You are on page 1of 1

Diriyah Gate Development Authority

Design & Development Division


Health & Safety Department
Date from: 04-DECEMBER-2021 TO: 9-DECEMBER -2021
Project Name: Diriyah Art Oasis
Main Contractor Name : MARCO
Supervision Consultant Name : Saud Consultant / Arcadis
No Description Week No (86)
1 Fatality On Job (FAT) 0
2 Lost Time Injury/Illness Report (LTI) 0
3 Restricted Duty Incident (RDI) 0
4 Medical Treatment Case (MTC) 0
5 First Aid Injury 0
6 Motor Vehicle Accident (MVA) 0
7 Motor Vehicle Accident Fatality (MVA Fat) 0
8 Near Miss Report 3
9 Off-Job Injury 0
10 Incidents or Damage To Property (IDTP) 0
11 Fire 0
12 Incidents Involving Damage to DGDA Equipment 0
13 Crane, Heavy Equipment & Manlift Accidents 0
14 Environmental Incidents 0
15 Positive Safety Observations 2
16 Negative Safety Observations 24
17 Safety Meeting 2
18 HSE Training/Certification 1
19 Emergency Drills 0
20 TBT (Toolbox Talk) 5
21 Manpower (Actual Physical Head Count) 337
22 Construction Man-hours during The Week 16,176
23 Safe Man-hours during The Week 16,176
24 Main Contractor: HSE Manager/Deputy 1
25 Main Contractor: Safety Supervisors/Superintendent 0
26 Main Contractor: Safety Officers/Inspectors 3
27 Main Contractor: HSE Saudis 4
28 Main Contractor: Nurse/Doctor ; If required 1
29 Main Contractor: First Aiders 9
30 Main Contractor: Environmental Coordinator; If required 0
31 Sub-Contractor: HSE Manager 0
32 Sub-Contractor: HSE Officer 0
33 Sub-Contractor: HSE Saudis 0
34 Sub-Contractor: Nurse/Doctor; If required 0
35 Sub-Contractor: First Aiders 0

Submitted by: TABREJ ALAM


cc: DGDA Project Director Contractor HSE Manager

You might also like