You are on page 1of 1

NEWS & NOTES

PERFORMANCE OF THERMAL POWER STATIONS DURING


DECEMBER 2018

Availability Plant Load


Power Station Unit Generation in MU
factor(%) Factor (%)

I (210 MW) 100.00 133.870 85.70

II (210 MW) 50.10 69.540 44.50


TTPS
III (210 MW) 96.40 134.360 86.00
(5 X 210 MW)
IV(210 MW) 0.00 0.000 0.00

V (210 MW) 100.00 139.270 89.10

STATION 69.30 477.040 61.06

I (210 MW) 81.27 116.042 74.27

MTPS-I II (210 MW) 100.00 142.062 90.93


(4x210 MW)
III (210 MW) 100.00 149.580 95.74

IV(210 MW) 100.00 142.039 90.91

STATION 95.32 549.723 87.96

I (210 MW) 54.68 59.975 38.39


NCTPS -I
II (210 MW) 100.00 142.200 91.01
(3 X 210 MW)
III(210 MW) 92.95 127.730 81.75
STATION 82.54 329.905 70.38

MTPS -II
I (600 MW) 80.58 278.320 62.35
(1x600 MW)

NCTPS-II I (600 MW) 81.82 311.195 69.71


(2X600 MW) II (600 MW) 98.86 372.052 83.34
STATION 90.34 683.247 76.53
..2..

2. GENERAL:

MTPS- NCTPS-
Sl.No. DETAILS TTPS MTPS-I NCTPS-I
II II
Sp. Coal
1 Consumption 0.718 0.713 0.703 0.692 0.730
(Kg/kwhr)
Sp. Oil
2 Consumption 0.670 0.359 0.160 0.577 0.490
(ml/kwhr)
Auxiliary
3 7.63 8.47 9.34 6.89 5.92
Consumption (%)

(Sd/- 19.01.2019)
Superintending Engineer / B.Th
For Chief Engineer / Mechanical
To Thermal Stations

The Tamil Development wing, HQ, Chennai


Copy to EA to CMD
Copy to EA to Director (Generation)
Copy to SE/ IT for website updation
Copy submitted to CE/ MTS