Professional Documents
Culture Documents
VESSEL'S NAME :
IMO No. :
DATE OF SURVEY :
PLACE OF SURVEY :
SURVEYOR'S NAME :
SIMSL Report ID: Date:
2. IMO number
5. Vessel type
Gross Tonnage
7. Dimensions (L x B x D)
Summer Draft (d)
9. Trading area
Captain’s name
13.
Owner's / Manager’s Superintendent
Remarks:
Remarks:
SIMSL Report ID: Date:
a) Windlass, winches a)
b) Mooring ropes/wires b)
6. Cargo pumps
Remarks:
SIMSL Report ID: Date:
Particular attention is to be afforded to the general cleanliness of machinery spaces and safety/housekeeping
aspects.
3. Main/Auxiliary
Boiler(s)/Economisers/Heaters: type /
number / working pressure / visual
condition.
4 (a)
Fuel change over procedures available
and crew familiar?
c) Thruster control/Local(tested) c)
Remarks:
A4. Certification, Surveys and Record Books
Last Annual /
Certificate Type Date of Issue Date of Expiry
Intermediate
Last Annual /
Certificate Type Date of Issue Date of Expiry
Intermediate
19.a)
International Anti-Fouling
N/A N/A
Certificate
31. Stability:
Remarks:
A5. Personnel
1. Master
2. Deck Officers
Engineer
3. N/A
Officers
4. Radio Officers
5. Other Officers
Engine Room
7. N/A
Crew
Minimum
9. Manning Complies: Yes / No Date of issue:
Certificate
a) Galley: a)
a. Clean a.
b. Free of infestations b.
c. Grease traps clean c.
d. Fridges / freezers / stores d.
i. Cleanliness i.
ii. Temperatures ii.
Remarks:
B. SAFETY
Required 1st Jul 2016 - (SOLAS Chap XI-1 Reg. 7 testing enclosed spaces
prior to entry)
8.
A. Portable gas meters:
a) Type a)
b) Number b)
a) Type a)
b) Number b)
a) Specific to vessel? a)
15.
Records of recent risk assessment?
Remarks:
C. NAVIGATION AND COMMUNICATIONS
C1. Navigation
NOTES: 1. State where items are not fitted or not fully operational
2. State where items have been exempted by flag state
ARPA Y N Radar Y N
Frequency of errors? c)
Remarks:
C2. Communications
Equipment operational?
a) Distress operation? a)
2. Handheld Radios:
Working Sets
GMDSS Sets
(Spare Batteries & Chargers?)
Remarks:
SIMSL Report ID: Date:
D. SHIPBOARD MANAGEMENT
1. ISM System:
• Issuing Authority? •
• Date of issue? •
• Annual endorsement in date? •
• Expiry date? •
• Issuing Authority? •
• Date of issue? •
• Date of intermediate audit? •
• Expiry date? •
• Issuing Authority? •
• Date of issue? •
• Date of intermediate audit? •
• Expiry date? •
Part l Part l
• Issuing Authority? •
Part ll Part ll
• Issuing Owner or Ship Manager? •
a) Deck a)
b) Engine room b)
4. Garbage/Refuse Disposal:
MARPOL 73/78 Annex V
5. Bunkering Bunkering
d) Scupper plugs? d)
a) Operation tested? a)
a) Convention compliance: a)
• Compliance required? •
• Issue date •
• Expiry date •
Remarks:
E. SHIPBOARD SECURITY
• Issuing authority? •
• Date of Issue? •
• Date of intermediate survey? •
• Date of expiry? •
2. Ro/Ro Security:
4. Cyber Security
Remarks:
F. CARGOWORTHINESS (DRY CARGO)
State cargoworthiness tests conducted during the survey and results of all tests:-
9. Container capacity:
Remarks:
SIMSL Report ID: Date:
Date(s) of loading
Remarks:
SIMSL Report ID: Date:
H. CARGOWORTHINESS (TANKERS)
State cargoworthiness tests conducted during the survey and results of all tests:
a) Hawsers: a) Type
a. Manufacturer a.
b. Change out programme? b.
i. FSO Mooring i. Yes / No
ii. Offtake Tanker ii. Yes / No
c. Last change out? c.
i. FSO Mooring i.
ii. Offtake Tanker ii.
Remarks:
Surveyor to attach a copy or sketch of cargo tanks and pipeline system layouts.
I. CARGOWORTHINESS - PCTC, PCC and Ro-Ro (Passenger** and Freight)
**Complete Part “L” of checklist – for passenger areas of Ro-Ro Passenger Ferries.
I.1 Shell Openings – Bow Visor / Outer Bow door / Inner Bow door / Bow Ramp / Stern
Ramp / Quarter Ramp / Side Ramp / Pilot doors / Bunker doors
Remarks:
Remarks:-
Remarks:
Surveyor to request opening and closing operation of shell openings as considered appropriate.
J. OFFSHORE VESSELS – Inc. BARGES, ANCHOR HANDLING TUG SUPPLY,
PLATFORM SUPPLY, TUG, S-LAY PIPELAYERS & WORKOVER / INSTALLATION
VESSELS
1. Barges
4. S-Lay Pipelay
5. Dynamic Positioning
a) DP class? a)
d) Last FMEA? d)
a) Any modifications since last FMEA? a.
b) New FMEA undertaken? b.
b) Helidecks:- b)
Internal & external nets, perimeter lights,
windsock & floodlights, aeronautical radios,
helideck markings, firefighting appliances,
refuelling & hanger facilities?
Remarks:
K. SUPER / MEGA AND GIGA YACHTS
2. Helidecks – check:
• Internal and external nets
• Perimeter lights
• Windsock
• Floodlights
• Aeronautical radios
• Markings
• Firefighting appliances
• Refuelling or hanger facilities
Remarks:
SIMSL Report ID: Date:
2. Fire Bulkheads:
3. Sprinkler System:
5. Fire Detection:
Remarks:
L.2 Life Saving
1. Emergency Organisation:
Remarks:
SIMSL Report ID: Date:
f) Audible Alarm g)
Remarks:
SIMSL Report ID: Date:
Remarks:
Remarks:
M. LIQUIFIED PETROLEUM GAS CARRIERS
b) Coverage effective? b)
Remarks:
M.2 Inert Gas System
Remarks:
SIMSL Report ID: Date:
Remarks:
SIMSL Report ID: Date:
Remarks:
SIMSL Report ID: Date:
Remarks:
M.6 Planning
Available on board?
Remarks:
This report, and any accompanying documentation or photographs, has been compiled for the
sole use of the Association for insurance purposes only. It should not be disclosed to any third
parties without prior written permission from the Association.
The information contained in this report, and any accompanying documentation or photographs,
is not exhaustive as to the general condition of the ship and should not be relied upon by
members or by any other party as any assurance, representation or warranty as to the condition
of the ship and nothing herein shall prejudice the Club’s rights under the insurance policy, in the
event of a dispute between the Club and the member relating to the condition of this ship.
SIMSL Report ID: Date:
PORT: DATE:
LIST OF DEFICIENCIES
Notes:
A. Leave 1 copy onboard with the Master & attach 1 copy to the summary & formal
reports. B. Add more rows as required.
C. For follow-up surveys the status of all defects, recommendations and outstanding tests &
requirements is to be noted as either COMPLETED, IN PROGRESS or OUTSTANDING
D. All deficiencies that present a claims risk to the Club are to be noted as Defects. These to be rectified to the satisfaction of the Club.
SECT.
NO. DEFECTS REMEDIAL ACTION REQUIRED
REF1.
E. All outstanding tests, requirements and inspections are to be noted as such and not as defects.
TOTALS:
Defects
Tests/Requirements
Observations
A B C D
1
2
3
4
5
6
7
8
9
10
1
– Sect Ref numbers to reference back to Summary report format.
SIMSL Report ID: Date:
Photographs