You are on page 1of 1

STATUS 

OF COAL BASED GENERATION OF RRVUNL (28.09.2022)

Constant Data Variable Data

Required Coal Required Working Available Coal Stock


Projects Technology Installed Capacity Normative per day for rakes per day Capacity as on Hourly Running Load as on date
Quantity Rakes Received at TPS
(MW) as on date Stock for 26 installed for installed date @ 09.00 (09:00 AM)
including No. of Days (For on 27.09.2022
Projects/Linkage days (MT) capacity (MT) capacity @ Hrs. (MW)
Bunker Coal Installed capacity)
@85% PLF 85% (MW)
(MT)
KaTPP, Kalisindh, (2x600) =1200
400000 14500 3.7 1200 48973 3.4 3 725
(Jhalawar) (PEKB)
(2x110+3x210+2x195)
KTPS (Kota) =1240 500000 17000 4.4 920 49919 2.9 4 983
(SECL& NCL)
Sub Critical (2x250) =500
6500 1.65
CTPP (SECL)
300000 500 28068 2.2 2 550
Chhabra (Baran) (2x250) =500
6500 1.65
(PEKB)
STPS, Suratgarh (6x250)= 1500
500000 19000 4.9 750 115069 6.1 2 697
(Sriganganagar) (SECL & NCL)
CTPP-SC (2x660)= 1320
Chhabra-Super 400000 14500 3.7 1320 68123 4.7 2 787
Critical (Baran) (PEKB)

STPS-SC Super Critical (2x660)= 1320


Suratgarh-Super
400000 14500 3.7 660 110084 7.6 1 443
Critical,
(Sriganganagar) (PEKB)

Total 7580 25 LMT CIL 42500 10.95 5350 420236 4.5 14 4185
PEKB 50000 12.75
Total 92500 23.70

Total Rakes Rceived in RVUN (Avg last 7 Days)
- Coal linkage of CIL Linked (3240 MW)- Received 12.43 rakes per day (avg last 7 days) against 11.66 rakes per day as per FSA Received 12.57
- Coal linkage of PEKB Linked (4340 MW)- Received 0.00 rakes per day (avg last 7 days) against 8.0 rakes per day as per CMDA As per agreement 20
- Imported coal received 0.14 rakes per day (avg last 7 days)

-    Available Coal Stock as on 27.09.2022 Total Generation (in MU/MW) (27.09.2022)


(a)   CIL- 4.20 Lac MT (2.8 Days) (b) Own Coal Block (PEKB)- 0.00 Lac MT (0 Days) Power produce (Gross gen) 97.299 MU (4054.1 MW)
Self used (Aux Power Cons.) 9.009 MU (375.4 MW)
Net Sent-out Power 88.280 MU (3678.3 MW)
Ø  Due to Technical Reason:  (1570 MW)
o CTPP U#4 (250 MW) – Due to ESP structure damage. o STPS U#1 (250 MW) – Stator Earth Fault. o KTPS U#3 (210 MW) – Problem in seal oil flow of generator.
o STPS U#4 (250 MW) – Flame failure. o STPS U#3 (250 MW) – steam leakage. o KTPS U#2 (110 MW) – Low vaccume.
o CTPP U#2 (250 MW) – Electrical Protection (Clearance awaited from Bhilwara, RVPN).
Ø  Due to Annual Shut Down:  (660 MW)
o STPS U#7 (660 MW) – under Annual Shut Down.