Professional Documents
Culture Documents
Kurva S Tahap I CTP 15112022
Kurva S Tahap I CTP 15112022
I CCTV
A CAMERA & ACCESSORIES
1 Kamera PTZ Unit 2 34,000,000 68,000,000 1.17 2 1.17 68,000,000 0 - - 2 1.17 68,000,000 0 - 0
2 Bracket PTZ Unit 2 2,500,000 5,000,000 0.09 2 0.09 5,000,000 0 - - 2 0.09 5,000,000 0 - 0
3 Kamera Fixed Unit 13 19,000,000 247,000,000 4.24 9 2.93 171,000,000 0 - - 9 2.93 171,000,000 4 1.30 76,000,000
4 NVR Kapasitas 4 TB x 4 (16 Port) unit 4 84,500,000 338,000,000 5.80 4 5.80 338,000,000 0 - - 4 5.80 338,000,000 0 - 0
5 Switch 8 Port (Gigabit) Unit 15 2,750,000 41,250,000 0.71 9 0.42 24,750,000 0 - - 9 0.42 24,750,000 6 0.28 16,500,000
6 Patch Core FO buah 30 350,000 10,500,000 0.18 22 0.13 7,700,000 0 - - 22 0.13 7,700,000 8 0.05 2,800,000
7 Pigtail buah 30 250,000 7,500,000 0.13 22 0.09 5,500,000 0 - - 22 0.09 5,500,000 8 0.03 2,000,000
8 Kabel UTP meter 150 20,000 3,000,000 0.05 110 0.04 2,200,000 0 - - 110 0.04 2,200,000 40 0.01 800,000
9 RJ 45 buah 30 10,200 306,000 0.01 22 0.00 224,400 0 - - 22 0.00 224,400 8 0.00 81,600
10 Converter fiber optik unit 10 2,150,000 21,500,000 0.37 8 0.29 17,200,000 0 - - 8 0.29 17,200,000 2 0.07 4,300,000
11 Converter fiber optik (MM) 210 unit 20 2,750,000 55,000,000 0.94 14 0.66 38,500,000 0 - - 14 0.66 38,500,000 6 0.28 16,500,000
12 Mikrotik Router RB750Gr unit 15 2,000,000 30,000,000 0.51 0 0.00 - 0 - - 0 - 0 15 0.51 30,000,000
B JARINGAN
Kabel fiber optik & Instalasi meter 7500 94,500 708,750,000 12.15 3932 6.37 371,574,000 0 - - 3932 6.37 371,574,000 3568 5.78 337,176,000
Subduct
C PANEL BOX
1 Panel box CCTV buah 15 1,750,000 26,250,000 0.45 7 0.21 12,250,000 0 - - 7 0.21 12,250,000 8 0.24 14,000,000
2 Terminal Listrik buah 15 300,000 4,500,000 0.08 11 0.06 3,300,000 0 - - 11 0.06 3,300,000 4 0.02 1,200,000
3 Bracket Extended buah 15 120,000 1,800,000 0.03 11 0.02 1,320,000 0 - - 11 0.02 1,320,000 4 0.01 480,000
4 Instalasi Listrik + Material titik 15 205,000 3,075,000 0.05 11 0.04 2,255,000 0 - - 11 0.04 2,255,000 4 0.01 820,000
5 Gembok buah 15 95,000 1,425,000 0.02 0 0.00 - 0 - - 0 - 0 15 0.02 1,425,000
D GROUNDING
1 Grounding system titik 15 2,500,000 37,500,000 0.64 0 0.00 - 0 - - 0 - 0 15 0.64 37,500,000
2 Sewa Crane ls 1 10,000,000 10,000,000 0.17 1 0.17 10,000,000 0 - - 1 0.17 10,000,000 0 - 0
II VMS
BIAYA PEKERJAAN
A. Peralatan VMS
1 3 Color VMS Board (P16)- 8m x 2m (Main Road) Unit 0 490,088,513 - - 0 0.00 - 0 - - - 0 0 - 0
2 3 Color VMS Board (P16) - 6m x 2m (Gerbang) Unit 1 375,057,927 375,057,927 6.43 1 6.43 375,057,927 0 - - 1 6.43 375,057,927 0 - 0
###
B. Rangka VMS ###
Rangka VMS Akses Gerbang (L=40 m) Unit 1 1,851,845,799 1,851,845,799 31.76 1 31.76 1,851,845,799 0 - - 1 31.76 1,851,845,799 0.00 - 0
Rangka VMS Main Road (L=16,8 m) Unit 310,447,513 - - 0 0.00 - 0 - - - 0 0 - 0
Rangka VMS Akses gerbag (L=21 m) Unit 369,202,104 - - 0 0.00 - 0 - - - 0 0 - 0
PROGRESS PEKERJAAN PENGADAAN, PEMASANGAN DAN PEMELIHARAAN
CLOSED CIRCUIT TELEVISION(CCTV) DAN VARIABLE MESSAGE SIGN(VMS)
PADA RUAS JALAN TOL CIBITUNG CILINCING
TAHAP 1(SEGMEN CIBITUNG - TELAGA ASIH)
No. Kontrak : CTP-ADM-CTR-IX-2019-MMP-00001 Tanggal 23 September 2019
No. SPMK : 056/CTP/DIR/II/2020 tanggal 4 Februari 2020
No. Addendum I : CTP-ADM-CTR-II-2021-MMP-00002 Tanggal 1 Februari 2021
No. Addendum II : CTP-ADM-CTR-V-2021-MMP-00003 Tanggal 24 Mei 2021
1 Integrasi Sistem ls 1 200,000,000 200,000,000 3.43 1 3.43 200,000,000 0 - - 1 3.43 200,000,000 0.0 - 0
2 Integrasi VMS - FO Backbone Unit 1 30,000,000 30,000,000 0.51 1 0.51 30,000,000 0 - - 1 0.51 30,000,000 0.0 - 0
3 Instalasi Jaringan Listrik VMS Unit 1 40,000,000 40,000,000 0.69 1 0.69 40,000,000 0 - - 1 0.69 40,000,000 0.0 - 0
4 Server VMS - Type Rack Unit 1 70,000,000 70,000,000 1.20 0 0.00 - 0 - - 0 - 0 1 1.20 70,000,000
5 PC Workstation untuk Monitoring Unit 1 20,000,000 20,000,000 0.34 1 0.34 20,000,000 0 - - 1 0.34 20,000,000 0 - 0
6 RJ-45 Surge Protector Unit 1 3,500,000 3,500,000 0.06 1 0.06 3,500,000 0 - - 1 0.06 3,500,000 0 - 0
7 UTP Cable CAT 5e rolls 1 2,500,000 2,500,000 0.04 1 0.04 2,500,000 0 - - 1 0.04 2,500,000 0 - 0
8 RJ-45 Connector box 1 1,000,000 1,000,000 0.02 1 0.02 1,000,000 0 - - 1 0.02 1,000,000 0 - 0
9 Switch Hub 3com 8 Port units 2 32,500,000 65,000,000 1.11 0 0.00 - 0 - - 0 - 0 2 1.11 65,000,000
10 Box Panel 50x60x20cm Outdoor units 2 3,000,000 6,000,000 0.10 2 0.10 6,000,000 0 - - 2 0.10 6,000,000 0 - 0
11 Rak Server 42U units 1 23,000,000 23,000,000 0.39 1 0.39 23,000,000 0 - - 1 0.39 23,000,000 0 - 0
12 Pemasangan CCTV untuk VMS units 1 5,000,000 5,000,000 0.09 1 0.09 5,000,000 0 - - 1 0.09 5,000,000 0 - 0
BIAYA PELATIHAN DAN PELAPORAN
1 Biaya Pelatihan ls 1 15,000,000 15,000,000 0.26 0 0.00 - 0 - - 0 - 0 1 0.26 15,000,000
2 Dokumentasi / Pelaporan 0 0.00 - 0 - - -
a. Laporan Pendahuluan set 1 750,000 750,000 0.01 0 0.00 - 0 - - 0 - 0 1 0.01 750,000
b. Laporan Final set 1 1,000,000 1,000,000 0.02 0 0.00 - 0 - - 0 - 0 1 0.02 1,000,000
c. Training Kit set 1 2,000,000 2,000,000 0.03 0 0.00 - 0 - - 0 - 0 1 0.03 2,000,000
d. Flash Disk 16 GB unit 1 500,000 500,000 0.01 0 0.00 - 0 - - 0 - 0 1 0.01 500,000
III TV WALL
1 Peralatan Display TIC lot
- LG HDTV TV WALL 47" unit 9 60,000,000 540,000,000 9.26 0 0.00 - 0 - - 0 - 0 9 9.26 540,000,000
- Bracket unit 9 450,000 4,050,000 0.07 0 0.00 - 0 - - 0 - 0 9 0.07 4,050,000
- Decoder Splitter (ATEN) unit 1 5,000,000 5,000,000 0.09 0.5 0.04 2,500,000 0 - - 0.5 0.04 2,500,000 0.5 0.04 2,500,000
- Instalasi ls 1 10,000,000 10,000,000 0.17 0.5 0.09 5,000,000 0 - - 0.5 0.09 5,000,000 0.5 0.09 5,000,000
IV T I C
A Telepon TIC
Pekerjaan Perancangan, Perijinan, Pengadaan,
1 dan Line 2 10,000,000 20,000,000 0.34 2 0.34 20,000,000 0 - - 2 0.34 20,000,000 0 - 0
Pemasangan Nomor Telepon untuk TIC
Pekerjaan Perancangan, Perijinan, Pengadaan,
dan
2 Line 0 10,000,000 - - 0 0.00 - 0 - - 0 - 0 0 - 0
Pemasangan Nomor Telepon untuk Kantor
Operasi
3 Biaya Langganan Telepon Tahun 2.5 14,400,000 36,000,000 0.62 1 0.25 14,400,000 0 - - 1 0.25 14,400,000 1.5 0.37 21,600,000
B Pekerjaan
Jaringan Internet
Pengadaan Perancangan Sistem
1 Jaringan ls 1 150,000,000 150,000,000 2.57 0 0.00 - 0 - - 0 - 0 1 2.57 150,000,000
Internet
2 Paket dan HotspotInternet
Pemasangan Kantor Operasi Paket 3 5,000,000 15,000,000 0.26 2 0.17 10,000,000 0 - - 2 0.17 10,000,000 1 0.09 5,000,000
3 - Langganan Jaringan Internet 100mbps Lt.1 Tahun 5 30,000,000 150,000,000 2.57 1 0.51 30,000,000 0 - - 1 0.51 30,000,000 4 2.06 120,000,000
- Langganan Jaringan Internet 100mbps Lt.2 Tahun 5 30,000,000 150,000,000 2.57 0 0.00 - 0 - - 0 - 0 5 2.57 150,000,000
- Langganan Jaringan Internet 100mbps Lt.3 Tahun 5 30,000,000 150,000,000 2.57 0 0.00 - 0 - - 0 - 0 5 2.57 150,000,000
PT. Cibitung TanjungPriok Port PT. VIRAMA KARYA PT. MANIKAM MEGA PERSADA ###
Tollways
No. Kontrak : CTP-ADM-CTR-IX-2019-MMP-00001 Tanggal 23 September 2019
a
I CCTV
A CAMERA & ACCESSORIES
1 Kamera PTZ
2 Bracket PTZ
3 Kamera Fixed
4 NVR Kapasitas 4 TB x 4 (16 Port)
5 Switch 8 Port (Gigabit)
6 Patch Core FO
7 Pigtail
8 Kabel UTP
9 RJ 45
10 Converter fiber optik
11 Converter fiber optik (MM) 210
12 Mikrotik Router RB750Gr
B JARINGAN
Kabel fiber optik & Instalasi
Subduct
C PANEL BOX
1 Panel box CCTV
2 Terminal Listrik
3 Bracket Extended
4 Instalasi Listrik + Material
5 Gembok
D GROUNDING
1 Grounding system
2 Sewa Crane
II VMS
BIAYA PEKERJAAN
A. Peralatan VMS
1 3 Color VMS Board (P16)- 8m x 2m (Main Road)
2 3 Color VMS Board (P16) - 6m x 2m (Gerbang)
B. Rangka VMS
Rangka VMS Akses Gerbang (L=40 m)
Rangka VMS Main Road (L=16,8 m)
Rangka VMS Akses gerbag (L=21 m)
Rangka VMS Akses Gerbang (L=26 m)
Rangka VMS Akses Gerbang (L = 14 m)
C. Pengaman Pondasi
Guardrail
III TV WALL
1 Peralatan Display TIC
- LG HDTV TV WALL 47"
- Bracket
- Decoder Splitter (ATEN)
- Instalasi
3 Furniture TIC
- Meja Kerja
- Loker Cabinet
- Kursi kerja
- Panel TV
- Panel dinding atas
- Logo & Huruf BUJT
- Credenza
5 Lain lain
UPS 6kVA (APC)
IV TIC
A Telepon TIC
1 Pekerjaan Perancangan, Perijinan, Pengadaan, dan Pemasangan Nomor Telepon untuk TIC
2 Pekerjaan Perancangan, Perijinan, Pengadaan, danPemasangan Nomor Telepon untuk Kantor Operasi
3 Biaya Langganan Telepon
B Jaringan Internet
1 Pekerjaan Pengadaan Perancangan Sistem Jaringan
2 Internet
Paket dan Hotspot
Pemasangan Kantor Operasi
Internet
3 - Langganan Jaringan Internet 100mbps Lt.1
- Langganan Jaringan Internet 100mbps Lt.2
- Langganan Jaringan Internet 100mbps Lt.3
(…..................................................)
IX-2019-MMP-00001 Tanggal 23 September 2019
NAMA ALAT
rt)
0
x 2m (Main Road)
x 2m (Gerbang)
=40 m)
,8 m)
21 m)
=26 m)
= 14 m)
ring
or
ORAN
nan, Pengadaan, dan Pemasangan Nomor Telepon untuk TIC
nan, Pengadaan, danPemasangan Nomor Telepon untuk Kantor Operasi
ngan Sistem Jaringan
Operasi
t 100mbps Lt.1
t 100mbps Lt.2
t 100mbps Lt.3
99.63
0.069 0.069
0.572
0.086
ADDENDUM
0.114
0.057
0.066
A
2.04 1.15 1.07 2.38 2.39 2.46 2.46
17.82 18.97 20.04 22.42 24.81 27.28 29.74
KURVA S PEKERJAAN PENGADAAN, PEMASANG
CLOSED CIRCUIT TELEVISION(CCTV) DAN VARIAB
PADA RUAS JALAN TOL CIBITUNG
TAHAP 1(SEGMEN CIBITUNG - TEL
15 16
56 57 58 59 60 61 62 63 64
0.026
0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069
17 18 1
65 66 67 68 69 70 71 72 73
0.047 0.047
0.012 0.012
0.009 0.009
0.003 0.003
0.000 0.000
0.129 0.129
0.086 0.086
0.064 0.064
0.123
2.16 2.16 2.90 1.03 1.31 1.44 1.16 1.03 1.15
54.08 56.25 59.15 60.18 61.48 62.92 64.08 65.11 66.26
19 20 21
74 75 76 77 78 79 80 81 82
0.214 0.214
0.171 0.171
1.158 1.158
I CCTV
A CAMERA & ACCESSORIES
1 Kamera PTZ 1.17 0.292 0.292 0.292 0.292
2 Bracket PTZ 0.09 0.021 0.021 0.021 0.021
3 Kamera Fixed 4.24
4 NVR Kapasitas 4 TB x 4 (16 Port) 5.80 1.449 1.449 1.449 1.449
5 Switch 8 Port (Gigabit) 0.71
6 Patch Core FO 0.18
7 Pigtail 0.13
8 Kabel UTP 0.05
9 RJ 45 0.01
10 Converter fiber optik 0.37 0.074 0.074
11 Converter fiber optik (MM) 210 0.94
12 Mikrotik Router RB750Gr 0.51
0.00
B JARINGAN 0.00
Kabel fiber optik & Instalasi 12.15
Subduct 0.00
0.00
C PANEL BOX 0.00
1 Panel box CCTV 0.45
2 Terminal Listrik 0.08
3 Bracket Extended 0.03
4 Instalasi Listrik + Material 0.05
5 Gembok 0.02
0.00
D GROUNDING 0.00
1 Grounding system 0.64
2 Sewa Crane 0.17 0.057 0.057 0.057
0.00
E SETUP & INSTALASI 0.00
1 Setup & Instalasi Kamera 0.39
2 Instalasi Kabel Power 1.73
3 Tiang CCTV 0.00
0.00
II VMS 0.00
BIAYA PEKERJAAN 0.00
A. Peralatan VMS 0.00
1 3 Color VMS Board (P16)- 8m x 2m (Main Road) 0.00
2 3 Color VMS Board (P16) - 6m x 2m (Gerbang) 6.43 1.072 1.072
0.00
B. Rangka VMS 0.00
Rangka VMS Akses Gerbang (L=40 m) 31.76
Rangka VMS Main Road (L=16,8 m) 0.00
Rangka VMS Akses gerbag (L=21 m) 0.00
Rangka VMS Akses Gerbang (L=26 m) 0.00
Rangka VMS Akses Gerbang (L = 14 m) 0.00
0.00
C. Pengaman Pondasi 0.00
Guardrail 0.14
0.00
D. Instalasi & Integrasi 0.00
1 Integrasi Sistem 3.43 0.572 0.572 0.572 0.572
2 Integrasi VMS - FO Backbone 0.51 0.086 0.086 0.086 0.086
3 Instalasi Jaringan Listrik VMS 0.69 0.114 0.114 0.114 0.114
4 Server VMS - Type Rack 1.20
5 PC Workstation untuk Monitoring 0.34 0.057 0.057 0.057 0.057
6 RJ-45 Surge Protector 0.06 0.015 0.015 0.015 0.015
7 UTP Cable CAT 5e 0.04 0.011 0.011 0.011 0.011
8 RJ-45 Connector 0.02 0.009 0.009
9 Switch Hub 3com 8 Port 1.11
10 Box Panel 50x60x20cm Outdoor 0.10 0.026 0.026 0.026 0.026
11 Rak Server 42U 0.39 0.066 0.066 0.066 0.066
12 Pemasangan CCTV untuk VMS 0.09 0.029 0.029 0.029
0.00
E BIAYA PELATIHAN DAN PELAPORAN 0.00
1 Biaya Pelatihan 0.26
2 Dokumentasi / Pelaporan 0.00
a. Laporan Pendahuluan 0.01
b. Laporan Final 0.02
c. Training Kit 0.03
d. Flash Disk 16 GB 0.01
0.00
III TV WALL 0.00
1 Peralatan Display TIC 0.00
- LG HDTV TV WALL 47" 9.26
- Bracket 0.07
- Decoder Splitter (ATEN) 0.09
- Instalasi 0.17
0.00
2 Raised Floor TIC 0.00
- Raised Floor 0.00
- Panel grill 0.00
- Verry Bor (Kop) 0.00
- Pasang dan instalasi 0.00
0.00
3 Furniture TIC 0.00
- Meja Kerja 0.00
- Loker Cabinet 0.00
- Kursi kerja 0.00
- Panel TV 0.00
- Panel dinding atas 0.00
- Logo & Huruf BUJT 0.00
- Credenza 0.00
0.00
4 Instalasi Ruang TIC 0.00
- Ducting 0.43
- Panel 0.34
- Kabel power 0.26
- Kabel data 0.17
-Instalasi 0.13
0.00
5 Lain lain 0.00
UPS 6kVA (APC) 1.03
0.00
IV TIC 0.00
A Telepon TIC 0.00
1 Pekerjaan Perancangan, Perijinan, Pengadaan, dan Pemasangan Nomor Telepon untuk TIC 0.34 0.086 0.086 0.086 0.086
2 Pekerjaan Perancangan, Perijinan, Pengadaan, danPemasangan Nomor Telepon untuk Kantor Operasi 0.00
3 Biaya Langganan Telepon 0.62
0.00
B Jaringan Internet 0.00
1 Pekerjaan Pengadaan Perancangan Sistem Jaringan 2.57
2 Internet
Paket dan Hotspot
Pemasangan Kantor Operasi
Internet 0.26
3 - Langganan Jaringan Internet 100mbps Lt.1 2.57
- Langganan Jaringan Internet 100mbps Lt.2 2.57
- Langganan Jaringan Internet 100mbps Lt.3 2.57
100.00
Bobot Rencana Per Minggu
Bobot Rencana Akumulatif Perminggu
(…..................................................)
2 13 14 15
5 6 7 8 52 53 54 55 56 57 58 59 60 61 62
03/03/20 10/03/20 17/03/20 24/03/20 26/01/21 02/02/21 09/02/21 16/02/21 23/02/21 02/03/21 09/03/21 16/03/21 23/03/21 30/03/21 06/04/21
0.326 0.326 0.326 0.326 0.326 0.326 0.326 0.326 0.326 0.326 0.326
0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047
0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.074 0.074 0.074
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
1.985 1.985 1.985 1.985 1.985 1.985 1.985 1.985 1.985 1.985 1.985
0.572 0.572
0.086 0.086
ADDENDUM
0.114 0.114
0.057 0.057
0.066 0.066
2.04 2.04 1.15 1.07 2.38 2.39 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46
15.78 17.82 18.97 20.04 22.42 24.81 27.28 29.74 32.20 34.66 37.12 39.59 42.05 44.51 46.97
KURVA S PEKERJAAN PENGADAAN, PEMASANGAN DAN PEMELIHARAAN
CLOSED CIRCUIT TELEVISION(CCTV) DAN VARIABLE MESSAGE SIGN(VMS)
PADA RUAS JALAN TOL CIBITUNG CILINCING
TAHAP 1(SEGMEN CIBITUNG - TELAGA ASIH)
16 17 18
63 64 65 66 67 68 69 70
0.326 0.326
0.129 0.129
0.086 0.086
0.064 0.064
08/06/21 15/06/21 22/06/21 29/06/21 06/07/21 13/07/21 20/07/21 27/07/21 03/08/21 10/08/21 17/08/21 24/08/21 08/03/22 15/03/22 22/03/22
0.810 0.810 0.810 0.810 0.810 0.810 0.810 0.810 0.810 0.810 0.810
0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030
0.012 0.012
0.006 0.006
0.009 0.009
0.017 0.017
0.004 0.004
0.214 0.214
0.171 0.171
1.16 1.03 1.15 1.79 1.93 2.39 2.35 1.83 1.38 1.37 1.25 0.33 0.26 0.26 0.26
64.08 65.11 66.26 68.05 69.98 72.37 74.72 76.55 77.93 79.30 80.55 80.88 81.14 81.39 81.65
22 23 24 25
113 114 115 116 117 118 119 120 121 122 123 124
29/03/22 05/04/22 12/04/22 19/04/22 26/04/22 03/05/22 10/05/22 17/05/22 24/05/22 31/05/22 07/06/22 14/06/22
0.257
0.26 0.51 1.67 1.67 1.67 1.86 1.34 2.37 2.37 2.37 1.21 1.03
81.91 82.42 84.09 85.77 87.44 89.30 90.64 93.01 95.38 97.76 98.97 100.00
REKAPITULASI LAPO
PERIODE :
KEGIATAN :
NO. KONTRAK :
No. SPMK :
ADDENDUM I :
ADDENDUM II :
KONTRAKTOR :
NO URAIAN PEKERJAAN
I PEKERJAAN C C T V
II PEKERJAAN VMS
IV PEKERJAAN TIC
Disetujui Oleh :
REKAPITULASI LAPORAN KEMAJUAN PEKERJAAN BULANAN
BULAN KE - 1
PERIODE : 4 Februari 2020 - 2 Maret 2020
URAIAN PEKERJAAN
JAAN C C T V
JAAN TV WALL
JAAN TIC
BULAN KE - 1
ODE : 4 Februari 2020 - 2 Maret 2020
#REF! #REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
KEGIATAN : PEKERJAAN PENGADAAN, PEMASANGAN DAN PEMELIHARAAN
CLOSED CIRCUIT TELEVISION(CCTV) DAN VARIABLE MESSAGE SIGN(VMS)
PADA RUAS JALAN TOL CIBITUNG CILINCING
TAHAP 1(SEGMEN CIBITUNG - TELAGA ASIH)
NO. KONTRAK : CTP-ADM-CTR-IX-2019-MMP-00001 Tanggal 23 September 2019
No. SPMK : 056/CTP/DIR/II/2020 tanggal 4 Februari 2020
ADDENDUM I : CTP-ADM-CTR-II-2021-MMP-00002 Tanggal 1 Februari 2021
ADDENDUM II : CTP-ADM-CTR-V-2021-MMP-00003 Tanggal 24 Mei 2021
KONTRAKTOR : PT. MANIKAM MEGA PERSADA
NO URAIAN PEKERJAAN
I PEKERJAAN C C T V
A CAMERA & ACCESSORIES
1 Kamera PTZ
2 Bracket PTZ
3 Kamera Fixed
4 NVR Kapasitas 4 TB x 4 (16 Port)
5 Switch 8 Port (Gigabit)
6 Patch Core FO
7 Pigtail
8 Kabel UTP
9 RJ 45
10 Converter fiber optik
11 Converter fiber optik (MM) 210
12 Mikrotik Router RB750Gr
B JARINGAN
Kabel fiber optik & Instalasi
Subduct
C PANEL BOX
1 Panel box CCTV
2 Terminal Listrik
3 Bracket Extended
4 Instalasi Listrik + Material
5 Gembok
D GROUNDING
1 Grounding system
2 Sewa Crane
B. Rangka VMS
Rangka VMS Akses Gerbang (L=40 m)
Rangka VMS Main Road (L=16,8 m)
Rangka VMS Akses gerbag (L=21 m)
Rangka VMS Akses Gerbang (L=26 m)
Rangka VMS Akses Gerbang (L = 14 m)
C. Pengaman Pondasi
Guardrail
C Furniture TIC
- Meja Kerja
- Loker Cabinet
- Kursi kerja
- Panel TV
- Panel dinding atas
- Logo & Huruf BUJT
- Credenza
B Jaringan Internet
1 Pekerjaan Pengadaan Perancangan Sistem Jaringan
2 Internet
Paket dan Hotspot
Pemasangan Kantor Operasi
Internet
3 - Langganan Jaringan Internet 100mbps Lt.1
- Langganan Jaringan Internet 100mbps Lt.2
- Langganan Jaringan Internet 100mbps Lt.3
Disetujui Oleh :
LAPORAN BULANAN
LAPORAN KEMAJUAN PEKERJAAN BULAN KE - 1
PERIODE : 4 Februari 2020 - 2 Maret 2020
EMELIHARAAN
LE MESSAGE SIGN(VMS)
eptember 2019
bruari 2021
Mei 2021
1,743,631,000.00 29.90
Unit 490,088,513 0 - - -
Unit 375,057,927 1 375,057,926.67 6.43 -
2,720,153,725.67 46.65 -
m2 4,000,000 0 - - -
pcs 350,000 0 - - -
ls 2,450,000 0 - - -
m2 750,000 0 - - -
unit 6,000,000 0 - - -
unit 4,500,000 0 - - -
unit 1,300,000 0 - - -
m2 3,500,000 0 - - -
m2 2,500,000 0 - - -
ls 35,000,000 0 - - -
unit 3,500,000 0 - - -
696,550,000.00 11.94
671,000,000.00 11.51 -
5,831,334,725.67 100.00
583,133,472.57
6,414,468,198.23
6,414,468,000.00
S/D BULAN LALU BULAN INI S/D BULAN INI
PERSEN BOBOT PERSEN BOBOT PERSEN BOBOT
VOLUME VOLUME
% % % % % %
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - 1 100.00 0.17 1.00 100.00 0.17
- - - - - - -
- - - - - - -
- - - - - -
- - - #REF! - - #REF!
- - 0.25 25.00 1.61 0.25 25.00 1.61
-
-
- - - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - - -
- - - - - - -
- - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - #REF! #REF!
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - 0.34 0.34
- #REF! #REF!
Dibuat Oleh :
KONTRAKTOR PELAKSANA
KET
-