You are on page 1of 1

DOWNSTREAM PIPELINE HARDAH INCREMENT (HUG2) PROJECT

CONTRACT No: 660004075 BI: 10- 02142

Equipment ( Excavator- Loader-Bobcat-Bulldozer-JCB-Grader- Fork Lift) Checklist


Contractor:- ENPPI Last Month Meter Reading: Current Reading: Total KM Run: Month:
Operator Name: Equipment Type: Equipment No. / ID:
SN. Item Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Work Operation Time (Hrs.)
1 Operator has valid authorization certificate
2 Equipment has valid certificate of inspection
3 Equipment body in good condition and clean
4 Tires Pressure and condition
5 Any Leaks (Specify)
6 Wheel Nuts & Rims
7 Cage & Enter. Handrails
8 Counter Weight ( if applicable)
9 Bucket Cylinder
10 Boom Cylinder
11 Transmission Oil Level
12 Engine Oil level
13 Hydraulic Oil Level
14 Diesel & water Levels
15 Hydraulic Pipes
16 Control Levers
17 Gauges & Lights
18 Outriggers fully extended and pads available
19 Mirrors
20 Petrol Level
21 Brakes Conditions
22 Wire ropes condition
23 Fire extinguisher
24 Brakes Conditions
25 Equipment PWAS and Sencer

Checked By: Remarks

Operator Name& Signature Supervisor Name& Signature

You might also like