You are on page 1of 1
MATERIALS E -NGINEER REVIEWER Revision 2 96. volume: 8) Plastic mit D) Liquid tit ©) Shrinkage timit ) Credit unit {s the bmit were {mit were futher loss of water due to evaporation which wil not result in reduction of onset et mie nm matt 5 sec ‘98. Failed samples does not necessary mean that the structure it represents defective why? a) Maybe sampling is incorrect b) Maybe sampling is correct ©) Maybe curing is correct dd) Maybe testing is correct 99. Before the project starts the Materials Engineer or the technician must have a program on how many samples for each item of work should be tested based on the minimum testing requirements. What program or reports this? a). Program of work b) Program of activities ) Quality contro! activities 4) Quality control program 4100. As the work progresses the Materials Engineer should know how many samples has been submitted and tested and how many samples are to be submitted, in other words the Materials Engineer must refer to what report so that he/she may be updated on the balance and on file quality test of the construction ‘materials being used in the project? a). Quality control assurance report b)_ Quality control program ¢) Status of Test d) None of the above Foranswer references and adaional otes watch MATERIALS ENGINEER REVIEWER on YouTube chan ies mace a IWER on YouTube channel Engineering Ch Integrity

You might also like