2. PREPRATION OF ACCESS FOR JCB / POCKLAIN MOVEMENT. 3. CUTTING OF SOIL WITH THE JCB / POCKLAIN BUCKET. 4. LOADING OF EXCAVATED SOIL IN TO DUMPER. 5. EXCAVATED SOIL IS SHIFT BY DUMPER AND STACK AWAY FROM WORK PLACE.
HAZARD: -
1. BURRIED CABLE AND PIPE LINE.
2. THE JCB / POCKLAND BUCKET MAY STRIKE TO ANY PERSON AND CAUSE INJURY. 3. THE SOIL MAY COLLAPES. 4. THERE IS CHANCE OF ELECTRIC SHOCK DUE TO OVERHEAD CABLE.
SAFETY PRECATION: -
1. BEFORE STARTING WORK INSURE THAT THERE IS NO
UNDERGROUND ELECTRIC CABLE OR PIPELINE. 2. BARRICATION SHOULD BE DONE TO AVOID THE PERSON OR ANY VECHILE COME IN THE REACH OF JCB / POCKLAIN BUCKET. 3. PROPER GROUND LEVEL SHOULD BE PROVIDED FOR STABILITY OF JCB. 4. OVER HEAD CABLE SHOULD BE OUT OF REACH OF JCB / POCKLAIN BUCKET