You are on page 1of 1

INCREASE EAST WEST PIPELINE CAPACITY Project No.

: BI-10-01214
Water Tanker Daily Inspection Checklist

Contractor:- Petrojet Sub-Contractor:- Month:- Year :-


Equipment : WATER TANKER
Operator Name: Optr. Cert#: Equipment No. / ID: Rated Capacity:
SN. Item Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 Operator has valid authorization license
2 Equipment has valid certificate of inspection
3 Equipment body in good condition and clean
4 Any Leaks (Specify)
5 All Covers and Guards
6 Transmission Oil Level
7 Engine Oil level
8 Hydraulic Oil Level
9 Coolant
10 Diesel & water Levels
11 PWAS and Camera condition
12 Side Mirrors
13 Beacon light
14 First Aid box
15 Fire extinguisher (UL/FM listed)
16 Brakes Conditions
17 Battery Condition
18 High beam ight
19 Low Beam Light
20 Indicators
21 Windscreen
22 Wipers
23 Wiring Condition
24 Backup Audible Alarm
25 Seat Belt
26 Isolation Mechanism (Key System Function)
27 Horn
Recommendation : Operator shall turn off and isolate the heavy equipment when he keeps the key himself.
Checked By: Signature Remarks

You might also like