You are on page 1of 1

Checklist For Mobil Crane Doc Number: VTP-EHS-CL-24

Project Name:
Equipment No. Date of Insception :
Location: Next Due Date:
9
5

7
6

CONTRACTOR NAME- CHECK ITEMS DATE OF CHECK-

Sl .No Check items OK Not OK REMARKS


1 Safety latch in hook.

2 Hoist limit switch (Or presence of plate).

3 SWL marked in crane.

Wire rope and slings free from tolerable


4 damage( No kinks, broken wires more
than 10% is N.G).

5 No oil leak in hydraulic parts (piston drums).

No Damage in Tire ( Crack, cut, air


6
pressure etc).

7 Head and tail lamps (for night working).

8 Front and reverse horn.

Boom structure condition while full


9 expansion (damage, crack and jamming
while extending).

10 Fire extinguisher in operator cabin.


11 DOCUMENTS:
11.a Third party certificate(Form 32)
11.b Vehicle valid insurance
11.c Operator license (heavy duty).
11.d Road tax
NAME SIGNATURE
Chkd by Operator and P&M in charge

Checked by Safety Officer

You might also like