Abdelrahman Abounar Final (WF-060769) CP06-Material Submittal for Floo… 1:13 PM

KEO INTERNATIONAL CONSULTANTS WORKFLOW TRANSMI… KEO-IC-WTRAN-063521

Expo Village Development


DWTC
Dubai
United Arab Emirates

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Workflow Transmittal KEO-IC-WTRAN-063521 KEO-IC-WTRAN-063521

Final (WF-060769) CP06-Material Submittal for Floor Panels for Lower


Roof; Supply & Installation by M/s Exeed Litecrete

From Mr Abdelrahman Abounar - KEO International Consultants

To (13) Mr Ajith Nair - China State Construction Engineering Corporation Middle East (+12 more...)

Cc (21) Mr Arvind Ramaganapathy - AECOM (+20 more...)

Sent Thursday, 30 May 2019 1:13:01 PM GST (GMT +04:00)

Status N/A

DOCUMENT ATTACHMENTS (1)

(0 selected)

Revision
File Document No Revision Title Status
Date

PN1502-CP06- Material Submittal for Floor Panels


B - Approved
MAS-AR-CSC- 00 23/05/2019 for Lower Roof; Supply &
As Noted
00275 Installation by M/s Exeed Litecrete

MESSAGE

Workflow Review History

The attached documents have completed the "CP06-Material Submittal for Floor Panels for Lower Roof; Supply & Installation by
M/s Exeed Litecrete" workflow with the following results :

This transmittal was automatically generated.

Doc No Step Participant Comments


Review
Outcome

PN1502-CP06-
KEO SUS Review B - Approved No objection for Sustainability subject to
MAS-AR-CSC- C Makhol
Duration 6 Days As Noted compliance with project spec.
00275

Letter related to Environmental compliance


KEO ENV Review
L Dahdah A - Approved is noted. No additional environmental
Duration 6 Days
comments.

KEO Lead Review B - Approved


A Abounar
Duration 4 Days As Noted
CP06 EXPO VILLAGE
SUPPLEMENTAL COMMENTS
Contract Title: CP06 Reference: PN1502-CP07-MAS-AR-CSC-00275
Contract No: SA14 - PARCEL 10 & 11 Revision: 00
Subject: Material Submittal for Floor Date: 23/05/2019
Panels for Lower Roof; Supply &
Installation by M/s Exeed
Litecrete

Company: KEO International Consultants Name: Abdelrahman Abounar

Comments:

No. KEO Comments Contractor’s Reply


1 AAC Panels to be properly secured in position. the
details provided in the technical data sheet, submitted
via email and attached herewith, can be followed.

2 Subject to obtain approval for all relevant Shop drawings.


3
KEO ENV Comment: Code A - Approved
Letter related to Environmental compliance is noted. No
additional environmental comments.
4
KEO SUS Comment: Code B - Approved as Noted,
No objection for Sustainability subject to compliance with
project spec

Action: Status A: Approved


Status B: Approved with Comments. Subject to Incorporation of all comments as noted
Status C: Revise and Resubmit