Doha Metro Project

Asset Fault/Defect Report

S200-ACIFM-MNT-30- M008: GWEE074


ACIFM Report No: Station: Date: 17/08/2020
RPT-XXXXXXX-02014 Emergency Exit

Sub 08:00
RKH Ref. No. CM WO: 192411 RCU: FCU Time:
System

Qatar National Library Station; Emergency Exit 04; Level ACIFM/ Sub- ACIFM
Location of Event:
A/R06 Contractor: Technicians

Position & Mechanical


Person(s) Involved: Mohamed Ben Shaam
I.D: Supervisor

☐ Customer ☒ Assets
Subsequent Impact: Safety: ☐ High* ☒ Med* ☐ Low* ☒ Operations
Experience Reliability / Life
* High: Immediate Safety Impact (within 1 week) Medium: Potential Safety Impact (~1week or more) Low: Potential Safety Impact (~1month or more)

Fault/ Defect Title: Faulty Air Vent & Isolation gate Valve not installed

Fault/ Defect Description: Corrective Maintenance (CM) reported by Station Master (SM):
192411: Heavy water leakage in firefighting pump room coming from CHWR
PIPE as per reported by SG patrolling.

When ACIFM inspected, it was found that water leakage is due to faulty air vent
installed on Chilled water pipes of FCU. It was also noted that there is no isolation
valve installed to isolate the air vent.

Asset/ Plant/ Equipment reference: MEP-RCU-FCU08 (FCU-IL-08)

Means of Fault / Defect realisation ☐ PM ☒ CM ☐ Testing ☐ Random Inspection ☐ Incident /Accident


☐ Other Specify______________

Actions Taken:  Visual inspection done


 For temporary mitigation, isolation valve was closed on the CHWS &
CHWR and opened the bypass valve. Unit was kept in Maintenance
mode

Parts removed ☐ Yes ☒ NO


Is Yes [Specify Equipment Description/Part Number/Serial Number]
1.
2.

Parts Used ☐ Yes ☒ NO


Is Yes [Specify Equipment Description/Part Number/Serial Number]
1.
2.

Current Status: ☒ Open/Outstanding ☐ Partial/Temporary ☐ Closed/resolved


☐ Other Specify______________

Property: QHSE Dept. ACIFM – Internal Use Only


M01-ACI-HSE-FRM-0034 Rev. 2 Page 1 of 2
Doha Metro Project

Action(s) to Be Taken/ Recommendation(s): Responsible Due Date

JV shall replace the defective air vent and also installed the missing PSH JV 27.08.2020
isolation valve before the air vent and shall make the unit in normal
operational condition

Root cause analysis shall be conducted on the above-mentioned defect, PSH JV 27.08.2020
corrective action shall be derived and implemented

Full Name Mohamed Ben Shaam Position Mechanical Supervisor

Supporting information: CM wo:192411(13.08.2020)


PPM wo:188655(07.08.2020),167982(06.07.2020),150712(12.06.2020)

Faulty Air Vent & Isolation gate Valve not installed for the airvent

Photo

Property: QHSE Dept. ACIFM – Internal Use Only


M01-ACI-HSE-FRM-0034 Rev. 2 Page 2 of 2