OF COAL BASED GENERATION OF RRVUNL (10.10.2022)

Constant Data Variable Data

Required Coal Required Working Available Coal Stock


Projects Technology Installed Capacity Normative per day for rakes per day Capacity as on Hourly Running Load as on date
Quantity Rakes Received at TPS
(MW) as on date Stock for 26 installed for installed date @ 09.00 (09:00 AM)
including No. of Days (For on 09.10.2022
Projects/Linkage days (MT) capacity (MT) capacity @ Hrs. (MW)
Bunker Coal Installed capacity)
@85% PLF 85% (MW)
(MT)
KaTPP, Kalisindh, (2x600) =1200
400000 14500 3.7 1200 13225 0.9 3 635
(Jhalawar) (PEKB)
(2x110+3x210+2x195)
KTPS (Kota) =1240 500000 17000 4.4 1030 69988 4.1 5 963
(SECL& NCL)
Sub Critical (2x250) =500
6500 1.65
CTPP (SECL)
300000 500 23540 1.8 2 358
Chhabra (Baran) (2x250) =500
6500 1.65
(PEKB)
STPS, Suratgarh (6x250)= 1500
500000 19000 4.9 750 50282 2.6 0 626
(Sriganganagar) (SECL & NCL)
CTPP-SC (2x660)= 1320
Chhabra-Super 400000 14500 3.7 1320 54874 3.8 3 840
Critical (Baran) (PEKB)

STPS-SC Super Critical (2x660)= 1320


Suratgarh-Super
400000 14500 3.7 660 114925 7.9 1 519
Critical,
(Sriganganagar) (PEKB)

Total 7580 25 LMT CIL 42500 10.95 5460 326834 3.5 14 3941
PEKB 50000 12.75
Total 92500 23.70

Total Rakes Rceived in RVUN (Avg last 7 Days)
- Coal linkage of CIL Linked (3240 MW)- Received 16.86 rakes per day (avg last 7 days) against 11.66 rakes per day as per FSA Received 16.86
- Coal linkage of PEKB Linked (4340 MW)- Received 0.00 rakes per day (avg last 7 days) against 8.0 rakes per day as per CMDA As per agreement 20
- Imported coal received 0.00 rakes per day (avg last 7 days)

-    Available Coal Stock as on 09.10.2022 Total Generation (in MU/MW) (09.10.2022)


(a)   CIL- 3.26 Lac MT (2.3 Days) (b) Own Coal Block (PEKB)- 0.00 Lac MT (0 Days) Power produce (Gross gen) 87.927 MU (3663.60 MW)
Self used (Aux Power Cons.) 8.229 MU (342.9 MW)
Net Sent-out Power 79.698 MU (3320.8 MW)
Ø  Due to Technical Reason:  (1210 MW)
o CTPP U#4 (250 MW) – Due to ESP structure damage. o STPS U#1 (250 MW) – Stator Earth Fault. o KTPS U#3 (210 MW) – Problem in seal oil flow of generator.
o CTPP U#3 (250 MW) – ESP problem. o STPS U#3 (250 MW) – boiler tube leakage.

Ø  Due to Annual Shut Down:  (660 MW)
o STPS U#7 (660 MW) – under Annual Shut Down.

Ø  On SLDC:  (250 MW)
o STPS U# 2 (250 MW) – SLDC