ZHEJIANG PROVINCIAL NO.

1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

PLANILLA RESUMEN DE VOLUMENES DE EXCAVACION Y RELLENO - RED DE TUBERIAS ALCANTARILLADO SANITARIO

DESDE 1/1/2020 HASTA 8/31/2020 MAT. :

TRAMO CAMARA CAMARA INSPECCION TUBERIA TUBERIA TUBERIA TUBERIA TUBERIA TUBERIA VOLUMEN ZANJA VOLUMENES EXCAVACION VOLUMENES EXCAVACION CON AGOTAMIENTO VOLUMENES
N° TRAMO NUEVO NUEVO DESDE COORD. COORD. COTA COTA HASTA REPLANTEO 6" 8" 10" 12" 14" 16" DEL TUBO CON EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 EXCAV. 6-8 EXCAV. 8-10 EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 EXCAV. 6-8 EXCAV. 8-10 ASIENTO
NOMBRE NOMBRE TERRENO SOLERA ml ml ml ml ml ml m3 AGOTAMIENTO m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3
1 TB -606 OK OK 2516 523684.340 8782421.220 201.830 199.560 1619 84.07 83.07 0.00 0.00 0.00 0.00 0.00 1.66 SI 0.00 0.00 0.00 0.00 132.91 82.65 0.81 0.00 6.65
2 TB -874 OK OK 1619 523732.300 8782352.170 203.200 199.170 1620 26.70 25.70 0.00 0.00 0.00 0.00 0.00 0.51 SI 0.00 0.00 0.00 0.00 51.40 49.47 1.24 0.00 2.57
3 TB -149 OK OK 2671 523757.450 8782409.890 202.750 199.210 1620 49.96 48.96 0.00 0.00 0.00 0.00 0.00 0.98 SI 0.00 0.00 0.00 0.00 97.92 93.71 5.21 0.00 4.90
4 TB -145 OK OK 2290 523862.100 8782466.870 201.860 198.960 2669 49.68 48.68 0.00 0.00 0.00 0.00 0.00 0.98 SI 0.00 0.00 0.00 0.00 77.89 52.43 0.00 0.00 3.89
5 TB -140 TB-140A OK 1620 523757.850 8782359.930 203.150 199.060 2665 54.15 53.15 0.00 0.00 0.00 0.00 0.00 1.06 SI 0.00 0.00 0.00 0.00 85.04 83.46 0.93 0.00 4.25
6 TB -185 OK OK 2670 523887.180 8782467.200 202.140 200.940 2243 80.14 79.14 0.00 0.00 0.00 0.00 0.00 1.59 NO 101.75 20.55 0.00 0.00 0.00 0.00 0.00 0.00 5.54
7 TB -52 OK OK 1870 524071.940 8782084.530 202.440 198.630 1915 67.32 66.32 0.00 0.00 0.00 0.00 0.00 1.33 SI 0.00 0.00 0.00 0.00 106.11 93.02 0.00 0.00 5.31
8 TB -1352 OK OK 2052 524012.700 8781948.350 201.300 199.990 1478 68.09 67.09 0.00 0.00 0.00 0.00 0.00 1.34 NO 80.11 6.32 0.00 0.00 0.00 0.00 0.00 0.00 4.70
9 TB -381 OK OK 2363 524115.620 8781892.860 201.830 200.630 1478 48.86 47.86 0.00 0.00 0.00 0.00 0.00 0.96 NO 51.63 1.17 0.00 0.00 0.00 0.00 0.00 0.00 2.87
10 TB -208 OK OK 1478 524072.110 8781915.090 202.150 199.420 1486 27.85 26.85 0.00 0.00 0.00 0.00 0.00 0.54 NO 42.96 20.33 0.00 0.00 0.00 0.00 0.00 0.00 2.15
11 TB -580 OK OK 2472 523861.860 8782544.210 201.780 199.200 2290 77.34 76.34 0.00 0.00 0.00 0.00 0.00 1.53 SI 0.00 0.00 0.00 0.00 122.14 45.67 0.00 0.00 6.11
12 TB -443 OK OK 2410 524612.670 8782764.450 202.230 201.030 2411 69.92 68.92 0.00 0.00 0.00 0.00 0.00 1.38 NO 73.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.14
13 TB -140 OK OK 2701 524518.500 8782694.390 202.660 201.460 2620 38.97 37.97 0.00 0.00 0.00 0.00 0.00 0.76 NO 41.83 1.08 0.00 0.00 0.00 0.00 0.00 0.00 2.28
14 TB -192 OK OK 2620 524557.470 8782694.590 203.110 201.000 2411 55.02 54.02 0.00 0.00 0.00 0.00 0.00 1.08 NO 60.23 0.91 0.00 0.00 0.00 0.00 0.00 0.00 3.24
15 TB -500 OK OK 2411 524612.490 8782694.530 202.360 200.530 2359 75.60 74.60 0.00 0.00 0.00 0.00 0.00 1.49 NO 103.14 8.77 0.00 0.00 0.00 0.00 0.00 0.00 5.22
16 TB -193 OK OK 2490 524567.850 8782619.460 201.720 200.520 2359 44.69 43.69 0.00 0.00 0.00 0.00 0.00 0.88 NO 44.45 0.51 0.00 0.00 0.00 0.00 0.00 0.00 3.06
17 TB -376 TB-376A OK 2359 524612.540 8782618.930 202.510 200.120 2360 76.17 75.17 0.00 0.00 0.00 0.00 0.00 1.51 NO 120.27 44.53 0.00 0.00 0.00 0.00 0.00 0.00 6.01
18 TB -142 TB-142A OK 2490 1515 60.48 59.48 0.00 0.00 0.00 0.00 0.00 1.19 NO 66.61 3.43 0.00 0.00 0.00 0.00 0.00 0.00 3.57
19 TB -189 OK OK 1514 524457.660 8782618.130 200.130 197.370 1515 49.75 48.75 0.00 0.00 0.00 0.00 0.00 0.98 NO 62.23 7.25 0.00 0.00 0.00 0.00 0.00 0.00 3.90
20 TB -136 OK OK 1515 524507.410 8782618.480 200.180 197.200 2412 76.10 75.10 0.00 0.00 0.00 0.00 0.00 1.50 NO 120.16 68.30 0.00 0.00 0.00 0.00 0.00 0.00 6.01
21 TB -230 OK OK 2412 524507.700 8782542.380 200.020 196.940 2687 50.03 49.03 0.00 0.00 0.00 0.00 0.00 0.98 NO 78.45 64.90 2.60 0.00 0.00 0.00 0.00 0.00 3.92
22 TB -194 OK OK 2651 524801.310 8782618.580 199.330 198.130 2361 83.84 82.84 0.00 0.00 0.00 0.00 0.00 1.66 NO 126.93 55.16 0.00 0.00 0.00 0.00 0.00 0.00 6.63
23 TB -377 OK OK 2361 524717.470 8782618.080 201.470 197.750 2302 75.36 74.36 0.00 0.00 0.00 0.00 0.00 1.49 NO 148.72 147.84 58.75 0.00 0.00 0.00 0.00 0.00 7.44
24 TB -1407 OK OK 2624 524886.050 8782542.440 200.760 199.560 2195 46.78 45.78 0.00 0.00 0.00 0.00 0.00 0.92 NO 49.35 2.59 0.00 0.00 0.00 0.00 0.00 0.00 2.75
25 TB -1313 OK OK 2195 524932.030 8782533.830 201.650 199.350 1480 59.36 58.36 0.00 0.00 0.00 0.00 0.00 1.17 NO 81.70 24.45 0.00 0.00 0.00 0.00 0.00 0.00 4.09
26 TB -154 OK OK 87 525074.250 8782607.860 202.510 201.310 86 107.60 106.60 0.00 0.00 0.00 0.00 0.00 2.14 NO 114.53 11.23 0.00 0.00 0.00 0.00 0.00 0.00 6.40
27 TB -152 OK OK 86 525047.010 8782503.800 199.860 198.660 1480 59.48 58.48 0.00 0.00 0.00 0.00 0.00 1.17 NO 87.70 23.04 0.00 0.00 0.00 0.00 0.00 0.00 4.68
28 TB -226 OK OK 1480 524989.410 8782518.630 201.620 197.220 1876 68.87 67.87 0.00 0.00 0.00 0.00 0.00 1.36 NO 135.74 135.74 55.33 0.00 0.00 0.00 0.00 0.00 6.79
29 TB -936 OK OK 1722 525093.850 8782443.160 200.180 198.980 1723 36.52 35.52 0.00 0.00 0.00 0.00 0.00 0.71 NO 54.05 18.38 0.00 0.00 0.00 0.00 0.00 0.00 2.84
30 TB -93 OK OK 1875 524964.530 8782431.770 201.450 200.250 1469 49.90 48.90 0.00 0.00 0.00 0.00 0.00 0.98 NO 50.39 0.62 0.00 0.00 0.00 0.00 0.00 0.00 2.93
31 TB -103 OK OK 1469 524950.730 8782383.820 201.920 199.840 2642 59.98 58.98 0.00 0.00 0.00 0.00 0.00 1.18 NO 94.37 24.54 0.00 0.00 0.00 0.00 0.00 0.00 4.72
32 TB -104 OK OK 2642 525006.540 8782361.860 202.200 199.560 2480 64.57 63.57 0.00 0.00 0.00 0.00 0.00 1.27 NO 101.71 34.69 0.00 0.00 0.00 0.00 0.00 0.00 5.09
33 TB -1315 OK OK 2196 526396.710 8782214.650 195.870 194.170 2197 60.98 59.98 0.00 0.00 0.00 0.00 0.00 1.20 NO 54.46 0.42 0.00 0.00 0.00 0.00 0.00 0.00 3.60
34 TB -511 OK OK 2197 526455.630 8782199.470 191.550 190.050 2398 81.61 80.61 0.00 0.00 0.00 0.00 0.00 1.61 NO 65.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.84
35 TB -117 OK OK 2398 526534.460 8782178.350 190.700 189.500 2645 49.80 48.80 0.00 0.00 0.00 0.00 0.00 0.98 NO 44.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.93
36 TB -351 OK OK 2339 526472.110 8782228.860 190.700 189.300 1931 68.50 67.50 0.00 0.00 0.00 0.00 0.00 1.35 NO 56.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.05
37 TB -545 OK OK 2392 526410.550 8782313.850 193.450 191.900 2392A 47.57 46.57 0.00 0.00 0.00 0.00 0.00 0.93 NO 39.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.79
38 TB -545a OK OK 2392a 526456.770 8782302.880 190.610 189.410 1931 36.30 35.30 0.00 0.00 0.00 0.00 0.00 0.71 NO 30.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.12
39 TB -1088 OK OK 1931 526492.050 8782294.390 190.110 188.510 1428 52.33 51.33 0.00 0.00 0.00 0.00 0.00 1.03 NO 59.31 2.33 0.00 0.00 0.00 0.00 0.00 0.00 3.08

39.024 2340.26 2301.24 0.00 0.00 0.00 0.00 0.00 46.10 2441.01 729.08 116.68 0.00 0.00 673.42 500.42 8.19 0.00 168.02

CAO16 2338.53 2338.54 0.00 0.00 0.00 0.00 0.00 46.84 2473.67 734.18 97.07 0.00 0.00 682.73 508.17 8.49 0.00 170.23

-1.74 37.30 0.00 0.00 0.00 0.00 0.00 0.75 32.66 5.10 -19.61 0.00 0.00 9.32 7.75 0.30 0.00 0.00 2.22

Por el CONTRATISTA _______________________ Revisado por el SUPERVISOR____________________


NITARIO

PVC SDR41 D3034 AG Y PEAD CON J.E.

VOLUMENES ANCHO ALTURA ENTIBADO ENTIBADO ENTIBADO ENTIBADO PRUEBA DIFERENCIA ALTURA PLANILLA
RELL. CER. RELL. COM. ENTIBADO DE PROMEDIO 0.00<H<2.00 2.01<H<4.00 4.01<H<6.00 H>6.00 BARRIO MATERIAL CAMISA HIDRAULICA COTAS TOTAL COBRADA
m3 m3 ZANJA m2 m2 m2 m2 8" 4"-6" 0,20+0,05 (LOSA Y POBRE)
18.92 189.14 SI 0.80 3.32 0.000 270.459 0.000 0.000 SAN PEDRO TIERRA 216.37 214.52 1.85 2.27 2.52 14
7.44 91.58 SI 1.00 4.03 0.000 0.000 102.106 0.000 SAN PEDRO TIERRA 102.11 105.74 -3.63 4.03 4.28 14
14.18 176.79 SI 1.00 4.01 0.000 0.000 196.847 0.000 SAN PEDRO TIERRA 196.85 201.10 -4.25 3.54 3.79 17
11.09 114.37 SI 0.80 3.34 0.000 162.903 0.000 0.000 27 DE JUNIO TIERRA 130.32 133.67 -3.35 2.90 3.15 20
12.10 152.01 SI 0.80 3.98 0.000 211.786 0.000 0.000 27 DE JUNIO TIERRA 169.43 172.55 -3.12 4.09 4.34 17
15.57 99.61 NO 0.70 2.22 0.000 0.000 0.000 0.000 27 DE JUNIO TIERRA 122.30 115.21 7.09 1.20 1.45 19
15.10 177.40 SI 0.80 3.76 0.000 248.917 0.000 0.000 27 DE JUNIO ASFALTO 199.13 202.03 -2.89 3.81 4.06 24
13.20 67.19 SI 0.70 1.91 123.475 0.000 0.000 0.000 27 DE JUNIO TIERRA 86.43 88.35 -1.92 1.31 1.56 16
7.93 41.04 NO 0.60 1.84 0.000 0.000 0.000 0.000 27 DE JUNIO HORMIGON 52.80 54.05 -1.25 1.20 1.45 16
6.11 54.49 SI 0.80 2.95 0.000 79.118 0.000 0.000 27 DE JUNIO TIERRA 63.29 65.72 -2.43 2.73 2.98 16
17.38 142.80 SI 0.80 2.77 0.000 209.773 0.000 0.000 AMISTAD TIERRA 167.82 169.79 -1.97 2.58 2.83 16
11.43 56.14 NO 0.60 1.75 0.000 0.000 0.000 0.000 AMISTAD TIERRA 73.08 74.27 -1.19 1.20 1.45 16
6.30 33.58 NO 0.60 1.87 0.000 0.000 0.000 0.000 AMISTAD TIERRA 42.91 43.70 -0.79 1.20 1.45 16
8.96 47.86 NO 0.60 1.91 0.000 0.000 0.000 0.000 AMISTAD TIERRA 61.14 61.97 -0.83 2.11 2.36 16
14.68 90.52 NO 0.70 2.17 0.000 0.000 0.000 0.000 AMISTAD TIERRA 111.91 113.62 -1.71 1.83 2.08 16
8.60 32.43 SI 0.70 1.60 64.223 0.000 0.000 0.000 AMISTAD TIERRA 44.96 48.02 -3.06 1.20 1.45 16
17.12 140.16 SI 0.80 2.75 0.000 205.999 0.000 0.000 AMISTAD TIERRA 164.80 167.18 -2.38 2.39 2.64 16
9.86 55.42 NO 0.60 1.90 0.000 0.000 0.000 0.000 AMISTAD TIERRA 70.04 71.10 -1.06
11.10 53.50 SI 0.80 2.00 86.851 0.000 0.000 0.000 AMISTAD TIERRA 69.48 62.56 6.92 2.76 3.01 20
17.10 163.85 SI 0.80 3.14 0.000 235.576 0.000 0.000 AMISTAD TIERRA 188.46 191.01 -2.54 2.98 3.23 16
11.17 129.87 SI 0.80 3.75 0.000 182.424 0.000 0.000 AMISTAD ASFALTO 145.94 149.38 -3.44 3.08 3.33 20
18.87 154.94 SI 0.80 2.79 0.000 227.615 0.000 0.000 AMISTAD TIERRA 182.09 185.03 -2.94 1.20 1.45 16
21.54 324.84 SI 1.00 4.75 0.000 0.000 355.309 0.000 AMISTAD TIERRA 355.31 360.33 -5.02 3.72 3.97 16
7.59 40.69 NO 0.60 1.92 0.000 0.000 0.000 0.000 1° DE MAYO ASFALTO 51.94 53.35 -1.42 1.20 1.45 22
11.48 89.41 NO 0.70 2.59 0.000 0.000 0.000 0.000 1° DE MAYO ASFALTO 106.15 108.04 -1.89 2.30 2.55 22
17.67 99.56 NO 0.60 1.89 0.000 0.000 0.000 0.000 1° DE MAYO TIERRA 125.76 127.75 -1.99 1.20 1.45 19
13.32 91.57 SI 0.80 2.38 0.000 138.427 0.000 0.000 1° DE MAYO TIERRA 110.74 113.29 -2.54 1.20 1.45 19
19.66 299.01 SI 1.00 4.83 0.000 0.000 326.815 0.000 1° DE MAYO ASFALTO 326.81 309.96 16.85 4.40 4.65 22
8.09 60.79 SI 0.80 2.58 0.000 90.539 0.000 0.000 1° DE MAYO TIERRA 72.43 75.05 -2.62 1.20 1.45 19
8.11 38.98 NO 0.60 1.75 0.000 0.000 0.000 0.000 1° DE MAYO ASFALTO 51.00 52.25 -1.25 1.20 1.45 22
13.43 99.58 SI 0.80 2.52 0.000 148.640 0.000 0.000 1° DE MAYO ASFALTO 118.91 121.12 -2.20 2.08 2.33 22
14.48 115.57 SI 0.80 2.62 0.000 170.502 0.000 0.000 1° DE MAYO ASFALTO 136.40 138.22 -1.82 2.64 2.89 22
9.94 40.14 NO 0.60 1.55 0.000 0.000 0.000 0.000 PUERTO ALTO LOSETA 54.88 55.73 -0.85 1.70 1.95 24
13.36 45.26 NO 0.60 1.35 0.000 0.000 0.000 0.000 PUERTO ALTO LOSETA 65.07 65.91 -0.84 1.50 1.75 16
8.09 32.34 NO 0.60 1.52 0.000 0.000 0.000 0.000 PUERTO ALTO LOSETA 44.34 45.35 -1.01 1.20 1.45 16
11.19 39.59 NO 0.60 1.40 0.000 0.000 0.000 0.000 PUERTO ALTO LOSETA 56.18 57.03 -0.85 1.40 1.65 16
7.72 27.76 NO 0.60 1.41 0.000 0.000 0.000 0.000 PUERTO ALTO LOSETA 39.20 39.93 -0.73 1.55 1.80 24
5.85 21.65 NO 0.60 1.46 0.000 0.000 0.000 0.000 PUERTO ALTO LOSETA 30.33 31.30 -0.97 1.20 1.45 16
8.51 49.02 NO 0.60 2.05 0.000 0.000 0.000 0.000 PUERTO ALTO LOSETA 2766.2 61.64 59.11 2.52 1.60 1.85 16

474.25 3780.42 4468.79 4468.79 0.00 274.55 2582.68 981.08 0.00 0.00 2766.20 -35.52

480.36 3806.87 4504.31 4504.31 0.00 284.19 2623.17 977.13 0.00 0.00 0.00 cao14
cao16
6.11 26.45 35.52 35.52 0.00 9.64 40.49 -3.95 0.00 cao17
cao19
cao20
cao22
cao24
OBSERVACION CRITERIO
CLASIFICACION
CAIDA DE ACUERDO A LA ALTURA CLASIFICACION DE ACUERDO A LA ALTURA PROF. PROF. PROF. PROF. PROF. VOLUMENES AREA 6.25 VOLUMENES
ALTURA 0,00 1,51 2,01 2,51 3,01 3,51 4,01 4,51 5,01 5,51 6,01 8.01 ALTURA 0,00 1,51 2,01 2,51 3,01 3,51 4,01 4,51 5,01 5,51 6,01 8.01 EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. AGOTAMIENTO EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. EXCAV.
1,50 2,00 2.50 3,00 3,50 4,00 4,50 5,00 5,50 6,00 8,00 10.00 1,50 2,00 2.50 3,00 3,50 4,00 4,50 5,00 5,50 6,00 8,00 10.00 0-2m 2-4m 4-6m 6-8m 8-10m 0-2m 2-4m 4-6m 6-8m 8-10m 0-2m 2-4m 4-6m 6-8m 8-10m
DOBLE SIN 2.52 0.00 0.00 0.00 2.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.52 2.00 0.52 0.00 0.00 0.00 SI 0.00 0.00 0.00 0.00 0.00 12.50 3.25 0.00 0.00 0.00
DOBLE SIN 4.28 0.00 0.00 0.00 0.00 0.00 0.00 4.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.28 2.00 2.00 0.28 0.00 0.00 SI 0.00 0.00 0.00 0.00 0.00 12.50 12.50 1.75 0.00 0.00
DOBLE SIN 3.79 0.00 0.00 0.00 0.00 0.00 3.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.79 2.00 1.79 0.00 0.00 0.00 SI 0.00 0.00 0.00 0.00 0.00 12.50 11.19 0.00 0.00 0.00
TRIPLE H=0,00; H=1,33 CON 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.15 0.00 0.00 0.00 0.00 3.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.15 2.00 1.15 0.00 0.00 0.00 SI 0.00 0.00 0.00 0.00 0.00 12.50 7.19 0.00 0.00 0.00
TRIPLE SIN 4.34 0.00 0.00 0.00 0.00 0.00 0.00 4.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.34 2.00 2.00 0.34 0.00 0.00 SI 0.00 0.00 0.00 0.00 0.00 12.50 12.50 2.13 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 4.06 0.00 0.00 0.00 0.00 0.00 0.00 4.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.06 2.00 2.00 0.06 0.00 0.00 SI 0.00 0.00 0.00 0.00 0.00 12.50 12.50 0.38 0.00 0.00
ARRANQUE SIN 1.56 0.00 1.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.56 1.56 0.00 0.00 0.00 0.00 NO 9.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TRIPLE H=0,00; H=0,60 SIN 2.98 0.00 0.00 0.00 2.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.98 2.00 0.98 0.00 0.00 0.00 NO 12.50 6.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TETRA H=0,00; H=0,00; H=1,35 CON 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.83 0.00 0.00 0.00 2.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.83 2.00 0.83 0.00 0.00 0.00 SI 0.00 0.00 0.00 0.00 0.00 12.50 5.19 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 2.36 0.00 0.00 2.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.36 2.00 0.36 0.00 0.00 0.00 NO 12.50 2.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TRIPLE SIN 2.08 0.00 0.00 2.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.08 2.00 0.08 0.00 0.00 0.00 NO 12.50 0.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TRIPLE H=0,00; H=0,10 SIN 2.64 0.00 0.00 0.00 2.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.64 2.00 0.64 0.00 0.00 0.00 NO 12.50 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

DOBLE SIN 3.01 0.00 0.00 0.00 0.00 3.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.01 2.00 1.01 0.00 0.00 0.00 NO 12.50 6.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TRIPLE H=0,00; H=1,30 CON 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.23 0.00 0.00 0.00 0.00 3.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.23 2.00 1.23 0.00 0.00 0.00 NO 12.50 7.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TRIPLE SIN 3.33 0.00 0.00 0.00 0.00 3.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.33 2.00 1.33 0.00 0.00 0.00 NO 12.50 8.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TETRA H=0,00; H=0,00; H=2,00 CON 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.97 0.00 0.00 0.00 0.00 0.00 3.97 0.00 0.00 0.00 0.00 0.00 0.00 3.97 2.00 1.97 0.00 0.00 0.00 NO 12.50 12.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TRIPLE H=0,00; H=1,10 CON 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.55 0.00 0.00 0.00 2.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.55 2.00 0.55 0.00 0.00 0.00 NO 12.50 3.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TETRA H=0,00; H=1,83; H=1,14 CON 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.65 0.00 0.00 0.00 0.00 4.65 2.00 2.00 0.65 0.00 0.00 NO 12.50 12.50 4.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TRIPLE SIN 2.33 0.00 0.00 2.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.33 2.00 0.33 0.00 0.00 0.00 NO 12.50 2.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 2.89 0.00 0.00 0.00 2.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.89 2.00 0.89 0.00 0.00 0.00 NO 12.50 5.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.95 0.00 1.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.95 1.95 0.00 0.00 0.00 0.00 NO 12.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.75 0.00 1.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.75 1.75 0.00 0.00 0.00 0.00 NO 10.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TRIPLE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.65 0.00 1.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.65 1.65 0.00 0.00 0.00 0.00 NO 10.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.80 0.00 1.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.80 1.80 0.00 0.00 0.00 0.00 NO 11.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TRIPLE H=0,00; H=0,20 SIN 1.85 0.00 1.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.85 1.85 0.00 0.00 0.00 0.00 NO 11.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

32.00 13.00 6.00 3.00 4.00 2.00 1.00 3.00 0.00 0.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 2.00 2.00 1.00 0.00 1.00 0.00 0.00 0.00 0.00 333.81 71.06 4.06 0.00 0.00 87.50 64.31 4.25 0.00 0.00

2.00 0.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 15.75 1.75 0.00 0.00
15.00 7.00 4.00 2.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 181.00 32.88 0.00 0.00 0.00 12.50 5.19 0.00 0.00 0.00
2.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 23.69 2.13 0.00 0.00
4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 14.63 0.00 0.00 0.00 12.50 7.19 0.00 0.00 0.00
4.00 2.00 0.00 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 68.12 23.56 4.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.00 0.00 2.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.44 0.00 0.00 0.00 0.00 12.50 12.50 0.38 0.00 0.00
MATERIAL RELLENO ENTIBADO LADO 2.5
EXCEDENTE COMPACTADO 0,00<H<2.00 2.01<H<4.00 2.01<H<6.00 H>6.01
M3 M3
3.90 11.85 SI 0.000 25.200 0.000 0.000
6.77 19.98 SI 0.000 0.000 42.800 0.000
5.97 17.72 SI 0.000 37.900 0.000 0.000
4.93 14.76 SI 0.000 31.500 0.000 0.000
6.87 20.26 SI 0.000 0.000 43.400 0.000
2.16 6.90 NO 0.000 0.000 0.000 0.000
6.41 18.97 SI 0.000 0.000 40.600 0.000
2.34 7.41 NO 0.000 0.000 0.000 0.000
2.16 6.90 NO 0.000 0.000 0.000 0.000
4.65 13.97 SI 0.000 29.800 0.000 0.000
4.41 13.28 SI 0.000 28.300 0.000 0.000
2.16 6.90 NO 0.000 0.000 0.000 0.000
2.16 6.90 NO 0.000 0.000 0.000 0.000
3.64 11.11 NO 0.000 0.000 0.000 0.000
3.18 9.82 NO 0.000 0.000 0.000 0.000
2.16 6.90 SI 14.500 0.000 0.000 0.000
4.10 12.40 SI 0.000 26.400 0.000 0.000

4.70 14.11 SI 0.000 30.100 0.000 0.000


5.06 15.13 SI 0.000 32.300 0.000 0.000
5.22 15.59 SI 0.000 33.300 0.000 0.000
2.16 6.90 NO 0.000 0.000 0.000 0.000
6.26 18.55 SI 0.000 39.700 0.000 0.000
2.16 6.90 NO 0.000 0.000 0.000 0.000
3.95 11.99 NO 0.000 0.000 0.000 0.000
2.16 6.90 NO 0.000 0.000 0.000 0.000
2.16 6.90 SI 14.500 0.000 0.000 0.000
7.37 21.69 SI 0.000 0.000 46.500 0.000
2.16 6.90 NO 0.000 0.000 0.000 0.000
2.16 6.90 NO 0.000 0.000 0.000 0.000
3.59 10.97 SI 0.000 23.300 0.000 0.000
4.50 13.56 SI 0.000 28.900 0.000 0.000
2.97 9.21 NO 0.000 0.000 0.000 0.000
2.65 8.29 NO 0.000 0.000 0.000 0.000
2.16 6.90 NO 0.000 0.000 0.000 0.000
2.48 7.83 NO 0.000 0.000 0.000 0.000
2.73 8.52 NO 0.000 0.000 0.000 0.000
2.16 6.90 NO 0.000 0.000 0.000 0.000
2.81 8.75 NO 0.000 0.000 0.000 0.000

139.51 425.49 29.00 366.70 173.30 0.00

10.67 31.83 0.00 25.20 42.80 0.00


56.69 174.88 14.50 156.50 0.00 0.00
12.83 37.98 0.00 37.90 43.40 0.00
8.63 27.62 14.50 0.00 0.00 0.00
14.85 44.47 0.00 94.90 0.00 0.00
23.73 72.02 0.00 52.20 46.50 0.00
12.11 36.70 0.00 0.00 40.60 0.00
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -1088 DESDE C.I. : 1931 526492.050 8782294.390 190.110 188.510 LONGITUD TRAMO : 51.33 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -1088
HASTA C.I. : 1428 526543.000 8782282.490 190.070 187.780 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 51.33 ML i (%) : -1.395 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : PUERTO ALTO DIST. ESTIMADA 52.33 i (°/o) TRAMO : -1.395 % FECHA : jueves, 19 de abril de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1931 0.00 0.00 190.110 -1.395 188.510 0.0043 0.100 1.704 1 0.000 0.00 190.110 -1.395 188.510 0.0043 0.10 1.704 1.704 0.000 188.406 159.70 188.665 0.60 0.15 0.000 1.295 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 190.100
190.060
-1.395
-1.395
188.370
188.231
0.0043
0.0043
0.100
0.100
1.834
1.933
2
3
10.000
10.000
10.00
20.00
190.100
190.060
-1.395
-1.395
188.370
188.231
0.0043
0.0043
0.10
0.10
1.834
1.933
1.834
1.933
0.000
0.000
188.266
188.127
159.70
159.70
188.526
188.386
0.60
0.60
0.15
0.15
0.200
0.200
1.424
1.524
10.614
11.301
0.000
0.000
0.600
0.600
1.658
1.658
8.156
8.843
10.00 30.00 190.020 -1.395 188.091 0.0043 0.100 2.033 4 10.000 30.00 190.020 -1.395 188.091 0.0043 0.10 2.033 2.000 0.033 187.987 159.70 188.247 0.60 0.15 0.200 1.623 11.800 0.098 0.600 1.658 9.440
10.00 40.00 190.000 -1.395 187.952 0.0043 0.100 2.152 5 10.000 40.00 190.000 -1.395 187.952 0.0043 0.10 2.152 2.000 0.152 187.848 159.70 188.107 0.60 0.15 0.200 1.743 12.000 0.555 0.600 1.658 10.097
10.00 50.00 190.020 -1.395 187.812 0.0043 0.100 2.312 6 10.000 50.00 190.020 -1.395 187.812 0.0043 0.10 2.312 2.000 0.312 187.708 159.70 187.968 0.60 0.15 0.200 1.902 12.000 1.393 0.600 1.658 10.934
1428 1.330 51.33 190.070 -1.395 187.780 0.0043 0.100 2.394 7 1.330 51.33 190.070 -1.395 187.780 0.0043 0.10 2.394 2.000 0.394 187.676 159.70 187.935 0.60 0.15 0.027 1.985 1.596 0.282 0.080 0.220 1.551

ESQUEMA PLANIMETRICO TRAMOS 51.33 2.052 1.028 59.312 2.328 3.080 8.510 49.022
11.590

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 51.33
190,070 190.500
190.110
12.33 12.55 188,030 190.100 190.060 190.020 190.000 190.020 190.070
190.000

6.00
1931
TAS-PVC-DN150--1,395%-51,33 TB-1088 1428
189.500

189.000
PERFILCOTA TERRENO TRAMO
188.500 PERFIL COTA SOLERA TUBO RED
188.510 188.370
190,110 188.000 188.231
188.091
188,510 187.952

C.I. 1931
187.812

C.I.1428
187.500 187.780
TRAMO TB -1088
187.000

186.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -545a DESDE C.I. : 2392a 526456.770 8782302.880 190.610 189.410 LONGITUD TRAMO : 35.30 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -545a
HASTA C.I. : 1931 526492.050 8782294.390 190.110 188.510 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 35.30 ML i (%) : -2.479 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : PUERTO ALTO DIST. ESTIMADA 36.30 i (°/o) TRAMO : -2.479 % FECHA : jueves, 19 de abril de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2392a 0.00 0.00 190.610 -2.479 189.410 0.0043 0.100 1.304 1 0.000 0.00 190.610 -2.479 189.410 0.0043 0.10 1.304 1.304 0.000 189.306 159.70 189.565 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 190.460
190.190
-2.479
-2.479
189.162
188.914
0.0043
0.0043
0.100
0.100
1.402
1.380
2
3
10.000
10.000
10.00
20.00
190.460
190.190
-2.479
-2.479
189.162
188.914
0.0043
0.0043
0.10
0.10
1.402
1.380
1.402
1.380
0.000
0.000
189.058
188.810
159.70
159.70
189.317
189.070
0.60
0.60
0.15
0.15
0.200
0.200
0.993
0.970
8.120
8.347
0.000
0.000
0.600
0.600
1.658
1.658
5.661
5.889
10.00 30.00 190.090 -2.479 188.666 0.0043 0.100 1.528 4 10.000 30.00 190.090 -2.479 188.666 0.0043 0.10 1.528 1.528 0.000 188.562 159.70 188.822 0.60 0.15 0.200 1.118 8.725 0.000 0.600 1.658 6.267
1931 5.300 35.30 190.110 -2.479 188.510 0.0043 0.100 1.704 5 5.300 35.30 190.110 -2.479 188.510 0.0043 0.10 1.704 1.704 0.000 188.406 159.70 188.665 0.60 0.15 0.106 1.295 5.140 0.000 0.318 0.879 3.837

ESQUEMA PLANIMETRICO TRAMOS 35.30 1.464 0.707 30.331 0.000 2.118 5.852 21.654
7.970

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 35.30
190,110 191.000
190.610
12.33 12.55 188,510 190.460
190.500
190.190 190.110
190.090
6.00
2392A
TAS-PVC-DN150--2,479%-35,30 TB-545a 1931
190.000

189.500
PERFILCOTA TERRENO TRAMO
189.410
189.000 189.162 PERFIL COTA SOLERA TUBO RED
188.914
190,610

C.I. 2392(1)
188.500 188.666
189,410 188.510

C.I.1931
188.000
TRAMO TB -545a
187.500

187.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -545 DESDE C.I. : 2392 526410.550 8782313.850 193.450 191.900 LONGITUD TRAMO : 46.57 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -545
HASTA C.I. : 2392A 526456.770 8782302.880 190.610 189.410 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 46.57 ML i (%) : -5.234 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : PUERTO ALTO DIST. ESTIMADA 47.57 i (°/o) TRAMO : -5.234 % FECHA : jueves, 19 de abril de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2392 0.00 0.00 193.450 -5.234 191.900 0.0043 0.100 1.654 1 0.000 0.00 193.450 -5.234 191.900 0.0043 0.10 1.654 1.654 0.000 191.796 159.70 192.055 0.60 0.15 0.000 1.245 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 193.030
192.110
-5.234
-5.234
191.377
190.853
0.0043
0.0043
0.100
0.100
1.758
1.361
2
3
10.000
10.000
10.00
20.00
193.030
192.110
-5.234
-5.234
191.377
190.853
0.0043
0.0043
0.10
0.10
1.758
1.361
1.758
1.361
0.000
0.000
191.272
190.749
159.70
159.70
191.532
191.009
0.60
0.60
0.15
0.15
0.200
0.200
1.348
0.951
10.236
9.357
0.000
0.000
0.600
0.600
1.658
1.658
7.778
6.899
10.00 30.00 191.450 -5.234 190.330 0.0043 0.100 1.225 4 10.000 30.00 191.450 -5.234 190.330 0.0043 0.10 1.225 1.225 0.000 190.225 159.70 190.485 0.60 0.15 0.200 0.815 7.758 0.000 0.600 1.658 5.299
10.00 40.00 190.830 -5.234 189.806 0.0043 0.100 1.128 5 10.000 40.00 190.830 -5.234 189.806 0.0043 0.10 1.128 1.128 0.000 189.702 159.70 189.962 0.60 0.15 0.200 0.718 7.058 0.000 0.600 1.658 4.600
2392A 6.570 46.57 190.610 -5.234 189.410 0.0043 0.100 1.304 6 6.570 46.57 190.610 -5.234 189.410 0.0043 0.10 1.304 1.304 0.000 189.306 159.70 189.565 0.60 0.15 0.132 0.895 4.794 0.000 0.394 1.089 3.179

ESQUEMA PLANIMETRICO TRAMOS 46.57 1.405 0.933 39.203 0.000 2.794 7.721 27.755
10.515

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 46.57
190,610 194.000 193.450
12.33 12.55 189,410 193.030
193.000
6.00 192.110
2392
TAS-PVC-DN150--5,234%-46,57 TB-545 2392A 192.000
191.450
191.900
191.000 191.377 190.830 PERFILCOTA TERRENO TRAMO
190.610
190.853 PERFIL COTA SOLERA TUBO RED
190.000 190.330
193,450
189.806
191,900

C.I.2392A
C.I. 2392
189.000 189.410

188.000 TRAMO TB -545

187.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -351 DESDE C.I. : 2339 526472.110 8782228.860 190.700 189.300 LONGITUD TRAMO : 67.50 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -351
HASTA C.I. : 1931 526492.050 8782294.390 190.110 188.710 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 67.50 ML i (%) : -0.861 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : PUERTO ALTO DIST. ESTIMADA 68.50 i (°/o) TRAMO : -0.861 % FECHA : jueves, 19 de abril de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2339 0.00 0.00 190.700 -0.861 189.300 0.0043 0.100 1.504 1 0.000 0.00 190.700 -0.861 189.300 0.0043 0.10 1.504 1.504 0.000 189.196 159.70 189.455 0.60 0.15 0.000 1.095 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 190.480
190.380
-0.861
-0.861
189.214
189.128
0.0043
0.0043
0.100
0.100
1.370
1.357
2
3
10.000
10.000
10.00
20.00
190.480
190.380
-0.861
-0.861
189.214
189.128
0.0043
0.0043
0.10
0.10
1.370
1.357
1.370
1.357
0.000
0.000
189.110
189.023
159.70
159.70
189.369
189.283
0.60
0.60
0.15
0.15
0.200
0.200
0.961
0.947
8.624
8.181
0.000
0.000
0.600
0.600
1.658
1.658
6.166
5.723
10.00 30.00 190.330 -0.861 189.042 0.0043 0.100 1.393 4 10.000 30.00 190.330 -0.861 189.042 0.0043 0.10 1.393 1.393 0.000 188.937 159.70 189.197 0.60 0.15 0.200 0.983 8.248 0.000 0.600 1.658 5.790
10.00 40.00 190.230 -0.861 188.955 0.0043 0.100 1.379 5 10.000 40.00 190.230 -0.861 188.955 0.0043 0.10 1.379 1.379 0.000 188.851 159.70 189.111 0.60 0.15 0.200 0.969 8.315 0.000 0.600 1.658 5.856
10.00 50.00 190.140 -0.861 188.869 0.0043 0.100 1.375 6 10.000 50.00 190.140 -0.861 188.869 0.0043 0.10 1.375 1.375 0.000 188.765 159.70 189.025 0.60 0.15 0.200 0.965 8.261 0.000 0.600 1.658 5.803
10.00 60.00 190.020 -0.861 188.783 0.0043 0.100 1.341 7 10.000 60.00 190.020 -0.861 188.783 0.0043 0.10 1.341 1.341 0.000 188.679 159.70 188.939 0.60 0.15 0.200 0.931 8.148 0.000 0.600 1.658 5.690
1931 7.500 67.50 190.110 -0.861 188.710 0.0043 0.100 1.504 8 7.500 67.50 190.110 -0.861 188.710 0.0043 0.10 1.504 1.504 0.000 188.606 159.70 188.865 0.60 0.15 0.150 1.095 6.402 0.000 0.450 1.243 4.558

ESQUEMA PLANIMETRICO TRAMOS 67.50 1.403 1.352 56.179 0.000 4.050 11.191 39.586
15.241

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 67.50
190,110 191.000 190.700
12.33 12.55 188,710
190.480
190.500 190.380 190.330
190.230
190.140 190.110
6.00
TB-351
190.020
TAS-PVC-DN150--0,861%-67,50 1931 190.000
2339

189.500 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
189.000 189.300 189.214
189.128
190,700 189.042
188.955
188.869
189,300 188.783

C.I. 2339
188.500

C.I.1931
188.710

188.000 TRAMO TB -351

187.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -117 DESDE C.I. : 2398 526534.460 8782178.350 190.700 189.500 LONGITUD TRAMO : 48.80 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -117
HASTA C.I. : 2645 526541.960 8782227.580 190.410 188.780 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 48.80 ML i (%) : -1.446 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : PUERTO ALTO DIST. ESTIMADA 49.80 i (°/o) TRAMO : -1.446 % FECHA : jueves, 19 de abril de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2398 0.00 0.00 190.700 -1.446 189.500 0.0043 0.100 1.304 1 0.000 0.00 190.700 -1.446 189.500 0.0043 0.10 1.304 1.304 0.000 189.396 159.70 189.655 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 190.630
190.590
-1.446
-1.446
189.355
189.211
0.0043
0.0043
0.100
0.100
1.379
1.483
2
3
10.000
10.000
10.00
20.00
190.630
190.590
-1.446
-1.446
189.355
189.211
0.0043
0.0043
0.10
0.10
1.379
1.483
1.379
1.483
0.000
0.000
189.251
189.107
159.70
159.70
189.511
189.366
0.60
0.60
0.15
0.15
0.200
0.200
0.969
1.074
8.050
8.587
0.000
0.000
0.600
0.600
1.658
1.658
5.591
6.129
10.00 30.00 190.530 -1.446 189.066 0.0043 0.100 1.568 4 10.000 30.00 190.530 -1.446 189.066 0.0043 0.10 1.568 1.568 0.000 188.962 159.70 189.222 0.60 0.15 0.200 1.158 9.154 0.000 0.600 1.658 6.696
10.00 40.00 190.460 -1.446 188.922 0.0043 0.100 1.643 5 10.000 40.00 190.460 -1.446 188.922 0.0043 0.10 1.643 1.643 0.000 188.817 159.70 189.077 0.60 0.15 0.200 1.233 9.632 0.000 0.600 1.658 7.174
2645 8.800 48.80 190.410 -1.446 188.780 0.0043 0.100 1.734 6 8.800 48.80 190.410 -1.446 188.780 0.0043 0.10 1.734 1.734 0.000 188.676 159.70 188.935 0.60 0.15 0.176 1.325 8.915 0.000 0.528 1.459 6.752

ESQUEMA PLANIMETRICO TRAMOS 48.80 1.519 0.978 44.337 0.000 2.928 8.091 32.341
11.019

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 48.80
190,410 191.000 190.700
12.33 12.55 188,780 190.630 190.590 190.530 190.460 190.410
190.500
6.00
2398
TAS-PVC-DN150--1,446%-48,80 TB-117 2645 190.000

189.500 PERFILCOTA TERRENO TRAMO


189.500 189.355 PERFIL COTA SOLERA TUBO RED
189.000 189.211
190,700 189.066
188.922
189,500

C.I. 2398
188.500 188.780

C.I.2645
188.000 TRAMO TB -117

187.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -511 DESDE C.I. : 2197 526455.630 8782199.470 191.550 190.050 LONGITUD TRAMO : 80.61 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -511
HASTA C.I. : 2398 526534.460 8782178.350 190.700 189.500 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 80.61 ML i (%) : -0.674 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : PUERTO ALTO DIST. ESTIMADA 81.61 i (°/o) TRAMO : -0.674 % FECHA : jueves, 19 de abril de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2197 0.00 0.00 191.550 -0.674 190.050 0.0043 0.100 1.604 1 0.000 0.00 191.550 -0.674 190.050 0.0043 0.10 1.604 1.604 0.000 189.946 159.70 190.205 0.60 0.15 0.000 1.195 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 191.350
191.250
-0.674
-0.674
189.983
189.915
0.0043
0.0043
0.100
0.100
1.472
1.439
2
3
10.000
10.000
10.00
20.00
191.350
191.250
-0.674
-0.674
189.983
189.915
0.0043
0.0043
0.10
0.10
1.472
1.439
1.472
1.439
0.000
0.000
189.878
189.811
159.70
159.70
190.138
190.071
0.60
0.60
0.15
0.15
0.200
0.200
1.062
1.029
9.228
8.732
0.000
0.000
0.600
0.600
1.658
1.658
6.770
6.274
10.00 30.00 191.140 -0.674 189.848 0.0043 0.100 1.396 4 10.000 30.00 191.140 -0.674 189.848 0.0043 0.10 1.396 1.396 0.000 189.744 159.70 190.003 0.60 0.15 0.200 0.987 8.507 0.000 0.600 1.658 6.048
10.00 40.00 191.000 -0.674 189.780 0.0043 0.100 1.324 5 10.000 40.00 191.000 -0.674 189.780 0.0043 0.10 1.324 1.324 0.000 189.676 159.70 189.936 0.60 0.15 0.200 0.914 8.161 0.000 0.600 1.658 5.703
10.00 50.00 190.900 -0.674 189.713 0.0043 0.100 1.291 6 10.000 50.00 190.900 -0.674 189.713 0.0043 0.10 1.291 1.291 0.000 189.609 159.70 189.868 0.60 0.15 0.200 0.882 7.845 0.000 0.600 1.658 5.387
10.00 60.00 190.800 -0.674 189.646 0.0043 0.100 1.259 7 10.000 60.00 190.800 -0.674 189.646 0.0043 0.10 1.259 1.259 0.000 189.541 159.70 189.801 0.60 0.15 0.200 0.849 7.650 0.000 0.600 1.658 5.192
10.00 70.00 190.610 -0.674 189.578 0.0043 0.100 1.136 8 10.000 70.00 190.610 -0.674 189.578 0.0043 0.10 1.136 1.136 0.000 189.474 159.70 189.734 0.60 0.15 0.200 0.726 7.184 0.000 0.600 1.658 4.726
10.00 80.00 190.700 -0.674 189.511 0.0043 0.100 1.293 9 10.000 80.00 190.700 -0.674 189.511 0.0043 0.10 1.293 1.293 0.000 189.407 159.70 189.666 0.60 0.15 0.200 0.884 7.288 0.000 0.600 1.658 4.830
2398 0.610 80.61 190.700 -0.674 189.500 0.0043 0.100 1.304 10 0.610 80.61 190.700 -0.674 189.500 0.0043 0.10 1.304 1.304 0.000 189.396 159.70 189.655 0.60 0.15 0.012 0.895 0.475 0.000 0.037 0.101 0.325

ESQUEMA PLANIMETRICO TRAMOS 80.61 1.352 1.615 65.071 0.000 4.837 13.364 45.256
18.201

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 80.61
190,700 192.000
12.33 12.55 189,500 191.550
191.500 191.350
191.250
191.140
191.000
6.00 190.900
2197
TAS-PVC-DN150--0,674%-80,61 TB-511 2398
191.000 190.800
190.610 190.700 190.700

190.500
PERFILCOTA TERRENO TRAMO
190.000 PERFIL COTA SOLERA TUBO RED
190.050 189.983 189.915 189.848
191,550 189.500
189.780 189.713 189.646 189.578
190,050 189.511

C.I. 2197
189.500

C.I.2398
189.000
TRAMO TB -511
188.500

188.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -1315 DESDE C.I. : 2196 526396.710 8782214.650 195.870 194.170 LONGITUD TRAMO : 59.98 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -1315
HASTA C.I. : 2197 526455.630 8782199.470 191.550 190.050 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 59.98 ML i (%) : -6.756 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : PUERTO ALTO DIST. ESTIMADA 60.98 i (°/o) TRAMO : -6.756 % FECHA : jueves, 19 de abril de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2196 0.00 0.00 195.870 -6.756 194.170 0.0043 0.100 1.804 1 0.000 0.00 195.870 -6.756 194.170 0.0043 0.10 1.804 1.804 0.000 194.066 159.70 194.325 0.60 0.15 0.000 1.395 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 195.460
194.160
-6.756
-6.756
193.494
192.819
0.0043
0.0043
0.100
0.100
2.070
1.445
2
3
10.000
10.000
10.00
20.00
195.460
194.160
-6.756
-6.756
193.494
192.819
0.0043
0.0043
0.10
0.10
2.070
1.445
2.000
1.445
0.070
0.000
193.390
192.715
159.70
159.70
193.650
192.974
0.60
0.60
0.15
0.15
0.200
0.200
1.660
1.036
11.413
10.336
0.210
0.210
0.600
0.600
1.658
1.658
9.164
8.088
10.00 30.00 193.300 -6.756 192.143 0.0043 0.100 1.261 4 10.000 30.00 193.300 -6.756 192.143 0.0043 0.10 1.261 1.261 0.000 192.039 159.70 192.299 0.60 0.15 0.200 0.851 8.120 0.000 0.600 1.658 5.662
10.00 40.00 192.650 -6.756 191.468 0.0043 0.100 1.287 5 10.000 40.00 192.650 -6.756 191.468 0.0043 0.10 1.287 1.287 0.000 191.363 159.70 191.623 0.60 0.15 0.200 0.877 7.643 0.000 0.600 1.658 5.185
10.00 50.00 192.070 -6.756 190.792 0.0043 0.100 1.382 6 10.000 50.00 192.070 -6.756 190.792 0.0043 0.10 1.382 1.382 0.000 190.688 159.70 190.947 0.60 0.15 0.200 0.973 8.007 0.000 0.600 1.658 5.549
2197 9.980 59.98 191.550 -6.756 190.050 0.0043 0.100 1.604 7 9.980 59.98 191.550 -6.756 190.050 0.0043 0.10 1.604 1.604 0.000 189.946 159.70 190.205 0.60 0.15 0.200 1.195 8.942 0.000 0.599 1.655 6.489

ESQUEMA PLANIMETRICO TRAMOS 59.98 1.551 1.201 54.461 0.419 3.599 9.944 40.136
13.543

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 59.98
191,550 197.000
12.33 12.55 190,050 195.870
196.000 195.460

195.000
6.00
TB-1315
194.160
TAS-PVC-DN150--6,756%-59,98 2197 194.000
2196 193.300
194.170
193.000 193.494 192.650
192.070 PERFILCOTA TERRENO TRAMO
192.819
192.000 192.143
191.550 PERFIL COTA SOLERA TUBO RED
195,870 191.000 191.468
194,170 190.792

C.I. 2196
190.000

C.I.2197
190.050
189.000
TRAMO TB -1315
188.000
187.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -104 DESDE C.I. : 2642 525006.540 8782361.860 202.200 199.560 LONGITUD TRAMO : 63.57 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -104
HASTA C.I. : 2480 525066.680 8782338.370 201.110 199.000 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.80 DN : 6" PLG LONG. : 63.57 ML i (%) : -0.867 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 1° DE MAYO DIST. ESTIMADA 64.57 i (°/o) TRAMO : -0.867 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2642 0.00 0.00 202.200 -0.867 199.560 0.0043 0.100 2.744 1 0.000 0.00 202.200 -0.867 199.560 0.0043 0.10 2.744 2.000 0.744 199.456 159.70 199.715 0.80 0.15 0.000 2.335 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.136
202.097
-0.867
-0.867
199.473
199.387
0.0043
0.0043
0.100
0.100
2.767
2.815
2
3
10.000
10.000
10.00
20.00
202.136
202.097
-0.867
-0.867
199.473
199.387
0.0043
0.0043
0.10
0.10
2.767
2.815
2.000
2.000
0.767
0.815
199.369
199.282
159.70
159.70
199.629
199.542
0.80
0.80
0.15
0.15
0.200
0.200
2.357
2.405
16.000
16.000
6.045
6.327
0.800
0.800
2.277
2.277
18.768
19.050
10.00 30.00 201.989 -0.867 199.300 0.0043 0.100 2.793 4 10.000 30.00 201.989 -0.867 199.300 0.0043 0.10 2.793 2.000 0.793 199.196 159.70 199.455 0.80 0.15 0.200 2.384 16.000 6.433 0.800 2.277 19.155
10.00 40.00 201.820 -0.867 199.213 0.0043 0.100 2.711 5 10.000 40.00 201.820 -0.867 199.213 0.0043 0.10 2.711 2.000 0.711 199.109 159.70 199.368 0.80 0.15 0.200 2.302 16.000 6.019 0.800 2.277 18.741
10.00 50.00 201.622 -0.867 199.126 0.0043 0.100 2.600 6 10.000 50.00 201.622 -0.867 199.126 0.0043 0.10 2.600 2.000 0.600 199.022 159.70 199.282 0.80 0.15 0.200 2.190 16.000 5.245 0.800 2.277 17.967
10.00 60.00 201.288 -0.867 199.040 0.0043 0.100 2.353 7 10.000 60.00 201.288 -0.867 199.040 0.0043 0.10 2.353 2.000 0.353 198.935 159.70 199.195 0.80 0.15 0.200 1.943 16.000 3.811 0.800 2.277 16.533
2480 3.570 63.57 201.110 -0.867 199.000 0.0043 0.100 2.214 8 3.570 63.57 201.110 -0.867 199.000 0.0043 0.10 2.214 2.000 0.214 198.896 159.70 199.155 0.80 0.15 0.072 1.805 5.712 0.810 0.286 0.813 5.352

ESQUEMA PLANIMETRICO TRAMOS 63.57 2.625 1.273 101.712 34.689 5.086 14.477 115.566
19.562

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 63.57
201,110 203.000
12.33 12.55 199,000 202.200
202.136 202.097 201.989
202.000 201.820
201.622
6.00
TB-104
201.288
TAS-PVC-DN150--0,867%-63,56 2480
201.110
2642 201.000
PERFILCOTA TERRENO TRAMO
200.000 PERFIL COTA SOLERA TUBO RED
202,200 199.473 199.387
199,560 199.000 199.560 199.300 199.213 199.126

C.I. 2642
199.040

C.I.2480
199.000

198.000 TRAMO TB -104

197.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES: Tramo entibado


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -103 DESDE C.I. : 1469 524950.730 8782383.820 201.920 199.840 LONGITUD TRAMO : 58.98 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -103
HASTA C.I. : 2642 525006.540 8782361.860 202.200 199.560 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.80 DN : 6" PLG LONG. : 58.98 ML i (%) : -0.467 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 1° DE MAYO DIST. ESTIMADA 59.98 i (°/o) TRAMO : -0.467 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1469 0.00 0.00 201.920 -0.467 199.840 0.0043 0.100 2.184 1 0.000 0.00 201.920 -0.467 199.840 0.0043 0.10 2.184 2.000 0.184 199.736 159.70 199.995 0.80 0.15 0.000 1.775 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 201.962
202.075
-0.467
-0.467
199.793
199.747
0.0043
0.0043
0.100
0.100
2.273
2.433
2
3
10.000
10.000
10.00
20.00
201.962
202.075
-0.467
-0.467
199.793
199.747
0.0043
0.0043
0.10
0.10
2.273
2.433
2.000
2.000
0.273
0.433
199.689
199.642
159.70
159.70
199.949
199.902
0.80
0.80
0.15
0.15
0.200
0.200
1.863
2.023
16.000
16.000
1.829
2.823
0.800
0.800
2.277
2.277
14.552
15.545
10.00 30.00 202.148 -0.467 199.700 0.0043 0.100 2.552 4 10.000 30.00 202.148 -0.467 199.700 0.0043 0.10 2.552 2.000 0.552 199.596 159.70 199.855 0.80 0.15 0.200 2.143 16.000 3.940 0.800 2.277 16.663
10.00 40.00 202.223 -0.467 199.653 0.0043 0.100 2.674 5 10.000 40.00 202.223 -0.467 199.653 0.0043 0.10 2.674 2.000 0.674 199.549 159.70 199.809 0.80 0.15 0.200 2.264 16.000 4.906 0.800 2.277 17.628
10.00 50.00 202.250 -0.467 199.607 0.0043 0.100 2.748 6 10.000 50.00 202.250 -0.467 199.607 0.0043 0.10 2.748 2.000 0.748 199.502 159.70 199.762 0.80 0.15 0.200 2.338 16.000 5.687 0.800 2.277 18.409
2642 8.980 58.98 202.200 -0.467 199.560 0.0043 0.100 2.744 7 8.980 58.98 202.200 -0.467 199.560 0.0043 0.10 2.744 2.000 0.744 199.456 159.70 199.715 0.80 0.15 0.180 2.335 14.368 5.359 0.718 2.045 16.784

ESQUEMA PLANIMETRICO TRAMOS 58.98 2.515 1.181 94.368 24.544 4.718 13.431 99.581
18.150

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 58.98
202,200 202.500
202.148 202.223 202.250 202.200
12.33 12.55 199,560 201.920 201.962
202.075
202.000

6.00 201.500
1469
TAS-PVC-DN150--0,467%-58,98 TB-103 2642
201.000

200.500 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
200.000
201,920
199.793
199,840 199.500 199.840 199.747 199.700 199.653 199.607

C.I. 1469

C.I.2642
199.560
199.000
TRAMO TB -103
198.500

198.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES: Tramo entibado


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -93 DESDE C.I. : 1875 524964.530 8782431.770 201.450 200.250 LONGITUD TRAMO : 48.90 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -93
HASTA C.I. : 1469 524950.730 8782383.820 201.920 199.840 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 48.90 ML i (%) : -0.822 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 1° DE MAYO DIST. ESTIMADA 49.90 i (°/o) TRAMO : -0.822 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1875 0.00 0.00 201.450 -0.822 200.250 0.0043 0.100 1.304 1 0.000 0.00 201.450 -0.822 200.250 0.0043 0.10 1.304 1.304 0.000 200.146 159.70 200.405 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 201.549
201.640
-0.822
-0.822
200.168
200.086
0.0043
0.0043
0.100
0.100
1.485
1.659
2
3
10.000
10.000
10.00
20.00
201.549
201.640
-0.822
-0.822
200.168
200.086
0.0043
0.0043
0.10
0.10
1.485
1.659
1.485
1.659
0.000
0.000
200.064
199.981
159.70
159.70
200.323
200.241
0.60
0.60
0.15
0.15
0.200
0.200
1.076
1.249
8.369
9.432
0.000
0.000
0.600
0.600
1.658
1.658
5.911
6.974
10.00 30.00 201.721 -0.822 200.003 0.0043 0.100 1.822 4 10.000 30.00 201.721 -0.822 200.003 0.0043 0.10 1.822 1.822 0.000 199.899 159.70 200.159 0.60 0.15 0.200 1.412 10.441 0.000 0.600 1.658 7.983
10.00 40.00 201.839 -0.822 199.921 0.0043 0.100 2.022 5 10.000 40.00 201.839 -0.822 199.921 0.0043 0.10 2.022 2.000 0.022 199.817 159.70 200.077 0.60 0.15 0.200 1.612 11.465 0.066 0.600 1.658 9.073
1469 8.900 48.90 201.920 -0.822 199.840 0.0043 0.100 2.184 6 8.900 48.90 201.920 -0.822 199.840 0.0043 0.10 2.184 2.000 0.184 199.736 159.70 199.995 0.60 0.15 0.178 1.775 10.680 0.551 0.534 1.476 9.043

ESQUEMA PLANIMETRICO TRAMOS 48.90 1.746 0.980 50.388 0.617 2.934 8.107 38.984
11.041

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 48.90
201,920 202.500
12.33 12.55 199,840 201.920
202.000 201.839
201.640 201.721
201.450 201.549
6.00
1875
TAS-PVC-DN150--0,822%-48,90 TB-93 1469
201.500

201.000
PERFILCOTA TERRENO TRAMO
200.500 PERFIL COTA SOLERA TUBO RED
201,450 200.000 200.168
200.250 200.086
200,250 200.003 199.921

C.I. 1875

C.I.1469
199.500 199.840

TRAMO TB -93
199.000

198.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -936 DESDE C.I. : 1722 525093.850 8782443.160 200.180 198.980 LONGITUD TRAMO : 35.52 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -936
HASTA C.I. : 1723 525083.540 8782408.130 202.100 198.800 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.80 DN : 6" PLG LONG. : 35.52 ML i (%) : -0.493 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 1° DE MAYO DIST. ESTIMADA 36.52 i (°/o) TRAMO : -0.493 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1722 0.00 0.00 200.180 -0.493 198.980 0.0043 0.100 1.304 1 0.000 0.00 200.180 -0.493 198.980 0.0043 0.10 1.304 1.304 0.000 198.876 159.70 199.135 0.80 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 200.914
201.659
-0.493
-0.493
198.931
198.881
0.0043
0.0043
0.100
0.100
2.088
2.882
2
3
10.000
10.000
10.00
20.00
200.914
201.659
-0.493
-0.493
198.931
198.881
0.0043
0.0043
0.10
0.10
2.088
2.882
2.000
2.000
0.088
0.882
198.826
198.777
159.70
159.70
199.086
199.037
0.80
0.80
0.15
0.15
0.200
0.200
1.678
2.472
13.217
16.000
0.350
3.878
0.800
0.800
2.277
2.277
10.290
16.600
10.00 30.00 201.940 -0.493 198.832 0.0043 0.100 3.212 4 10.000 30.00 201.940 -0.493 198.832 0.0043 0.10 3.212 2.000 1.212 198.728 159.70 198.988 0.80 0.15 0.200 2.802 16.000 8.376 0.800 2.277 21.099
1723 5.520 35.52 202.100 -0.493 198.800 0.0043 0.100 3.404 5 5.520 35.52 202.100 -0.493 198.800 0.0043 0.10 3.404 2.000 1.404 198.696 159.70 198.955 0.80 0.15 0.111 2.995 8.832 5.777 0.442 1.257 12.800

ESQUEMA PLANIMETRICO TRAMOS 35.52 2.578 0.711 54.049 18.382 2.842 8.089 60.789
10.931

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 35.52
202,100 203.000
12.33 12.55 198,800
202.100
201.940
202.000 201.659
6.00
1722
TAS-PVC-DN150--0,493%-35,52 TB-936 1723
201.000
200.914

200.180 PERFILCOTA TERRENO TRAMO


200.000 PERFIL COTA SOLERA TUBO RED
200,180
198,980 199.000

C.I. 1722
198.931

C.I.1723
198.881 198.832
198.980 198.800
198.000 TRAMO TB -936

197.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES: Tramo entibado


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -226 DESDE C.I. : 1480 524989.410 8782518.630 201.620 197.220 LONGITUD TRAMO : 67.87 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -226

HASTA C.I. : 1876 524970.680 8782452.360 201.340 196.280 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 1.00 DN : 6" PLG LONG. : 67.87 ML i (%) : -1.365 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 1° DE MAYO DIST. ESTIMADA 68.87 i (°/o) TRAMO : -1.365 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m 4-6m m mm ml ml ml m3 ml m3 m3 m3 m3 m3 m3
1480 0.00 0.00 201.620 -1.365 197.220 0.0043 0.100 4.504 1 0.000 0.00 201.620 -1.365 197.220 0.0043 0.10 4.504 2.000 2.000 0.504 197.116 159.70 197.375 1.00 0.15 0.000 4.095 0.000 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 201.533
201.495
-1.365
-1.365
197.084
196.947
0.0043
0.0043
0.100
0.100
4.554
4.652
2
3
10.000
10.000
10.00
20.00
201.533
201.495
-1.365
-1.365
197.084
196.947
0.0043
0.0043
0.10
0.10
4.554
4.652
2.000
2.000
2.000
2.000
0.554
0.652
196.979
196.843
159.70
159.70
197.239
197.102
1.00
1.00
0.15
0.15
0.200
0.200
4.144
4.243
20.000
20.000
20.000
20.000
5.290
6.030
1.000
1.000
2.897
2.897
41.193
41.933
10.00 30.00 201.507 -1.365 196.811 0.0043 0.100 4.801 4 10.000 30.00 201.507 -1.365 196.811 0.0043 0.10 4.801 2.000 2.000 0.801 196.706 159.70 196.966 1.00 0.15 0.200 4.391 20.000 20.000 7.265 1.000 2.897 43.168
10.00 40.00 201.408 -1.365 196.674 0.0043 0.100 4.838 5 10.000 40.00 201.408 -1.365 196.674 0.0043 0.10 4.838 2.000 2.000 0.838 196.570 159.70 196.829 1.00 0.15 0.200 4.429 20.000 20.000 8.195 1.000 2.897 44.098
10.00 50.00 201.423 -1.365 196.538 0.0043 0.100 4.990 6 10.000 50.00 201.423 -1.365 196.538 0.0043 0.10 4.990 2.000 2.000 0.990 196.433 159.70 196.693 1.00 0.15 0.200 4.580 20.000 20.000 9.140 1.000 2.897 45.043
10.00 60.00 201.403 -1.365 196.401 0.0043 0.100 5.106 7 10.000 60.00 201.403 -1.365 196.401 0.0043 0.10 5.106 2.000 2.000 1.106 196.297 159.70 196.556 1.00 0.15 0.200 4.697 20.000 20.000 10.480 1.000 2.897 46.383
1876 7.870 67.87 201.340 -1.365 196.280 0.0043 0.100 5.164 8 7.870 67.87 201.340 -1.365 196.280 0.0043 0.10 5.164 2.000 2.000 1.164 196.176 159.70 196.435 1.00 0.15 0.158 4.755 15.740 15.740 8.934 0.787 2.280 37.190

ESQUEMA PLANIMETRICO TRAMOS 67.87 4.826 1.359 135.740 135.740 55.335 6.787 19.660 299.008
26.447

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 67.87
201,345 203.000
12.33 12.55 196,920 201.620
202.000 201.533 201.495 201.507 201.408 201.423 201.403 201.340
201.000
6.00
1480
TAS-PVC-DN150--1,365%-67,87 TB-226 1876 200.000
199.000 PERFILCOTA TERRENO TRAMO
198.000 PERFIL COTA SOLERA TUBO RED
201,625 197.000
197.084 196.947
197,220 197.220 196.811 196.674 196.538

C.I. 1480
196.000 196.401

C.I.1876
196.280
195.000
TRAMO TB -226
194.000
193.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES: Tramo entibado


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -152 DESDE C.I. : 86 525047.010 8782503.800 199.860 198.660 LONGITUD TRAMO : 58.48 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -152

HASTA C.I. : 1480 524989.410 8782518.630 201.620 198.360 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.80 DN : 6" PLG LONG. : 58.48 ML i (%) : -0.504 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 1° DE MAYO DIST. ESTIMADA 59.48 i (°/o) TRAMO : -0.504 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m 4-6m m mm ml ml ml m3 ml m3 m3 m3 m3 m3 m3
86 0.00 0.00 199.860 -0.504 198.660 0.0043 0.100 1.304 1 0.000 0.00 199.860 -0.504 198.660 0.0043 0.10 1.304 1.304 0.000 0.000 198.556 159.70 198.815 0.80 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 200.120
200.560
-0.504
-0.504
198.610
198.559
0.0043
0.0043
0.100
0.100
1.615
2.105
2
3
10.000
10.000
10.00
20.00
200.120
200.560
-0.504
-0.504
198.610
198.559
0.0043
0.0043
0.10
0.10
1.615
2.105
1.615
2.000
0.000
0.105
0.000
0.000
198.505
198.455
159.70
159.70
198.765
198.715
0.80
0.80
0.15
0.15
0.200
0.200
1.205
1.695
11.676
14.459
0.000
0.421
0.000
0.000
0.800
0.800
2.277
2.277
8.399
11.602
10.00 30.00 200.940 -0.504 198.509 0.0043 0.100 2.536 4 10.000 30.00 200.940 -0.504 198.509 0.0043 0.10 2.536 2.000 0.536 0.000 198.404 159.70 198.664 0.80 0.15 0.200 2.126 16.000 2.563 0.000 0.800 2.277 15.286
10.00 40.00 201.140 -0.504 198.458 0.0043 0.100 2.786 5 10.000 40.00 201.140 -0.504 198.458 0.0043 0.10 2.786 2.000 0.786 0.000 198.354 159.70 198.614 0.80 0.15 0.200 2.376 16.000 5.287 0.000 0.800 2.277 18.009
10.00 50.00 201.250 -0.504 198.408 0.0043 0.100 2.946 6 10.000 50.00 201.250 -0.504 198.408 0.0043 0.10 2.946 2.000 0.946 0.000 198.304 159.70 198.563 0.80 0.15 0.200 2.537 16.000 6.930 0.000 0.800 2.277 19.653
1480 8.480 58.48 201.620 -0.504 198.360 0.0043 0.100 3.364 7 8.480 58.48 201.620 -0.504 198.360 0.0043 0.10 3.364 2.000 1.364 0.000 198.256 159.70 198.515 0.80 0.15 0.170 2.955 13.568 7.838 0.000 0.678 1.931 18.627

ESQUEMA PLANIMETRICO TRAMOS 58.48 2.380 1.171 87.703 23.039 0.000 4.678 13.318 91.575
17.996

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 58.48
201,620 202.000 201.620
12.33 12.55 198,360 201.140 201.250
200.940
201.000
200.560
6.00
86
TAS-PVC-DN150--0,504%-58.48 TB-152 1480 200.000
199.860
200.120

PERFILCOTA TERRENO TRAMO


199.000 PERFIL COTA SOLERA TUBO RED
199,860 198.660
198.610 198.559 198.509 198.458 198.408
198,660 198.000 198.360

C.I. 2195

C.I.1480
197.000 TRAMO TB -1313

196.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES: Tramo entibado


AL EJE DE VIA SIN CHIMENEA = 0
N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -154 DESDE C.I. : 87 525074.250 8782607.860 202.510 201.310 LONGITUD TRAMO : 106.60 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -154
HASTA C.I. : 86 525047.010 8782503.800 199.860 198.660 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 106.60 ML i (%) : -2.463 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 1° DE MAYO DIST. ESTIMADA 107.60 i (°/o) TRAMO : -2.463 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
87 0.00 0.00 202.510 -2.463 201.310 0.0043 0.100 1.304 1 0.000 0.00 202.510 -2.463 201.310 0.0043 0.10 1.304 1.304 0.000 201.206 159.70 201.465 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.420
202.340
-2.463
-2.463
201.064
200.817
0.0043
0.0043
0.100
0.100
1.461
1.627
2
3
10.000
10.000
10.00
20.00
202.420
202.340
-2.463
-2.463
201.064
200.817
0.0043
0.0043
0.10
0.10
1.461
1.627
1.461
1.627
0.000
0.000
200.959
200.713
159.70
159.70
201.219
200.973
0.60
0.60
0.15
0.15
0.200
0.200
1.051
1.217
8.295
9.262
0.000
0.000
0.600
0.600
1.658
1.658
5.836
6.804
10.00 30.00 202.250 -2.463 200.571 0.0043 0.100 1.783 4 10.000 30.00 202.250 -2.463 200.571 0.0043 0.10 1.783 1.783 0.000 200.467 159.70 200.727 0.60 0.15 0.200 1.373 10.230 0.000 0.600 1.658 7.772
10.00 40.00 202.180 -2.463 200.325 0.0043 0.100 1.959 5 10.000 40.00 202.180 -2.463 200.325 0.0043 0.10 1.959 1.959 0.000 200.221 159.70 200.480 0.60 0.15 0.200 1.550 11.228 0.000 0.600 1.658 8.770
10.00 50.00 202.160 -2.463 200.079 0.0043 0.100 2.186 6 10.000 50.00 202.160 -2.463 200.079 0.0043 0.10 2.186 2.000 0.186 199.974 159.70 200.234 0.60 0.15 0.200 1.776 11.878 0.557 0.600 1.658 9.977
10.00 60.00 202.160 -2.463 199.832 0.0043 0.100 2.432 7 10.000 60.00 202.160 -2.463 199.832 0.0043 0.10 2.432 2.000 0.432 199.728 159.70 199.988 0.60 0.15 0.200 2.022 12.000 1.853 0.600 1.658 11.395
10.00 70.00 202.070 -2.463 199.586 0.0043 0.100 2.588 8 10.000 70.00 202.070 -2.463 199.586 0.0043 0.10 2.588 2.000 0.588 199.482 159.70 199.741 0.60 0.15 0.200 2.179 12.000 3.061 0.600 1.658 12.603
10.00 80.00 201.740 -2.463 199.340 0.0043 0.100 2.505 9 10.000 80.00 201.740 -2.463 199.340 0.0043 0.10 2.505 2.000 0.505 199.235 159.70 199.495 0.60 0.15 0.200 2.095 12.000 3.279 0.600 1.658 12.820
10.00 90.00 201.150 -2.463 199.093 0.0043 0.100 2.161 10 10.000 90.00 201.150 -2.463 199.093 0.0043 0.10 2.161 2.000 0.161 198.989 159.70 199.249 0.60 0.15 0.200 1.751 12.000 1.996 0.600 1.658 11.538
10.00 100.00 200.160 -2.463 198.847 0.0043 0.100 1.417 11 10.000 100.00 200.160 -2.463 198.847 0.0043 0.10 1.417 1.417 0.000 198.743 159.70 199.003 0.60 0.15 0.200 1.007 10.251 0.483 0.600 1.658 8.276
86 6.600 106.60 199.860 -2.463 198.660 0.0043 0.100 1.304 12 6.600 106.60 199.860 -2.463 198.660 0.0043 0.10 1.304 1.304 0.000 198.556 159.70 198.815 0.60 0.15 0.132 0.895 5.388 0.000 0.396 1.094 3.766

ESQUEMA PLANIMETRICO TRAMOS 106.60 1.894 2.135 114.533 11.229 6.396 17.673 99.558
24.069

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 106.60
199,860 203.000 202.510
202.420
12.33 12.55 198,660 202.340 202.250 202.180 202.160 202.160 202.070
202.000 201.740

6.00 201.150

87
TAS-PVC-DN150--2,463%-106,60 TB-154 86 201.000
201.310201.064
200.817 200.160
200.571 199.860
200.000 200.325 PERFILCOTA TERRENO TRAMO
200.079
199.832 PERFIL COTA SOLERA TUBO RED
199.586
199.000 199.340
202,510 199.093
198.847
201,310 198.660
198.000

C.I. 87

C.I.86
197.000 TRAMO TB -154

196.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -1313 DESDE C.I. : 2195 524932.030 8782533.830 201.650 199.350 LONGITUD TRAMO : 58.36 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -1313
HASTA C.I. : 1480 524989.410 8782518.630 201.620 199.050 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 58.36 ML i (%) : -0.505 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 1° DE MAYO DIST. ESTIMADA 59.36 i (°/o) TRAMO : -0.505 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2195 0.00 0.00 201.650 -0.505 199.350 0.0043 0.100 2.404 1 0.000 0.00 201.650 -0.505 199.350 0.0043 0.10 2.404 2.000 0.404 199.246 159.70 199.505 0.70 0.15 0.000 1.995 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 201.755
201.739
-0.505
-0.505
199.299
199.249
0.0043
0.0043
0.100
0.100
2.560
2.594
2
3
10.000
10.000
10.00
20.00
201.755
201.739
-0.505
-0.505
199.299
199.249
0.0043
0.0043
0.10
0.10
2.560
2.594
2.000
2.000
0.560
0.594
199.195
199.145
159.70
159.70
199.455
199.404
0.70
0.70
0.15
0.15
0.200
0.200
2.150
2.185
14.000
14.000
3.374
4.040
0.700
0.700
1.968
1.968
14.507
15.172
10.00 30.00 201.717 -0.505 199.198 0.0043 0.100 2.623 4 10.000 30.00 201.717 -0.505 199.198 0.0043 0.10 2.623 2.000 0.623 199.094 159.70 199.354 0.70 0.15 0.200 2.213 14.000 4.261 0.700 1.968 15.393
10.00 40.00 201.677 -0.505 199.148 0.0043 0.100 2.633 5 10.000 40.00 201.677 -0.505 199.148 0.0043 0.10 2.633 2.000 0.633 199.044 159.70 199.303 0.70 0.15 0.200 2.224 14.000 4.397 0.700 1.968 15.529
10.00 50.00 201.644 -0.505 199.097 0.0043 0.100 2.651 6 10.000 50.00 201.644 -0.505 199.097 0.0043 0.10 2.651 2.000 0.651 198.993 159.70 199.253 0.70 0.15 0.200 2.241 14.000 4.496 0.700 1.968 15.628
1480 8.360 58.36 201.620 -0.505 199.050 0.0043 0.100 2.674 7 8.360 58.36 201.620 -0.505 199.050 0.0043 0.10 2.674 2.000 0.674 198.946 159.70 199.205 0.70 0.15 0.167 2.265 11.704 3.878 0.585 1.645 13.184

ESQUEMA PLANIMETRICO TRAMOS 58.36 2.591 1.169 81.704 24.445 4.085 11.483 89.412
15.568

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 58.36
201,620 202.000 201.650 201.755 201.739 201.717 201.677 201.644 201.620
12.33 12.55 199,050
201.500

6.00 201.000
2195
TAS-PVC-DN150--0,505%-58.36 TB-1313 1480
200.500

200.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
199.500
201,650
199.299
199,350 199.000 199.350 199.249 199.198 199.148 199.097

C.I. 2195

C.I.1480
199.050
198.500
TRAMO TB -1313
198.000

197.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -1407 DESDE C.I. : 2624 524886.050 8782542.440 200.760 199.560 LONGITUD TRAMO : 45.78 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -1407
HASTA C.I. : 2195 524932.030 8782533.830 201.650 199.350 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 45.78 ML i (%) : -0.449 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 1° DE MAYO DIST. ESTIMADA 46.78 i (°/o) TRAMO : -0.449 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2624 0.00 0.00 200.760 -0.449 199.560 0.0043 0.100 1.304 1 0.000 0.00 200.760 -0.449 199.560 0.0043 0.10 1.304 1.304 0.000 199.456 159.70 199.715 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 201.008
201.186
-0.449
-0.449
199.515
199.470
0.0043
0.0043
0.100
0.100
1.597
1.820
2
3
10.000
10.000
10.00
20.00
201.008
201.186
-0.449
-0.449
199.515
199.470
0.0043
0.0043
0.10
0.10
1.597
1.820
1.597
1.820
0.000
0.000
199.411
199.366
159.70
159.70
199.671
199.626
0.60
0.60
0.15
0.15
0.200
0.200
1.187
1.410
8.704
10.252
0.000
0.000
0.600
0.600
1.658
1.658
6.246
7.794
10.00 30.00 201.409 -0.449 199.425 0.0043 0.100 2.088 4 10.000 30.00 201.409 -0.449 199.425 0.0043 0.10 2.088 2.000 0.088 199.321 159.70 199.581 0.60 0.15 0.200 1.678 11.460 0.264 0.600 1.658 9.266
10.00 40.00 201.563 -0.449 199.380 0.0043 0.100 2.287 5 10.000 40.00 201.563 -0.449 199.380 0.0043 0.10 2.287 2.000 0.287 199.276 159.70 199.536 0.60 0.15 0.200 1.877 12.000 1.125 0.600 1.658 10.666
2195 5.780 45.78 201.650 -0.449 199.350 0.0043 0.100 2.404 6 5.780 45.78 201.650 -0.449 199.350 0.0043 0.10 2.404 2.000 0.404 199.246 159.70 199.505 0.60 0.15 0.116 1.995 6.936 1.198 0.347 0.958 6.714

ESQUEMA PLANIMETRICO TRAMOS 45.78 1.917 0.917 49.353 2.587 2.747 7.590 40.686
10.337

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 45.78
201,650 202.000
201.650
12.33 12.55 199,350 201.563
201.409
201.500
201.186
201.008
6.00
2624
TAS-PVC-DN150--0,449%-45.78 TB-1407 2195
201.000 200.760

200.500
PERFILCOTA TERRENO TRAMO
200.000 PERFIL COTA SOLERA TUBO RED
200,760 199.500
199,560 199.560
199.515 199.470 199.425

C.I. 2624
199.380

C.I.2195
199.000 199.350

TRAMO TB -1407
198.500

198.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -377 DESDE C.I. : 2361 524717.470 8782618.080 201.470 197.750 LONGITUD TRAMO : 74.36 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -377

HASTA C.I. : 2302 524717.070 8782542.720 202.340 197.400 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 1.00 DN : 6" PLG LONG. : 74.36 ML i (%) : -0.464 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 75.36 i (°/o) TRAMO : -0.464 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m 4-6m m mm ml ml ml m3 ml m3 m3 m3 m3 m3 m3
2361 0.00 0.00 201.470 -0.464 197.750 0.0043 0.100 3.824 1 0.000 0.00 201.470 -0.464 197.750 0.0043 0.10 3.824 2.000 1.824 0.000 197.646 159.70 197.905 1.00 0.15 0.000 3.415 0.000 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 201.657
202.179
-0.464
-0.464
197.704
197.657
0.0043
0.0043
0.100
0.100
4.058
4.626
2
3
10.000
10.000
10.00
20.00
201.657
202.179
-0.464
-0.464
197.704
197.657
0.0043
0.0043
0.10
0.10
4.058
4.626
2.000
2.000
2.000
2.000
0.058
0.626
197.599
197.553
159.70
159.70
197.859
197.813
1.00
1.00
0.15
0.15
0.200
0.200
3.648
4.216
20.000
20.000
19.122
20.000
0.289
3.420
1.000
1.000
2.897
2.897
35.313
39.323
10.00 30.00 202.463 -0.464 197.611 0.0043 0.100 4.957 4 10.000 30.00 202.463 -0.464 197.611 0.0043 0.10 4.957 2.000 2.000 0.957 197.506 159.70 197.766 1.00 0.15 0.200 4.547 20.000 20.000 7.914 1.000 2.897 43.817
10.00 40.00 202.617 -0.464 197.564 0.0043 0.100 5.157 5 10.000 40.00 202.617 -0.464 197.564 0.0043 0.10 5.157 2.000 2.000 1.157 197.460 159.70 197.720 1.00 0.15 0.200 4.747 20.000 20.000 10.568 1.000 2.897 46.471
10.00 50.00 202.522 -0.464 197.518 0.0043 0.100 5.109 6 10.000 50.00 202.522 -0.464 197.518 0.0043 0.10 5.109 2.000 2.000 1.109 197.413 159.70 197.673 1.00 0.15 0.200 4.699 20.000 20.000 11.328 1.000 2.897 47.231
10.00 60.00 202.412 -0.464 197.471 0.0043 0.100 5.045 7 10.000 60.00 202.412 -0.464 197.471 0.0043 0.10 5.045 2.000 2.000 1.045 197.367 159.70 197.627 1.00 0.15 0.200 4.635 20.000 20.000 10.767 1.000 2.897 46.670
10.00 70.00 202.290 -0.464 197.425 0.0043 0.100 4.969 8 10.000 70.00 202.290 -0.464 197.425 0.0043 0.10 4.969 2.000 2.000 0.969 197.321 159.70 197.580 1.00 0.15 0.200 4.560 20.000 20.000 10.072 1.000 2.897 45.975
2302 4.360 74.36 202.340 -0.464 197.400 0.0043 0.100 5.044 9 4.360 74.36 202.340 -0.464 197.400 0.0043 0.10 5.044 2.000 2.000 1.044 197.296 159.70 197.555 1.00 0.15 0.087 4.635 8.720 8.720 4.390 0.436 1.263 20.044

ESQUEMA PLANIMETRICO TRAMOS 74.36 4.754 1.489 148.720 147.842 58.748 7.436 21.540 324.844
28.976

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 74.36
202,340 204.000
12.33 12.55 197,400 202.617
203.000 202.463 202.522 202.412 202.290 202.340
202.179
202.000 201.470 201.657
6.00
2361
TAS-PVC-DN150--0,464%-74.36 TB-377 2302 201.000
200.000 PERFILCOTA TERRENO TRAMO
199.000 PERFIL COTA SOLERA TUBO RED
201,470 198.000
197,750 197.704 197.657 197.611 197.564 197.518

C.I. 2361
197.000 197.750 197.471 197.425

C.I.2302
197.400
196.000
TRAMO TB -377
195.000
194.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES: Tramo entibado


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -194 DESDE C.I. : 2651 524801.310 8782618.580 199.330 198.130 LONGITUD TRAMO : 82.84 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -194
HASTA C.I. : 2361 524717.470 8782618.080 201.470 197.750 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.80 DN : 6" PLG LONG. : 82.84 ML i (%) : -0.453 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 83.84 i (°/o) TRAMO : -0.453 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2651 0.00 0.00 199.330 -0.453 198.130 0.0043 0.100 1.304 1 0.000 0.00 199.330 -0.453 198.130 0.0043 0.10 1.304 1.304 0.000 198.026 159.70 198.285 0.80 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 199.627
200.222
-0.453
-0.453
198.085
198.039
0.0043
0.0043
0.100
0.100
1.647
2.287
2
3
10.000
10.000
10.00
20.00
199.627
200.222
-0.453
-0.453
198.085
198.039
0.0043
0.0043
0.10
0.10
1.647
2.287
1.647
2.000
0.000
0.287
197.980
197.935
159.70
159.70
198.240
198.195
0.80
0.80
0.15
0.15
0.200
0.200
1.237
1.877
11.804
14.586
0.000
1.148
0.800
0.800
2.277
2.277
8.526
12.457
10.00 30.00 200.635 -0.453 197.994 0.0043 0.100 2.745 4 10.000 30.00 200.635 -0.453 197.994 0.0043 0.10 2.745 2.000 0.745 197.890 159.70 198.149 0.80 0.15 0.200 2.336 16.000 4.129 0.800 2.277 16.851
10.00 40.00 200.820 -0.453 197.949 0.0043 0.100 2.976 5 10.000 40.00 200.820 -0.453 197.949 0.0043 0.10 2.976 2.000 0.976 197.844 159.70 198.104 0.80 0.15 0.200 2.566 16.000 6.883 0.800 2.277 19.606
10.00 50.00 200.886 -0.453 197.903 0.0043 0.100 3.087 6 10.000 50.00 200.886 -0.453 197.903 0.0043 0.10 3.087 2.000 1.087 197.799 159.70 198.059 0.80 0.15 0.200 2.677 16.000 8.250 0.800 2.277 20.972
10.00 60.00 201.011 -0.453 197.858 0.0043 0.100 3.257 7 10.000 60.00 201.011 -0.453 197.858 0.0043 0.10 3.257 2.000 1.257 197.754 159.70 198.013 0.80 0.15 0.200 2.848 16.000 9.377 0.800 2.277 22.099
10.00 70.00 201.035 -0.453 197.813 0.0043 0.100 3.327 8 10.000 70.00 201.035 -0.453 197.813 0.0043 0.10 3.327 2.000 1.327 197.708 159.70 197.968 0.80 0.15 0.200 2.917 16.000 10.335 0.800 2.277 23.058
10.00 80.00 201.154 -0.453 197.767 0.0043 0.100 3.491 9 10.000 80.00 201.154 -0.453 197.767 0.0043 0.10 3.491 2.000 1.491 197.663 159.70 197.923 0.80 0.15 0.200 3.081 16.000 11.270 0.800 2.277 23.992
2361 2.840 82.84 201.470 -0.453 197.750 0.0043 0.100 3.824 10 2.840 82.84 201.470 -0.453 197.750 0.0043 0.10 3.824 2.000 1.824 197.646 159.70 197.905 0.80 0.15 0.057 3.415 4.544 3.766 0.227 0.647 7.379

ESQUEMA PLANIMETRICO TRAMOS 82.84 2.794 1.659 126.934 55.158 6.627 18.865 154.940
25.492

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 82.84
201,470 202.000
201.470
12.33 12.55 197,750 201.011 201.035 201.154
200.820 200.886
201.000 200.635
200.222
6.00
2651
TAS-PVC-DN150--0,453%-82.84 TB-194 2361 200.000
199.330
199.627

199.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
198.000
199,330 198.130
198.085 198.039 197.994 197.949 197.903 197.858 197.813 197.767
198,130 197.750

C.I. 2651

C.I.2361
197.000

196.000 TRAMO TB -194

195.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES: Tramo entibado


AL EJE DE VIA SIN CHIMENEA = 0
N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -230 DESDE C.I. : 2412 524507.700 8782542.380 200.020 196.940 LONGITUD TRAMO : 49.03 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -230

HASTA C.I. : 2687 524557.730 8782542.420 201.110 196.770 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.80 DN : 6" PLG LONG. : 49.03 ML i (%) : -0.340 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 50.03 i (°/o) TRAMO : -0.340 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m 4-6m m mm ml ml ml m3 ml m3 m3 m3 m3 m3 m3
2412 0.00 0.00 200.020 -0.340 196.940 0.0043 0.100 3.184 1 0.000 0.00 200.020 -0.340 196.940 0.0043 0.10 3.184 2.000 1.184 0.000 196.836 159.70 197.095 0.80 0.15 0.000 2.775 0.000 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 200.150
200.312
-0.340
-0.340
196.906
196.872
0.0043
0.0043
0.100
0.100
3.348
3.544
2
3
10.000
10.000
10.00
20.00
200.150
200.312
-0.340
-0.340
196.906
196.872
0.0043
0.0043
0.10
0.10
3.348
3.544
2.000
2.000
1.348
1.544
0.000
0.000
196.802
196.768
159.70
159.70
197.061
197.027
0.80
0.80
0.15
0.15
0.200
0.200
2.939
3.135
16.000
16.000
10.130
11.570
0.000
0.000
0.800
0.800
2.277
2.277
22.853
24.293
10.00 30.00 200.555 -0.340 196.838 0.0043 0.100 3.821 4 10.000 30.00 200.555 -0.340 196.838 0.0043 0.10 3.821 2.000 1.821 0.000 196.734 159.70 196.993 0.80 0.15 0.200 3.412 16.000 13.462 0.000 0.800 2.277 26.184
10.00 40.00 200.830 -0.340 196.804 0.0043 0.100 4.130 5 10.000 40.00 200.830 -0.340 196.804 0.0043 0.10 4.130 2.000 2.000 0.130 196.700 159.70 196.959 0.80 0.15 0.200 3.721 16.000 15.285 0.521 0.800 2.277 28.528
2687 9.030 49.03 201.110 -0.340 196.770 0.0043 0.100 4.444 6 9.030 49.03 201.110 -0.340 196.770 0.0043 0.10 4.444 2.000 2.000 0.444 196.666 159.70 196.925 0.80 0.15 0.181 4.035 14.448 14.448 2.075 0.722 2.056 28.011

ESQUEMA PLANIMETRICO TRAMOS 49.03 3.745 0.982 78.448 64.895 2.596 3.922 11.166 129.869
15.088

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 49.03
201,110 202.000
12.33 12.55 196,770 201.110
200.830
201.000 200.555
200.020 200.150 200.312
6.00
2412
TAS-PVC-DN150--0,340%-49.03 TB-230 2687
200.000

199.000
PERFILCOTA TERRENO TRAMO
198.000 PERFIL COTA SOLERA TUBO RED
200,020 197.000
196,940 196.906 196.872 196.838 196.804

C.I. 2412

C.I.2687
196.940 196.770
196.000
TRAMO TB -230
195.000

194.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES: Tramo entibado


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -136 DESDE C.I. : 1515 524507.410 8782618.480 200.180 197.200 LONGITUD TRAMO : 75.10 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -136
HASTA C.I. : 2412 524507.700 8782542.380 200.020 196.940 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.80 DN : 6" PLG LONG. : 75.10 ML i (%) : -0.342 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 76.10 i (°/o) TRAMO : -0.342 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1515 0.00 0.00 200.180 -0.342 197.200 0.0043 0.100 3.084 1 0.000 0.00 200.180 -0.342 197.200 0.0043 0.10 3.084 2.000 1.084 197.096 159.70 197.355 0.80 0.15 0.000 2.675 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 200.160
200.140
-0.342
-0.342
197.166
197.132
0.0043
0.0043
0.100
0.100
3.098
3.112
2
3
10.000
10.000
10.00
20.00
200.160
200.140
-0.342
-0.342
197.166
197.132
0.0043
0.0043
0.10
0.10
3.098
3.112
2.000
2.000
1.098
1.112
197.062
197.027
159.70
159.70
197.321
197.287
0.80
0.80
0.15
0.15
0.200
0.200
2.689
2.703
16.000
16.000
8.731
8.843
0.800
0.800
2.277
2.277
21.453
21.565
10.00 30.00 200.120 -0.342 197.098 0.0043 0.100 3.126 4 10.000 30.00 200.120 -0.342 197.098 0.0043 0.10 3.126 2.000 1.126 196.993 159.70 197.253 0.80 0.15 0.200 2.717 16.000 8.955 0.800 2.277 21.678
10.00 40.00 200.100 -0.342 197.063 0.0043 0.100 3.140 5 10.000 40.00 200.100 -0.342 197.063 0.0043 0.10 3.140 2.000 1.140 196.959 159.70 197.219 0.80 0.15 0.200 2.731 16.000 9.068 0.800 2.277 21.790
10.00 50.00 200.079 -0.342 197.029 0.0043 0.100 3.155 6 10.000 50.00 200.079 -0.342 197.029 0.0043 0.10 3.155 2.000 1.155 196.925 159.70 197.185 0.80 0.15 0.200 2.745 16.000 9.180 0.800 2.277 21.902
10.00 60.00 200.059 -0.342 196.995 0.0043 0.100 3.169 7 10.000 60.00 200.059 -0.342 196.995 0.0043 0.10 3.169 2.000 1.169 196.891 159.70 197.150 0.80 0.15 0.200 2.759 16.000 9.292 0.800 2.277 22.015
10.00 70.00 200.039 -0.342 196.961 0.0043 0.100 3.183 8 10.000 70.00 200.039 -0.342 196.961 0.0043 0.10 3.183 2.000 1.183 196.857 159.70 197.116 0.80 0.15 0.200 2.773 16.000 9.404 0.800 2.277 22.127
2412 5.10 75.10 200.020 -0.342 196.940 0.0043 0.100 3.184 9 5.100 75.10 200.020 -0.342 196.940 0.0043 0.10 3.184 2.000 1.184 196.836 159.70 197.095 0.80 0.15 0.102 2.775 8.160 4.828 0.408 1.161 11.317

ESQUEMA PLANIMETRICO TRAMOS 75.10 3.139 1.504 120.160 68.301 6.008 17.102 163.846
23.110

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 75.10
200,020 201.000
12.33 12.55 196,940 200.180 200.160 200.140 200.120 200.100 200.079 200.059 200.039 200.020
200.000
6.00
1515
TAS-PVC-DN150--0,342%-75,10 TB-376 2412
199.000
PERFILCOTA TERRENO TRAMO
198.000 PERFIL COTA SOLERA TUBO RED
200,180
197,200 197.000 197.166 197.132 197.098

C.I. 1515
197.200 197.063 197.029 196.995 196.961

C.I.2412
196.940
196.000 TRAMO TB -136

195.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES: Tramo entibado


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -189 DESDE C.I. : 1514 524457.660 8782618.130 200.130 197.370 LONGITUD TRAMO : 48.75 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -189
HASTA C.I. : 1515 524507.410 8782618.480 200.180 197.200 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.80 DN : 6" PLG LONG. : 48.75 ML i (%) : -0.342 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 49.75 i (°/o) TRAMO : -0.342 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1514 0.00 0.00 200.130 -0.342 197.370 0.0043 0.100 2.864 1 0.000 0.00 200.130 -0.342 197.370 0.0043 0.10 2.864 2.000 0.864 197.266 159.70 197.525 0.80 0.15 0.000 2.455 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 198.754
198.411
-0.342
-0.342
197.336
197.302
0.0043
0.0043
0.100
0.100
1.522
1.214
2
3
10.000
10.000
10.00
20.00
198.754
198.411
-0.342
-0.342
197.336
197.302
0.0043
0.0043
0.10
0.10
1.522
1.214
1.522
1.214
0.000
0.000
197.232
197.197
159.70
159.70
197.491
197.457
0.80
0.80
0.15
0.15
0.200
0.200
1.113
0.804
14.090
10.944
3.457
0.000
0.800
0.800
2.277
2.277
14.269
7.667
10.00 30.00 198.496 -0.342 197.267 0.0043 0.100 1.333 4 10.000 30.00 198.496 -0.342 197.267 0.0043 0.10 1.333 1.333 0.000 197.163 159.70 197.423 0.80 0.15 0.200 0.923 10.186 0.000 0.800 2.277 6.908
10.00 40.00 199.086 -0.342 197.233 0.0043 0.100 1.957 5 10.000 40.00 199.086 -0.342 197.233 0.0043 0.10 1.957 1.957 0.000 197.129 159.70 197.389 0.80 0.15 0.200 1.547 13.159 0.000 0.800 2.277 9.882
1515 8.750 48.75 200.180 -0.342 197.200 0.0043 0.100 3.084 6 8.750 48.75 200.180 -0.342 197.200 0.0043 0.10 3.084 2.000 1.084 197.096 159.70 197.355 0.80 0.15 0.175 2.675 13.849 3.795 0.700 1.993 14.777

ESQUEMA PLANIMETRICO TRAMOS 48.75 1.996 0.977 62.229 7.252 3.900 11.102 53.503
15.002

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 48.75
200,180 200.500 200.130 200.180
12.33 12.55 197,200
200.000
199.500
6.00
TB-189
199.086
TAS-PVC-DN150--0,342%-48.75 1515 199.000 198.754
1514
198.411 198.496
198.500 PERFILCOTA TERRENO TRAMO
198.000 PERFIL COTA SOLERA TUBO RED
200,130 197.500
197,370 197.336 197.302 197.267

C.I. 1514
197.000 197.370 197.233

C.I.1515
197.200
196.500
TRAMO TB -189
196.000
195.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES: Tramo entibado


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -142 DESDE C.I. : 2490 524567.850 8782619.460 201.720 200.520 LONGITUD TRAMO : 59.48 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -142
HASTA C.I. : 1515 524507.410 8782618.480 200.180 198.500 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 59.48 ML i (%) : -3.340 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 60.48 i (°/o) TRAMO : -3.340 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2490 0.00 0.00 201.720 -3.340 200.520 0.0043 0.100 1.304 1 0.000 0.00 201.720 -3.340 200.520 0.0043 0.10 1.304 1.304 0.000 200.416 159.70 200.675 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 201.853
201.808
-3.340
-3.340
200.186
199.852
0.0043
0.0043
0.100
0.100
1.771
2.060
2
3
10.000
10.000
10.00
20.00
201.853
201.808
-3.340
-3.340
200.186
199.852
0.0043
0.0043
0.10
0.10
1.771
2.060
1.771
2.000
0.000
0.060
200.082
199.748
159.70
159.70
200.341
200.007
0.60
0.60
0.15
0.15
0.200
0.200
1.362
1.651
9.227
11.314
0.000
0.181
0.600
0.600
1.658
1.658
6.769
9.036
10.00 30.00 201.660 -3.340 199.518 0.0043 0.100 2.246 4 10.000 30.00 201.660 -3.340 199.518 0.0043 0.10 2.246 2.000 0.246 199.414 159.70 199.673 0.60 0.15 0.200 1.837 12.000 0.920 0.600 1.658 10.461
10.00 40.00 201.345 -3.340 199.184 0.0043 0.100 2.265 5 10.000 40.00 201.345 -3.340 199.184 0.0043 0.10 2.265 2.000 0.265 199.080 159.70 199.339 0.60 0.15 0.200 1.856 12.000 1.534 0.600 1.658 11.076
10.00 50.00 200.627 -3.340 198.850 0.0043 0.100 1.881 6 10.000 50.00 200.627 -3.340 198.850 0.0043 0.10 1.881 1.881 0.000 198.746 159.70 199.005 0.60 0.15 0.200 1.472 11.644 0.796 0.600 1.658 9.981
1515 9.480 59.48 200.180 -3.340 198.500 0.0043 0.100 1.784 7 9.480 59.48 200.180 -3.340 198.500 0.0043 0.10 1.784 1.784 0.000 198.396 159.70 198.655 0.60 0.15 0.190 1.375 10.425 0.000 0.569 1.572 8.094

ESQUEMA PLANIMETRICO TRAMOS 59.48 1.902 1.191 66.609 3.431 3.569 9.861 55.418
13.430

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 59.48
200,180 203.000
12.33 12.55 198,500
201.720 201.853 201.808
202.000 201.660
201.345
6.00
2490
TAS-PVC-DN150--3,340%-60.48 TB-142 1515 201.000 200.627
200.180
200.000 200.520 200.186 PERFILCOTA TERRENO TRAMO
199.852 PERFIL COTA SOLERA TUBO RED
199.518
199.000 199.184
201,720 198.850
200,520

C.I. 2490
198.000 198.500

C.I.1515
197.000 TRAMO TB -142

196.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -376 DESDE C.I. : 2359 524612.540 8782618.930 202.510 200.120 LONGITUD TRAMO : 75.17 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -376
HASTA C.I. : 2360 524611.540 8782542.770 202.360 199.500 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.80 DN : 6" PLG LONG. : 75.17 ML i (%) : -0.814 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 76.17 i (°/o) TRAMO : -0.814 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2359 0.00 0.00 202.510 -0.814 200.120 0.0043 0.100 2.494 1 0.000 0.00 202.510 -0.814 200.120 0.0043 0.10 2.494 2.000 0.494 200.016 159.70 200.275 0.80 0.15 0.000 2.085 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 202.510
202.402
-0.814
-0.814
200.039
199.957
0.0043
0.0043
0.100
0.100
2.576
2.549
2
3
10.000
10.000
10.00
20.00
202.510
202.402
-0.814
-0.814
200.039
199.957
0.0043
0.0043
0.10
0.10
2.576
2.549
2.000
2.000
0.576
0.549
199.934
199.853
159.70
159.70
200.194
200.113
0.80
0.80
0.15
0.15
0.200
0.200
2.166
2.139
16.000
16.000
4.280
4.499
0.800
0.800
2.277
2.277
17.002
17.222
10.00 30.00 202.426 -0.814 199.876 0.0043 0.100 2.654 4 10.000 30.00 202.426 -0.814 199.876 0.0043 0.10 2.654 2.000 0.654 199.772 159.70 200.031 0.80 0.15 0.200 2.245 16.000 4.814 0.800 2.277 17.537
10.00 40.00 202.502 -0.814 199.794 0.0043 0.100 2.812 5 10.000 40.00 202.502 -0.814 199.794 0.0043 0.10 2.812 2.000 0.812 199.690 159.70 199.950 0.80 0.15 0.200 2.402 16.000 5.866 0.800 2.277 18.588
10.00 50.00 202.437 -0.814 199.713 0.0043 0.100 2.828 6 10.000 50.00 202.437 -0.814 199.713 0.0043 0.10 2.828 2.000 0.828 199.609 159.70 199.868 0.80 0.15 0.200 2.419 16.000 6.561 0.800 2.277 19.283
10.00 60.00 202.465 -0.814 199.632 0.0043 0.100 2.938 7 10.000 60.00 202.465 -0.814 199.632 0.0043 0.10 2.938 2.000 0.938 199.527 159.70 199.787 0.80 0.15 0.200 2.528 16.000 7.064 0.800 2.277 19.786
10.00 70.00 202.385 -0.814 199.550 0.0043 0.100 2.939 8 10.000 70.00 202.385 -0.814 199.550 0.0043 0.10 2.939 2.000 0.939 199.446 159.70 199.706 0.80 0.15 0.200 2.529 16.000 7.507 0.800 2.277 20.229
2360 5.17 75.17 202.360 -0.814 199.500 0.0043 0.100 2.964 9 5.170 75.17 202.360 -0.814 199.500 0.0043 0.10 2.964 2.000 0.964 199.396 159.70 199.655 0.80 0.15 0.104 2.555 8.272 3.936 0.414 1.177 10.514

ESQUEMA PLANIMETRICO TRAMOS 75.17 2.751 1.506 120.272 44.527 6.014 17.118 140.161
23.132

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 75.17
202,360 203.000 202.510
202.510 202.502 202.465
12.33 12.55 199,500 202.402 202.426 202.437 202.385 202.360

202.000
6.00
2359
TAS-PVC-DN150--0,814%-75,17 TB-376 2360
201.000
PERFILCOTA TERRENO TRAMO
200.000 PERFIL COTA SOLERA TUBO RED
200.039 199.957
200.120 199.876 199.794
202,510 199.713 199.632 199.550
200,120 199.000 199.500

C.I. 2359

C.I.2360
198.000 TRAMO TB -376

197.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES: Tramo entibado


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -193 DESDE C.I. : 2490 524567.850 8782619.460 201.720 200.520 LONGITUD TRAMO : 43.69 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -193
HASTA C.I. : 2359 524612.540 8782618.930 202.510 200.220 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 43.69 ML i (%) : -0.671 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 44.69 i (°/o) TRAMO : -0.671 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2490 0.00 0.00 201.720 -0.671 200.520 0.0043 0.100 1.304 1 0.000 0.00 201.720 -0.671 200.520 0.0043 0.10 1.304 1.304 0.000 200.416 159.70 200.675 0.70 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 201.626
201.622
-0.671
-0.671
200.453
200.386
0.0043
0.0043
0.100
0.100
1.277
1.341
2
3
10.000
10.000
10.00
20.00
201.626
201.622
-0.671
-0.671
200.453
200.386
0.0043
0.0043
0.10
0.10
1.277
1.341
1.277
1.341
0.000
0.000
200.349
200.281
159.70
159.70
200.608
200.541
0.70
0.70
0.15
0.15
0.200
0.200
0.868
0.931
9.036
9.163
0.000
0.000
0.700
0.700
1.968
1.968
6.168
6.295
10.00 30.00 201.699 -0.671 200.319 0.0043 0.100 1.485 4 10.000 30.00 201.699 -0.671 200.319 0.0043 0.10 1.485 1.485 0.000 200.214 159.70 200.474 0.70 0.15 0.200 1.075 9.888 0.000 0.700 1.968 7.020
10.00 40.00 201.938 -0.671 200.252 0.0043 0.100 1.791 5 10.000 40.00 201.938 -0.671 200.252 0.0043 0.10 1.791 1.791 0.000 200.147 159.70 200.407 0.70 0.15 0.200 1.381 11.464 0.000 0.700 1.968 8.596
2359 3.690 43.69 202.510 -0.671 200.220 0.0043 0.100 2.394 6 3.690 43.69 202.510 -0.671 200.220 0.0043 0.10 2.394 2.000 0.394 200.116 159.70 200.375 0.70 0.15 0.074 1.985 4.896 0.509 0.258 0.726 4.347

ESQUEMA PLANIMETRICO TRAMOS 43.69 1.599 0.875 44.447 0.509 3.058 8.596 32.426
11.655

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 43.69
202,510 203.000
12.33 12.55 200,220 202.510
202.500
6.00 201.938

2490
TAS-PVC-DN150--0,671%-43,69 TB-193 2359
202.000 201.720
201.626 201.622 201.699

201.500
PERFILCOTA TERRENO TRAMO
201.000 PERFIL COTA SOLERA TUBO RED
201,720 200.500
200,520 200.453

C.I. 2490
200.520 200.386

C.I.2359
200.319 200.252
200.000 200.220
TRAMO TB -193
199.500

199.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES: Tramo entibado


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -500 DESDE C.I. : 2411 524612.490 8782694.530 202.360 200.530 LONGITUD TRAMO : 74.60 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -500
HASTA C.I. : 2359 524612.540 8782618.930 202.510 200.120 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 74.60 ML i (%) : -0.542 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 75.60 i (°/o) TRAMO : -0.542 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2411 0.00 0.00 202.360 -0.542 200.530 0.0043 0.100 1.934 1 0.000 0.00 202.360 -0.542 200.530 0.0043 0.10 1.934 1.934 0.000 200.426 159.70 200.685 0.70 0.15 0.000 1.525 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 202.248
202.288
-0.542
-0.542
200.476
200.422
0.0043
0.0043
0.100
0.100
1.877
1.971
2
3
10.000
10.000
10.00
20.00
202.248
202.288
-0.542
-0.542
200.476
200.422
0.0043
0.0043
0.10
0.10
1.877
1.971
1.877
1.971
0.000
0.000
200.371
200.317
159.70
159.70
200.631
200.577
0.70
0.70
0.15
0.15
0.200
0.200
1.467
1.561
13.338
13.466
0.000
0.000
0.700
0.700
1.968
1.968
10.470
10.598
10.00 30.00 202.366 -0.542 200.367 0.0043 0.100 2.103 4 10.000 30.00 202.366 -0.542 200.367 0.0043 0.10 2.103 2.000 0.103 200.263 159.70 200.523 0.70 0.15 0.200 1.693 13.898 0.360 0.700 1.968 11.390
10.00 40.00 202.369 -0.542 200.313 0.0043 0.100 2.160 5 10.000 40.00 202.369 -0.542 200.313 0.0043 0.10 2.160 2.000 0.160 200.209 159.70 200.468 0.70 0.15 0.200 1.751 14.000 0.921 0.700 1.968 12.053
10.00 50.00 202.400 -0.542 200.259 0.0043 0.100 2.245 6 10.000 50.00 202.400 -0.542 200.259 0.0043 0.10 2.245 2.000 0.245 200.155 159.70 200.414 0.70 0.15 0.200 1.836 14.000 1.420 0.700 1.968 12.552
10.00 60.00 202.435 -0.542 200.205 0.0043 0.100 2.335 7 10.000 60.00 202.435 -0.542 200.205 0.0043 0.10 2.335 2.000 0.335 200.100 159.70 200.360 0.70 0.15 0.200 1.925 14.000 2.031 0.700 1.968 13.163
10.00 70.00 202.452 -0.542 200.150 0.0043 0.100 2.406 8 10.000 70.00 202.452 -0.542 200.150 0.0043 0.10 2.406 2.000 0.406 200.046 159.70 200.306 0.70 0.15 0.200 1.996 14.000 2.592 0.700 1.968 13.724
2359 4.600 74.60 202.510 -0.542 200.120 0.0043 0.100 2.494 9 4.600 74.60 202.510 -0.542 200.120 0.0043 0.10 2.494 2.000 0.494 200.016 159.70 200.275 0.70 0.15 0.092 2.085 6.440 1.449 0.322 0.905 6.570

ESQUEMA PLANIMETRICO TRAMOS 74.60 2.169 1.494 103.141 8.774 5.222 14.678 90.520
19.900

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 74.60
202,510 203.000
12.33 12.55 200,120 202.360 202.366 202.369 202.400 202.435 202.452 202.510
202.500 202.248 202.288

6.00 202.000
2411
TAS-PVC-DN150--0,542%-74.60 TB-500 2359
201.500

201.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
200.500
202,360 200.530
200.476 200.422 200.367 200.313
200,530 200.000 200.259 200.205 200.150

C.I. 2411

C.I.2359
200.120
199.500
TRAMO TB -500
199.000

198.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -192 DESDE C.I. : 2620 524557.470 8782694.590 203.110 201.000 LONGITUD TRAMO : 54.02 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -192
HASTA C.I. : 2411 524612.490 8782694.530 202.360 200.530 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 54.02 ML i (%) : -0.854 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 55.02 i (°/o) TRAMO : -0.854 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2620 0.00 0.00 203.110 -0.854 201.000 0.0043 0.100 2.214 1 0.000 0.00 203.110 -0.854 201.000 0.0043 0.10 2.214 2.000 0.214 200.896 159.70 201.155 0.60 0.15 0.000 1.805 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.855
202.610
-0.854
-0.854
200.915
200.829
0.0043
0.0043
0.100
0.100
2.045
1.885
2
3
10.000
10.000
10.00
20.00
202.855
202.610
-0.854
-0.854
200.915
200.829
0.0043
0.0043
0.10
0.10
2.045
1.885
2.000
1.885
0.045
0.000
200.810
200.725
159.70
159.70
201.070
200.985
0.60
0.60
0.15
0.15
0.200
0.200
1.635
1.475
12.000
11.655
0.777
0.134
0.600
0.600
1.658
1.658
10.319
9.331
10.00 30.00 202.458 -0.854 200.744 0.0043 0.100 1.819 4 10.000 30.00 202.458 -0.854 200.744 0.0043 0.10 1.819 1.819 0.000 200.639 159.70 200.899 0.60 0.15 0.200 1.409 11.111 0.000 0.600 1.658 8.653
10.00 40.00 202.280 -0.854 200.658 0.0043 0.100 1.726 5 10.000 40.00 202.280 -0.854 200.658 0.0043 0.10 1.726 1.726 0.000 200.554 159.70 200.814 0.60 0.15 0.200 1.316 10.634 0.000 0.600 1.658 8.175
10.00 50.00 202.209 -0.854 200.573 0.0043 0.100 1.740 6 10.000 50.00 202.209 -0.854 200.573 0.0043 0.10 1.740 1.740 0.000 200.469 159.70 200.728 0.60 0.15 0.200 1.331 10.399 0.000 0.600 1.658 7.941
2411 4.020 54.02 202.360 -0.854 200.530 0.0043 0.100 1.934 7 4.020 54.02 202.360 -0.854 200.530 0.0043 0.10 1.934 1.934 0.000 200.426 159.70 200.685 0.60 0.15 0.081 1.525 4.432 0.000 0.241 0.666 3.443

ESQUEMA PLANIMETRICO TRAMOS 54.02 1.909 1.082 60.231 0.911 3.241 8.956 47.863
12.197

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 54.02
202,360 203.500 203.110
12.33 12.55 200,530 202.855
203.000
202.610
202.458
202.500 202.280 202.360
6.00
TB-192
202.209
TAS-PVC-DN150--0,854%-54.02 2411
2620 202.000

201.500 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
201.000
203,110 201.000 200.915 200.829
201,000 200.500 200.744 200.658 200.573

C.I. 2620

C.I.2411
200.530
200.000
TRAMO TB -192
199.500

199.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -140 DESDE C.I. : 2701 524518.500 8782694.390 202.660 201.460 LONGITUD TRAMO : 37.97 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -140
HASTA C.I. : 2620 524557.470 8782694.590 203.110 201.000 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 37.97 ML i (%) : -1.180 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 38.97 i (°/o) TRAMO : -1.180 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2701 0.00 0.00 202.660 -1.180 201.460 0.0043 0.100 1.304 1 0.000 0.00 202.660 -1.180 201.460 0.0043 0.10 1.304 1.304 0.000 201.356 159.70 201.615 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.970
203.113
-1.180
-1.180
201.342
201.224
0.0043
0.0043
0.100
0.100
1.732
1.993
2
3
10.000
10.000
10.00
20.00
202.970
203.113
-1.180
-1.180
201.342
201.224
0.0043
0.0043
0.10
0.10
1.732
1.993
1.732
1.993
0.000
0.000
201.238
201.120
159.70
159.70
201.497
201.379
0.60
0.60
0.15
0.15
0.200
0.200
1.323
1.584
9.110
11.177
0.000
0.000
0.600
0.600
1.658
1.658
6.652
8.719
10.00 30.00 203.107 -1.180 201.106 0.0043 0.100 2.105 4 10.000 30.00 203.107 -1.180 201.106 0.0043 0.10 2.105 2.000 0.105 201.002 159.70 201.261 0.60 0.15 0.200 1.696 11.980 0.316 0.600 1.658 9.838
2620 7.970 37.97 203.110 -1.180 201.000 0.0043 0.100 2.214 5 7.970 37.97 203.110 -1.180 201.000 0.0043 0.10 2.214 2.000 0.214 200.896 159.70 201.155 0.60 0.15 0.160 1.805 9.564 0.764 0.478 1.321 8.369

ESQUEMA PLANIMETRICO TRAMOS 37.97 1.870 0.761 41.831 1.081 2.278 6.295 33.578
8.573

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 37.97
203,110 203.500
12.33 12.55 201,000 202.970
203.113 203.107 203.110
203.000 202.660
6.00
2701
TAS-PVC-DN150--1,180%-37.97 TB-140 2620
202.500

202.000
PERFILCOTA TERRENO TRAMO
201.500 PERFIL COTA SOLERA TUBO RED
201.342
202,660 201.000
201.460 201.224
201.106
201,460

C.I. 2701
201.000

C.I.2620
200.500
TRAMO TB -140
200.000

199.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -443 DESDE C.I. : 2410 524612.670 8782764.450 202.230 201.030 LONGITUD TRAMO : 68.92 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -443
HASTA C.I. : 2411 524612.490 8782694.530 202.360 200.530 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 68.92 ML i (%) : -0.715 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 69.92 i (°/o) TRAMO : -0.715 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2410 0.00 0.00 202.230 -0.715 201.030 0.0043 0.100 1.304 1 0.000 0.00 202.230 -0.715 201.030 0.0043 0.10 1.304 1.304 0.000 200.926 159.70 201.185 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.463
202.516
-0.715
-0.715
200.958
200.887
0.0043
0.0043
0.100
0.100
1.609
1.733
2
3
10.000
10.000
10.00
20.00
202.463
202.516
-0.715
-0.715
200.958
200.887
0.0043
0.0043
0.10
0.10
1.609
1.733
1.609
1.733
0.000
0.000
200.854
200.783
159.70
159.70
201.114
201.042
0.60
0.60
0.15
0.15
0.200
0.200
1.199
1.324
8.739
10.026
0.000
0.000
0.600
0.600
1.658
1.658
6.281
7.568
10.00 30.00 202.511 -0.715 200.815 0.0043 0.100 1.800 4 10.000 30.00 202.511 -0.715 200.815 0.0043 0.10 1.800 1.800 0.000 200.711 159.70 200.971 0.60 0.15 0.200 1.390 10.599 0.000 0.600 1.658 8.141
10.00 40.00 202.501 -0.715 200.744 0.0043 0.100 1.861 5 10.000 40.00 202.501 -0.715 200.744 0.0043 0.10 1.861 1.861 0.000 200.640 159.70 200.899 0.60 0.15 0.200 1.452 10.983 0.000 0.600 1.658 8.525
10.00 50.00 202.431 -0.715 200.672 0.0043 0.100 1.863 6 10.000 50.00 202.431 -0.715 200.672 0.0043 0.10 1.863 1.863 0.000 200.568 159.70 200.828 0.60 0.15 0.200 1.453 11.173 0.000 0.600 1.658 8.714
10.00 60.00 202.399 -0.715 200.601 0.0043 0.100 1.902 7 10.000 60.00 202.399 -0.715 200.601 0.0043 0.10 1.902 1.902 0.000 200.497 159.70 200.756 0.60 0.15 0.200 1.493 11.296 0.000 0.600 1.658 8.837
2411 8.920 68.92 202.360 -0.715 200.530 0.0043 0.100 1.934 8 8.920 68.92 202.360 -0.715 200.530 0.0043 0.10 1.934 1.934 0.000 200.426 159.70 200.685 0.60 0.15 0.179 1.525 10.267 0.000 0.535 1.479 8.074

ESQUEMA PLANIMETRICO TRAMOS 68.92 1.751 1.381 73.084 0.000 4.135 11.426 56.142
15.561

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 68.92
202,360 203.000
12.33 12.55 200,530 202.516 202.511 202.501
202.463 202.431 202.399
202.500 202.230 202.360

6.00
2410
TAS-PVC-DN150--0,715%-68.92 TB-443 2411 202.000

201.500 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
201.000
202,230 200.958
201.030 200.887
201,030 200.815 200.744

C.I. 2410
200.500 200.672

C.I.2411
200.601
200.530
200.000 TRAMO TB -443

199.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -580 DESDE C.I. : 2472 523861.860 8782544.210 201.780 199.200 LONGITUD TRAMO : 76.34 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -580
HASTA C.I. : 2290 523862.100 8782466.870 201.860 198.960 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.80 DN : 6" PLG LONG. : 76.34 ML i (%) : -0.310 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 77.34 i (°/o) TRAMO : -0.310 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2472 0.00 0.00 201.780 -0.310 199.200 0.0043 0.100 2.684 1 0.000 0.00 201.780 -0.310 199.200 0.0043 0.10 2.684 2.000 0.684 199.096 159.70 199.355 0.80 0.15 0.000 2.275 0.000 0.000 0.000 0.000 0.000
10.00 10.00 201.583 -0.310 199.169 0.0043 0.100 2.518 2 10.000 10.00 201.583 -0.310 199.169 0.0043 0.10 2.518 2.000 0.518 199.065 159.70 199.324 0.80 0.15 0.200 2.109 16.000 4.811 0.800 2.277 17.533
10.00
10.00
20.00
30.00
opcional 201.661
201.678
-0.310
-0.310
199.138
199.107
0.0043
0.0043
0.100
0.100
2.627
2.675
3
4
10.000
10.000
20.00
30.00
201.661
201.678
-0.310
-0.310
199.138
199.107
0.0043
0.0043
0.10
0.10
2.627
2.675
2.000
2.000
0.627
0.675
199.034
199.003
159.70
159.70
199.293
199.262
0.80
0.80
0.15
0.15
0.200
0.200
2.218
2.266
16.000
16.000
4.583
5.211
0.800
0.800
2.277
2.277
17.305
17.933
10.00 40.00 201.745 -0.310 199.076 0.0043 0.100 2.773 5 10.000 40.00 201.745 -0.310 199.076 0.0043 0.10 2.773 2.000 0.773 198.972 159.70 199.231 0.80 0.15 0.200 2.364 16.000 5.795 0.800 2.277 18.518
10.00 50.00 201.747 -0.310 199.045 0.0043 0.100 2.806 6 10.000 50.00 201.747 -0.310 199.045 0.0043 0.10 2.806 2.000 0.806 198.941 159.70 199.200 0.80 0.15 0.200 2.397 16.000 6.320 0.800 2.277 19.042
10.00 60.00 201.695 -0.310 199.014 0.0043 0.100 2.785 7 10.000 60.00 201.695 -0.310 199.014 0.0043 0.10 2.785 2.000 0.785 198.910 159.70 199.169 0.80 0.15 0.200 2.376 16.000 6.368 0.800 2.277 19.090
10.00 70.00 201.934 -0.310 198.983 0.0043 0.100 3.056 8 10.000 70.00 201.934 -0.310 198.983 0.0043 0.10 3.056 2.000 1.056 198.878 159.70 199.138 0.80 0.15 0.200 2.646 16.000 7.364 0.800 2.277 20.086
2290 6.340 76.34 201.860 -0.310 198.960 0.0043 0.100 3.004 9 6.340 76.34 201.860 -0.310 198.960 0.0043 0.10 3.004 2.000 1.004 198.856 159.70 199.115 0.80 0.15 0.127 2.595 10.144 5.224 0.507 1.444 13.290

ESQUEMA PLANIMETRICO TRAMOS 76.34 2.770 1.529 122.144 45.675 6.107 17.385 142.797
23.492

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 76.34
201,865 203.000
12.33 12.55 198,960
201.780 201.934 201.860
202.000 201.583 201.661 201.678 201.745 201.747 201.695
6.00
2472
TAS-PVC-DN150--0,310%-76,34 TB-580 2290
201.000
PERFILCOTA TERRENO TRAMO
200.000 PERFIL COTA SOLERA TUBO RED
201,775
199,200 199.000 199.169 199.138 199.107

C.I. 2472
199.200 199.076 199.045 199.014 198.983 198.960

C.I. 2290
198.000 TRAMO TB -580

197.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES: Tramo entibado y retiro de lodo


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -208 DESDE C.I. : 1478 524072.110 8781915.090 202.150 199.420 LONGITUD TRAMO : 26.85 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -208
HASTA C.I. : 1486 524072.350 8781942.940 202.210 199.290 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.80 DN : 6" PLG LONG. : 26.85 ML i (%) : -0.467 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 27.85 i (°/o) TRAMO : -0.467 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1478 0.00 0.00 202.150 -0.467 199.420 0.0043 0.100 2.834 1 0.000 0.00 202.150 -0.467 199.420 0.0043 0.10 2.834 2.000 0.834 199.316 159.70 199.575 0.80 0.15 0.000 2.425 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.183 -0.467 199.373 0.0043 0.100 2.914 2 10.000 10.00 202.183 -0.467 199.373 0.0043 0.10 2.914 2.000 0.914 199.269 159.70 199.529 0.80 0.15 0.200 2.504 16.000 6.993 0.800 2.277 19.716

1486
10.00
6.850
20.00
26.85
opcional 202.243
202.210
-0.467
-0.467
199.327
199.290
0.0043
0.0043
0.100
0.100
3.021
3.024
3
4
10.000
6.850
20.00
26.85
202.243
202.210
-0.467
-0.467
199.327
199.290
0.0043
0.0043
0.10
0.10
3.021
3.024
2.000
2.000
1.021
1.024
199.222
199.186
159.70
159.70
199.482
199.445
0.80
0.80
0.15
0.15
0.200
0.137
2.611
2.615
16.000
10.960
7.739
5.603
0.800
0.548
2.277
1.560
20.461
14.318

ESQUEMA PLANIMETRICO TRAMOS 26.85 2.948 0.538 42.960 20.335 2.148 6.115 54.494
8.263

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 26.85
202,210 202.500 202.150 202.183 202.243 202.210
12.33 12.55 199,290
202.000
201.500
6.00
1478
TAS-PVC-DN150--0,467%-26.85 TB-208 1486 201.000
200.500 PERFILCOTA TERRENO TRAMO
200.000 PERFIL COTA SOLERA TUBO RED
202,150 199.500
199,420 199.373 199.327

C.I. 1486
199.290

C.I. 1478
199.000 199.420

198.500
TRAMO TB -208
198.000
197.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES: Tramo entibado


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -381 DESDE C.I. : 2363 524115.620 8781892.860 201.830 200.630 LONGITUD TRAMO : 47.86 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -381
HASTA C.I. : 1478 524072.110 8781915.090 202.150 200.020 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 47.86 ML i (%) : -1.248 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 48.86 i (°/o) TRAMO : -1.248 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2363 0.00 0.00 201.830 -1.248 200.630 0.0043 0.100 1.304 1 0.000 0.00 201.830 -1.248 200.630 0.0043 0.10 1.304 1.304 0.000 200.526 159.70 200.785 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00 10.00 201.979 -1.248 200.505 0.0043 0.100 1.578 2 10.000 10.00 201.979 -1.248 200.505 0.0043 0.10 1.578 1.578 0.000 200.401 159.70 200.661 0.60 0.15 0.200 1.168 8.647 0.000 0.600 1.658 6.189
10.00
10.00
20.00
30.00
opcional 202.116
202.114
-1.248
-1.248
200.380
200.255
0.0043
0.0043
0.100
0.100
1.840
1.963
3
4
10.000
10.000
20.00
30.00
202.116
202.114
-1.248
-1.248
200.380
200.255
0.0043
0.0043
0.10
0.10
1.840
1.963
1.840
1.963
0.000
0.000
200.276
200.151
159.70
159.70
200.536
200.411
0.60
0.60
0.15
0.15
0.200
0.200
1.430
1.553
10.254
11.408
0.000
0.000
0.600
0.600
1.658
1.658
7.796
8.950
10.00 40.00 202.142 -1.248 200.131 0.0043 0.100 2.116 5 10.000 40.00 202.142 -1.248 200.131 0.0043 0.10 2.116 2.000 0.116 200.026 159.70 200.286 0.60 0.15 0.200 1.706 11.888 0.347 0.600 1.658 9.777
1478 7.860 47.86 202.150 -1.248 200.020 0.0043 0.100 2.234 6 7.860 47.86 202.150 -1.248 200.020 0.0043 0.10 2.234 2.000 0.234 199.916 159.70 200.175 0.60 0.15 0.157 1.825 9.432 0.825 0.472 1.303 8.325

ESQUEMA PLANIMETRICO TRAMOS 47.86 1.839 0.959 51.630 1.172 2.872 7.935 41.038
10.806

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 47.86
202,150 202.500
202.142 202.150
12.33 12.55 200,020 201.979
202.116 202.114
201.830
202.000
6.00
2363
TAS-PVC-DN150--1,248%-47,86 TB-381 1478
201.500

201.000
PERFILCOTA TERRENO TRAMO
200.500 PERFIL COTA SOLERA TUBO RED
200.630 200.505
200.380
201,830 200.000
200.255
200.131
200,630 200.020

C.I. 1478
C.I. 2363
199.500
TRAMO TB -381
199.000

198.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0 N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -1352 DESDE C.I. : 2052 524012.700 8781948.350 201.300 199.990 LONGITUD TRAMO : 67.09 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -1352
HASTA C.I. : 1478 524072.110 8781915.090 202.150 199.420 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 67.09 ML i (%) : -0.837 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 68.09 i (°/o) TRAMO : -0.837 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2052 0.00 0.00 201.300 -0.837 199.990 0.0043 0.100 1.414 1 0.000 0.00 201.300 -0.837 199.990 0.0043 0.10 1.414 1.414 0.000 199.886 159.70 200.145 0.70 0.15 0.000 1.005 0.000 0.000 0.000 0.000 0.000
10.00 10.00 201.137 -0.837 199.906 0.0043 0.100 1.335 2 10.000 10.00 201.137 -0.837 199.906 0.0043 0.10 1.335 1.335 0.000 199.802 159.70 200.062 0.70 0.15 0.200 0.925 9.623 0.000 0.700 1.968 6.755
10.00
10.00
20.00
30.00
opcional 201.123
201.318
-0.837
-0.837
199.823
199.739
0.0043
0.0043
0.100
0.100
1.405
1.683
3
4
10.000
10.000
20.00
30.00
201.123
201.318
-0.837
-0.837
199.823
199.739
0.0043
0.0043
0.10
0.10
1.405
1.683
1.405
1.683
0.000
0.000
199.718
199.635
159.70
159.70
199.978
199.894
0.70
0.70
0.15
0.15
0.200
0.200
0.995
1.274
9.589
10.809
0.000
0.000
0.700
0.700
1.968
1.968
6.721
7.941
10.00 40.00 201.447 -0.837 199.655 0.0043 0.100 1.896 5 10.000 40.00 201.447 -0.837 199.655 0.0043 0.10 1.896 1.896 0.000 199.551 159.70 199.811 0.70 0.15 0.200 1.486 12.529 0.000 0.700 1.968 9.661
10.00 50.00 201.621 -0.837 199.571 0.0043 0.100 2.154 6 10.000 50.00 201.621 -0.837 199.571 0.0043 0.10 2.154 2.000 0.154 199.467 159.70 199.727 0.70 0.15 0.200 1.744 13.637 0.539 0.700 1.968 11.307
10.00 60.00 201.914 -0.837 199.488 0.0043 0.100 2.531 7 10.000 60.00 201.914 -0.837 199.488 0.0043 0.10 2.531 2.000 0.531 199.383 159.70 199.643 0.70 0.15 0.200 2.121 14.000 2.396 0.700 1.968 13.528
1478 7.090 67.09 202.150 -0.837 199.420 0.0043 0.100 2.834 8 7.090 67.09 202.150 -0.837 199.420 0.0043 0.10 2.834 2.000 0.834 199.316 159.70 199.575 0.70 0.15 0.142 2.425 9.926 3.387 0.496 1.395 11.280

ESQUEMA PLANIMETRICO TRAMOS 67.09 1.907 1.344 80.111 6.321 4.696 13.201 67.192
17.897

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 67.09
202,150 202.500
202.150
12.33 12.55 199,420 201.914
202.000
201.621
201.300 201.447
6.00 201.500 201.318

2052
TAS-PVC-DN150--0,837%-67,09 TB-1352 1478
201.000
201.137 201.123

200.500 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
200.000
201,300 199.990 199.906 199.823
199,990 199.500 199.739 199.655

C.I. 1478
199.571

C.I. 2052
199.488 199.420
199.000
TRAMO TB -1352
198.500

198.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES: Tramo entibado


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -52 DESDE C.I. : 1870 524071.940 8782084.530 202.440 198.630 LONGITUD TRAMO : 66.32 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -52
HASTA C.I. : 1915 524071.690 8782151.850 202.010 198.340 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.80 DN : 6" PLG LONG. : 66.32 ML i (%) : -0.431 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 67.32 i (°/o) TRAMO : -0.431 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1870 0.00 0.00 202.440 -0.431 198.630 0.0043 0.100 3.914 1 0.000 0.00 202.440 -0.431 198.630 0.0043 0.10 3.914 2.000 1.914 198.526 159.70 198.785 0.80 0.15 0.000 3.505 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.309
202.190
-0.431
-0.431
198.587
198.544
0.0043
0.0043
0.100
0.100
3.826
3.750
2
3
10.000
10.000
10.00
20.00
202.309
202.190
-0.431
-0.431
198.587
198.544
0.0043
0.0043
0.10
0.10
3.826
3.750
2.000
2.000
1.826
1.750
198.483
198.440
159.70
159.70
198.742
198.699
0.80
0.80
0.15
0.15
0.200
0.200
3.417
3.341
16.000
16.000
14.963
14.307
0.800
0.800
2.277
2.277
27.685
27.030
10.00 30.00 202.167 -0.431 198.501 0.0043 0.100 3.771 4 10.000 30.00 202.167 -0.431 198.501 0.0043 0.10 3.771 2.000 1.771 198.396 159.70 198.656 0.80 0.15 0.200 3.361 16.000 14.084 0.800 2.277 26.806
10.00 40.00 202.041 -0.431 198.458 0.0043 0.100 3.688 5 10.000 40.00 202.041 -0.431 198.458 0.0043 0.10 3.688 2.000 1.688 198.353 159.70 198.613 0.80 0.15 0.200 3.278 16.000 13.833 0.800 2.277 26.555
10.00 50.00 202.030 -0.431 198.415 0.0043 0.100 3.720 6 10.000 50.00 202.030 -0.431 198.415 0.0043 0.10 3.720 2.000 1.720 198.310 159.70 198.570 0.80 0.15 0.200 3.310 16.000 13.629 0.800 2.277 26.352
10.00 60.00 201.928 -0.431 198.372 0.0043 0.100 3.661 7 10.000 60.00 201.928 -0.431 198.372 0.0043 0.10 3.661 2.000 1.661 198.267 159.70 198.527 0.80 0.15 0.200 3.251 16.000 13.522 0.800 2.277 26.244
1915 6.320 66.32 202.010 -0.431 198.340 0.0043 0.100 3.774 8 6.320 66.32 202.010 -0.431 198.340 0.0043 0.10 3.774 2.000 1.774 198.236 159.70 198.495 0.80 0.15 0.127 3.365 10.112 8.684 0.506 1.439 16.724

ESQUEMA PLANIMETRICO TRAMOS 66.32 3.763 1.328 106.112 93.021 5.306 15.103 177.396
20.409

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 66.32
202,010 203.000 202.440
12.33 12.55 198,340 202.309 202.190 202.167 202.041 202.030 202.010
201.928
202.000
6.00
1870
TAS-PVC-DN150--0,431%-66.32 TB-52 1915 201.000

200.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
199.000
202,440
198,630 198.587 198.544 198.501 198.458

C.I. 1870

C.I.1915
198.000 198.630 198.415 198.372 198.340

197.000 TRAMO TB -52

196.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES: Tramo entibado y retiro de lodo


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -185 DESDE C.I. : 2670 523887.180 8782467.200 202.140 200.940 LONGITUD TRAMO : 79.14 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -185
HASTA C.I. : 2243 523967.310 8782467.070 203.130 199.970 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 79.14 ML i (%) : -1.210 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 80.14 i (°/o) TRAMO : -1.210 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2670 0.00 0.00 202.140 -1.210 200.940 0.0043 0.100 1.304 1 0.000 0.00 202.140 -1.210 200.940 0.0043 0.10 1.304 1.304 0.000 200.836 159.70 201.095 0.70 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.169 -1.210 200.819 0.0043 0.100 1.454 2 10.000 10.00 202.169 -1.210 200.819 0.0043 0.10 1.454 1.454 0.000 200.715 159.70 200.974 0.70 0.15 0.200 1.045 9.655 0.000 0.700 1.968 6.787
10.00
10.00
20.00
30.00
opcional 202.243
202.425
-1.210
-1.210
200.698
200.577
0.0043
0.0043
0.100
0.100
1.649
1.952
3
4
10.000
10.000
20.00
30.00
202.243
202.425
-1.210
-1.210
200.698
200.577
0.0043
0.0043
0.10
0.10
1.649
1.952
1.649
1.952
0.000
0.000
200.594
200.473
159.70
159.70
200.853
200.732
0.70
0.70
0.15
0.15
0.200
0.200
1.240
1.543
10.863
12.606
0.000
0.000
0.700
0.700
1.968
1.968
7.995
9.738
10.00 40.00 202.641 -1.210 200.456 0.0043 0.100 2.289 5 10.000 40.00 202.641 -1.210 200.456 0.0043 0.10 2.289 2.000 0.289 200.352 159.70 200.611 0.70 0.15 0.200 1.880 13.834 1.013 0.700 1.968 11.979
10.00 50.00 202.746 -1.210 200.335 0.0043 0.100 2.516 6 10.000 50.00 202.746 -1.210 200.335 0.0043 0.10 2.516 2.000 0.516 200.230 159.70 200.490 0.70 0.15 0.200 2.106 14.000 2.817 0.700 1.968 13.950
10.00 60.00 202.829 -1.210 200.214 0.0043 0.100 2.720 7 10.000 60.00 202.829 -1.210 200.214 0.0043 0.10 2.720 2.000 0.720 200.109 159.70 200.369 0.70 0.15 0.200 2.310 14.000 4.323 0.700 1.968 15.455
10.00 70.00 202.859 -1.210 200.093 0.0043 0.100 2.871 8 10.000 70.00 202.859 -1.210 200.093 0.0043 0.10 2.871 2.000 0.871 199.988 159.70 200.248 0.70 0.15 0.200 2.461 14.000 5.566 0.700 1.968 16.698
2243 9.140 79.14 203.130 -1.210 199.970 0.0043 0.100 3.264 9 9.140 79.14 203.130 -1.210 199.970 0.0043 0.10 3.264 2.000 1.264 199.866 159.70 200.125 0.70 0.15 0.183 2.855 12.796 6.830 0.640 1.798 17.004

ESQUEMA PLANIMETRICO TRAMOS 79.14 2.224 1.585 101.754 20.549 5.540 15.572 99.606
21.111

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 79.14
203,130 204.000
12.33 12.55 199,970
203.130
202.829 202.859
203.000 202.641 202.746
6.00 202.425

2670
TAS-PVC-DN150--1,210%-79.14 TB-185 2243
202.000
202.140 202.169 202.243

PERFILCOTA TERRENO TRAMO


201.000 PERFIL COTA SOLERA TUBO RED
200.819
202,140 200.940 200.698 200.577 200.456
200,940 200.000 200.335 200.214

C.I. 2243
200.093

C.I. 2670
199.970

199.000 TRAMO TB -185

198.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -140 DESDE C.I. : 1620 523757.850 8782359.930 203.150 199.060 LONGITUD TRAMO : 53.15 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -140

HASTA C.I. : 2665 523812.000 8782360.630 202.620 198.840 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.80 DN : 6" PLG LONG. : 53.15 ML i (%) : -0.406 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 54.15 i (°/o) TRAMO : -0.406 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m 4-6m m mm ml ml ml m3 ml m3 m3 m3 m3 m3 m3
1620 0.00 0.00 203.150 -0.406 199.060 0.0043 0.100 4.194 1 0.000 0.00 203.150 -0.406 199.060 0.0043 0.10 4.194 2.000 2.000 0.194 198.956 159.70 199.215 0.80 0.15 0.000 3.785 0.000 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.900 -0.406 199.019 0.0043 0.100 3.985 2 10.000 10.00 202.900 -0.406 199.019 0.0043 0.10 3.985 2.000 1.985 0.000 198.915 159.70 199.175 0.80 0.15 0.200 3.575 16.000 15.940 0.777 0.800 2.277 29.439
10.00
10.00
20.00
30.00
opcional 202.894
202.767
-0.406
-0.406
198.979
198.938
0.0043
0.0043
0.100
0.100
4.020
3.933
3
4
10.000
10.000
20.00
30.00
202.894
202.767
-0.406
-0.406
198.979
198.938
0.0043
0.0043
0.10
0.10
4.020
3.933
2.000
2.000
2.000
1.933
0.020
0.000
198.874
198.834
159.70
159.70
199.134
199.094
0.80
0.80
0.15
0.15
0.200
0.200
3.610
3.523
16.000
16.000
15.940
15.733
0.078
0.078
0.800
0.800
2.277
2.277
28.740
28.533
10.00 40.00 202.762 -0.406 198.898 0.0043 0.100 3.969 5 10.000 40.00 202.762 -0.406 198.898 0.0043 0.10 3.969 2.000 1.969 0.000 198.793 159.70 199.053 0.80 0.15 0.200 3.559 16.000 15.608 0.000 0.800 2.277 28.330
10.00 50.00 202.651 -0.406 198.857 0.0043 0.100 3.898 6 10.000 50.00 202.651 -0.406 198.857 0.0043 0.10 3.898 2.000 1.898 0.000 198.753 159.70 199.012 0.80 0.15 0.200 3.489 16.000 15.469 0.000 0.800 2.277 28.191
2665 3.150 53.15 202.620 -0.406 198.840 0.0043 0.100 3.884 7 3.150 53.15 202.620 -0.406 198.840 0.0043 0.10 3.884 2.000 1.884 0.000 198.736 159.70 198.995 0.80 0.15 0.063 3.475 5.040 4.766 0.000 0.252 0.717 8.774

ESQUEMA PLANIMETRICO TRAMOS 53.15 3.983 1.065 85.040 83.455 0.934 4.252 12.104 152.008
16.356

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 53.15
202,620 204.000
12.33 12.55 198,840 203.150
202.900 202.894 202.767 202.762
203.000 202.651 202.620

6.00
1620
TAS-PVC-DN150--0,406%-53.15 TB-140 2665
202.000

201.000
PERFILCOTA TERRENO TRAMO
200.000 PERFIL COTA SOLERA TUBO RED
202,150 199.000
199,060 199.019 198.979 198.938 198.898 198.857

C.I. 2665
198.840

C.I. 1620
199.060
198.000
TRAMO TB -140
197.000

196.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES: Tramo entibado y retiro de lodo


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -145 DESDE C.I. : 2290 523862.100 8782466.870 201.860 198.960 LONGITUD TRAMO : 48.68 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -145
HASTA C.I. : 2669 523861.920 8782417.190 202.260 198.810 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.80 DN : 6" PLG LONG. : 48.68 ML i (%) : -0.302 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 49.68 i (°/o) TRAMO : -0.302 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2290 0.00 0.00 201.860 -0.302 198.960 0.0043 0.100 3.004 1 0.000 0.00 201.860 -0.302 198.960 0.0043 0.10 3.004 2.000 1.004 198.856 159.70 199.115 0.80 0.15 0.000 2.595 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.221 -0.302 198.930 0.0043 0.100 3.395 2 10.000 10.00 202.221 -0.302 198.930 0.0043 0.10 3.395 2.000 1.395 198.826 159.70 199.085 0.80 0.15 0.200 2.986 16.000 9.599 0.800 2.277 22.322
10.00
10.00
20.00
30.00
opcional 202.080
202.111
-0.302
-0.302
198.900
198.869
0.0043
0.0043
0.100
0.100
3.285
3.346
3
4
10.000
10.000
20.00
30.00
202.080
202.111
-0.302
-0.302
198.900
198.869
0.0043
0.0043
0.10
0.10
3.285
3.346
2.000
2.000
1.285
1.346
198.795
198.765
159.70
159.70
199.055
199.025
0.80
0.80
0.15
0.15
0.200
0.200
2.875
2.936
16.000
16.000
10.721
10.522
0.800
0.800
2.277
2.277
23.443
23.245
10.00 40.00 202.182 -0.302 198.839 0.0043 0.100 3.447 5 10.000 40.00 202.182 -0.302 198.839 0.0043 0.10 3.447 2.000 1.447 198.735 159.70 198.995 0.80 0.15 0.200 3.037 16.000 11.172 0.800 2.277 23.894
2669 8.680 48.68 202.260 -0.302 198.810 0.0043 0.100 3.554 6 8.680 48.68 202.260 -0.302 198.810 0.0043 0.10 3.554 2.000 1.554 198.706 159.70 198.965 0.80 0.15 0.174 3.145 13.888 10.421 0.694 1.977 21.464

ESQUEMA PLANIMETRICO TRAMOS 48.68 3.339 0.975 77.888 52.435 3.894 11.086 114.367
14.980

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 48.68
202,260 203.000
12.33 12.55 198,810 202.221 202.182 202.260
202.080 202.111
201.860
202.000
6.00
2290
TAS-PVC-DN150--0,302%-48,68 TB-145 2669
201.000
PERFILCOTA TERRENO TRAMO
200.000 PERFIL COTA SOLERA TUBO RED
201,860
198,960 199.000

C.I. 2669
C.I. 2290
198.930 198.900 198.869 198.839 198.810
198.960
198.000 TRAMO TB -145

197.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES: Tramo entibado y retiro de lodos


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -149 DESDE C.I. : 2671 523757.450 8782409.890 202.750 199.210 LONGITUD TRAMO : 48.96 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -149

HASTA C.I. : 1620 523757.850 8782359.930 203.150 199.060 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 1.00 DN : 6" PLG LONG. : 48.96 ML i (%) : -0.300 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : SAN PEDRO DIST. ESTIMADA 49.96 i (°/o) TRAMO : -0.300 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m 4-6m m mm ml ml ml m3 ml m3 m3 m3 m3 m3 m3
2671 0.00 0.00 202.750 -0.300 199.210 0.0043 0.100 3.644 1 0.000 0.00 202.751 -0.300 199.210 0.0043 0.10 3.645 2.000 1.645 0.000 199.106 159.70 199.365 1.00 0.15 0.000 3.236 0.000 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.889 -0.300 199.180 0.0043 0.100 3.813 2 10.000 10.00 202.889 -0.300 199.180 0.0043 0.10 3.813 2.000 1.813 0.000 199.076 159.70 199.335 1.00 0.15 0.200 3.404 20.000 17.293 0.000 1.000 2.897 33.196
10.00 20.00 202.989 -0.300 199.150 0.0043 0.100 3.943 3 10.000 20.00 202.989 -0.300 199.150 0.0043 0.10 3.943 2.000 1.943 0.000 199.046 159.70 199.305 1.00 0.15 0.200 3.534 20.000 18.783 0.000 1.000 2.897 34.686
10.00
10.00
30.00
40.00
opcional 203.153
203.297
-0.300
-0.300
199.120
199.090
0.0043
0.0043
0.100
0.100
4.137
4.311
4
5
10.000
10.000
30.00
40.00
203.153
203.297
-0.300
-0.300
199.120
199.090
0.0043
0.0043
0.10
0.10
4.137
4.311
2.000
2.000
2.000
2.000
0.137
0.311
199.016
198.986
159.70
159.70
199.275
199.245
1.00
1.00
0.15
0.15
0.200
0.200
3.728
3.902
20.000
20.000
19.717
20.000
0.687
2.244
1.000
1.000
2.897
2.897
36.307
38.147
1620 8.960 48.96 203.150 -0.300 199.060 0.0043 0.100 4.194 6 8.960 48.96 203.154 -0.300 199.060 0.0043 0.10 4.198 2.000 2.000 0.198 198.956 159.70 199.215 1.00 0.15 0.179 3.789 17.920 17.920 2.283 0.896 2.595 34.453

ESQUEMA PLANIMETRICO TRAMOS 48.96 4.008 0.981 97.920 93.713 5.214 4.896 14.182 176.788
19.078

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 48.96
203,150 204.000
12.33 12.55 199,060 203.153 203.297 203.154
202.751 202.889 202.989
203.000

6.00
2671
TAS-PVC-DN150--0,300%-48.96 TB-149 1620
202.000

201.000
PERFILCOTA TERRENO TRAMO
200.000 PERFIL COTA SOLERA TUBO RED
202,750 199.000 199.180 199.150 199.120
199,210 199.210
199.090 199.060

C.I. 2671

C.I. 1620
198.000
TRAMO TB -149
197.000

196.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES: Tramo entibado y retiro de lodo


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -874 DESDE C.I. : 1619 523732.300 8782352.170 203.200 199.170 LONGITUD TRAMO : 25.70 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -874

HASTA C.I. : 1620 523757.850 8782359.930 203.150 199.060 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 1.00 DN : 6" PLG LONG. : 25.70 ML i (%) : -0.412 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : SAN PEDRO DIST. ESTIMADA 26.70 i (°/o) TRAMO : -0.412 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m 4-6m m mm ml ml ml m3 ml m3 m3 m3 m3 m3 m3
1619 0.00 0.00 203.200 -0.412 199.170 0.0043 0.100 4.134 1 0.000 0.00 203.200 -0.412 199.170 0.0043 0.10 4.134 2.000 2.000 0.134 199.066 159.70 199.325 1.00 0.15 0.000 3.725 0.000 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.865
202.940
-0.412
-0.412
199.129
199.088
0.0043
0.0043
0.100
0.100
3.840
3.957
2
3
10.000
10.000
10.00
20.00
202.865
202.940
-0.412
-0.412
199.129
199.087
0.0043
0.0043
0.10
0.10
3.841
3.957
2.000
2.000
1.841
1.957
0.000
0.000
199.024
198.983
159.70
159.70
199.284
199.243
1.00
1.00
0.15
0.15
0.200
0.200
3.431
3.547
20.000
20.000
19.203
18.989
0.672
0.000
1.000
1.000
2.897
2.897
35.778
34.892
1620 5.700 25.70 203.150 -0.412 199.060 0.0043 0.100 4.194 4 5.700 25.70 203.154 -0.412 199.060 0.0043 0.10 4.198 2.000 2.000 0.198 198.956 159.70 199.215 1.00 0.15 0.114 3.789 11.400 11.278 0.565 0.570 1.651 20.907

ESQUEMA PLANIMETRICO TRAMOS 25.70 4.033 0.515 51.400 49.469 1.237 2.570 7.444 91.577
10.014

VIA 2
CONEX.
VIA 1

PERFIL LONGITUDINAL
DOMIC.
0.00 10.00 20.00 25.70
203,150 204.000
203.200
12.33 12.55 199,060 202.865 202.940
203.154
203.000

6.00
1619
TAS-PVC-DN150--0,412%-25,70 TB-874 1620
202.000

201.000
PERFILCOTA TERRENO TRAMO
200.000 PERFIL COTA SOLERA TUBO RED
203,200 199.000
199,170 199.129 199.087 199.060
199.170

C.I. 1619

C.I. 1620
198.000
TRAMO TB -874
197.000

196.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES: Tramo entibado y retiro de lodo


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0
N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -606 DESDE C.I. : 2516 523684.340 8782421.220 201.830 199.560 LONGITUD TRAMO : 83.07 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -606

HASTA C.I. : 1619 523732.300 8782352.170 203.200 199.170 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.80 DN : 6" PLG LONG. : 83.07 ML i (%) : -0.464 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : SAN PEDRO DIST. ESTIMADA 84.07 i (°/o) TRAMO : -0.464 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m 4-6m m mm ml ml ml m3 ml m3 m3 m3 m3 m3 m3
2516 0.00 0.00 201.830 -0.464 199.560 0.0043 0.100 2.374 1 0.000 0.00 201.845 -0.464 199.560 0.0043 0.10 2.389 2.000 0.389 0.000 199.456 159.70 199.715 0.80 0.15 0.000 1.980 0.000 0.000 0.000 0.000 0.000 0.000
10.00 10.00 201.957 -0.464 199.514 0.0043 0.100 2.548 2 10.000 10.00 201.957 -0.464 199.513 0.0043 0.10 2.549 2.000 0.549 0.000 199.408 159.70 199.668 0.80 0.15 0.200 2.139 16.000 3.751 0.000 0.800 2.277 16.474
10.00 20.00 202.063 -0.464 199.467 0.0043 0.100 2.700 3 10.000 20.00 202.063 -0.464 199.465 0.0043 0.10 2.702 2.000 0.702 0.000 199.361 159.70 199.621 0.80 0.15 0.200 2.292 16.000 5.002 0.000 0.800 2.277 17.724
10.00
10.00
30.00
40.00 opcional 202.190
202.440
-0.464
-0.464
199.421
199.374
0.0043
0.0043
0.100
0.100
2.873
3.170
4
5
10.000
10.000
30.00
40.00
202.190
202.440
-0.464
-0.464
199.418
199.371
0.0043
0.0043
0.10
0.10
2.876
3.173
2.000
2.000
0.876
1.173
0.000
0.000
199.314
199.267
159.70
159.70
199.574
199.526
0.80
0.80
0.15
0.15
0.200
0.200
2.466
2.764
16.000
16.000
6.312
8.198
0.000
0.000
0.800
0.800
2.277
2.277
19.034
20.920
10.00 50.00 202.781 -0.464 199.328 0.0043 0.100 3.557 6 10.000 50.00 202.781 -0.464 199.324 0.0043 0.10 3.562 2.000 1.562 0.000 199.219 159.70 199.479 0.80 0.15 0.200 3.152 16.000 10.940 0.000 0.800 2.277 23.662
10.00 60.00 202.930 -0.464 199.282 0.0043 0.100 3.753 7 10.000 60.00 202.930 -0.464 199.276 0.0043 0.10 3.758 2.000 1.758 0.000 199.172 159.70 199.432 0.80 0.15 0.200 3.348 16.000 13.278 0.000 0.800 2.277 26.001
10.00 70.00 203.028 -0.464 199.235 0.0043 0.100 3.897 8 10.000 70.00 203.028 -0.464 199.229 0.0043 0.10 3.903 2.000 1.903 0.000 199.125 159.70 199.385 0.80 0.15 0.200 3.493 16.000 14.644 0.000 0.800 2.277 27.367
10.00 80.00 203.200 -0.464 199.189 0.0043 0.100 4.115 9 10.000 80.00 203.200 -0.464 199.182 0.0043 0.10 4.122 2.000 2.000 0.122 199.078 159.70 199.337 0.80 0.15 0.200 3.713 16.000 15.613 0.490 0.800 2.277 28.825
1619 3.070 83.07 203.200 -0.464 199.170 0.0043 0.100 4.134 10 3.070 83.07 203.200 -0.464 199.170 0.0043 0.10 4.134 2.000 2.000 0.134 199.066 159.70 199.325 0.80 0.15 0.061 3.725 4.912 4.912 0.315 0.246 0.699 9.133

ESQUEMA PLANIMETRICO TRAMOS 83.07 3.317 1.664 132.912 82.650 0.805 6.646 18.917 189.140
25.563

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 83.07
203,200 204.000
12.33 12.55 199,170 203.028
203.200 203.200
202.781 202.930
203.000
202.440
6.00 202.063 202.190

2516
TAS-PVC-DN150--0,464%-83,07 TB-606 1619 202.000
201.845 201.957

201.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
200.000
201,830
199,560 199.513 199.465

C.I. 2516
199.418 199.371 199.324

C.I. 1619
199.000 199.560 199.276 199.229 199.182
199.170

198.000 TRAMO TB -606

197.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES: Tramo entibado y retiro de lodo


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________