Professional Documents
Culture Documents
1
JCB OIL & GAS SERVICES SDN BHD (525411-V)
2
JCB OIL & GAS SERVICES SDN BHD (525411-V)
3
JCB OIL & GAS SERVICES SDN BHD (525411-V)
4
JCB OIL & GAS SERVICES SDN BHD (525411-V)
Chart (Please State Chart No, Year of Publication & Last Corrected Notice Number)
Chart No. Year Pub. Last Chart No. Year Pub. Last
Correction Correction
5
JCB OIL & GAS SERVICES SDN BHD (525411-V)
6
JCB OIL & GAS SERVICES SDN BHD (525411-V)
7
JCB OIL & GAS SERVICES SDN BHD (525411-V)
8
JCB OIL & GAS SERVICES SDN BHD (525411-V)
9
JCB OIL & GAS SERVICES SDN BHD (525411-V)
4 Life raft 25 Men (Port & Starboard) 8 UNIT DECEMBER 2016 AUGUST 2018
Date Last
Emergency Drills/HSE Meeting Remarks
Conducted
1 Fire Drill 18 MARCH
2016
2 Abandon Ship Drill 18 MARCH
2016
3 Man overboard Drill 18 MARCH
2016
4 Rescue Boat/FRC Drill
5 Steering Gear Drill
6 Oil Pollution Drill (SOPEP)
7 Power Failure Drill 06 MARCH
2016
8 Collision/Grounding Drill 06 MARCH
2016
9 Safety/HSE Meeting 06 MARCH
2016
10
JCB OIL & GAS SERVICES SDN BHD (525411-V)
11
JCB OIL & GAS SERVICES SDN BHD (525411-V)
12
JCB OIL & GAS SERVICES SDN BHD (525411-V)
13
JCB OIL & GAS SERVICES SDN BHD (525411-V)
14
JCB OIL & GAS SERVICES SDN BHD (525411-V)
15
JCB OIL & GAS SERVICES SDN BHD (525411-V)
Soft Moorings
Size Qty Condition Size Qt Conditi
y on
MOORING 48 MM 3 SET
ROPE SATISFACTO
RY
16
JCB OIL & GAS SERVICES SDN BHD (525411-V)
Deck/Hull/Superstructure Condition/Remarks
1 Boat Transfer Area SATISFACTORY
2 Boat Landing (P & S) SATISFACTORY
3 Fendering SATISFACTORY
4 Paint Work SATISFACTORY
5 Wood on Aft Deck SATISFACTORY
6 Railing/Bulwark SATISFACTORY
7 Crash Rails
8 Deck Lighting SATISFACTORY
9 Ventilators SATISFACTORY
10 Water Tight Door & Hatches SATISFACTORY
17
JCB OIL & GAS SERVICES SDN BHD (525411-V)
Chief Signature
Engineer’s :
Name:
18
JCB OIL & GAS SERVICES SDN BHD (525411-V)
19