You are on page 1of 3

Welding Machine Inspection Report Doc.No.

RE/HSE/WMIRM/FM 318

- Monthly Date issued: 10/02/2011

Project Name: GCS Revision No. 000

Equipment No: Month:

Location: Date:
Sr.
Items for checking Findings Remarks
No.

1 Leakages

2 ELCB

3 Earthing Cable Available

4 Tyres of the Machine

5 WM Stand

6 Exhaust

7 Cable Condition

8 Color Code

9 Others

10

11

12

13

14

15

Additional Comments:

Checked by Name Signature

Verified by Name Signature

RE318 - 0

Page 1 of 3
Doc.No. RE/HSE/WMIRM/FM 318
Welding Machine & Powere Generator
Inspection Report - Monthly Date issued: 10/02/2011

Project Name: Revision No. 000

Equipment No: Month:

Location: Date:
Sr.
Items for checking Findings Remarks
No.
1 Leakages

2 ELCB

3 Earthing Cable Available

4 Tyres of the Machine

5 WM Stand

6 Exhaust

7 Cable Condition

8 Color Code

9 Others

10

11

12

13

14

15

Additional Comments:

Checked by Name Signature

Verified by Name Signature


RE318 - 0

You might also like