Energy Schemes 15.787
Co-Generation & Biomass 50 29 31 29
(i) Co-Generation *711.00 50 23 24 23
(ii) Biomass *265.60 0 6 6 6
Wind & Solar 2860 2748 1150 3118 60.662
(iii) Wind *8543.195 2860 2748 1150 2051 51.362
(iv) Solar(With Roof top) *4193.866 0 0 0 1067 9.300
5 CGS (capacity) - Share for TNEB 6166 4154 2567 2771 2893 71.711
(i) Neyveli TS1 (BILATERAL) 0 0 0 0 0.000
(ii) NTPC (2600) + SIMHADRI (1000 ) 835
(iii) NlyTS2(1470) 473
(iv) NlyTS1 Expansion (420) 227
(v) NlyTS2 Expansion (500) 270
(vi) New Neyveli TPP (500) 327
(vii) Talcher Stg2 (2000) 487 6131 4128 2541 2745 2866 71.092
(vii)
(vii)VALLUR (1500) 1066
(ix) NTPL (1000) 414
(x) MAPS (440) 331
(xi) KAPS (880) 226
(xii) KUDANKULAM(2000) 1152
(xiii) Kudgi(2400) 323
(xiv) Eastern region power 35 26 26 27 27 0.619
7 Power Purchase
(MTOA+LTOA+*STOA+*Exchange) 2830.0 3582 3350 3012 3290 67.452

Total TamilNadu Installed capapcity/ Demand 17682.28 13400 11716 9615 12030 265.685
8 (i) UI : OD(+) / UD (-) -613 -237 -269
(ii) Kadamparai Pump 0 0 0 0.455
(iii) Load Shedding 0 0 0 0.000
9 (i) This day Last Year 12584 10735 13184 281.910
(ii) Load Shedding / R & C 0 0 0 0.000
(iii) Freq. in HZ. 50.08 50.02 50.06
Max Consumption 369.940 MU on 12-04-19
Max Demand 16151 MW on 03-04-19 19:05 Hrs. at 50.01
Yesterday's Sustained Peak 12,041 MW 18.30 Hrs at 50.10 Hz
Load shedding 0 MW
Note: * All these items are not included in total Installed capacity.

# yesterday's solar generation(max): 1146 MW


:: Tamil Nadu Transmission Corporation Ltd ::

LD2 Report Date 12-Oct-20 Day : Monday


Inst. Cap in Yesterday's Today's Target for the Target for the Target till today Gen. for the day Gen. for the
Tamil Nadu Lighting peak in Morning peak month day month till today
(MW) (MW) in (MW) (MU) (MU) (MU)
(MU) (MU)
Pykara 59.2 0 0 0.000 0.000
Pushep 150 60 0 0.195 6.955
Moyar 36 3 3 0.101 2.231
Kundah1 60 5 10 0.300 8.040
Kundah2 175 25 25 1.142 21.301
Kundah3 180 15 20 0.792 12.592
Kundah4 100 50 0 0.122 5.202
Kundah5 40 0 0 0.000 6.589
Kundah6 30 0 0 0.000 1.055
Mettur dam 50 30 30 0.728 5.643
Mettur tunnel 200 128 128 3.060 21.023
Lower Mettur 120 84 84 1.992 15.781
BKB 1,BKB 2 & BKB 3 90 60 60 1.249 12.029
Periyar 168 126 126 3.032 33.391
Suruliyar 35 35 20 0.178 1.980
Papanasam 32 14 14 0.360 4.669
Servalar 20 0 16 0.110 1.575
Sholayar 1 84 42 42 1.011 11.126
Sholayar 2 25 0 0 0.000 0.000
Aliyar 60 fl fl 0.093 5.234
Kadamparai 400 100 0 0.325 6.185
Sarkarpathy 30 20 20 0.484 5.565
Kodayar 1 60 0 0 0.000 5.517
Kodayar 2 40 22 0 0.111 2.181
BBR 1 10 0 0
BBR 2 10 0 0 0.004 0.197
Total Micro 57.7 22 24 0.521 7.455
Hydro total 2321.9 841 622 500 16.667 177.419 15.910 203.516
NCTPS 1 630 300 160 300 10.000 106.452 4.160 55.520
Tuticorin TPS 1050 340 340 450 15.000 159.677 8.280 81.083
MTPS 1 840 190 190 530 17.667 188.065 4.605 51.072
MTPS 2 600 0 0 380 12.667 134.839 0.000 0.000
NCTPS 2 1200 430 450 650 21.667 230.645 10.231 171.434
Thermal total 4320.0 1260 1140 2310 77.000 819.677 27.276 359.109
BBGTP 120 0 0 0 0.000 0.000 0.000 0.000
KovilKalappal 108 0 0 25 0.833 8.871 0.000 5.773
Vazhudur Stage1 95 90 91 65 2.167 23.065 2.171 23.862
Vazhudur Stage2 92 69 68 45 1.500 15.968 1.657 18.059
Kuttalam 101 88 92 35 1.167 12.419 2.128 22.056
Gas total 516.08 247 251 170 5.667 60.323 5.956 69.750
TAQA 250 0 0 0 0.000 0.000 0.000 0.000
PP.Nallur 331 0 0 0 0.000 0.000 0.000 0.000
Lanco 113 0 0 0 0.000 0.000 0.000 0.000
Pioneer 53 38 38 30 1.000 10.645 0.931 10.381
IPP total 746.5 38 38 30 1.000 10.645 0.931 10.381
CPP (Purchase) 986.18 0 0 1700 56.667 603.226

CPP (Others) * 986.18 636 649 15.787 175.643


400 13.333 141.935
Co-Generation * 721.40 23 23
Biomass *265.59 6 6
Wind Mill (EB+PVT)*8522.945 2748 2051 300 10.000 106.452 51.362 559.882
Solar *3832.771 0 1067 550 18.333 195.161 9.300 179.000
NCES Total 3413 3796 2950 98.333 1046.774 76.449 914.525
NNTPP 0 0 250 8.333 88.710 9.300 105.700
Neyveli TS1 (Bilateral) 0.000 0.000 0.000 0.000
Neyveli TS1 (Exp) 205 205 134 4.467 47.548 4.541 92.421
Neyveli TS2 150 320 240 8.000 85.161 3.655 66.636
Neyveli TS2 ( Exp) 335 250 80 2.667 28.387 8.054 87.883
MAPS 180 180 90 3.000 31.935 4.186 47.056
NTPL 845 520 210 7.000 74.516 13.23 182.26
VALLUR 6166 990 780 550 18.333 195.161 18.247 114.676
KUDANKULAM 1835 1835 580 19.333 205.806 44.654 491.225
AP EXP/IMP 1530 2330 606 20.200 215.032 27.777 584.107
Karnataka EXP/IMP 185 300 303 10.100 107.516 7.277 76.704
Kerala EXP/IMP -1086 -1062 0 0.000 0.000 -32.719 -245.027
Pondy EXP/IMP 135 -330 0 0.000 0.000 -6.970 -74.190
CGS & Ext Ass 5304 5328 3043 101.433 1079.77 101.232 1529.451
NLY TS2 Mines(E) -49 -50 0 -1.574 -16.137
TTGS ICT 15.200 82.400
Total 17682.28 11716 12030 9003 300.100 3194.613 265.685 3284.652
Load shedding 0 0 0.000 0.000
0.000 0.000
HT R&C 0 0 0.000 0.000
Power Purchase 3350 3290 0 0.000 0.000 67.45 771.531
Kadam. Pump 0 0 0.000 0.000 0.455 3.380
ILFS 310 300 8.300 88.430
Coastal Energen 370 340 7.160 30.470
:: Tamil Nadu Transmission Corporation Ltd ::

HYDRO DETAILS LD3


Report Date : 12-Oct-20 Day : Monday

Inflow
So far Max. Storage Storage This date Storage 1st of today 0600- Generation 0600-
Full reservoir 15/8/18 last year this month Storage today 0600 Hrs in 0600 Hrs in
Reservoir Name Storage (MU) (MU) (MU) (MU) (MU) (MU) (MU)
Pykara 365.01 360.30 267.061 0.000 0.246

Kundah 1,158.09 1,132.18 930.780 1.840 2.432

Nilgiris Group 1,523.10 1,492.48 1,419.469 1,206.146 1,197.841 1.840 2.678

Parambikulam& Aliyar 256.77 255.56 253.625 2.049 1.913

Periyar 168.88 160.10 77.395 1.411 3.031

Suriliyar 37.95 32.76 23.414 0.235 0.301


Papanasam
50.26 46.28 19.225 0.449 0.446
&Servalar
Kodayar 192.49 192.40 186.590 0.654 0.111

Except Nilgris Total 706.35 687.10 509.720 586.623 560.249 4.797 5.801
2,229.45 2,179.58 1,929.189 1,792.770 1,758.090 6.638 8.479
Mettur 210.20 210.20 189.370 114.720 122.580 6.114 7.116
Total 2,439.65 2,389.78 2,118.559 1,907.490 1,880.670 12.752 15.595
HYDRO GENERATION

This Year 01/04/20 TO 12-10-20 2054.167 MU


Last Year 01/04/19 TO 12-10-19 2018.264 MU

Mettur level :-

Mettur level in Feet 99.11 / 120 feet Inflow Cusecs 26102

Nett Storage Mcft. 58675.00 / 88452 Mcft Discharge Cusecs 16000+900

PWD Demand in Cusecs @ 6:00 hrs

Mettur 16000+900 Periyar 1,630

Bhavani Sagar Nil Papanasam 700

Bhavani Sagar RBC 2,300 Sarkarpathy 1,000

Kadamparai Pumping Details

Total water Pumped (06:00 - 06:00 hrs )

Mcft M.U
0.00 0.000
LD4 :: Tamil Nadu Transmission Corporation Ltd ::
(Subsidiary of TNEB Ltd.)

Report Date: 12-Oct-20 Machines outage at 8 AM today

SL Units Outage Duration


Forced Commited
Station From Reason / date by the
No No MW days hh:mm Planned field
dd/mm/yy hh:mm

HYDRO

1 Kundah PH 4 1 50 18-09-20 12:35 23 19:25 Intake emergency gate problem F 31-10-20


Abnormal sound observed in
1 100 25-08-20 23:45 47 8:15 F 31-10-20
Turbine bit
2 Kadamparai
Generator differential
4 100 16-11-19 22:10 330 9:50 F 31-10-20
protection trip
3 Sholayar PH 1 1 42 25-09-20 23:26 16 8:34 Pendulam motor repair work F 15-10-20
4 Periyar PH 1 42 29-09-20 18:57 12 13:03 Water leak in shaft seal F 15-10-20
THERMAL
High Chloride in hot well /
5 210 03-11-19 22:02 343 9:58 F 31-10-20
Turbine side problem
1 TTPS Standby from 19 hrs on 10.10.20 after attending
3 210 10-10-20 04:32 2 3:28
Boiler tube puncture.
2 210 10-10-20 19:52 1 12:08 Reserve shutdown to accommodate RE power
2 210 05-09-20 23:03 36 8:57 Reserve shutdown to accommodate RE power
Standby from 17:45 hrs on 12.09.20 after Renewal of
2 MTPS 1 3 210 07-09-20 00:00 35 8:00
Boiler license
4 210 22-08-20 06:10 50 1:50 Reserve shutdown to accommodate RE power
3 MTPP 600 10-09-20 20:42 31 11:18 Reserve shutdown to accommodate RE power
4 NCTPS 2 1 600 10-10-20 21:57 1 10:03 Reserve shutdown to accommodate RE power
1 210 10-10-20 15:24 1 16:36 Reserve shutdown to accommodate RE power
5 NCTPS 1 Buchhloz Relay Protection
2 210 12-10-20 01:00 0 7:00 F 12-10-20
Operated
GAS
STG 38 01-10-20 11:00 10 21:00 Line conductivity high F 22-10-20
1 KKPL
GTG 70 10-10-20 09:00 1 23:00 Boiler License Renewal P 15-10-20
IPP
STG 100 05-12-16 21:03 1406 10:57
1 PPN Fuel not as per fuel supply agreement
GTG 231 05-12-16 21:15 1406 10:45
AOH from 00:00 hrs on
2 TAQA 250 25-09-20 22:38 16 9:22 P 06-11-20
03.10.20.
CGS
1
69 20-09-20 20:00 21 12:00 AOH P 13-10-20
(210 MW)
7
75 27-09-20 18:02 14 13:58 Boiler License Renewal P 13-10-20
(210 MW)
3 ABG(After burning gate)
1 NLY TS2 69 25-09-20 09:46 16 22:14 F 28-10-20
(210 MW) problem
5
75 30-06-20 09:31 103 22:29 Boiler side problem F 31-10-20
(210 MW)
6
75 07-05-20 16:48 157 15:12 Blast in furnace of Unit 6 F 31-10-20
(210 MW)
1
2 NLY TS1 E 114 10-10-20 14:41 1 17:19 Turbine side problem F 13-10-20
(210 MW)
1
3 MAPS 166 30-01-18 16:30 985 15:30 Long outage from 30.01.18 F 31-10-20
(220 MW)
2
48 09-09-20 00:28 33 7:32 Turbine vibration F 31-10-20
(200 MW)
5 RSTPS
6
119 25-08-20 17:20 47 14:40 Bearing temp high F 31-10-20
(500 MW)
3
106 19-09-20 00:30 23 7:30 Reserve shutdown to accommodate RE power
(500 MW)
6 Simadri
4
106 11-10-20 13:25 0 18:35 Reserve shutdown to accommodate RE power
(500 MW)
1
108 08-09-20 09:32 33 22:28 Reserve shutdown to accommodate RE power
(800 MW)
2
7 KUDGI 108 27-03-20 09:36 198 22:24 Reserve shutdown to accommodate RE power
(800 MW)
3
108 09-09-20 23:21 32 8:39 Reserve shutdown to accommodate RE power
(800 MW)
F FORCED
Forced Planned Total P PLANNED
TANGEDCO 792 0 792
CGS 666 144 810
Total Outage 1602
LD 5 Date : 12-Oct-20 Monday
Load Curve Date : 11-Oct-20 Sunday
Load Curve
12500

12000
Load in MW

11500

11000

10500

10000
14.00
9500 15.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 16.00
Load met 10975 10564 10020 10113 10238 10431 10996 11877 11355 11477 11331 11289 10940 10854 10484 10653 10884 11177 11840 11417 11055 11317 10813 10327 17.00
Demand 10975 10564 10020 10113 10238 10431 10996 11877 11355 11477 11331 11289 10940 10854 10484 10653 10884 11177 11840 11417 11055 11317 10813 10327
18.00

Time in Hrs 19.00


20.00
21.00
22.00
23.00
24.00

Frequency Curve MAX


50.30

50.20

50.10
Frequency in HZ

50.00

49.90

49.80

49.70
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Freq 50.03 50.05 50.08 50.06 50.02 50.08 50.05 50.05 50.02 50.09 49.95 50.05 50.08 50.08 50.00 50.10 50.02 50.03 50.05 50.02 50.03 50.15 50.02 50.10
LD 5 Date : 12-Oct-20 Monday
Load Curve Date : 11-Oct-20 Sunday

Wind Curve
3200

2700
Wind Generation in MW

2200

1700

1200

700

200
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Wind 2526 2253 1820 1695 1891 1698 1774 1636 1758 2225 2141 2268 2347 2156 1745 2061 2118 2365 2665 2276 2416 2599 2635 2102

Solar Curve
1200

1000
Solar Generation in MW

800

600

400

200

0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Solar 0 0 0 0 0 1 165 769 951 963 1092 1038 1008 1053 952 790 352 -2 0 0 0 0 0 0
Report Date: Monday, October 12, 2020
1) Performance of Thermal Stations:-
Capacity Load Energy generated on 26-Jan-19 Cumulative from

Sl Station Installed Morning During Maximum Actual for Actual 01-Apr-19

No Name Capacity available Mor. Peak possible the day PLF for Actual PLF
MW MW MW MU MU the day MU
1 NCTPS 1 630 420 160 15.120 4.160 28% 2403.319 17.18%
2 TTPS 1050 420 340 25.200 8.280 33% 3942.608 16.91%
3 MTPS 1 840 210 190 20.310 4.605 23% 3420.372 18.34%
4 MTPS 2 600 0 0 14.400 0.000 0% 1782.350 13.38%
5 NCTPS 2 1200 1200 450 28.800 10.231 36% 3940.563 14.79%
2) Daily coal stock at thermal
stations :- Receipt (MT) Consumption (MT) Stock No. of
Days(As on
Sl.No Station 10-Oct-20 10-Oct-20 in (MT) yesterday)
1 Tuticorin TPS IND 10,774 11,150 514,092 27.8
27.8
IMP 0 0 0
2 Mettur TPS IND 0 3,432 150,110 #REF!

ARR 0 218 108,833 10.8


IMP 0 0 505 19.4
3 MTPP IND 0 0 94,530
ARR 0 218 69,414 9.9
IMP 0 0 33,317 24.1
4 NCTPS I IND 12,570 5,532 231,277
IMP 5,390 452 24,612
5 NCTPS II IND 0 12,570
8.6
IMP 0 5,390
6 NCTPS ECHS IND 0 12,570 300,385
IMP 0 5,390 120,955
TOTAL IND 23,344 32,902 1,168,256
21.3
IMP 5,390 5,842 58,434

3) Performanceof IPPs/Captive plants:


Capacity Energy gen. on 11-Oct-20 Cum. from
Sl Station Installed Availa. Load during Max. Actual for Actual 01-04-19
No Name MW MW mor. peak possible the day PLF of the day MU PLF
1 PPN 331 0 0 0.00 0.00 0% 0.00 0%
2 TAQA 250 250 0 6.00 0.00 0% 86713.84 2581%
3 LANCO 113 113 0 2.71 0.00 0% 159602.39 10490%
4 PIONEER 53 53 38 1.27 0.93 73% 293599.46 41217%
Total 747.2 416 38 9.98 0.93 24% 539915.70 18096%

4 a) Interstate Share / Drawal in (MU) :-


Slno. State Share for the day Drawal for the day Excess/deficit
For the day For the month From 01/04/19
1 Tamil Nadu 146.060 140.430 -5.63 -19.74 3.46
2 Pondy 7.370 7.280 -0.09 -1.95 -63.76
3 Andhra Pradesh 68.540 67.160 -1.38 3.36 53.12
4 Karnataka 38.990 39.240 0.25 9.09 35.68
5 Kerala 40.150 40.840 0.69 2.38 246.62
6 Telengana 49.870 47.850 -2.02 -6.45 11.19

4 b) Grid Highlights :
Maximum Sustained Demand in MW Time in Hrs Frequency in Hz
12,041 18.30 50.10 Hz
Maximum Frequency 22:01 50.20
MIinimum Frequency 18:12 49.86
Average Frequency 50.05
Rate at Average frequency in Rs. 0.00

TAMILNADU UI in M.U. -5.63


Report Date: Monday, October 12, 2020
1a) Power from Eastern Region:-(Special allocation) 11-Oct-20
For the
From Firm Power
SlNo. To Hrs. day For the month MU
Hrs. in MW
MU
1 Eastern Region 0:00 1:00 26.88 0.619 7.335
1:00 4:00 24.30
4:00 7:00 25.59
7:00 9:30 25.17
9:30 10:00 25.82
10:00 12:30 26.08
h 12:30 13:00 26.24
13:00 15:00 25.89
15:00 23:30 26.24
23:30 24:00 26.88

2 URS Power ( Eastern Region) 0:00 24:00 0.00 0.000 0.049

1b) Purchase for the day:-

1 TNEB <-- IEX & PXIL 0:00 24:00 0 0.000 33.966

4 TNEB <-- STOA 0:00 5:00 1082 26.554 267.319


0:00 24:00 11
5:00 9:00 1229
9:00 24:00 1082

7
Report Date: Monday, October 12, 2020
8) Comparative Group wise inflow :-
Cummulative inflow for the water Year upto Inflow this day last year
Reservoir yesterday
(July - June)
Last year (MU) This year (MU) in M.U
Nilgiris 3138.574 2327.719 10.109
Excl.Mettur 1930.886 2,390.818 3.419
For Mettur 616.740 593.138 3.151
9) Surplus/ discharge details:-
Reservoir Name Water surplused (MU) Water discharged (MU) Remarks
for the
for the day from from
day
06-06 hrs 01/04/18 01/04/18
06-06 hrs
Pykara Bypass discharge

L. Kodayar Dam surplus


Papanasam & Servalar Karayar dam disharge
Scourvent discharge and
Periyar
forebay spill
U.Kodayar

Mukuruthy Bypass discharge

Moyar FB& Maravakandy

Suriliyar dam surplus

Pegumbahalla
Porthimund
Parsons Valley
Avl& Emerald
Kundah Palam Surplus
Sholayar Bypass discharge

Sholayar Spillway
Pillur CBE drinking water
Kadamparai
dam surplus /Bypass
Thunakadavu
discharge
Glenmargon
Upper Aliyar dam surplus
SandiNallah
Parambikulam
Mettur
Papanasam Dam & FB
Upper Bhavani --
10) Rainfall (above 25 mm) Details :-
For the day 11-10-20
Sl. No. Reservoir MM sl.No Reservoir MM
1 Periyar 27

11) Details of operation of Kadamparai PH Pump :-


Qty. of Energy
Unit No. Date Time in hrs. Duration water Consumed in
Pumped MU
0 00-01-00 0:00 0:00 0:00 0.00 0.000
0 00-01-00 0:00 0:00 0:00 0.00 0.000
0 00-01-00 0:00 0:00 0:00 0.00 0.000
Monday, October 12, 2020

7) IPP ACTUAL GENERATION SCHEDULE :- For the day: 11-Oct-20

Name of the Backing down to (MW) Picking up to (MW)


plant & inst. Requested Actual Requested Actual
Cap in MW
MW From To MW From To Dur. MW From To MW From To Dur.

Hrs Hrs Hrs Hrs. Hrs Hrs. Hrs Hrs.


PPN 0 0:00 24:00 0 0:00 24:00 1day 00:00
330.5

3:50 5:30
TAQA 170
0 0:00 24:00 0 0:00 24:00 1day 00:00
250

PIONEER 52.8 0:00 24:00 35 0:00 24:00 1day 00:00


52.8
(GTG+STG)
(38+14.8)

PPN - Fuel not as per fuel supply agreement


LANCO - PPA expired from 00:00 hrs of 01.08.2020.

TAQA - AOH from 00 hrs on 03.10.20.


:: Tamil Nadu Transmission Corporation Ltd ::
(Subsidiary of TNEB Ltd.)

RESERVOIR CONDITION AS AT 06.00 AM ON : Report Date: 12-Oct-20 Monday


Nett. For Previous Rainfall At this rate of Present
SL. Name of the FRL (MDDL) Capacity Level Nett. day 24 hrs. inflow & discharge storage
No. Reservoir at FRL in Storage Inflows Dis. till 6 AM the reservoir will as % of
in today get filled up in FRL
(Feet) (Mcft) (Feet) (Mcft) (Mcft) (Mcft) (mm) ...… days (%)

1 Mukurthy 6884 (6804) 1785 6778.50 1583.000 0.00 11.63 5 --- 88.7

2 Pykara 6799 (6710) 1945 6774.30 943.20 0.00 0.00 -- ----- 48.5

3 Sandyanallah 7039 (6995) 768 7038.70 761.070 15.62 18.14 -- ---- 99.1

4 Glenmorgan Dam 6623 (6616.1) 9.33 6622.50 8.88 0.00 18.14 -- --- 95.2

5 Glenmorgan FB 6470 (6456.5) 91.7 6466.75 68.82 0.00 2.04 3 ----- 75.0

6 Upper Bhavani 7470 (7372) 3012 7439.90 1730.66 0.00 0.00 7 ----- 57.5

7 Porthimund 7285 (7181.8) 1849.5 7273.80 1531.16 0.00 0.00 7 ----- 82.8

8 Parson Valley 7250 (7201) 475 7248.70 446.70 8.66 0.26 -- --- 94.0

9 AV & Emerald 6515 (6375) 5436.8 6510.40 5049.50 6.26 15.26 1 62 92.9
6510.40
10 Kundha Palam 5330 (5310) 31.57 5323.40 18.070 4.78 26.42 3 ----- 57.2

11 Pegumbahallah 2852 (2800) 24.37 2840.00 16.67 1.26 28.71 -- ----- 68.4

12 Pillur 1400 (1335) 991 1394.00 849.00 65.29 29.00 -- 4 85.7

13 Parambikulam 1825 (1781) 12311 1824.62 12223.66 42.68 99.10 2 ----- 99.3

14 Thunnakkadavu 1770 (1748) 319 1769.58 311.87 5.88 74.22 5 --- 98

15 Kadamparai 1149 (1112) 940.38 1148.40 915.78 10.26 12.31 2 ----- 97.4
WP :0
16 Upper Aliyar 2525 (2396) 914.89 2520.50 862.44 1.37 3.33 -- 38 94.3

17 Sholayar 3290 (3145) 4869.95 3290.21 4882.22 40.94 34.17 11 --- 100.3

18 Periyar 142 (108) 6755 126.80 3095.80 56.44 121.24 27 65 45.8

19 Manalar 1492 (1470.4) 11.82 1487.90 7.55 0.10 0.12 4 ---- 63.9
(M) (MCM)
20 Highwavys 1506 (1486) 2.38 1498.90 0.855 0.00 0.00 -- ----- 35.9
(M) (MCM) WP :
21 Eravangalar 1472 (1459.5) 1.42 1471.25 1.232 0.00 0.00 6 ----- 86.8
(M) (MCM)
22 Papanasam Dam 868 (720) 5270 813.20 2225.80 47.007 1.73 -- ---- 42.2

23 Servalar 265 (235) 1135.2 246.52 331.80 0.000 49.18 1 ----- 29.2
(M)
24 Upper Kodayar 4350 (4250) 2578.8 4348.90 2500.27 4.87 0.00 17 16 97.0

25 Lower Kodayar 1150 (1065) 24.07 1141.00 20.23 8.80 7.99 13 ---- 84.0

26 Mettur 790 (670) 88452 99.11 58675 2255.21 1460 -- 37 66.3

Cusecs Cusecs
26102 16900
120

EXECUTIVE ENGINEER / SLDC ,


TANTRANSCO / CHENNAI - 2.
.
Storage in Mcft.
Reservoir As On :- 12-Oct-19 As On :- 12-Oct-20
Gross Nett Gross Nett

1. Upper Bhavani 3455.100 2895.100 2290.663 1730.663

2. Porthimund 1912.400 1639.400 1804.160 1531.160

3. Parson Valley 643.300 438.300 651.700 446.700

4. Avalanchee & 5354.300 5254.300 5149.500 5049.500


Emerald
5. Pykara Group 4247.730 4017.730 3517.270 3287.270

TOTAL 15612.830 14244.830 13413.293 12045.293

Name of the Reservoir FRL. & Nett. Level Nett. Storage


As on 12-Oct-20 Storage (Feet) (Mcft)
1. Kerala Sholayar 2663 2638.200 3191.400
(5297)
2. Lower Aliyar 1050 1049.350 3793.850
(3829)

3. Lower Bhavani 920 916.970 29765.000


(32273)
4. Vaigai Dam 71 62.980 3816.400
(6496)
5. Pechiparai 302 290.000 2663.000
(4350)
6. Perunchani 306 301.600 2444.000
(2890)
7. Chittar-1 269 263.820 256.120
(393)
8. Chittar-2 269 263.960 404.180
. (600)
TOTAL (Items 5 to 8) (8233)

.
14.Bus Voltage
11-10-20
Sl. Name of CB 400 KV 230 KV 110KV
No. Sub-Station Mvar Max Min Max Min Max Min
1 Acharapakkam -- -- -- 0 0 0 0
2 Alagarkoil 2x24 -- -- 238 224 112 108
3 Alamathy 400KV 2x24 418 413 239 236 115 112
4 Aliyar 230 KV 2x24 -- -- 243 225 115 111
5 Amuthapuram 230KV -- -- -- 242 234 -- --
6 Anupankulam 2x24 -- -- 238 228 117 111
7 Arasur 3x24 -- -- 241 229 114 109
8 Arni 2x24 -- -- 0 0 0 0
9 Arumuganeri -- -- -- -- -- 112 109
10 Basinbridge ss -- -- -- 233 229 114 112
11 Chekkanoorani -- 0 0 238 231 -- --
12 CMRL -- -- -- 236 232 113 100
13 Coimbatore 1x24 -- -- -- -- 116 111
14 Cuddalore 2x24 -- -- 235 225 114 107
15 Deviakuruchi 2x24 -- -- 230 222 115 109
16 Eachangadu 1x24 -- -- 230 220 110 105
17 Erode 2x24 -- -- -- -- 112 108
18 Gobi 2x24 -- -- 238 231 113 109
19 Gummidipoondi -- -- -- 240 237 116 106
20 Hosur 2x24 -- -- 239 230 117 112
21 Ingur 2x24 -- -- 235 228 114 110
22 Kadalangudi -- -- -- 221 218 106 105
23 Kadaperi 2x24 -- -- 236 231 116 113
24 Kanthamangalam -- -- -- 236 226 117 111
25 Karaikudi -- -- -- 246 239 111 107
26 KARAMBIYAM 230/110KV -- - - 226 218 113 108
27 Kavanoor 2x24 -- -- 232 226 113 110
28 Kayathar 2x24 -- -- 238 231 113 108
29 Kilpauk -- -- -- 234 230 114 112
30 KITZ Park -- -- -- 0 0 0 0
31 Kodikurichi -- -- -- 241 233 116 110
32 Korattur 2x24 -- -- 236 232 114 111
33 Koyambedu 2x24 -- -- 0 0 0 0
34 Mambakkam -- -- -- 236 232 115 113
35 Manali -- 232 229 111 100 0 0
36 MAPS -- -- -- 233 226 -- --
37 Mettur -- -- -- 240 232 114 110
38 Mosur 2x24 -- -- 230 225 122 112
39 Mylapore -- -- -- 238 232 117 114
40 Myvadi 400KV -- 0 0 243 235 -- --
41 Neyveli TS1 (Bilat.) -- -- -- 0 0 0 0
42 Neyveli TS1 EXPN -- 420 411 -- -- -- --
43 Neyveli TS2 -- 419 410 234 227 -- --
44 NOKIA -- -- -- 237 232 119 117
45 OK Mandapam -- -- -- 245 236 114 109
46 Oragadam -- -- -- 0 0 0 0
47 Palladam -- -- -- 240 232 116 111
48 Pasumalai 1x24 -- -- 237 230 111 107
49 Perambalur 2x24 -- -- 236 229 113 109
50 Ponnavaram -- -- -- 243 234 115 111
51 Pudanchandai -- -- -- 235 227 115 110
52 Pudukotttai -- -- -- 235 230 112 108
53 Pugalur 2x24 -- -- 240 233 114 109
54 Renganathapuram -- -- -- 239 230 115 110
55 Salem 230KV 2x24 -- -- 228 220 115 110
56 Salem 400KV -- 425 413 241 233 117 111
57 Samayapuram -- -- -- 231 223 114 110
58 Sanganeri -- -- -- 238 232 117 114
59 Sembatty -- -- -- 230 223 113 109
60 Singarapet 2x24 -- -- 236 227 113 108
61 Sipcot 1x24 -- -- 239 233 115 112
62 Siruseri -- -- -- 0 0 0 0
63 SP.Koil 2x24 -- -- 236 230 113 110
64 SR Pudur 2x24 -- -- 237 232 116 113
65 Sriperumpudur 2x24 426 418 237 233 114 111
66 Sterlite 2x24 -- -- 240 234 0 0
67 SVChathiram -- 409 402 237 233 115 113
68 Tanjore 2x24 -- -- 234 227 114 109
69 Tharamani 2x24 -- -- 241 236 115 112
70 Theni 1x24 -- -- 232 223 113 109
71 Thiruchengode(Unjanai) 2x24 -- -- 229 218 112 106
72 Thiruvalam 2x24 -- -- 233 226 115 109
73 Thiruvarur 2x24 -- -- 225 218 112 108
74 Thudiyalur 2x24 -- -- 243 234 116 111
75 Tondiarpet 1x24 -- -- 0 0 0 0
76 Trichy 230KV -- -- -- 235 227 114 109
77 Trichy 400KV(Alandur) 2x24 412 402 237 231 114 110
78 TV Malai -- -- -- 234 222 113 106
79 Udayathur 230/33KV -- -- -- 239 230 114 110
80 Udumalpet 4x24 -- -- 240 232 116 110
81 Vazhudur -- -- -- 249 241 122 118
82 Veeranam 230/33KV -- -- -- 239 232 -- --
83 Veerapuram -- -- -- 238 232 114 111
84 Villupuram 2x24 -- -- 228 216 111 104
85 Vinamangalam -- -- -- 238 225 120 113
86 Thiruvalam 400KV -- 423 413 234 228 0 0

Sl.No. Sub-Station Mvar Max Min Max Min Max Min


1 GMR -- -- -- -- -- 0 0
2 0 0 0 0 0 0 0 0
2 PP Nallur -- -- -- 231 223 -- --
4 0 0 0 0 0 0 0 0
3 STCMS -- -- -- 235 232 -- --
4 TCPL -- -- -- -- -- 110 107
12.Generation and MVAR in all Generating Stations at 1900 Hrs.

Date : 11-10-20
Sl.No. Station Rated cap. of Active power Reactive Percentage
unit on bars generation power MVAR / MW
(MW) (MW) generation (Rated cap of
(MVAR) unit on bars)

Hydro P
1 Sholayar PH1 0 0 0 NIS
2 Kadamparai 0 0 0 NIS
3 Pykara 0 0 0 NIS
4 Kundah PH5 0 0 0 NIS
5 Kundah PH4 100 0 0 NIS
6 Kodayar PH1 0 0 0 NIS
7 Aliyar 60 0 4 Condenser
8 Sholayar PH2 25 0 21 Condenser
9 Moyar 36 29 10 27.78%
10 Kundah PH1 60 60 15 25.00%
11 Suruliyar 35 20 8 22.86%
12 Papanasam 30 14 6 20.00%
13 Kundah PH3 180 20 24 13.33%
14 Kundah PH2 175 26 21 12.00%
15 Mettur Dam 50 5 6 12.00%
16 Periyar 140 126 15 10.71%
17 Mettur TPH 200 128 18 9.00%
18 BKB 1 30 20 2 6.67%
19 PUESHEP 150 60 8 5.33%
20 Kodayar PH2 40 22 0 0.00%
21 Parsons Valley 30 30 0 0.00%
22 L.Mtr PH1 30 20 0 0.00%
23 L.Mtr PH4 30 19 0 0.00%
24 Servalar 20 16 0 0.00%
25 L.Mtr PH3 30 22 0 0.00%
26 L.Mtr PH2 30 22 0 0.00%
27 Sarkarpathy 30 12 0 0.00%

Thermal Stations
1 Ennore 0 0 0 NIS
2 Neyveli TS1 0 0 0 NIS
3 Mettur TPS 210 190 25 11.90%
4 Neyveli TS2 420 208 31 7.38%
5 Tuticorin TPS 420 348 15 3.57%
6 North Chennai TPS 420 290 3 0.71%
7 Neyveli TS1 EXPN 210 191 -80 -38.10%
Atomic Power Stations
1 MAPS 220 217 40 18.18%

Gas Power Stations


1 Koilkalapal GTS 0 0 0 NIS
2 Basin Bridge 120 0 20 Condenser
3 Valathur GTS 95 91 10 10.53%
4 Kuttalam GTS 113 89 -10 -8.85%

IPP Stations
PP Nallur 0 0 0 NIS
1 ABAN 0 0 0 NIS
2 STCMS 0 0 0 NIS

3 Penna 52.8 38.3 11.5 21.78%


4 TCPL 63.5 30 0 0.00%
5

Total in MW 3855 2363.3 223.5 Mvar


Percentage Mvar / MW 5.80%
16.Daily Energy Generated. Report dated : Monday 12-10-20
Details for : Sunday 11-10-20
Sl. Cu.Till For the For the Sl. Cu.Till For the For the
No. Description Prev Day day month No. Description Prev Day day month
1 Pykara 85 PONDY(I) 4 NNTPP-Pondy
2 PUSHEP 6.760 0.195 6.955 86 PONDY(I) 4 SVCM-Pondy 15.626 0.444 16.070
3 Moyar 2.130 0.101 2.231 87 PONDY(I) NLY2-Viliyanur 0.221 0.221
4 Kundah 1 7.740 0.300 8.040 88 PONDY(I) NLY2 - KARAIKAL 0.010 0.010
5 Kundah 2 20.159 1.142 21.301 89 Kolar-tvlm(I) 5.140 0.910 6.050
6 Kundah 3 11.800 0.792 12.592 90 Total imp. / pur. 2832.144 273.482 3019.826
7 Kundah 4 5.080 0.122 5.202
8 Kundah 5 6.589 6.589 Gross. 3415.377 322.624 3652.201
9 Kundah 6 1.055 1.055 91 4SPDR-Chittore (E)
10 Total Nilgiris 61.313 2.652 63.965 92 4SPDR-Nellore -1&2# (E)
11 Kadamparai 5.860 0.325 6.185 93 4 DHPURI - MADUKURI (E) 0.200
12 Aliyar 5.141 0.093 5.234 94 2GPD-Sulurpet(E) 1.395 0.647 2.042
13 Suriliyar 1.802 0.178 1.980 95 Kolar-Tvlm(E) 3.810 3.810
14 BBR 1 & 2 0.193 0.004 0.197 96 4Sulagiri-Kolar(E)
14 Non Irrigation 74.309 3.252 77.561 97 4Chittore-Tvlm(E) 67.130 6.260 73.390
15 Sarkarpathy 5.081 0.484 5.565 98 4Shoolagiri-Bangalore(E) 0.150 0.240 0.390
16 Sholayar 1 10.115 1.011 11.126 99 2Hosur-Erandahalli(E) 10.467 0.999 11.466
17 Sholayar 2 100 4MYV-Trichur(E) 65.460 5.640 71.100
18 Mettur dam 4.915 0.728 5.643 101 4ABKPatty-Trivandrum 65.420 6.120 71.540
19 Mettur Tunnel 17.963 3.060 21.023 102 2Theni-Sabaragiri(E) 1.736 0.394 2.130
20 L M P H -1 3.548 0.470 4.018 103 2Abishegapa-Edamon(E) 76.860 7.280 84.140
21 L M P H -2 3.522 0.525 4.047 104 2UDPT-Iddky 2.333 0.301 2.634
22 L M P H -3 3.619 0.537 4.156 105 KLA(E) K.THUR 2.221 0.215 2.436
23 L M P H -4 3.100 0.460 3.560 106 4CUDDAPAH-TVLM (E)
24 BKB-1 10.780 1.249 12.029 107 PONDY(E) NNTPP-Pondy 60.900 5.940 66.840
25 Periyar 30.359 3.032 33.391 108 PONDY(E) SVCM-Pondy 11.507 0.449 11.956
26 Papanasam 4.309 0.360 4.669 109 PONDY(E) NLY2-Viliyanur 6.505 0.602 7.107
27 Servalar 1.465 0.110 1.575 110 PONDY(E) NLY2 - KARAIKAL 4.165 0.423 4.588
28 Kodayar 1 5.517 5.517 111 4Nellore-Tvlm (E) 0 0 0
29 Kodayar 2 2.070 0.111 2.181 112 4 DHMPRI - SMNHLI (E) 35.1 6.4 41.50
30 Total irrigation 106.363 12.137 118.500 113 Total Export. 380.059 56.484 457.069
31 Total Micro 6.934 0.521 7.455 114 Nett 3035.318 266.140 3195.132
32 Total Hydro 187.606 15.910 203.516 115 KPSHEP Pump 2.925 0.455 3.380
33 Ennore TPS 116 Export to TS2 Mines 14.563 1.574 16.137
34 NCTPS 1 51.360 4.160 55.520 DAY 11 th Net(-)pump
35 NCTPS 2 161.203 10.231 171.434 TNEB aveg. cons. 290.467 MU. 265.685
36 Tuticorin TPS 72.803 8.280 81.083 Sustained Load 12041.100 MW.
37 MTPS 1 46.467 4.605 51.072 Time 18.30 Hrs.
38 MTPS 2 Frequency 50.100 HZ. For the month
39 TNEB Thermal 331.833 27.276 359.109 Hydro aveg.Gen 662.917 MW. Net(-)pump
40 Basin Bridge GTP Thermal aveg. Gen. 1136.500 MW. 3191.75
41 Koilvilkalappal GTP 5.773 5.773 TS1 average relief. 0.000 MW.
42 Vazhathur GTP (Stg1) 21.691 2.171 23.862 TS2 average relief. 152.292 MW.
43 Vazhathur GTP (Stg2) 16.402 1.657 18.059 MAPS average relief 174.417 MW.
44 Kuttalam GTP 19.928 2.128 22.056 I.STATE imp. average. 2000.250 MW.
45 Total gas 63.794 5.956 69.750 I.STATE exp. average. 1218.750 MW.
46 IL & FS (U1&2) 80.130 8.300 88.430 TNEB ave. demand 10701.667 MW.
47 TTGS-ICT(CTU CONN WIND) 67.200 15.200 82.400 Chennai Demand 2363.000 23:00
48 Madurai PCL(I) Chennai Consumption 56.214 MU.
49 ST-CMS
50 P.P.Nallur(I) Load factor 88.876 %
51 ABAN (I) Nil. Gen. Today 2.652 MU.
52 PENNA(I) 9.450 0.931 10.381 Nil. Gen. Month 63.965 MU.
53 IPP Total 76.650 0.931 10.381 Nil. Gen. Aver. (month) 5.815 MU.
54 Chennai Others 113.100 11.102 124.202 KLA (nett) -11.865 MU.
55 Erode Others 7.219 0.821 8.040 Pondy (nett) 6.970 MU.
56 Madurai Others 39.537 3.864 43.401 TNDrawal 130.318 MU.
57 Wind Mill (Total) 508.520 51.362 559.882
58 Solar 169.700 9.300 179.000 PYKARA 0.0000
59 Neyveli TS1(BI-LAT) MARAVAKANDI 0.0000
60 Neyveli TS1 (Exp) 87.880 4.541 92.421 BHAVANISAGAR 0.0000
61 Neyveli TS2 62.981 3.655 66.636 VAIGAI 0.1442 MU.
62 NLY TS2 Expansion 79.829 8.05400 87.88300 POONACHI 0.0103 MU.
63 Kalpakkam APS 42.870 4.186 47.056 AMARAVATHI 0.0000
64 Vallur 96.429 18.247 114.676 LOWER ALIYAR 0.0282 MU.
65 Coastal Energy (U1 &2) 23.310 7.160 30.470 THIRUMOORTHY 0.0000
66 NTPL 169.030 13.230 182.260
67 KUDANKULAM (U1&U2) 446.571 44.654 491.225 PERUNCHANI 0.0248 MU.
68 4SPDR-Chittore (I) 39.020 2.600 41.620 PECHIPARAI 0.0000
69 4Nellore-SPDR 2# (I) 38.175 2.240 40.415 MUKURTHY 0.0162 MU.
70 2GPD-Sulurpet(I) 4.662 0.026 4.688 TUKLAPATTI 0.0000
71 2TVLM-Chittore(I) 20.973 1.578 22.551 SATHANUR 0.0000
72 4CUDDAPAH-TVLM (I) 168.160 7.180 175.340 L.BHAVANI RBC 0.0852 MU.
73 4Sulagiri-Kolar (I) 90.944 7.606 98.550 PYR BRG-1 0.0665 MU.
74 4Shoolagiri-Bangalore(I) 14.470 14.470 PYR BRG-2 0.0459 MU.
75 2Hosur-Erandahalli PYR BRG-3 0.0677 MU.
76 4MYV-Trichur(I)
77 4ABKPatty-Trivandrum TOTAL MICRO 0.5211 MU.
78 2Theni-Sabaragiri(I) 0.949 0.018 0.967
79 2Abisheg-Edamon (I) R&C & HT Relief 0.000
80 2Udumalpet-Iddiky(I) 0.773 0.013 0.786 Load Shedding 0
81 2K.Thurai(I) Total Relief 0.000
82 4Spdr-Nellore - 1# (I) 38.175 2.240 40.415 Demand 0
83 4Chittore-Tvlm (I)
84 4Nellore-Tvlm (I) 309.090 25.420 334.510 KUDANKULAM (U1) 23.400
84A 4 DHPURI - MADUKURI (I) 12.400 12.400 KUDANKULAM (U2) 24.398
84B 4 DHMPRI - SMNHLI (I) 2.400 2.400
84C TVNL - KOCHI 1 (Imp)
84D TVNL - KOCHI 1 (Exp) 65.900 6.400 72.300
84E TVNL - KOCHI 2 (Imp)
84F TVNL - KOCHI 2 (Exp) 65.900 6.400 72.300
84G NNTPP 96.400 9.300 105.700
84H Pugalur - Raigarh (Import) 9.300
84I Pugalur - Raigarh (Export)
230 KV Maximum & Minimum Voltages
13
Date: 11-10-20
S.No Name of theMaximum
Thermal Station
Voltage
Time /Substation
hrs
in kVMinimum Voltage
Time hrs
in kV
1 ETPS 232 24 229 1
2 NCTPS 227 3 223 10
3 TTPS 239 1 235 8
4 MTPS 240 1 231 9
5 Neyveli TS1 0 0 0 0
6 Neyveli TS2 234 0 227 0
7 MAPS 233 -26 226 13
8 SR Pudur 230 kV 234 1 227 9
9 Kayathar 230 kV 238 1 231 10
10 Udumalpet 230 kV240 3 232 19
11 Trichy 230 kV 235 2 227 9
12 Theni 230 kV 232 1 223 7
13 Arani 230 kV 0 0 0 0
14 Singarapet 230 kV236 14 227 11
15 Thiruvarur 230 kV 232 1 226 10
16 Paramakudi 230 kV 230 1 220 8
17 Korattur 230 kV 236 0 232 0
18 Aliyar 230 kV 243 225