Gas Cutting Set Inspection Report

Onshore Construction Company Pvt. Ltd.


NEW VPS & DHT REVAMP WORKS, MREP, HPCL, Mumbai. Month:
G/C Set No: G/C Set No: G/C Set No: G/C Set No: G/C Set No: G/C Set No: G/C Set No: Remarks
Location: Location: Location: Location: Location: Location: Location:
Sl Description of Check Points
No OK NOT OK NOT OK NOT OK NOT OK NOT OK NOT OK NOT
OK OK OK OK OK OK OK
1 Gas cylinder to be kept on trolley and
chained
2 Gas cylinder to have valve cap
3 ISI mark regulator with double gauge.
4 Hose with ISI mark and without any
joint and damage.
5 Flash back arrestor on both end with
ISI/CE/EN mark
6 Fire extinguisher (ABC) type available
nearby job.
7 Sparking lighter must be available with
gas cutter.
8 Soap liquid available with cylinder
trolley for leak test
9 Gas cutter have proper PPEs.
10 Gas cutter have adequate knowledge.
11 HPCL inspection tag.
12 Any Other
13 Checked by Gas cutter
14 Inspected by Job Engineer/ Supvr.
15 Witnessed by HSE Officer/Supervisor
Remarks