You are on page 1of 1

Revision : 0 – Date : 12.01.

2012
SMS FORM NO. COMP / 006
Page 1 of 1

DRILL PROGRAMME FOLLOW SHEET


VESSEL NAME : MV IRMAK S Year 2014
SAFETY DRILLS SOPEP DRILLS
Drill item                       Interval         Flooding of compartments (FO) Explosion (E)      
Fire in accomodation (FA), Fire in Engine room (FE), Fire on deck (FD) Once in every 1,5 months  Unexpected list of the ship (UL) Medical matter injurj (MI)
Oil Spill Once in every Month Grounding (G)   Jettissoning of cargo (JC)
Emergency lightening (EL), Rescue from Enclosed Space (RE) Once in every 3 months Collision (C)   Piracy and robbery (PR)  
Manoverboard (M) Once in every month  
Steering gear drill (SG)                   Once in every three month      
Abandon ship drill (AS)                 Twice in every month                            
Abandon ship drill WITH LAUNCHING OF LIFE BOAT(AS)   Once in every three month * Ship-office combine drill              
Year 2014
Month                                                              
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
January
February
March
April
May
June
July
August
September
October
November
December

Not : 1. The drill can be postponed to the nearest date if the vessel is under cargo operation or in unusual weather condition.
2. (*) means; the drill will be carried out together with the main office.
3. The Abandon and firedrills' shall take place if more than 25% of the crew did not participate in abandon and fire drills the previous month.
4. It is neccessary to take the confirmation of the company before carry out of each conbined drill so as not to cause a confusion.

You might also like