You are on page 1of 67

ZHEJIANG PROVINCIAL NO.

1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

PLANILLA RESUMEN DE VOLUMENES DE EXCAVACION Y RELLENO - RED DE TUBERIAS ALCANTARILLADO SANITARIO

DESDE 1/1/2020 HASTA 8/31/2020

TRAMO CAMARA CAMARA INSPECCION TUBERIA TUBERIA TUBERIA TUBERIA TUBERIA TUBERIA VOLUMEN ZANJA VOLUMENES EXCAVACION VOLUMENES EXCAVACION CON AGOTAMIENTO
N° TRAMO NUEVO NUEVO DESDE COORD. COORD. COTA COTA HASTA REPLANTEO 6" 8" 10" 12" 14" 16" DEL TUBO CON EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 EXCAV. 6-8 EXCAV. 8-10 EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 EXCAV. 6-8 EXCAV. 8-10
NOMBRE NOMBRE TERRENO SOLERA ml ml ml ml ml ml m3 AGOTAMIENTO m3 m3 m3 m3 m3 m3 m3 m3 m3 m3
1 TB -148 OK OK 2492 523756.860 8782466.860 201.330 199.390 2671 56.97 55.97 0.00 0.00 0.00 0.00 0.00 1.12 NO 78.06 32.33 0.00 0.00 0.00 0.00 0.00 0.00
2 TB -1411 OK OK 2291 523781.220 8782466.390 201.860 200.660 2290 80.88 79.88 0.00 0.00 0.00 0.00 0.00 1.60 NO 73.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 TB -608 OK OK 2517 524054.880 8782543.520 203.030 201.830 2241 87.65 86.65 0.00 0.00 0.00 0.00 0.00 1.74 NO 75.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 TB -246 OK OK 2241 523967.230 8782543.970 203.100 201.420 2575 45.95 44.95 0.00 0.00 0.00 0.00 0.00 0.90 NO 44.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 TB -716 OK OK 2575 523921.280 8782543.750 202.430 201.200 2472 59.43 58.43 0.00 0.00 0.00 0.00 0.00 1.17 NO 39.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 TB -204 OK OK 2683 524177.510 8782645.510 202.510 201.310 2463 49.96 48.96 0.00 0.00 0.00 0.00 0.00 0.98 NO 38.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 TB -261 OK OK 2463 524177.390 8782695.470 202.280 201.070 2700 49.98 48.98 0.00 0.00 0.00 0.00 0.00 0.98 NO 42.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 TB -262 OK OK 2700 524227.370 8782695.300 202.320 200.830 1533 63.81 62.81 0.00 0.00 0.00 0.00 0.00 1.26 NO 64.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 TB -265 OK OK 1533 524291.130 8782694.050 199.800 198.600 2702 59.77 58.77 0.00 0.00 0.00 0.00 0.00 1.18 NO 47.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 TB -266 OK OK 2702 524350.900 8782694.520 200.110 198.330 2601 51.43 50.43 0.00 0.00 0.00 0.00 0.00 1.01 NO 70.20 8.65 0.00 0.00 0.00 0.00 0.00 0.00
11 TB -221 OK OK 2590 523984.920 8782619.910 203.080 201.880 1495 86.71 85.71 0.00 0.00 0.00 0.00 0.00 1.72 NO 76.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12 TB -1009 OK OK 1826 524071.510 8782563.780 202.880 201.680 1495 56.26 55.26 0.00 0.00 0.00 0.00 0.00 1.11 NO 47.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13 TB -268 OK OK 1495 524071.630 8782620.040 202.740 201.160 2703 55.84 54.84 0.00 0.00 0.00 0.00 0.00 1.10 NO 57.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14 TB -267 OK OK 2703 524127.470 8782620.190 202.760 200.910 2462 49.93 48.93 0.00 0.00 0.00 0.00 0.00 0.98 NO 57.60 0.10 0.00 0.00 0.00 0.00 0.00 0.00
15 TB -205 OK OK 2462 524177.400 8782619.890 202.610 200.680 2684 65.72 64.72 0.00 0.00 0.00 0.00 0.00 1.30 NO 90.61 3.60 0.00 0.00 0.00 0.00 0.00 0.00
16 TB -206 OK OK 2684 524243.120 8782619.460 202.430 200.380 2562 69.92 68.92 0.00 0.00 0.00 0.00 0.00 1.38 NO 96.49 20.69 0.00 0.00 0.00 0.00 0.00 0.00
17 TB -692 OK OK 2562 524313.040 8782619.400 202.620 200.060 2550 89.91 88.91 0.00 0.00 0.00 0.00 0.00 1.78 NO 142.26 74.91 0.00 0.00 0.00 0.00 0.00 0.00
18 TB -620 OK OK 2523 524093.870 8782543.540 203.240 202.040 1994 83.14 82.14 0.00 0.00 0.00 0.00 0.00 1.65 NO 64.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00
19 TB -1138 OK OK 1994 524177.010 8782543.350 202.870 201.660 1992 59.98 58.98 0.00 0.00 0.00 0.00 0.00 1.18 NO 46.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00
20 TB -1137 OK OK 1992 524236.990 8782542.890 202.630 201.390 1993 51.26 50.26 0.00 0.00 0.00 0.00 0.00 1.01 NO 41.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00
21 TB -234 OK OK 1993 524288.250 8782542.950 202.440 201.160 2689 60.06 59.06 0.00 0.00 0.00 0.00 0.00 1.18 NO 49.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22 TB -235 OK OK 2689 524348.310 8782542.810 202.200 200.890 2603 54.24 53.24 0.00 0.00 0.00 0.00 0.00 1.07 NO 45.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23 TB -232 OK OK 2603 524402.550 8782543.160 201.940 200.640 2688 49.89 48.89 0.00 0.00 0.00 0.00 0.00 0.98 NO 43.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00
24 TB -233 OK OK 2688 524452.440 8782542.830 201.280 200.080 2412 55.35 54.35 0.00 0.00 0.00 0.00 0.00 1.09 NO 58.96 7.74 0.00 0.00 0.00 0.00 0.00 0.00
25 TB -199 OK OK 2655 524633.690 8782694.790 202.420 201.220 2577 83.24 82.24 0.00 0.00 0.00 0.00 0.00 1.65 NO 109.12 32.77 0.00 0.00 0.00 0.00 0.00 0.00
26 TB -279 OK OK 2654 524787.370 8782693.670 201.280 200.080 2577 70.46 69.46 0.00 0.00 0.00 0.00 0.00 1.39 NO 90.74 33.90 0.00 0.00 0.00 0.00 0.00 0.00
27 TB -200 OK OK 2577 524716.920 8782694.470 202.980 199.750 2361 76.42 75.42 0.00 0.00 0.00 0.00 0.00 1.51 NO 120.67 106.95 1.26 0.00 0.00 0.00 0.00 0.00
28 TB -509 OK OK 2458 524637.760 8782617.830 202.560 201.360 2361 79.73 78.73 0.00 0.00 0.00 0.00 0.00 1.58 NO 86.35 4.13 0.00 0.00 0.00 0.00 0.00 0.00
29 TB -85 OK OK 2632 524373.320 8782287.670 201.700 200.500 2571 73.16 72.16 0.00 0.00 0.00 0.00 0.00 1.45 NO 69.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00
30 TB -25 OK OK 2498 524156.710 8782045.010 202.180 200.980 2587 84.66 83.66 0.00 0.00 0.00 0.00 0.00 1.68 NO 86.57 0.22 0.00 0.00 0.00 0.00 0.00 0.00
31 TB -49 OK OK 2617 523993.990 8781978.890 201.940 200.590 2053 50.75 49.75 0.00 0.00 0.00 0.00 0.00 1.00 NO 47.80 0.31 0.00 0.00 0.00 0.00 0.00 0.00
32 TB -1091 OK OK 1934 523927.440 8782074.680 202.860 201.660 1504 64.84 63.84 0.00 0.00 0.00 0.00 0.00 1.28 NO 58.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00
33 TB -318 OK OK 1504 523890.450 8782127.930 202.940 201.350 1483 21.50 20.50 0.00 0.00 0.00 0.00 0.00 0.41 NO 19.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00
34 TB -474 OK OK 1483 523891.270 8782149.410 202.840 201.240 1493 74.05 73.05 0.00 0.00 0.00 0.00 0.00 1.46 NO 99.94 7.16 0.00 0.00 0.00 0.00 0.00 0.00
35 TB -1294 OK OK 2176 523800.830 8782253.600 202.940 201.740 2011 61.26 60.26 0.00 0.00 0.00 0.00 0.00 1.21 NO 52.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00
36 TB -1150 OK OK 2010 523862.650 8782327.670 202.470 201.270 2011 73.51 72.51 0.00 0.00 0.00 0.00 0.00 1.45 NO 61.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00
37 TB -250 OK OK 2083 523860.780 8782186.110 202.750 201.450 2011 68.06 67.06 0.00 0.00 0.00 0.00 0.00 1.34 NO 64.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00
38 TB -134 OK OK 2011 523862.080 8782254.160 202.640 200.720 2662 50.30 49.30 0.00 0.00 0.00 0.00 0.00 0.99 NO 55.31 0.07 0.00 0.00 0.00 0.00 0.00 0.00
39 TB -213 OK OK 2662 523912.370 8782254.860 202.300 200.480 1471 54.08 53.08 0.00 0.00 0.00 0.00 0.00 1.06 NO 74.05 15.71 0.00 0.00 0.00 0.00 0.00 0.00
40 TB -212 OK OK 2131 523965.720 8782177.280 202.020 200.820 1471 77.42 76.42 0.00 0.00 0.00 0.00 0.00 1.53 NO 99.88 13.66 0.00 0.00 0.00 0.00 0.00 0.00
41 TB -137 OK OK 2663 523966.790 8782314.430 202.780 201.580 1471 59.75 58.75 0.00 0.00 0.00 0.00 0.00 1.18 NO 46.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00
42 TB -128 OK OK 2659 524176.320 8782181.600 201.730 200.530 2031 73.47 72.47 0.00 0.00 0.00 0.00 0.00 1.45 NO 89.80 6.93 0.00 0.00 0.00 0.00 0.00 0.00
43 TB -158 OK OK 2261 524177.160 8782314.370 202.550 201.350 2031 59.33 58.33 0.00 0.00 0.00 0.00 0.00 1.17 NO 75.64 8.53 0.00 0.00 0.00 0.00 0.00 0.00
44 TB -160 OK OK 2554 524196.320 8782149.970 201.730 200.530 2224 88.73 87.73 0.00 0.00 0.00 0.00 0.00 1.76 NO 97.80 2.08 0.00 0.00 0.00 0.00 0.00 0.00
45 TB -163 OK OK 2224 524285.040 8782151.380 202.300 200.110 2676 49.80 48.80 0.00 0.00 0.00 0.00 0.00 0.98 NO 68.32 16.19 0.00 0.00 0.00 0.00 0.00 0.00
46 TB -164 OK OK 2676 524285.160 8782201.180 202.390 199.870 2030 53.31 52.31 0.00 0.00 0.00 0.00 0.00 1.05 NO 73.23 29.55 0.00 0.00 0.00 0.00 0.00 0.00
47 TB -215 OK OK 2519 523991.630 8782360.080 202.980 201.780 1521 85.20 84.20 0.00 0.00 0.00 0.00 0.00 1.69 NO 70.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00
48 TB -129 OK OK 1521 524076.830 8782360.310 202.710 201.380 2660 50.25 49.25 0.00 0.00 0.00 0.00 0.00 0.99 NO 38.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00
49 TB -130 OK OK 2660 524127.080 8782359.940 202.440 201.140 1906 49.89 48.89 0.00 0.00 0.00 0.00 0.00 0.98 NO 44.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00
50 TB -80 OK OK 1906 524176.970 8782359.630 202.530 200.900 1982 56.17 55.17 0.00 0.00 0.00 0.00 0.00 1.11 NO 56.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00
51 TB -1128 OK OK 1982 524233.140 8782360.250 202.470 200.630 1983 49.88 48.88 0.00 0.00 0.00 0.00 0.00 0.98 NO 65.46 2.31 0.00 0.00 0.00 0.00 0.00 0.00
52 TB -54 OK OK 2619 524283.940 8782278.940 202.400 201.200 1983 81.58 80.58 0.00 0.00 0.00 0.00 0.00 1.61 NO 82.61 1.45 0.00 0.00 0.00 0.00 0.00 0.00
53 TB -123 OK OK 1983 524283.020 8782360.510 202.730 200.390 2657 56.72 55.72 0.00 0.00 0.00 0.00 0.00 1.12 NO 78.01 16.16 0.00 0.00 0.00 0.00 0.00 0.00
54 TB -1360 OK OK 2240 524176.490 8782386.360 202.550 201.580 2112 80.24 79.24 0.00 0.00 0.00 0.00 0.00 1.59 NO 96.21 5.57 0.00 0.00 0.00 0.00 0.00 0.00
55 TB -399 OK OK 2376 525057.410 8782789.210 199.900 198.700 1977 66.19 65.19 0.00 0.00 0.00 0.00 0.00 1.31 NO 87.37 12.87 0.00 0.00 0.00 0.00 0.00 0.00
56 TB -1125 OK OK 1977 525041.970 8782724.850 200.420 198.400 1975 49.72 48.72 0.00 0.00 0.00 0.00 0.00 0.98 NO 67.21 7.29 0.00 0.00 0.00 0.00 0.00 0.00
57 TB -224 OK OK 1643 524849.630 8782469.280 202.260 200.670 2682 43.80 42.80 0.00 0.00 0.00 0.00 0.00 0.86 NO 47.32 0.13 0.00 0.00 0.00 0.00 0.00 0.00
58 TB -197 OK OK 2682 524838.340 8782426.960 202.450 200.470 2142 59.88 58.88 0.00 0.00 0.00 0.00 0.00 1.18 NO 65.27 0.95 0.00 0.00 0.00 0.00 0.00 0.00
59 TB -222 OK OK 2142 524894.120 8782405.190 201.310 200.110 1469 60.51 59.51 0.00 0.00 0.00 0.00 0.00 1.19 NO 52.19 0.53 0.00 0.00 0.00 0.00 0.00 0.00
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

PLANILLA RESUMEN DE VOLUMENES DE EXCAVACION Y RELLENO - RED DE TUBERIAS ALCANTARILLADO SANITARIO

DESDE 1/1/2020 HASTA 8/31/2020

TRAMO CAMARA CAMARA INSPECCION TUBERIA TUBERIA TUBERIA TUBERIA TUBERIA TUBERIA VOLUMEN ZANJA VOLUMENES EXCAVACION VOLUMENES EXCAVACION CON AGOTAMIENTO
N° TRAMO NUEVO NUEVO DESDE COORD. COORD. COTA COTA HASTA REPLANTEO 6" 8" 10" 12" 14" 16" DEL TUBO CON EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 EXCAV. 6-8 EXCAV. 8-10 EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 EXCAV. 6-8 EXCAV. 8-10
NOMBRE NOMBRE TERRENO SOLERA ml ml ml ml ml ml m3 AGOTAMIENTO m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

59.033 3731.93 3672.90 0.00 0.00 0.00 0.00 0.00 73.57 3990.41 473.46 1.26 0.00 0.00 0.00 0.00 0.00 0.00

CAO14 3742.79 3742.82 0.00 0.00 0.00 0.00 0.00 74.97 4052.61 535.49 1.26 0.00 0.00 0.00 0.00 0.00 0.00

Por el CONTRATISTA _______________________ Revisado por el SUPERVISOR____________________


TARIO

MAT. : PVC SDR41 D3034 AG Y PEAD CON J.E.

VOLUMENES ANCHO ALTURA ENTIBADO ENTIBADO ENTIBADO ENTIBADO DIFERENCIA ALTURA PLANILLA
ASIENTO RELL. CER. RELL. COM. ENTIBADO DE PROMEDIO 0.00<H<2.00 2.01<H<4.00 4.01<H<6.00 H>6.00 BARRIO MATERIAL COTAS TOTAL COBRADA
m3 m3 m3 ZANJA m2 m2 m2 m2 0,20+0,05 (LOSA Y POBRE)
3.92 11.01 94.34 NO 0.70 2.86 0.000 0.000 0.000 0.000 SAN PEDRO TIERRA 110.39 112.85 -2.47 1.94 2.19 14
4.79 13.24 54.06 NO 0.60 1.53 0.000 0.000 0.000 0.000 AMISTAD 73.70 74.74 -1.04 1.20 1.45 16
5.20 14.37 54.34 NO 0.60 1.47 0.000 0.000 0.000 0.000 AMISTAD 75.64 76.67 -1.02 1.20 1.45 16
2.70 7.45 33.34 NO 0.60 1.61 0.000 0.000 0.000 0.000 AMISTAD 44.39 52.43 -8.04 1.68 1.93 16
3.51 9.69 24.77 NO 0.60 1.15 0.000 0.000 0.000 0.000 AMISTAD 39.13 33.46 5.67 1.23 1.48 16
2.94 8.12 26.34 NO 0.60 1.31 0.000 0.000 0.000 0.000 AMISTAD 38.37 39.17 -0.80 1.20 1.45 15
2.94 8.12 30.63 NO 0.60 1.45 0.000 0.000 0.000 0.000 AMISTAD 42.67 43.63 -0.96 1.21 1.46 15
3.77 10.41 49.46 NO 0.60 1.67 0.000 0.000 0.000 0.000 AMISTAD 64.90 65.80 -0.90 1.49 1.74 16
3.53 9.74 32.99 NO 0.60 1.39 0.000 0.000 0.000 0.000 AMISTAD 47.43 48.47 -1.04 1.20 1.45 16
3.53 9.92 64.38 NO 0.70 2.23 0.000 0.000 0.000 0.000 AMISTAD 78.84 78.70 0.14 1.78 2.03 16
5.14 14.21 55.16 NO 0.60 1.47 0.000 0.000 0.000 0.000 AMISTAD 76.23 77.05 -0.82 1.20 1.45 16
3.32 9.16 33.72 NO 0.60 1.45 0.000 0.000 0.000 0.000 AMISTAD 47.31 48.34 -1.03 1.20 1.45 16
3.29 9.09 44.05 NO 0.60 1.77 0.000 0.000 0.000 0.000 AMISTAD 57.53 58.69 -1.16 1.58 1.83 16
2.94 8.11 45.67 NO 0.60 1.97 0.000 0.000 0.000 0.000 AMISTAD 57.70 58.89 -1.19 1.85 2.10 16
4.53 12.73 75.64 NO 0.70 2.08 0.000 0.000 0.000 0.000 AMISTAD 94.21 95.65 -1.45 1.93 2.18 17
4.82 13.56 97.42 NO 0.70 2.43 0.000 0.000 0.000 0.000 AMISTAD 117.18 119.07 -1.89 2.05 2.30 17
7.11 20.25 188.03 SI 0.80 3.04 0.000 271.459 0.000 0.000 AMISTAD 217.17 219.71 -2.54 2.56 2.81 17
4.93 13.62 44.49 NO 0.60 1.31 0.000 0.000 0.000 0.000 AMISTAD 64.68 65.49 -0.80 1.20 1.45 19
3.54 9.78 32.33 NO 0.60 1.32 0.000 0.000 0.000 0.000 AMISTAD 46.83 47.63 -0.80 1.21 1.46 19
3.02 8.33 28.86 NO 0.60 1.37 0.000 0.000 0.000 0.000 AMISTAD 41.22 42.04 -0.83 1.24 1.49 19
3.54 9.79 34.70 NO 0.60 1.39 0.000 0.000 0.000 0.000 AMISTAD 49.22 50.00 -0.79 1.28 1.53 19
3.19 8.83 32.14 NO 0.60 1.41 0.000 0.000 0.000 0.000 AMISTAD 45.23 46.10 -0.87 1.31 1.56 19
2.93 8.11 31.94 NO 0.60 1.47 0.000 0.000 0.000 0.000 AMISTAD 43.96 44.79 -0.84 1.30 1.55 19
3.26 9.01 53.34 NO 0.60 2.15 0.000 0.000 0.000 0.000 AMISTAD 66.70 37.26 29.44 1.20 1.45 20
5.76 16.18 118.31 NO 0.70 2.52 0.000 0.000 0.000 0.000 AMISTAD 141.89 144.23 -2.34 1.20 1.45 14
4.86 13.67 104.71 NO 0.70 2.54 0.000 0.000 0.000 0.000 AMISTAD 124.63 126.93 -2.30 1.20 1.45 14
6.03 17.18 204.17 SI 0.80 3.77 0.000 286.108 0.000 0.000 AMISTAD 228.89 231.93 -3.05 3.23 3.48 16
4.72 13.05 71.12 NO 0.60 1.88 0.000 0.000 0.000 0.000 AMISTAD 90.47 92.84 -2.37 1.20 1.45 14
4.33 11.96 51.51 NO 0.60 1.61 0.000 0.000 0.000 0.000 AMISTAD 69.25 70.33 -1.08 1.20 1.45 17
5.02 13.87 66.23 NO 0.60 1.75 0.000 0.000 0.000 0.000 27 DE JUNIO 86.80 88.06 -1.26 1.20 1.45 17
2.99 8.25 35.88 NO 0.60 1.64 0.000 0.000 0.000 0.000 27 DE JUNIO 48.10 48.30 -0.19 1.35 1.60 19
3.83 10.58 42.41 NO 0.60 1.53 0.000 0.000 0.000 0.000 27 DE JUNIO 58.10 59.10 -1.00 1.20 1.45 19
1.23 3.40 14.46 NO 0.60 1.64 0.000 0.000 0.000 0.000 27 DE JUNIO 19.50 20.52 -1.01 1.59 1.84 19
5.11 14.37 86.15 NO 0.70 2.11 0.000 0.000 0.000 0.000 27 DE JUNIO 107.10 108.78 -1.68 1.60 1.85 17
3.62 9.99 37.23 NO 0.60 1.50 0.000 0.000 0.000 0.000 27 DE JUNIO 52.04 53.61 -1.57 1.20 1.45 17
4.35 12.02 44.16 NO 0.60 1.46 0.000 0.000 0.000 0.000 27 DE JUNIO 61.98 61.95 0.04 1.20 1.45 19
4.02 11.12 47.57 NO 0.60 1.60 0.000 0.000 0.000 0.000 27 DE JUNIO 64.06 73.64 -9.58 1.30 1.55 17
2.96 8.17 43.26 NO 0.60 1.89 0.000 0.000 0.000 0.000 27 DE JUNIO 55.38 49.59 5.80 1.92 2.17 19
3.72 10.44 74.54 NO 0.70 2.46 0.000 0.000 0.000 0.000 27 DE JUNIO 89.76 87.98 1.78 1.82 2.07 19
5.35 15.04 91.63 NO 0.70 2.15 0.000 0.000 0.000 0.000 27 DE JUNIO 113.54 142.60 -29.05 1.20 1.45 17
3.53 9.74 31.70 NO 0.60 1.31 0.000 0.000 0.000 0.000 27 DE JUNIO 46.14 46.95 -0.81 1.20 1.45 17
5.07 14.26 75.94 NO 0.70 1.99 0.000 0.000 0.000 0.000 27 DE JUNIO 96.72 100.50 -3.78 1.20 1.45 17
4.08 11.48 67.44 NO 0.70 2.07 0.000 0.000 0.000 0.000 27 DE JUNIO 84.17 89.16 -4.99 1.20 1.45 17
5.26 14.54 78.32 NO 0.60 1.89 0.000 0.000 0.000 0.000 27 DE JUNIO 99.89 101.19 -1.30 1.20 1.45 17
3.42 9.60 70.52 NO 0.70 2.47 0.000 0.000 0.000 0.000 27 DE JUNIO 84.51 86.33 -1.82 2.19 2.44 17
3.66 10.29 87.78 NO 0.70 2.85 0.000 0.000 0.000 0.000 27 DE JUNIO 102.79 105.15 -2.36 2.52 2.77 17
5.05 13.96 50.24 NO 0.60 1.40 0.000 0.000 0.000 0.000 27 DE JUNIO 70.94 71.82 -0.88 1.20 1.45 17
2.96 8.17 26.25 NO 0.60 1.32 0.000 0.000 0.000 0.000 27 DE JUNIO 38.35 39.16 -0.80 1.33 1.58 20
2.93 8.11 32.11 NO 0.60 1.52 0.000 0.000 0.000 0.000 27 DE JUNIO 44.13 45.24 -1.11 1.30 1.55 17
3.31 9.15 42.86 NO 0.60 1.74 0.000 0.000 0.000 0.000 27 DE JUNIO 56.42 57.60 -1.18 1.63 1.88 20
3.42 9.62 53.75 NO 0.70 2.02 0.000 0.000 0.000 0.000 27 DE JUNIO 67.77 69.38 -1.62 1.84 2.09 17
4.83 13.36 64.26 NO 0.60 1.81 0.000 0.000 0.000 0.000 27 DE JUNIO 84.07 85.48 -1.41 1.20 1.45 17
3.90 10.96 78.19 NO 0.70 2.44 0.000 0.000 0.000 0.000 27 DE JUNIO 94.17 95.96 -1.79 2.34 2.59 17
5.55 15.59 79.06 NO 0.70 1.81 0.000 0.000 0.000 0.000 27 DE JUNIO 101.78 150.58 -48.80 0.97 1.22 17
4.56 12.83 81.54 NO 0.70 2.14 0.000 0.000 0.000 0.000 1° DE MAYO 100.24 101.86 -1.62 1.20 1.45 14
3.41 9.59 60.53 NO 0.70 2.26 0.000 0.000 0.000 0.000 1° DE MAYO 74.50 76.44 -1.94 2.02 2.27 14
2.57 7.10 36.93 NO 0.60 1.88 0.000 0.000 0.000 0.000 1° DE MAYO 47.45 48.69 -1.24 1.59 1.84 14
3.53 9.76 51.75 NO 0.60 1.84 0.000 0.000 0.000 0.000 1° DE MAYO 66.23 67.35 -1.13 1.98 2.23 14
3.57 9.87 38.09 NO 0.60 1.52 0.000 0.000 0.000 0.000 1° DE MAYO 52.72 53.50 -0.78 1.20 1.45 14
TARIO

MAT. : PVC SDR41 D3034 AG Y PEAD CON J.E.

VOLUMENES ANCHO ALTURA ENTIBADO ENTIBADO ENTIBADO ENTIBADO DIFERENCIA ALTURA PLANILLA
ASIENTO RELL. CER. RELL. COM. ENTIBADO DE PROMEDIO 0.00<H<2.00 2.01<H<4.00 4.01<H<6.00 H>6.00 BARRIO MATERIAL COTAS TOTAL COBRADA
m3 m3 m3 ZANJA m2 m2 m2 m2 0,20+0,05 (LOSA Y POBRE)

234.90 653.91 3502.75 4465.14 4465.14 0.00 0.00 557.57 0.00 0.00 -124.23

239.31 666.19 3608.89 4589.37 4589.37 0.00 0.00 564.55 0.00 0.00 cao14
cao15
-124.23 cao16
cao17
cao19
cao20
OBSERVACION CRITERIO
CLASIFICACION
CAIDA DE ACUERDO A LA ALTURA CLASIFICACION DE ACUERDO A LA ALTURA PROF. PROF. PROF. PROF. PROF. VOLUMENES AREA 6.25 VOLUMENES
ALTURA 0,00 1,51 2,01 2,51 3,01 3,51 4,01 4,51 5,01 5,51 6,01 8.01 ALTURA 0,00 1,51 2,01 2,51 3,01 3,51 4,01 4,51 5,01 5,51 6,01 8.01 EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. AGOTAMIENTO EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. EXCAV.
1,50 2,00 2.50 3,00 3,50 4,00 4,50 5,00 5,50 6,00 8,00 10.00 1,50 2,00 2.50 3,00 3,50 4,00 4,50 5,00 5,50 6,00 8,00 10.00 0-2m 2-4m 4-6m 6-8m 8-10m 0-2m 2-4m 4-6m 6-8m 8-10m 0-2m
DOBLE SIN 2.19 0.00 0.00 2.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.19 2.00 0.19 0.00 0.00 0.00 NO 12.50 1.19 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.93 0.00 1.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.93 1.93 0.00 0.00 0.00 0.00 NO 12.06 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.48 1.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.48 1.48 0.00 0.00 0.00 0.00 NO 9.25 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.46 1.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.46 1.46 0.00 0.00 0.00 0.00 NO 9.13 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.74 0.00 1.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.74 1.74 0.00 0.00 0.00 0.00 NO 10.87 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 2.03 0.00 0.00 2.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.03 2.00 0.03 0.00 0.00 0.00 NO 12.50 0.19 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
TRIPLE H=0,00;H=0,25 SIN 1.83 0.00 1.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.83 1.83 0.00 0.00 0.00 0.00 NO 11.44 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 2.10 0.00 0.00 2.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.10 2.00 0.10 0.00 0.00 0.00 NO 12.50 0.62 0.00 0.00 0.00 0.00
DOBLE SIN 2.18 0.00 0.00 2.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.18 2.00 0.18 0.00 0.00 0.00 NO 12.50 1.13 0.00 0.00 0.00 0.00
DOBLE SIN 2.30 0.00 0.00 2.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.30 2.00 0.30 0.00 0.00 0.00 NO 12.50 1.88 0.00 0.00 0.00 0.00
DOBLE SIN 2.81 0.00 0.00 0.00 2.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.81 2.00 0.81 0.00 0.00 0.00 NO 12.50 5.06 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.46 1.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.46 1.46 0.00 0.00 0.00 0.00 NO 9.13 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.49 1.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.49 1.49 0.00 0.00 0.00 0.00 NO 9.31 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.53 0.00 1.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.53 1.53 0.00 0.00 0.00 0.00 NO 9.56 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.56 0.00 1.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.56 1.56 0.00 0.00 0.00 0.00 NO 9.75 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.55 0.00 1.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.55 1.55 0.00 0.00 0.00 0.00 NO 9.69 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 3.48 0.00 0.00 0.00 0.00 3.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.48 2.00 1.48 0.00 0.00 0.00 NO 12.50 9.25 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.60 0.00 1.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.60 1.60 0.00 0.00 0.00 0.00 NO 10.00 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.84 0.00 1.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.84 1.84 0.00 0.00 0.00 0.00 NO 11.50 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.85 0.00 1.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.85 1.85 0.00 0.00 0.00 0.00 NO 11.56 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.55 0.00 1.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.55 1.55 0.00 0.00 0.00 0.00 NO 9.69 0.00 0.00 0.00 0.00 0.00
TETRA H=0,20;H=0,20;H=0,20 SIN 2.17 0.00 0.00 2.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.17 2.00 0.17 0.00 0.00 0.00 NO 12.50 1.06 0.00 0.00 0.00 0.00
DOBLE SIN 2.07 0.00 0.00 2.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.07 2.00 0.07 0.00 0.00 0.00 NO 12.50 0.44 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
TRIPLE SIN 2.44 0.00 0.00 2.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.44 2.00 0.44 0.00 0.00 0.00 NO 12.50 2.75 0.00 0.00 0.00 0.00
DOBLE SIN 2.77 0.00 0.00 0.00 2.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.77 2.00 0.77 0.00 0.00 0.00 NO 12.50 4.81 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.58 0.00 1.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.58 1.58 0.00 0.00 0.00 0.00 NO 9.88 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.55 0.00 1.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.55 1.55 0.00 0.00 0.00 0.00 NO 9.69 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 1.88 0.00 1.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.88 1.88 0.00 0.00 0.00 0.00 NO 11.75 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 2.09 0.00 0.00 2.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.09 2.00 0.09 0.00 0.00 0.00 NO 12.50 0.56 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
TETRA SIN 2.59 0.00 0.00 0.00 2.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.59 2.00 0.59 0.00 0.00 0.00 NO 12.50 3.69 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.22 1.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.22 1.22 0.00 0.00 0.00 0.00 NO 7.63 0.00 0.00 0.00 0.00 0.00
ARRANQUE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 2.27 0.00 0.00 2.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.27 2.00 0.27 0.00 0.00 0.00 NO 12.50 1.69 0.00 0.00 0.00 0.00
DOBLE SIN 1.84 0.00 1.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.84 1.84 0.00 0.00 0.00 0.00 NO 11.50 0.00 0.00 0.00 0.00 0.00
DOBLE SIN 2.23 0.00 0.00 2.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.23 2.00 0.23 0.00 0.00 0.00 NO 12.50 1.44 0.00 0.00 0.00 0.00
DOBLE SIN 1.45 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00
OBSERVACION CRITERIO
CLASIFICACION
CAIDA DE ACUERDO A LA ALTURA CLASIFICACION DE ACUERDO A LA ALTURA PROF. PROF. PROF. PROF. PROF. VOLUMENES AREA 6.25 VOLUMENES
ALTURA 0,00 1,51 2,01 2,51 3,01 3,51 4,01 4,51 5,01 5,51 6,01 8.01 ALTURA 0,00 1,51 2,01 2,51 3,01 3,51 4,01 4,51 5,01 5,51 6,01 8.01 EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. AGOTAMIENTO EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. EXCAV.
1,50 2,00 2.50 3,00 3,50 4,00 4,50 5,00 5,50 6,00 8,00 10.00 1,50 2,00 2.50 3,00 3,50 4,00 4,50 5,00 5,50 6,00 8,00 10.00 0-2m 2-4m 4-6m 6-8m 8-10m 0-2m 2-4m 4-6m 6-8m 8-10m 0-2m

59.00 30.00 14.00 11.00 3.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 607.44 35.75 0.00 0.00 0.00 0.00

9.00 5.00 1.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 94.31 4.31 0.00 0.00 0.00 0.00
2.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.19 0.00 0.00 0.00 0.00 0.00
12.00 6.00 3.00 2.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 126.44 10.06 0.00 0.00 0.00 0.00
21.00 11.00 3.00 4.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 216.69 19.88 0.00 0.00 0.00 0.00
12.00 5.00 5.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 121.13 1.50 0.00 0.00 0.00 0.00
3.00 1.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.69 0.00 0.00 0.00 0.00 0.00
59.00 30.00 14.00 11.00 3.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 607.44 35.75 0.00 0.00 0.00 0.00
MATERIAL RELLENO ENTIBADO LADO 2.5
EXCAV. EXCAV. EXCAV. EXCAV. EXCEDENTE COMPACTADO 0,00<H<2.00 2.01<H<4.00 2.01<H<6.00 H>6.01
2-4m 4-6m 6-8m 8-10m M3 M3
0.00 0.00 0.00 0.00 3.36 10.32 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.94 9.12 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.21 7.04 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.17 6.95 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.63 8.24 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 3.10 9.58 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.78 8.66 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 3.22 9.91 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 3.35 10.28 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 3.54 10.83 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 4.37 13.19 SI 0.000 28.100 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.17 6.95 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.22 7.09 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.29 7.27 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.34 7.41 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.32 7.37 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 5.46 16.29 SI 0.000 34.800 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.40 7.60 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.79 8.71 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.81 8.75 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.32 7.37 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 3.33 10.23 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 3.17 9.77 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 3.77 11.48 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 4.31 13.00 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.37 7.50 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.32 7.37 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.86 8.89 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 3.20 9.86 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 4.02 12.17 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 1.78 5.84 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 3.49 10.69 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.79 8.71 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 3.43 10.51 NO 0.000 0.000 0.000 0.000
0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000 0.000 0.000
MATERIAL RELLENO ENTIBADO LADO 2.5
EXCAV. EXCAV. EXCAV. EXCAV. EXCEDENTE COMPACTADO 0,00<H<2.00 2.01<H<4.00 2.01<H<6.00 H>6.01
2-4m 4-6m 6-8m 8-10m M3 M3

0.00 0.00 0.00 0.00 155.63 487.56 0.00 62.90 0.00 0.00

0.00 0.00 0.00 0.00 23.87 74.75 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 4.33 13.85 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 33.13 103.37 0.00 34.80 0.00 0.00
0.00 0.00 0.00 0.00 57.38 179.18 0.00 28.10 0.00 0.00
0.00 0.00 0.00 0.00 29.52 93.11 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 7.39 23.30 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 155.63 487.56 0.00 0.00 62.90 0.00 0.00
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -222 DESDE C.I. : 2142 524894.120 8782405.190 201.310 200.110 LONGITUD TRAMO : 59.51 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -222
HASTA C.I. : 1469 524950.730 8782383.820 201.920 199.840 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 59.51 ML i (%) : -0.446 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 1° DE MAYO DIST. ESTIMADA 60.51 i (°/o) TRAMO : -0.446 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2142 0.00 0.00 201.310 -0.446 200.110 0.0043 0.100 1.304 1 0.000 0.00 201.310 -0.446 200.110 0.0043 0.10 1.304 1.304 0.000 200.006 159.70 200.265 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 201.175
201.180
-0.446
-0.446
200.065
200.021
0.0043
0.0043
0.100
0.100
1.214
1.264
2
3
10.000
10.000
10.00
20.00
201.175
201.180
-0.446
-0.446
200.065
200.021
0.0043
0.0043
0.10
0.10
1.214
1.264
1.214
1.264
0.000
0.000
199.961
199.916
159.70
159.70
200.221
200.176
0.60
0.60
0.15
0.15
0.200
0.200
0.804
0.854
7.555
7.432
0.000
0.000
0.600
0.600
1.658
1.658
5.096
4.974
10.00 30.00 201.192 -0.446 199.976 0.0043 0.100 1.320 4 10.000 30.00 201.192 -0.446 199.976 0.0043 0.10 1.320 1.320 0.000 199.872 159.70 200.132 0.60 0.15 0.200 0.910 7.751 0.000 0.600 1.658 5.293
10.00 40.00 201.418 -0.446 199.932 0.0043 0.100 1.591 5 10.000 40.00 201.418 -0.446 199.932 0.0043 0.10 1.591 1.591 0.000 199.827 159.70 200.087 0.60 0.15 0.200 1.181 8.733 0.000 0.600 1.658 6.275
10.00 50.00 201.533 -0.446 199.887 0.0043 0.100 1.750 6 10.000 50.00 201.533 -0.446 199.887 0.0043 0.10 1.750 1.750 0.000 199.783 159.70 200.042 0.60 0.15 0.200 1.341 10.024 0.000 0.600 1.658 7.565
1469 9.510 59.51 201.920 -0.446 199.840 0.0043 0.100 2.184 7 9.510 59.51 201.920 -0.446 199.840 0.0043 0.10 2.184 2.000 0.184 199.736 159.70 199.995 0.60 0.15 0.190 1.775 10.700 0.526 0.571 1.577 8.888

ESQUEMA PLANIMETRICO TRAMOS 59.51 1.518 1.192 52.194 0.526 3.571 9.866 38.092
13.437

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 59.51
201,920 202.500
12.33 12.55 199,840 201.920
202.000
201.533
6.00 201.418
TB-222 201.500 201.310
TAS-PVC-DN150--0,446%-59,51 1469 201.175 201.180 201.192
2142
201.000
PERFILCOTA TERRENO TRAMO
200.500 PERFIL COTA SOLERA TUBO RED
201,310 200.000
200,110 200.065 200.021 199.976
200.110

C.I. 2142
199.932

C.I.1469
199.887
199.500 199.840

199.000
TRAMO TB -222

198.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -197 DESDE C.I. : 2682 524838.340 8782426.960 202.450 200.470 LONGITUD TRAMO : 58.88 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -197
HASTA C.I. : 2142 524894.120 8782405.190 201.310 200.110 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 58.88 ML i (%) : -0.601 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 1° DE MAYO DIST. ESTIMADA 59.88 i (°/o) TRAMO : -0.601 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2682 0.00 0.00 202.450 -0.601 200.470 0.0043 0.100 2.084 1 0.000 0.00 202.450 -0.601 200.470 0.0043 0.10 2.084 2.000 0.084 200.366 159.70 200.625 0.60 0.15 0.000 1.675 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.397
202.271
-0.601
-0.601
200.410
200.350
0.0043
0.0043
0.100
0.100
2.091
2.026
2
3
10.000
10.000
10.00
20.00
202.397
202.271
-0.601
-0.601
200.410
200.350
0.0043
0.0043
0.10
0.10
2.091
2.026
2.000
2.000
0.091
0.026
200.306
200.245
159.70
159.70
200.565
200.505
0.60
0.60
0.15
0.15
0.200
0.200
1.682
1.616
12.000
12.000
0.527
0.351
0.600
0.600
1.658
1.658
10.069
9.893
10.00 30.00 202.178 -0.601 200.290 0.0043 0.100 1.993 4 10.000 30.00 202.178 -0.601 200.290 0.0043 0.10 1.993 1.993 0.000 200.185 159.70 200.445 0.60 0.15 0.200 1.583 11.978 0.077 0.600 1.658 9.596
10.00 40.00 201.932 -0.601 200.230 0.0043 0.100 1.807 5 10.000 40.00 201.932 -0.601 200.230 0.0043 0.10 1.807 1.807 0.000 200.125 159.70 200.385 0.60 0.15 0.200 1.397 11.398 0.000 0.600 1.658 8.940
10.00 50.00 201.654 -0.601 200.169 0.0043 0.100 1.589 6 10.000 50.00 201.654 -0.601 200.169 0.0043 0.10 1.589 1.589 0.000 200.065 159.70 200.325 0.60 0.15 0.200 1.179 10.187 0.000 0.600 1.658 7.729
2142 8.880 58.88 201.310 -0.601 200.110 0.0043 0.100 1.304 7 8.880 58.88 201.310 -0.601 200.110 0.0043 0.10 1.304 1.304 0.000 200.006 159.70 200.265 0.60 0.15 0.178 0.895 7.708 0.000 0.533 1.472 5.525

ESQUEMA PLANIMETRICO TRAMOS 58.88 1.842 1.179 65.271 0.955 3.533 9.762 51.752
13.294

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 58.88
201,310 203.000
12.33 12.55 200,110 202.450
202.397
202.500 202.271 202.178
201.932
6.00 202.000
2682
TAS-PVC-DN150--0,601%-58,88 TB-197 2142 201.500
201.654
201.310

201.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
200.500
202,450 200.470 200.410 200.350 200.290
200,470 200.000 200.230 200.169

C.I. 2682

C.I.2142
200.110
199.500
TRAMO TB -197
199.000

198.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -224 DESDE C.I. : 1643 524849.630 8782469.280 202.260 200.670 LONGITUD TRAMO : 42.80 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -224
HASTA C.I. : 2682 524838.340 8782426.960 202.450 200.470 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 42.80 ML i (%) : -0.457 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 1° DE MAYO DIST. ESTIMADA 43.80 i (°/o) TRAMO : -0.457 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1643 0.00 0.00 202.260 -0.457 200.670 0.0043 0.100 1.694 1 0.000 0.00 202.260 -0.457 200.670 0.0043 0.10 1.694 1.694 0.000 200.566 159.70 200.825 0.60 0.15 0.000 1.285 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.293
202.313
-0.457
-0.457
200.624
200.579
0.0043
0.0043
0.100
0.100
1.773
1.839
2
3
10.000
10.000
10.00
20.00
202.293
202.313
-0.457
-0.457
200.624
200.579
0.0043
0.0043
0.10
0.10
1.773
1.839
1.773
1.839
0.000
0.000
200.520
200.474
159.70
159.70
200.780
200.734
0.60
0.60
0.15
0.15
0.200
0.200
1.363
1.429
10.402
10.835
0.000
0.000
0.600
0.600
1.658
1.658
7.944
8.377
10.00 30.00 202.297 -0.457 200.533 0.0043 0.100 1.868 4 10.000 30.00 202.297 -0.457 200.533 0.0043 0.10 1.868 1.868 0.000 200.429 159.70 200.688 0.60 0.15 0.200 1.459 11.121 0.000 0.600 1.658 8.663
10.00 40.00 202.398 -0.457 200.487 0.0043 0.100 2.015 5 10.000 40.00 202.398 -0.457 200.487 0.0043 0.10 2.015 2.000 0.015 200.383 159.70 200.643 0.60 0.15 0.200 1.605 11.605 0.045 0.600 1.658 9.191
2682 2.800 42.80 202.450 -0.457 200.470 0.0043 0.100 2.084 6 2.800 42.80 202.450 -0.457 200.470 0.0043 0.10 2.084 2.000 0.084 200.366 159.70 200.625 0.60 0.15 0.056 1.675 3.360 0.083 0.168 0.464 2.755

ESQUEMA PLANIMETRICO TRAMOS 42.80 1.879 0.857 47.322 0.128 2.568 7.096 36.929
9.664

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 42.80
202,450 203.000
12.33 12.55 200,470 202.450
202.398
202.500 202.260 202.293 202.313 202.297

6.00
1643
TAS-PVC-DN150--0,457%-42,80 TB-224 2682
202.000

201.500
PERFILCOTA TERRENO TRAMO
201.000 PERFIL COTA SOLERA TUBO RED
202,260 200.500 200.624 200.579
200,670 200.670 200.533 200.487

C.I. 1643

C.I.2682
200.470
200.000

199.500
TRAMO TB -224

199.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -1125 DESDE C.I. : 1977 525041.970 8782724.850 200.420 198.400 LONGITUD TRAMO : 48.72 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -1125
HASTA C.I. : 1975 525029.660 8782676.680 201.040 198.100 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 48.72 ML i (%) : -0.603 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 1° DE MAYO DIST. ESTIMADA 49.72 i (°/o) TRAMO : -0.603 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1977 0.00 0.00 200.420 -0.603 198.400 0.0043 0.100 2.124 1 0.000 0.00 200.420 -0.603 198.400 0.0043 0.10 2.124 2.000 0.124 198.296 159.70 198.555 0.70 0.15 0.000 1.715 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 200.117
200.151
-0.603
-0.603
198.340
198.279
0.0043
0.0043
0.100
0.100
1.882
1.976
2
3
10.000
10.000
10.00
20.00
200.117
200.151
-0.603
-0.603
198.340
198.279
0.0043
0.0043
0.10
0.10
1.882
1.976
1.882
1.976
0.000
0.000
198.235
198.175
159.70
159.70
198.495
198.435
0.70
0.70
0.15
0.15
0.200
0.200
1.472
1.566
13.586
13.502
0.435
0.000
0.700
0.700
1.968
1.968
11.153
10.634
10.00 30.00 200.162 -0.603 198.219 0.0043 0.100 2.047 4 10.000 30.00 200.162 -0.603 198.219 0.0043 0.10 2.047 2.000 0.047 198.115 159.70 198.374 0.70 0.15 0.200 1.638 13.916 0.166 0.700 1.968 11.214
10.00 40.00 200.564 -0.603 198.159 0.0043 0.100 2.510 5 10.000 40.00 200.564 -0.603 198.159 0.0043 0.10 2.510 2.000 0.510 198.054 159.70 198.314 0.70 0.15 0.200 2.100 14.000 1.949 0.700 1.968 13.082
1975 8.720 48.72 201.040 -0.603 198.100 0.0043 0.100 3.044 6 8.720 48.72 201.040 -0.603 198.100 0.0043 0.10 3.044 2.000 1.044 197.996 159.70 198.255 0.70 0.15 0.175 2.635 12.208 4.743 0.610 1.716 14.450

ESQUEMA PLANIMETRICO TRAMOS 48.72 2.264 0.976 67.211 7.293 3.410 9.586 60.532
12.997

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 48.72
201,040 201.500
12.33 12.55 198,100 201.040
201.000
200.420 200.564
200.500 200.162
6.00 200.117 200.151
1977
TAS-PVC-DN150--0,603%-48.72 TB-1125 1975 200.000
199.500 PERFILCOTA TERRENO TRAMO
199.000 PERFIL COTA SOLERA TUBO RED
200,420 198.500
198,400 198.340

C.I. 1977
198.000 198.279

C.I.1975
198.400 198.219 198.159
198.100
197.500
TRAMO TB -1125
197.000
196.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -399 DESDE C.I. : 2376 525057.410 8782789.210 199.900 198.700 LONGITUD TRAMO : 65.19 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -399
HASTA C.I. : 1977 525041.970 8782724.850 200.420 198.400 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 65.19 ML i (%) : -0.453 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 1° DE MAYO DIST. ESTIMADA 66.19 i (°/o) TRAMO : -0.453 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2376 0.00 0.00 199.900 -0.453 198.700 0.0043 0.100 1.304 1 0.000 0.00 199.900 -0.453 198.700 0.0043 0.10 1.304 1.304 0.000 198.596 159.70 198.855 0.70 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 200.341
200.631
-0.453
-0.453
198.655
198.609
0.0043
0.0043
0.100
0.100
1.791
2.126
2
3
10.000
10.000
10.00
20.00
200.341
200.631
-0.453
-0.453
198.655
198.609
0.0043
0.0043
0.10
0.10
1.791
2.126
1.791
2.000
0.000
0.126
198.550
198.505
159.70
159.70
198.810
198.765
0.70
0.70
0.15
0.15
0.200
0.200
1.381
1.716
10.832
13.267
0.000
0.441
0.700
0.700
1.968
1.968
7.964
10.840
10.00 30.00 200.769 -0.453 198.564 0.0043 0.100 2.309 4 10.000 30.00 200.769 -0.453 198.564 0.0043 0.10 2.309 2.000 0.309 198.460 159.70 198.719 0.70 0.15 0.200 1.900 14.000 1.523 0.700 1.968 12.655
10.00 40.00 200.879 -0.453 198.519 0.0043 0.100 2.465 5 10.000 40.00 200.879 -0.453 198.519 0.0043 0.10 2.465 2.000 0.465 198.414 159.70 198.674 0.70 0.15 0.200 2.055 14.000 2.709 0.700 1.968 13.841
10.00 50.00 200.911 -0.453 198.473 0.0043 0.100 2.542 6 10.000 50.00 200.911 -0.453 198.473 0.0043 0.10 2.542 2.000 0.542 198.369 159.70 198.629 0.70 0.15 0.200 2.132 14.000 3.523 0.700 1.968 14.655
10.00 60.00 200.804 -0.453 198.428 0.0043 0.100 2.480 7 10.000 60.00 200.804 -0.453 198.428 0.0043 0.10 2.480 2.000 0.480 198.324 159.70 198.583 0.70 0.15 0.200 2.071 14.000 3.578 0.700 1.968 14.710
1977 5.190 65.19 200.420 -0.453 198.400 0.0043 0.100 2.124 8 5.190 65.19 200.420 -0.453 198.400 0.0043 0.10 2.124 2.000 0.124 198.296 159.70 198.555 0.70 0.15 0.104 1.715 7.266 1.098 0.363 1.021 6.876

ESQUEMA PLANIMETRICO TRAMOS 65.19 2.143 1.306 87.365 12.871 4.563 12.827 81.541
17.390

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 65.19
200,418 201.500
12.33 12.55 198,400 200.879 200.911
201.000 200.769 200.804
200.631
200.341 200.420
6.00 200.500
2376
TAS-PVC-DN150--0,453%-65.19 TB-399 1977 200.000
199.900

199.500 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
199.000
199,900
198,700 198.500 198.655

C.I. 2376
198.609

C.I.1977
198.700 198.564 198.519 198.473 198.428
198.000 198.400
TRAMO TB -399
197.500

197.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -1360 DESDE C.I. : 2240 524176.490 8782386.360 202.550 201.580 LONGITUD TRAMO : 79.24 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -1360
HASTA C.I. : 2112 524176.820 8782466.600 202.850 200.780 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 79.24 ML i (%) : -0.997 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 80.24 i (°/o) TRAMO : -0.997 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2240 0.00 0.00 202.550 -0.997 201.580 0.0043 0.100 1.074 1 0.000 0.00 202.550 -0.997 201.580 0.0043 0.10 1.074 1.074 0.000 201.476 159.70 201.735 0.70 0.15 0.000 0.665 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.551 -0.997 201.480 0.0043 0.100 1.175 2 10.000 10.00 202.551 -0.997 201.480 0.0043 0.10 1.175 1.175 0.000 201.376 159.70 201.636 0.70 0.15 0.200 0.765 7.873 0.000 0.700 1.968 5.005
10.00
10.00
20.00
30.00
opcional 202.775
202.903
-0.997
-0.997
201.381
201.281
0.0043
0.0043
0.100
0.100
1.499
1.726
3
4
10.000
10.000
20.00
30.00
202.775
202.903
-0.997
-0.997
201.381
201.281
0.0043
0.0043
0.10
0.10
1.499
1.726
1.499
1.726
0.000
0.000
201.276
201.177
159.70
159.70
201.536
201.436
0.70
0.70
0.15
0.15
0.200
0.200
1.089
1.317
9.358
11.288
0.000
0.000
0.700
0.700
1.968
1.968
6.490
8.420
10.00 40.00 203.036 -0.997 201.181 0.0043 0.100 1.959 5 10.000 40.00 203.036 -0.997 201.181 0.0043 0.10 1.959 1.959 0.000 201.077 159.70 201.337 0.70 0.15 0.200 1.549 12.899 0.000 0.700 1.968 10.031
10.00 50.00 203.166 -0.997 201.082 0.0043 0.100 2.189 6 10.000 50.00 203.166 -0.997 201.082 0.0043 0.10 2.189 2.000 0.189 200.977 159.70 201.237 0.70 0.15 0.200 1.779 13.857 0.661 0.700 1.968 11.650
10.00 60.00 203.129 -0.997 200.982 0.0043 0.100 2.251 7 10.000 60.00 203.129 -0.997 200.982 0.0043 0.10 2.251 2.000 0.251 200.878 159.70 201.137 0.70 0.15 0.200 1.842 14.000 1.541 0.700 1.968 12.673
10.00 70.00 203.064 -0.997 200.882 0.0043 0.100 2.286 8 10.000 70.00 203.064 -0.997 200.882 0.0043 0.10 2.286 2.000 0.286 200.778 159.70 201.038 0.70 0.15 0.200 1.876 14.000 1.882 0.700 1.968 13.014
2112 9.240 79.24 202.850 -0.997 200.780 0.0043 0.100 2.174 9 9.240 79.24 202.850 -0.997 200.780 0.0043 0.10 2.174 2.000 0.174 200.676 159.70 200.935 0.70 0.15 0.185 1.765 12.936 1.489 0.647 1.818 11.775

ESQUEMA PLANIMETRICO TRAMOS 79.24 1.815 1.587 96.210 5.572 5.547 15.591 79.057
21.138

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 79.24
202,850 203.500
203.166 203.129
12.33 12.55 200,780 203.036 203.064
202.903 202.850
203.000 202.775
202.550 202.551
6.00
2240
TAS-PVC-DN150--0,997%-79,24 TB-1360 2112
202.500

202.000
PERFILCOTA TERRENO TRAMO
201.500 PERFIL COTA SOLERA TUBO RED
201.580 201.480
201.381
202,550 201.000
201.281
201.181
201.082
201,580 200.982

C.I. 2112
C.I. 2240
200.882
200.500 200.780

200.000
TRAMO TB -1360

199.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -123 DESDE C.I. : 1983 524283.020 8782360.510 202.730 200.390 LONGITUD TRAMO : 55.72 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -123
HASTA C.I. : 2657 524282.600 8782417.230 202.600 200.120 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 55.72 ML i (%) : -0.476 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 56.72 i (°/o) TRAMO : -0.476 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1983 0.00 0.00 202.730 -0.476 200.390 0.0043 0.100 2.444 1 0.000 0.00 202.730 -0.476 200.390 0.0043 0.10 2.444 2.000 0.444 200.286 159.70 200.545 0.70 0.15 0.000 2.035 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.600 -0.476 200.342 0.0043 0.100 2.362 2 10.000 10.00 202.600 -0.476 200.342 0.0043 0.10 2.362 2.000 0.362 200.238 159.70 200.498 0.70 0.15 0.200 1.952 14.000 2.822 0.700 1.968 13.954
10.00
10.00
20.00
30.00
opcional 202.531
202.604
-0.476
-0.476
200.295
200.247
0.0043
0.0043
0.100
0.100
2.341
2.461
3
4
10.000
10.000
20.00
30.00
202.531
202.604
-0.476
-0.476
200.295
200.247
0.0043
0.0043
0.10
0.10
2.341
2.461
2.000
2.000
0.341
0.461
200.190
200.143
159.70
159.70
200.450
200.403
0.70
0.70
0.15
0.15
0.200
0.200
1.931
2.051
14.000
14.000
2.458
2.806
0.700
0.700
1.968
1.968
13.591
13.938
10.00 40.00 202.467 -0.476 200.200 0.0043 0.100 2.372 5 10.000 40.00 202.467 -0.476 200.200 0.0043 0.10 2.372 2.000 0.372 200.095 159.70 200.355 0.70 0.15 0.200 1.962 14.000 2.915 0.700 1.968 14.047
10.00 50.00 202.537 -0.476 200.152 0.0043 0.100 2.489 6 10.000 50.00 202.537 -0.476 200.152 0.0043 0.10 2.489 2.000 0.489 200.048 159.70 200.307 0.70 0.15 0.200 2.080 14.000 3.014 0.700 1.968 14.146
2657 5.720 55.72 202.600 -0.476 200.120 0.0043 0.100 2.584 7 5.720 55.72 202.600 -0.476 200.120 0.0043 0.10 2.584 2.000 0.584 200.016 159.70 200.275 0.70 0.15 0.115 2.175 8.008 2.149 0.400 1.125 8.517

ESQUEMA PLANIMETRICO TRAMOS 55.72 2.436 1.116 78.008 16.163 3.900 10.963 78.191
14.864

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 55.72
202,600 203.000 202.730
202.600 202.604 202.600
12.33 12.55 200,120 202.531 202.467 202.537
202.500

6.00 202.000
1983
TAS-PVC-DN150--0,476%-55.72 TB-123 2657 201.500

201.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
200.500
202,730 200.342 200.295 200.247
200,390 200.000 200.390 200.200

C.I. 2657
200.152

C.I. 1983
200.120

199.500
TRAMO TB -123
199.000

198.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -54 DESDE C.I. : 2619 524283.940 8782278.940 202.400 201.200 LONGITUD TRAMO : 80.58 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -54
HASTA C.I. : 1983 524283.020 8782360.510 202.730 200.390 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 80.58 ML i (%) : -0.993 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 81.58 i (°/o) TRAMO : -0.993 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2619 0.00 0.00 202.400 -0.993 201.200 0.0043 0.100 1.304 1 0.000 0.00 202.400 -0.993 201.200 0.0043 0.10 1.304 1.304 0.000 201.096 159.70 201.355 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.368 -0.993 201.101 0.0043 0.100 1.372 2 10.000 10.00 202.368 -0.993 201.101 0.0043 0.10 1.372 1.372 0.000 200.996 159.70 201.256 0.60 0.15 0.200 0.962 8.028 0.000 0.600 1.658 5.569
10.00
10.00
20.00
30.00
opcional 202.352
202.446
-0.993
-0.993
201.001
200.902
0.0043
0.0043
0.100
0.100
1.455
1.648
3
4
10.000
10.000
20.00
30.00
202.352
202.446
-0.993
-0.993
201.001
200.902
0.0043
0.0043
0.10
0.10
1.455
1.648
1.455
1.648
0.000
0.000
200.897
200.798
159.70
159.70
201.157
201.058
0.60
0.60
0.15
0.15
0.200
0.200
1.045
1.238
8.479
9.309
0.000
0.000
0.600
0.600
1.658
1.658
6.021
6.851
10.00 40.00 202.465 -0.993 200.803 0.0043 0.100 1.766 5 10.000 40.00 202.465 -0.993 200.803 0.0043 0.10 1.766 1.766 0.000 200.699 159.70 200.958 0.60 0.15 0.200 1.357 10.244 0.000 0.600 1.658 7.786
10.00 50.00 202.433 -0.993 200.704 0.0043 0.100 1.834 6 10.000 50.00 202.433 -0.993 200.704 0.0043 0.10 1.834 1.834 0.000 200.599 159.70 200.859 0.60 0.15 0.200 1.424 10.801 0.000 0.600 1.658 8.342
10.00 60.00 202.426 -0.993 200.604 0.0043 0.100 1.926 7 10.000 60.00 202.426 -0.993 200.604 0.0043 0.10 1.926 1.926 0.000 200.500 159.70 200.760 0.60 0.15 0.200 1.516 11.279 0.000 0.600 1.658 8.821
10.00 70.00 202.487 -0.993 200.505 0.0043 0.100 2.086 8 10.000 70.00 202.487 -0.993 200.505 0.0043 0.10 2.086 2.000 0.086 200.401 159.70 200.660 0.60 0.15 0.200 1.677 11.778 0.259 0.600 1.658 9.579
10.00 80.00 202.572 -0.993 200.406 0.0043 0.100 2.271 9 10.000 80.00 202.572 -0.993 200.406 0.0043 0.10 2.271 2.000 0.271 200.301 159.70 200.561 0.60 0.15 0.200 1.861 12.000 1.071 0.600 1.658 10.613
1983 0.580 80.58 202.730 -0.993 200.390 0.0043 0.100 2.444 10 0.580 80.58 202.730 -0.993 200.390 0.0043 0.10 2.444 2.000 0.444 200.286 159.70 200.545 0.60 0.15 0.012 2.035 0.696 0.124 0.035 0.096 0.678

ESQUEMA PLANIMETRICO TRAMOS 80.58 1.811 1.614 82.614 1.454 4.835 13.359 64.260
18.194

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 80.58
202,730 203.000 202.730
12.33 12.55 200,390 202.400 202.446 202.465 202.433 202.426 202.487 202.572
202.500 202.368 202.352

6.00
2619
TAS-PVC-DN150--0,993%-80.58 TB-54 1983
202.000

201.500
PERFILCOTA TERRENO TRAMO
201.000 201.101 PERFIL COTA SOLERA TUBO RED
201.200 201.001
200.902
202,400 200.500
200.803
200.704 200.604
201,200 200.505

C.I. 1983
C.I. 2619
200.406
200.390
200.000

199.500
TRAMO TB -54

199.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -1128 DESDE C.I. : 1982 524233.140 8782360.250 202.470 200.630 LONGITUD TRAMO : 48.88 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -1128
HASTA C.I. : 1983 524283.020 8782360.510 202.730 200.390 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 48.88 ML i (%) : -0.481 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 49.88 i (°/o) TRAMO : -0.481 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1982 0.00 0.00 202.470 -0.481 200.630 0.0043 0.100 1.944 1 0.000 0.00 202.470 -0.481 200.630 0.0043 0.10 1.944 1.944 0.000 200.526 159.70 200.785 0.70 0.15 0.000 1.535 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.341 -0.481 200.582 0.0043 0.100 1.863 2 10.000 10.00 202.341 -0.481 200.582 0.0043 0.10 1.863 1.863 0.000 200.478 159.70 200.737 0.70 0.15 0.200 1.454 13.327 0.000 0.700 1.968 10.459
10.00
10.00
20.00
30.00
opcional 202.383
202.167
-0.481
-0.481
200.534
200.486
0.0043
0.0043
0.100
0.100
1.954
1.786
3
4
10.000
10.000
20.00
30.00
202.383
202.167
-0.481
-0.481
200.534
200.486
0.0043
0.0043
0.10
0.10
1.954
1.786
1.954
1.786
0.000
0.000
200.429
200.381
159.70
159.70
200.689
200.641
0.70
0.70
0.15
0.15
0.200
0.200
1.544
1.376
13.359
13.087
0.000
0.000
0.700
0.700
1.968
1.968
10.491
10.219
10.00 40.00 202.474 -0.481 200.438 0.0043 0.100 2.141 5 10.000 40.00 202.474 -0.481 200.438 0.0043 0.10 2.141 2.000 0.141 200.333 159.70 200.593 0.70 0.15 0.200 1.731 13.250 0.493 0.700 1.968 10.874
1983 8.880 48.88 202.730 -0.481 200.390 0.0043 0.100 2.444 6 8.880 48.88 202.730 -0.481 200.390 0.0043 0.10 2.444 2.000 0.444 200.286 159.70 200.545 0.70 0.15 0.178 2.035 12.432 1.818 0.622 1.747 11.704

ESQUEMA PLANIMETRICO TRAMOS 48.88 2.022 0.979 65.455 2.311 3.422 9.618 53.748
13.039

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 48.88
202,730 203.000 202.730
12.33 12.55 200,390 202.470 202.474
202.500 202.341 202.383
202.167
6.00
1982
TAS-PVC-DN150--0,481%-48.88 TB-1128 1983
202.000

201.500
PERFILCOTA TERRENO TRAMO
201.000 PERFIL COTA SOLERA TUBO RED
202,470 200.500 200.582
200,630 200.630 200.534 200.486

C.I. 1983
C.I. 1982
200.438 200.390
200.000

199.500
TRAMO TB -1128

199.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -80 DESDE C.I. : 1906 524176.970 8782359.630 202.530 200.900 LONGITUD TRAMO : 55.17 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -80
HASTA C.I. : 1982 524233.140 8782360.250 202.470 200.630 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 55.17 ML i (%) : -0.481 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 56.17 i (°/o) TRAMO : -0.481 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1906 0.00 0.00 202.530 -0.481 200.900 0.0043 0.100 1.734 1 0.000 0.00 202.530 -0.481 200.900 0.0043 0.10 1.734 1.734 0.000 200.796 159.70 201.055 0.60 0.15 0.000 1.325 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.337 -0.481 200.852 0.0043 0.100 1.589 2 10.000 10.00 202.337 -0.481 200.852 0.0043 0.10 1.589 1.589 0.000 200.748 159.70 201.007 0.60 0.15 0.200 1.180 9.971 0.000 0.600 1.658 7.513
10.00
10.00
20.00
30.00
opcional 202.291
202.350
-0.481
-0.481
200.804
200.756
0.0043
0.0043
0.100
0.100
1.591
1.698
3
4
10.000
10.000
20.00
30.00
202.291
202.350
-0.481
-0.481
200.804
200.756
0.0043
0.0043
0.10
0.10
1.591
1.698
1.591
1.698
0.000
0.000
200.700
200.652
159.70
159.70
200.959
200.911
0.60
0.60
0.15
0.15
0.200
0.200
1.182
1.289
9.542
9.870
0.000
0.000
0.600
0.600
1.658
1.658
7.084
7.412
10.00 40.00 202.373 -0.481 200.708 0.0043 0.100 1.770 5 10.000 40.00 202.373 -0.481 200.708 0.0043 0.10 1.770 1.770 0.000 200.603 159.70 200.863 0.60 0.15 0.200 1.360 10.404 0.000 0.600 1.658 7.946
10.00 50.00 202.381 -0.481 200.660 0.0043 0.100 1.826 6 10.000 50.00 202.381 -0.481 200.660 0.0043 0.10 1.826 1.826 0.000 200.555 159.70 200.815 0.60 0.15 0.200 1.416 10.786 0.000 0.600 1.658 8.327
1982 5.170 55.17 202.470 -0.481 200.630 0.0043 0.100 1.944 7 5.170 55.17 202.470 -0.481 200.630 0.0043 0.10 1.944 1.944 0.000 200.526 159.70 200.785 0.60 0.15 0.104 1.535 5.847 0.000 0.310 0.857 4.576

ESQUEMA PLANIMETRICO TRAMOS 55.17 1.736 1.105 56.420 0.000 3.310 9.147 42.858
12.457

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 55.17
202,470 203.000
12.33 12.55 200,630 202.530
202.470
202.500 202.337 202.350 202.373 202.381
202.291
6.00
1906
TAS-PVC-DN150--0,481%-55,17 TB-80 1982 202.000

201.500 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
201.000
202,530
200,900 200.852 200.804

C.I. 1982
200.900

C.I. 1906
200.756 200.708
200.500 200.660 200.630

200.000 TRAMO TB -80

199.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -130 DESDE C.I. : 2660 524127.080 8782359.940 202.440 201.140 LONGITUD TRAMO : 48.89 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -130
HASTA C.I. : 1906 524176.970 8782359.630 202.530 200.900 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 48.89 ML i (%) : -0.481 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 49.89 i (°/o) TRAMO : -0.481 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2660 0.00 0.00 202.440 -0.481 201.140 0.0043 0.100 1.404 1 0.000 0.00 202.440 -0.481 201.140 0.0043 0.10 1.404 1.404 0.000 201.036 159.70 201.295 0.60 0.15 0.000 0.995 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.400 -0.481 201.092 0.0043 0.100 1.412 2 10.000 10.00 202.400 -0.481 201.092 0.0043 0.10 1.412 1.412 0.000 200.988 159.70 201.247 0.60 0.15 0.200 1.003 8.450 0.000 0.600 1.658 5.992
10.00
10.00
20.00
30.00
opcional 202.328
202.428
-0.481
-0.481
201.044
200.996
0.0043
0.0043
0.100
0.100
1.389
1.537
3
4
10.000
10.000
20.00
30.00
202.328
202.428
-0.481
-0.481
201.044
200.996
0.0043
0.0043
0.10
0.10
1.389
1.537
1.389
1.537
0.000
0.000
200.939
200.891
159.70
159.70
201.199
201.151
0.60
0.60
0.15
0.15
0.200
0.200
0.979
1.127
8.403
8.775
0.000
0.000
0.600
0.600
1.658
1.658
5.945
6.317
10.00 40.00 202.479 -0.481 200.948 0.0043 0.100 1.636 5 10.000 40.00 202.479 -0.481 200.948 0.0043 0.10 1.636 1.636 0.000 200.843 159.70 201.103 0.60 0.15 0.200 1.226 9.517 0.000 0.600 1.658 7.059
1906 8.890 48.89 202.530 -0.481 200.900 0.0043 0.100 1.734 6 8.890 48.89 202.530 -0.481 200.900 0.0043 0.10 1.734 1.734 0.000 200.796 159.70 201.055 0.60 0.15 0.178 1.325 8.988 0.000 0.533 1.474 6.802

ESQUEMA PLANIMETRICO TRAMOS 48.89 1.519 0.979 44.133 0.000 2.933 8.105 32.115
11.039

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 48.89
202,530 203.000
12.33 12.55 200,900
202.440 202.479 202.530
202.400 202.428
202.500 202.328
6.00
2660
TAS-PVC-DN150--0,481%-48,89 TB-130 1906 202.000
PERFILCOTA TERRENO TRAMO
201.500 PERFIL COTA SOLERA TUBO RED
202,440
201,140 201.000

C.I. 1906
201.092

C.I. 2660
201.140 201.044 200.996 200.948 200.900

200.500 TRAMO TB -130

200.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -129 DESDE C.I. : 1521 524076.830 8782360.310 202.710 201.380 LONGITUD TRAMO : 49.25 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -129
HASTA C.I. : 2660 524127.080 8782359.940 202.440 201.140 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 49.25 ML i (%) : -0.478 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 50.25 i (°/o) TRAMO : -0.478 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1521 0.00 0.00 202.710 -0.478 201.380 0.0043 0.100 1.434 1 0.000 0.00 202.710 -0.478 201.380 0.0043 0.10 1.434 1.434 0.000 201.276 159.70 201.535 0.60 0.15 0.000 1.025 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.447 -0.478 201.332 0.0043 0.100 1.219 2 10.000 10.00 202.447 -0.478 201.332 0.0043 0.10 1.219 1.219 0.000 201.228 159.70 201.488 0.60 0.15 0.200 0.809 7.960 0.000 0.600 1.658 5.502
10.00
10.00
20.00
30.00
opcional 202.442
202.394
-0.478
-0.478
201.284
201.237
0.0043
0.0043
0.100
0.100
1.262
1.262
3
4
10.000
10.000
20.00
30.00
202.442
202.394
-0.478
-0.478
201.284
201.237
0.0043
0.0043
0.10
0.10
1.262
1.262
1.262
1.262
0.000
0.000
201.180
201.132
159.70
159.70
201.440
201.392
0.60
0.60
0.15
0.15
0.200
0.200
0.852
0.852
7.443
7.570
0.000
0.000
0.600
0.600
1.658
1.658
4.984
5.112
10.00 40.00 202.418 -0.478 201.189 0.0043 0.100 1.333 5 10.000 40.00 202.418 -0.478 201.189 0.0043 0.10 1.333 1.333 0.000 201.085 159.70 201.344 0.60 0.15 0.200 0.924 7.785 0.000 0.600 1.658 5.327
2660 9.250 49.25 202.440 -0.478 201.140 0.0043 0.100 1.404 6 9.250 49.25 202.440 -0.478 201.140 0.0043 0.10 1.404 1.404 0.000 201.036 159.70 201.295 0.60 0.15 0.185 0.995 7.597 0.000 0.555 1.534 5.323

ESQUEMA PLANIMETRICO TRAMOS 49.25 1.319 0.987 38.355 0.000 2.955 8.165 26.248
11.120

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 49.25
202,440 203.000
202.710
12.33 12.55 201,140
202.447 202.442 202.394 202.418 202.440
202.500
6.00
1521
TAS-PVC-DN150--0,478%-49.25 TB-129 2660 202.000
PERFILCOTA TERRENO TRAMO
201.500 PERFIL COTA SOLERA TUBO RED
202,710 201.380 201.332 201.284 201.237 201.189
201,380 201.000 201.140

C.I. 2660
C.I. 1521
200.500 TRAMO TB -129

200.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -215 DESDE C.I. : 2519 523991.630 8782360.080 202.980 201.780 LONGITUD TRAMO : 84.20 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -215
HASTA C.I. : 1521 524076.830 8782360.310 202.710 201.380 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 84.20 ML i (%) : -0.469 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 85.20 i (°/o) TRAMO : -0.469 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2519 0.00 0.00 202.980 -0.469 201.780 0.0043 0.100 1.304 1 0.000 0.00 202.980 -0.469 201.780 0.0043 0.10 1.304 1.304 0.000 201.676 159.70 201.935 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.992 -0.469 201.733 0.0043 0.100 1.363 2 10.000 10.00 202.992 -0.469 201.733 0.0043 0.10 1.363 1.363 0.000 201.629 159.70 201.888 0.60 0.15 0.200 0.954 8.003 0.000 0.600 1.658 5.544
10.00
10.00
20.00
30.00
opcional 203.035
202.950
-0.469
-0.469
201.686
201.639
0.0043
0.0043
0.100
0.100
1.453
1.415
3
4
10.000
10.000
20.00
30.00
203.035
202.950
-0.469
-0.469
201.686
201.639
0.0043
0.0043
0.10
0.10
1.453
1.415
1.453
1.415
0.000
0.000
201.582
201.535
159.70
159.70
201.842
201.795
0.60
0.60
0.15
0.15
0.200
0.200
1.043
1.005
8.449
8.605
0.000
0.000
0.600
0.600
1.658
1.658
5.991
6.147
10.00 40.00 202.890 -0.469 201.592 0.0043 0.100 1.402 5 10.000 40.00 202.890 -0.469 201.592 0.0043 0.10 1.402 1.402 0.000 201.488 159.70 201.748 0.60 0.15 0.200 0.992 8.452 0.000 0.600 1.658 5.994
10.00 50.00 202.809 -0.469 201.545 0.0043 0.100 1.368 6 10.000 50.00 202.809 -0.469 201.545 0.0043 0.10 1.368 1.368 0.000 201.441 159.70 201.701 0.60 0.15 0.200 0.958 8.310 0.000 0.600 1.658 5.852
10.00 60.00 202.805 -0.469 201.498 0.0043 0.100 1.411 7 10.000 60.00 202.805 -0.469 201.498 0.0043 0.10 1.411 1.411 0.000 201.394 159.70 201.654 0.60 0.15 0.200 1.001 8.337 0.000 0.600 1.658 5.879
10.00 70.00 202.777 -0.469 201.451 0.0043 0.100 1.430 8 10.000 70.00 202.777 -0.469 201.451 0.0043 0.10 1.430 1.430 0.000 201.347 159.70 201.607 0.60 0.15 0.200 1.020 8.523 0.000 0.600 1.658 6.065
10.00 80.00 202.747 -0.469 201.404 0.0043 0.100 1.447 9 10.000 80.00 202.747 -0.469 201.404 0.0043 0.10 1.447 1.447 0.000 201.300 159.70 201.560 0.60 0.15 0.200 1.037 8.630 0.000 0.600 1.658 6.172
1521 4.200 84.20 202.710 -0.469 201.380 0.0043 0.100 1.434 10 4.200 84.20 202.710 -0.469 201.380 0.0043 0.10 1.434 1.434 0.000 201.276 159.70 201.535 0.60 0.15 0.084 1.025 3.630 0.000 0.252 0.696 2.598

ESQUEMA PLANIMETRICO TRAMOS 84.20 1.403 1.687 70.940 0.000 5.052 13.959 50.242
19.011

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 84.20
202,710 203.500
12.33 12.55 201,380
202.980 202.992 203.035
202.950 202.890
203.000 202.809 202.805 202.777 202.747 202.710
6.00
2519
TAS-PVC-DN150--0,469%-84.20 TB-215 1521 202.500
PERFILCOTA TERRENO TRAMO
202.000 PERFIL COTA SOLERA TUBO RED
202,980 201.733
201.780 201.686
201,780 201.500 201.639

C.I. 1521
201.592

C.I. 2519
201.545 201.498 201.451 201.404
201.380
201.000 TRAMO TB -215

200.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -164 DESDE C.I. : 2676 524285.160 8782201.180 202.390 199.870 LONGITUD TRAMO : 52.31 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -164
HASTA C.I. : 2030 524282.720 8782254.430 202.370 199.360 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 52.31 ML i (%) : -0.957 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 53.31 i (°/o) TRAMO : -0.957 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2676 0.00 0.00 202.390 -0.957 199.870 0.0043 0.100 2.624 1 0.000 0.00 202.390 -0.957 199.870 0.0043 0.10 2.624 2.000 0.624 199.766 159.70 200.025 0.70 0.15 0.000 2.215 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.303
202.272
-0.957
-0.957
199.774
199.679
0.0043
0.0043
0.100
0.100
2.633
2.698
2
3
10.000
10.000
10.00
20.00
202.303
202.272
-0.957
-0.957
199.774
199.679
0.0043
0.0043
0.10
0.10
2.633
2.698
2.000
2.000
0.633
0.698
199.670
199.574
159.70
159.70
199.930
199.834
0.70
0.70
0.15
0.15
0.200
0.200
2.223
2.288
14.000
14.000
4.400
4.657
0.700
0.700
1.968
1.968
15.533
15.789
10.00 30.00 202.299 -0.957 199.583 0.0043 0.100 2.820 4 10.000 30.00 202.299 -0.957 199.583 0.0043 0.10 2.820 2.000 0.820 199.479 159.70 199.738 0.70 0.15 0.200 2.411 14.000 5.313 0.700 1.968 16.445
10.00 40.00 202.336 -0.957 199.487 0.0043 0.100 2.953 5 10.000 40.00 202.336 -0.957 199.487 0.0043 0.10 2.953 2.000 0.953 199.383 159.70 199.643 0.70 0.15 0.200 2.543 14.000 6.207 0.700 1.968 17.339
10.00 50.00 202.387 -0.957 199.392 0.0043 0.100 3.100 6 10.000 50.00 202.387 -0.957 199.392 0.0043 0.10 3.100 2.000 1.100 199.287 159.70 199.547 0.70 0.15 0.200 2.690 14.000 7.184 0.700 1.968 18.316
2030 2.310 52.31 202.370 -0.957 199.360 0.0043 0.100 3.114 7 2.310 52.31 202.370 -0.957 199.360 0.0043 0.10 3.114 2.000 1.114 199.256 159.70 199.515 0.70 0.15 0.046 2.705 3.234 1.790 0.162 0.455 4.361

ESQUEMA PLANIMETRICO TRAMOS 52.31 2.849 1.048 73.234 29.551 3.662 10.292 87.783
13.954

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 52.31
202,370 203.000
202.390
12.33 12.55 199,360 202.303 202.272 202.299 202.336 202.387 202.370

202.000
6.00
2676
TAS-PVC-DN150--0,957%-52,31 TB-164 2030 201.000
PERFILCOTA TERRENO TRAMO
200.000 PERFIL COTA SOLERA TUBO RED
199.774
202,390 199.870 199.679 199.583 199.487 199.392 199.360
199,870 199.000

C.I. 2676

C.I.2030
198.000 TRAMO TB -164

197.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -163 DESDE C.I. : 2224 524285.040 8782151.380 202.300 200.110 LONGITUD TRAMO : 48.80 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -163
HASTA C.I. : 2676 524285.160 8782201.180 202.390 199.870 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 48.80 ML i (%) : -0.482 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 49.80 i (°/o) TRAMO : -0.482 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2224 0.00 0.00 202.300 -0.482 200.110 0.0043 0.100 2.294 1 0.000 0.00 202.300 -0.482 200.110 0.0043 0.10 2.294 2.000 0.294 200.006 159.70 200.265 0.70 0.15 0.000 1.885 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.347
202.389
-0.482
-0.482
200.062
200.014
0.0043
0.0043
0.100
0.100
2.389
2.480
2
3
10.000
10.000
10.00
20.00
202.347
202.389
-0.482
-0.482
200.062
200.014
0.0043
0.0043
0.10
0.10
2.389
2.480
2.000
2.000
0.389
0.480
199.958
199.909
159.70
159.70
200.217
200.169
0.70
0.70
0.15
0.15
0.200
0.200
1.980
2.070
14.000
14.000
2.393
3.042
0.700
0.700
1.968
1.968
13.525
14.174
10.00 30.00 202.354 -0.482 199.965 0.0043 0.100 2.493 4 10.000 30.00 202.354 -0.482 199.965 0.0043 0.10 2.493 2.000 0.493 199.861 159.70 200.121 0.70 0.15 0.200 2.083 14.000 3.404 0.700 1.968 14.536
10.00 40.00 202.376 -0.482 199.917 0.0043 0.100 2.563 5 10.000 40.00 202.376 -0.482 199.917 0.0043 0.10 2.563 2.000 0.563 199.813 159.70 200.073 0.70 0.15 0.200 2.153 14.000 3.696 0.700 1.968 14.828
2676 8.800 48.80 202.390 -0.482 199.870 0.0043 0.100 2.624 6 8.800 48.80 202.390 -0.482 199.870 0.0043 0.10 2.624 2.000 0.624 199.766 159.70 200.025 0.70 0.15 0.176 2.215 12.320 3.657 0.616 1.731 13.453

ESQUEMA PLANIMETRICO TRAMOS 48.80 2.474 0.978 68.320 16.192 3.416 9.602 70.517
13.018

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 48.80
202,390 203.000
12.33 12.55 199,870 202.300 202.347 202.389 202.354 202.376 202.390
202.500

6.00 202.000
2224
TAS-PVC-DN150--0,482%-48.80 TB-163 2676 201.500

201.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
200.500
202,300
200,110 200.000

C.I. 2224

C.I.2676
200.062 200.014 199.965
200.110 199.917 199.870
199.500
TRAMO TB -163
199.000

198.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -160 DESDE C.I. : 2554 524196.320 8782149.970 201.730 200.530 LONGITUD TRAMO : 87.73 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -160
HASTA C.I. : 2224 524285.040 8782151.380 202.300 200.110 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 87.73 ML i (%) : -0.473 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 88.73 i (°/o) TRAMO : -0.473 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2554 0.00 0.00 201.730 -0.473 200.530 0.0043 0.100 1.304 1 0.000 0.00 201.730 -0.473 200.530 0.0043 0.10 1.304 1.304 0.000 200.426 159.70 200.685 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 201.995
202.066
-0.473
-0.473
200.483
200.435
0.0043
0.0043
0.100
0.100
1.617
1.735
2
3
10.000
10.000
10.00
20.00
201.995
202.066
-0.473
-0.473
200.483
200.435
0.0043
0.0043
0.10
0.10
1.617
1.735
1.617
1.735
0.000
0.000
200.378
200.331
159.70
159.70
200.638
200.591
0.60
0.60
0.15
0.15
0.200
0.200
1.207
1.325
8.763
10.055
0.000
0.000
0.600
0.600
1.658
1.658
6.305
7.597
10.00 30.00 202.184 -0.473 200.388 0.0043 0.100 1.900 4 10.000 30.00 202.184 -0.473 200.388 0.0043 0.10 1.900 1.900 0.000 200.284 159.70 200.543 0.60 0.15 0.200 1.491 10.906 0.000 0.600 1.658 8.448
10.00 40.00 202.113 -0.473 200.341 0.0043 0.100 1.877 5 10.000 40.00 202.113 -0.473 200.341 0.0043 0.10 1.877 1.877 0.000 200.236 159.70 200.496 0.60 0.15 0.200 1.467 11.331 0.000 0.600 1.658 8.873
10.00 50.00 202.163 -0.473 200.293 0.0043 0.100 1.974 6 10.000 50.00 202.163 -0.473 200.293 0.0043 0.10 1.974 1.974 0.000 200.189 159.70 200.449 0.60 0.15 0.200 1.564 11.552 0.000 0.600 1.658 9.094
10.00 60.00 202.250 -0.473 200.246 0.0043 0.100 2.108 7 10.000 60.00 202.250 -0.473 200.246 0.0043 0.10 2.108 2.000 0.108 200.142 159.70 200.401 0.60 0.15 0.200 1.699 11.922 0.325 0.600 1.658 9.789
10.00 70.00 202.217 -0.473 200.199 0.0043 0.100 2.123 8 10.000 70.00 202.217 -0.473 200.199 0.0043 0.10 2.123 2.000 0.123 200.094 159.70 200.354 0.60 0.15 0.200 1.713 12.000 0.693 0.600 1.658 10.235
10.00 80.00 202.050 -0.473 200.151 0.0043 0.100 2.003 9 10.000 80.00 202.050 -0.473 200.151 0.0043 0.10 2.003 2.000 0.003 200.047 159.70 200.307 0.60 0.15 0.200 1.593 12.000 0.377 0.600 1.658 9.919
2224 7.730 87.73 202.300 -0.473 200.110 0.0043 0.100 2.294 10 7.730 87.73 202.300 -0.473 200.110 0.0043 0.10 2.294 2.000 0.294 200.006 159.70 200.265 0.60 0.15 0.155 1.885 9.276 0.689 0.464 1.282 8.065

ESQUEMA PLANIMETRICO TRAMOS 87.73 1.894 1.757 97.804 2.084 5.264 14.545 78.322
19.808

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 87.73
202,300 202.500 202.250 202.217
202.300
202.184
12.33 12.55 200,110 201.995 202.066 202.113 202.163
202.050
202.000 201.730
6.00
2554
TAS-PVC-DN150--0,473%-87.73 TB-160 2224 201.500

201.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
200.500
201,730 200.483 200.435
200.530 200.388
200,530 200.341 200.293

C.I. 2554
200.246

C.I.2224
200.000 200.199 200.151
200.110

199.500 TRAMO TB -160

199.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -158 DESDE C.I. : 2261 524177.160 8782314.370 202.550 201.350 LONGITUD TRAMO : 58.33 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -158
HASTA C.I. : 2031 524176.850 8782255.060 202.490 199.800 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 58.33 ML i (%) : -2.612 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 59.33 i (°/o) TRAMO : -2.612 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2261 0.00 0.00 202.550 -2.612 201.350 0.0043 0.100 1.304 1 0.000 0.00 202.550 -2.612 201.350 0.0043 0.10 1.304 1.304 0.000 201.246 159.70 201.505 0.70 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.604
202.591
-2.612
-2.612
201.089
200.828
0.0043
0.0043
0.100
0.100
1.620
1.868
2
3
10.000
10.000
10.00
20.00
202.604
202.591
-2.612
-2.612
201.089
200.828
0.0043
0.0043
0.10
0.10
1.620
1.868
1.620
1.868
0.000
0.000
200.984
200.723
159.70
159.70
201.244
200.983
0.70
0.70
0.15
0.15
0.200
0.200
1.210
1.458
10.233
12.206
0.000
0.000
0.700
0.700
1.968
1.968
7.366
9.338
10.00 30.00 202.606 -2.612 200.566 0.0043 0.100 2.144 4 10.000 30.00 202.606 -2.612 200.566 0.0043 0.10 2.144 2.000 0.144 200.462 159.70 200.722 0.70 0.15 0.200 1.734 13.537 0.504 0.700 1.968 11.174
10.00 40.00 202.553 -2.612 200.305 0.0043 0.100 2.352 5 10.000 40.00 202.553 -2.612 200.305 0.0043 0.10 2.352 2.000 0.352 200.201 159.70 200.460 0.70 0.15 0.200 1.943 14.000 1.737 0.700 1.968 12.869
10.00 50.00 202.367 -2.612 200.044 0.0043 0.100 2.428 6 10.000 50.00 202.367 -2.612 200.044 0.0043 0.10 2.428 2.000 0.428 199.939 159.70 200.199 0.70 0.15 0.200 2.018 14.000 2.729 0.700 1.968 13.861
2031 8.330 58.33 202.490 -2.612 199.800 0.0043 0.100 2.794 7 8.330 58.33 202.490 -2.612 199.800 0.0043 0.10 2.794 2.000 0.794 199.696 159.70 199.955 0.70 0.15 0.167 2.385 11.662 3.562 0.583 1.639 12.835

ESQUEMA PLANIMETRICO TRAMOS 58.33 2.073 1.168 75.638 8.533 4.083 11.477 67.443
15.560

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 58.33
202,490 203.000 202.550
202.604 202.606
202.591 202.553
12.33 12.55 199,800 202.367
202.490
202.500
202.000
6.00
2261
TAS-PVC-DN150--2,612%-58,33 TB-158 2031 201.500
201.000 201.350 201.089 PERFILCOTA TERRENO TRAMO
200.828
200.500 PERFIL COTA SOLERA TUBO RED
200.566
200.305
202,550 200.000
200.044
201,350

C.I. 2261

C.I.2031
199.500 199.800
199.000
TRAMO TB -158
198.500
198.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -128 DESDE C.I. : 2659 524176.320 8782181.600 201.730 200.530 LONGITUD TRAMO : 72.47 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -128
HASTA C.I. : 2031 524176.850 8782255.060 202.490 199.800 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 72.47 ML i (%) : -0.994 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 73.47 i (°/o) TRAMO : -0.994 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2659 0.00 0.00 201.730 -0.994 200.530 0.0043 0.100 1.304 1 0.000 0.00 201.730 -0.994 200.530 0.0043 0.10 1.304 1.304 0.000 200.426 159.70 200.685 0.70 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 201.731
201.798
-0.994
-0.994
200.431
200.331
0.0043
0.0043
0.100
0.100
1.405
1.571
2
3
10.000
10.000
10.00
20.00
201.731
201.798
-0.994
-0.994
200.431
200.331
0.0043
0.0043
0.10
0.10
1.405
1.571
1.405
1.571
0.000
0.000
200.326
200.227
159.70
159.70
200.586
200.487
0.70
0.70
0.15
0.15
0.200
0.200
0.995
1.161
9.481
10.415
0.000
0.000
0.700
0.700
1.968
1.968
6.613
7.547
10.00 30.00 201.862 -0.994 200.232 0.0043 0.100 1.734 4 10.000 30.00 201.862 -0.994 200.232 0.0043 0.10 1.734 1.734 0.000 200.128 159.70 200.387 0.70 0.15 0.200 1.325 11.569 0.000 0.700 1.968 8.701
10.00 40.00 202.000 -0.994 200.133 0.0043 0.100 1.972 5 10.000 40.00 202.000 -0.994 200.133 0.0043 0.10 1.972 1.972 0.000 200.028 159.70 200.288 0.70 0.15 0.200 1.562 12.972 0.000 0.700 1.968 10.104
10.00 50.00 202.096 -0.994 200.033 0.0043 0.100 2.167 6 10.000 50.00 202.096 -0.994 200.033 0.0043 0.10 2.167 2.000 0.167 199.929 159.70 200.189 0.70 0.15 0.200 1.757 13.901 0.585 0.700 1.968 11.618
10.00 60.00 202.218 -0.994 199.934 0.0043 0.100 2.388 7 10.000 60.00 202.218 -0.994 199.934 0.0043 0.10 2.388 2.000 0.388 199.830 159.70 200.089 0.70 0.15 0.200 1.979 14.000 1.945 0.700 1.968 13.077
10.00 70.00 202.269 -0.994 199.834 0.0043 0.100 2.539 8 10.000 70.00 202.269 -0.994 199.834 0.0043 0.10 2.539 2.000 0.539 199.730 159.70 199.990 0.70 0.15 0.200 2.129 14.000 3.246 0.700 1.968 14.378
2031 2.470 72.47 202.490 -0.994 199.800 0.0043 0.100 2.794 9 2.470 72.47 202.490 -0.994 199.800 0.0043 0.10 2.794 2.000 0.794 199.696 159.70 199.955 0.70 0.15 0.049 2.385 3.458 1.153 0.173 0.486 3.902

ESQUEMA PLANIMETRICO TRAMOS 72.47 1.986 1.452 89.796 6.928 5.073 14.259 75.940
19.332

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 72.47
202,490 203.000
12.33 12.55 199,800 202.490
202.500 202.218 202.269
202.000 202.096
202.000 201.730 201.798 201.862
6.00 201.731

2659
TAS-PVC-DN150--0,994%-72.47 TB-128 2031 201.500
201.000 PERFILCOTA TERRENO TRAMO
200.500 PERFIL COTA SOLERA TUBO RED
200.530 200.431 200.331
201,730 200.000 200.232 200.133 200.033
200,530 199.934 199.834

C.I. 2659
199.800

C.I.2031
199.500
199.000
TRAMO TB -128
198.500
198.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -137 DESDE C.I. : 2663 523966.790 8782314.430 202.780 201.580 LONGITUD TRAMO : 58.75 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -137
HASTA C.I. : 1471 523966.440 8782254.680 202.260 201.050 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 58.75 ML i (%) : -0.887 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 59.75 i (°/o) TRAMO : -0.887 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2663 0.00 0.00 202.780 -0.887 201.580 0.0043 0.100 1.304 1 0.000 0.00 202.780 -0.887 201.580 0.0043 0.10 1.304 1.304 0.000 201.476 159.70 201.735 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.602
202.574
-0.887
-0.887
201.491
201.403
0.0043
0.0043
0.100
0.100
1.215
1.276
2
3
10.000
10.000
10.00
20.00
202.602
202.574
-0.887
-0.887
201.491
201.403
0.0043
0.0043
0.10
0.10
1.215
1.276
1.215
1.276
0.000
0.000
201.387
201.298
159.70
159.70
201.647
201.558
0.60
0.60
0.15
0.15
0.200
0.200
0.805
0.866
7.558
7.472
0.000
0.000
0.600
0.600
1.658
1.658
5.100
5.014
10.00 30.00 202.513 -0.887 201.314 0.0043 0.100 1.303 4 10.000 30.00 202.513 -0.887 201.314 0.0043 0.10 1.303 1.303 0.000 201.210 159.70 201.469 0.60 0.15 0.200 0.894 7.737 0.000 0.600 1.658 5.279
10.00 40.00 202.489 -0.887 201.225 0.0043 0.100 1.368 5 10.000 40.00 202.489 -0.887 201.225 0.0043 0.10 1.368 1.368 0.000 201.121 159.70 201.381 0.60 0.15 0.200 0.958 8.014 0.000 0.600 1.658 5.556
10.00 50.00 202.420 -0.887 201.137 0.0043 0.100 1.388 6 10.000 50.00 202.420 -0.887 201.137 0.0043 0.10 1.388 1.388 0.000 201.032 159.70 201.292 0.60 0.15 0.200 0.978 8.268 0.000 0.600 1.658 5.809
1471 8.750 58.75 202.260 -0.887 201.050 0.0043 0.100 1.314 7 8.750 58.75 202.260 -0.887 201.050 0.0043 0.10 1.314 1.314 0.000 200.946 159.70 201.205 0.60 0.15 0.175 0.905 7.093 0.000 0.525 1.451 4.942

ESQUEMA PLANIMETRICO TRAMOS 58.75 1.310 1.177 46.142 0.000 3.525 9.740 31.700
13.265

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 58.75
202,260 203.000 202.780
12.33 12.55 201,050 202.602 202.574 202.513 202.489
202.500 202.420
202.260
6.00
2663
TAS-PVC-DN150--0,887%-58,75 TB-137 1471 202.000
PERFILCOTA TERRENO TRAMO
201.500 PERFIL COTA SOLERA TUBO RED
201.580 201.491
201.403
202,780 201.314
201.225
201,580 201.000 201.137

C.I. 2663

C.I.1471
201.050

200.500 TRAMO TB -137

200.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -212 DESDE C.I. : 2131 523965.720 8782177.280 202.020 200.820 LONGITUD TRAMO : 76.42 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -212
HASTA C.I. : 1471 523966.440 8782254.680 202.260 199.460 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 76.42 ML i (%) : -1.757 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 77.42 i (°/o) TRAMO : -1.757 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2131 0.00 0.00 202.020 -1.757 200.820 0.0043 0.100 1.304 1 0.000 0.00 202.020 -1.757 200.820 0.0043 0.10 1.304 1.304 0.000 200.716 159.70 200.975 0.70 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.168
202.081
-1.757
-1.757
200.644
200.469
0.0043
0.0043
0.100
0.100
1.628
1.717
2
3
10.000
10.000
10.00
20.00
202.168
202.081
-1.757
-1.757
200.644
200.469
0.0043
0.0043
0.10
0.10
1.628
1.717
1.628
1.717
0.000
0.000
200.540
200.364
159.70
159.70
200.800
200.624
0.70
0.70
0.15
0.15
0.200
0.200
1.218
1.307
10.263
11.706
0.000
0.000
0.700
0.700
1.968
1.968
7.395
8.838
10.00 30.00 202.177 -1.757 200.293 0.0043 0.100 1.988 4 10.000 30.00 202.177 -1.757 200.293 0.0043 0.10 1.988 1.988 0.000 200.189 159.70 200.448 0.70 0.15 0.200 1.579 12.967 0.000 0.700 1.968 10.100
10.00 40.00 202.126 -1.757 200.117 0.0043 0.100 2.113 5 10.000 40.00 202.126 -1.757 200.117 0.0043 0.10 2.113 2.000 0.113 200.013 159.70 200.273 0.70 0.15 0.200 1.703 13.959 0.396 0.700 1.968 11.487
10.00 50.00 202.221 -1.757 199.942 0.0043 0.100 2.384 6 10.000 50.00 202.221 -1.757 199.942 0.0043 0.10 2.384 2.000 0.384 199.837 159.70 200.097 0.70 0.15 0.200 1.974 14.000 1.738 0.700 1.968 12.870
10.00 60.00 202.185 -1.757 199.766 0.0043 0.100 2.523 7 10.000 60.00 202.185 -1.757 199.766 0.0043 0.10 2.523 2.000 0.523 199.662 159.70 199.921 0.70 0.15 0.200 2.114 14.000 3.175 0.700 1.968 14.307
10.00 70.00 202.267 -1.757 199.590 0.0043 0.100 2.781 8 10.000 70.00 202.267 -1.757 199.590 0.0043 0.10 2.781 2.000 0.781 199.486 159.70 199.746 0.70 0.15 0.200 2.371 14.000 4.565 0.700 1.968 15.697
1471 6.420 76.42 202.260 -1.757 199.460 0.0043 0.100 2.904 9 6.420 76.42 202.260 -1.757 199.460 0.0043 0.10 2.904 2.000 0.904 199.356 159.70 199.615 0.70 0.15 0.129 2.495 8.988 3.787 0.449 1.263 10.934

ESQUEMA PLANIMETRICO TRAMOS 76.42 2.149 1.531 99.884 13.661 5.349 15.036 91.628
20.386

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 76.42
202,260 202.500 202.168 202.177 202.221 202.185 202.267 202.260
202.020 202.081 202.126
12.33 12.55 199,460
202.000

6.00 201.500
2131
TAS-PVC-DN150--1,757%-76.42 TB-212 1471 201.000

200.500 PERFILCOTA TERRENO TRAMO


200.820 200.644
200.469 PERFIL COTA SOLERA TUBO RED
200.293
200.000 200.117
202,020 199.942
199.766
199,820 199.500

C.I. 2131
199.590

C.I.1471
199.460
199.000
TRAMO TB -212
198.500

198.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -213 DESDE C.I. : 2662 523912.370 8782254.860 202.300 200.480 LONGITUD TRAMO : 53.08 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -213
HASTA C.I. : 1471 523966.440 8782254.680 202.260 199.460 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 53.08 ML i (%) : -1.886 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 54.08 i (°/o) TRAMO : -1.886 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2662 0.00 0.00 202.300 -1.886 200.480 0.0043 0.100 1.924 1 0.000 0.00 202.300 -1.886 200.480 0.0043 0.10 1.924 1.924 0.000 200.376 159.70 200.635 0.70 0.15 0.000 1.515 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.288
202.394
-1.886
-1.886
200.291
200.103
0.0043
0.0043
0.100
0.100
2.101
2.396
2
3
10.000
10.000
10.00
20.00
202.288
202.394
-1.886
-1.886
200.291
200.103
0.0043
0.0043
0.10
0.10
2.101
2.396
2.000
2.000
0.101
0.396
200.187
199.998
159.70
159.70
200.447
200.258
0.70
0.70
0.15
0.15
0.200
0.200
1.691
1.986
13.735
14.000
0.353
1.738
0.700
0.700
1.968
1.968
11.220
12.870
10.00 30.00 202.271 -1.886 199.914 0.0043 0.100 2.461 4 10.000 30.00 202.271 -1.886 199.914 0.0043 0.10 2.461 2.000 0.461 199.810 159.70 200.070 0.70 0.15 0.200 2.051 14.000 2.998 0.700 1.968 14.130
10.00 40.00 202.215 -1.886 199.726 0.0043 0.100 2.594 5 10.000 40.00 202.215 -1.886 199.726 0.0043 0.10 2.594 2.000 0.594 199.621 159.70 199.881 0.70 0.15 0.200 2.184 14.000 3.692 0.700 1.968 14.824
10.00 50.00 202.280 -1.886 199.537 0.0043 0.100 2.847 6 10.000 50.00 202.280 -1.886 199.537 0.0043 0.10 2.847 2.000 0.847 199.433 159.70 199.692 0.70 0.15 0.200 2.438 14.000 5.044 0.700 1.968 16.176
1471 3.080 53.08 202.260 -1.886 199.460 0.0043 0.100 2.904 7 3.080 53.08 202.260 -1.886 199.460 0.0043 0.10 2.904 2.000 0.904 199.356 159.70 199.615 0.70 0.15 0.062 2.495 4.312 1.888 0.216 0.606 5.317

ESQUEMA PLANIMETRICO TRAMOS 53.08 2.461 1.063 74.047 15.713 3.716 10.444 74.537
14.160

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 53.08
202,260 203.000
12.33 12.55 199,460 202.300 202.288 202.394 202.271 202.215 202.280 202.260

202.000
6.00
2662
TAS-PVC-DN150--1,886%-53,08 TB-213 1471 201.000
PERFILCOTA TERRENO TRAMO
200.000 200.480 200.291 PERFIL COTA SOLERA TUBO RED
200.103
199.914
202,300 199.726
199.537 199.460
200,480 199.000

C.I. 2662

C.I.1471
198.000 TRAMO TB -213

197.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -134 DESDE C.I. : 2011 523862.080 8782254.160 202.640 200.720 LONGITUD TRAMO : 49.30 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -134
HASTA C.I. : 2662 523912.370 8782254.860 202.300 200.480 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 49.30 ML i (%) : -0.477 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 50.30 i (°/o) TRAMO : -0.477 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2011 0.00 0.00 202.640 -0.477 200.720 0.0043 0.100 2.024 1 0.000 0.00 202.640 -0.477 200.720 0.0043 0.10 2.024 2.000 0.024 200.616 159.70 200.875 0.60 0.15 0.000 1.615 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.409
202.321
-0.477
-0.477
200.672
200.625
0.0043
0.0043
0.100
0.100
1.841
1.801
2
3
10.000
10.000
10.00
20.00
202.409
202.321
-0.477
-0.477
200.672
200.625
0.0043
0.0043
0.10
0.10
1.841
1.801
1.841
1.801
0.000
0.000
200.568
200.520
159.70
159.70
200.828
200.780
0.60
0.60
0.15
0.15
0.200
0.200
1.431
1.391
11.523
10.925
0.073
0.000
0.600
0.600
1.658
1.658
9.138
8.467
10.00 30.00 202.286 -0.477 200.577 0.0043 0.100 1.813 4 10.000 30.00 202.286 -0.477 200.577 0.0043 0.10 1.813 1.813 0.000 200.473 159.70 200.732 0.60 0.15 0.200 1.404 10.843 0.000 0.600 1.658 8.384
10.00 40.00 202.361 -0.477 200.529 0.0043 0.100 1.936 5 10.000 40.00 202.361 -0.477 200.529 0.0043 0.10 1.936 1.936 0.000 200.425 159.70 200.685 0.60 0.15 0.200 1.526 11.249 0.000 0.600 1.658 8.791
2662 9.300 49.30 202.300 -0.477 200.480 0.0043 0.100 1.924 6 9.300 49.30 202.300 -0.477 200.480 0.0043 0.10 1.924 1.924 0.000 200.376 159.70 200.635 0.60 0.15 0.186 1.515 10.771 0.000 0.558 1.542 8.485

ESQUEMA PLANIMETRICO TRAMOS 49.30 1.890 0.988 55.310 0.073 2.958 8.173 43.264
11.131

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 49.30
202,300 203.000 202.640
12.33 12.55 200,480 202.409
202.500 202.321 202.286 202.361 202.300

6.00
2011
TAS-PVC-DN150--0,477%-49.30 TB-134 2662
202.000

201.500
PERFILCOTA TERRENO TRAMO
201.000 PERFIL COTA SOLERA TUBO RED
202,640 200.500 200.672 200.625
200.720 200.577
200,720 200.529 200.480

C.I. 2011

C.I.2662
200.000

199.500
TRAMO TB -134

199.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -250 DESDE C.I. : 2083 523860.780 8782186.110 202.750 201.450 LONGITUD TRAMO : 67.06 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -250
HASTA C.I. : 2011 523862.080 8782254.160 202.640 200.920 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 67.06 ML i (%) : -0.779 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 68.06 i (°/o) TRAMO : -0.779 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2083 0.00 0.00 202.750 -0.779 201.450 0.0043 0.100 1.404 1 0.000 0.00 202.750 -0.779 201.450 0.0043 0.10 1.404 1.404 0.000 201.346 159.70 201.605 0.60 0.15 0.000 0.995 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.725
202.701
-0.779
-0.779
201.372
201.294
0.0043
0.0043
0.100
0.100
1.457
1.511
2
3
10.000
10.000
10.00
20.00
202.725
202.701
-0.779
-0.779
201.372
201.294
0.0043
0.0043
0.10
0.10
1.457
1.511
1.457
1.511
0.000
0.000
201.268
201.190
159.70
159.70
201.528
201.450
0.60
0.60
0.15
0.15
0.200
0.200
1.047
1.101
8.584
8.905
0.000
0.000
0.600
0.600
1.658
1.658
6.126
6.446
10.00 30.00 202.675 -0.779 201.216 0.0043 0.100 1.563 4 10.000 30.00 202.675 -0.779 201.216 0.0043 0.10 1.563 1.563 0.000 201.112 159.70 201.372 0.60 0.15 0.200 1.153 9.222 0.000 0.600 1.658 6.764
10.00 40.00 202.655 -0.779 201.139 0.0043 0.100 1.621 5 10.000 40.00 202.655 -0.779 201.139 0.0043 0.10 1.621 1.621 0.000 201.034 159.70 201.294 0.60 0.15 0.200 1.211 9.551 0.000 0.600 1.658 7.093
10.00 50.00 202.645 -0.779 201.061 0.0043 0.100 1.689 6 10.000 50.00 202.645 -0.779 201.061 0.0043 0.10 1.689 1.689 0.000 200.956 159.70 201.216 0.60 0.15 0.200 1.279 9.928 0.000 0.600 1.658 7.470
10.00 60.00 202.625 -0.779 200.983 0.0043 0.100 1.747 7 10.000 60.00 202.625 -0.779 200.983 0.0043 0.10 1.747 1.747 0.000 200.878 159.70 201.138 0.60 0.15 0.200 1.337 10.305 0.000 0.600 1.658 7.847
2011 7.060 67.06 202.640 -0.779 200.920 0.0043 0.100 1.824 8 7.060 67.06 202.640 -0.779 200.920 0.0043 0.10 1.824 1.824 0.000 200.816 159.70 201.075 0.60 0.15 0.141 1.415 7.563 0.000 0.424 1.170 5.827

ESQUEMA PLANIMETRICO TRAMOS 67.06 1.602 1.343 64.058 0.000 4.024 11.118 47.574
15.141

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 67.06
202,640 203.000 202.750
12.33 12.55 200,920 202.725 202.701 202.675 202.655 202.645 202.625 202.640

202.500
6.00
2083
TAS-PVC-DN150--0,779%-67,06 TB-250 2011 202.000
PERFILCOTA TERRENO TRAMO
201.500 PERFIL COTA SOLERA TUBO RED
201.372
202,750 201.450 201.294
201.216
201,450 201.000 201.139

C.I. 2083
201.061

C.I.2011
200.983
200.920
200.500 TRAMO TB -250

200.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -1150 DESDE C.I. : 2010 523862.650 8782327.670 202.470 201.270 LONGITUD TRAMO : 72.51 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -1150
HASTA C.I. : 2011 523862.080 8782254.160 202.640 200.920 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 72.51 ML i (%) : -0.476 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 73.51 i (°/o) TRAMO : -0.476 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2010 0.00 0.00 202.470 -0.476 201.270 0.0043 0.100 1.304 1 0.000 0.00 202.470 -0.476 201.270 0.0043 0.10 1.304 1.304 0.000 201.166 159.70 201.425 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.451
202.431
-0.476
-0.476
201.222
201.175
0.0043
0.0043
0.100
0.100
1.333
1.361
2
3
10.000
10.000
10.00
20.00
202.451
202.431
-0.476
-0.476
201.222
201.175
0.0043
0.0043
0.10
0.10
1.333
1.361
1.333
1.361
0.000
0.000
201.118
201.070
159.70
159.70
201.378
201.330
0.60
0.60
0.15
0.15
0.200
0.200
0.923
0.951
7.912
8.080
0.000
0.000
0.600
0.600
1.658
1.658
5.453
5.622
10.00 30.00 202.454 -0.476 201.127 0.0043 0.100 1.431 4 10.000 30.00 202.454 -0.476 201.127 0.0043 0.10 1.431 1.431 0.000 201.023 159.70 201.283 0.60 0.15 0.200 1.021 8.375 0.000 0.600 1.658 5.917
10.00 40.00 202.347 -0.476 201.080 0.0043 0.100 1.372 5 10.000 40.00 202.347 -0.476 201.080 0.0043 0.10 1.372 1.372 0.000 200.975 159.70 201.235 0.60 0.15 0.200 0.962 8.409 0.000 0.600 1.658 5.950
10.00 50.00 202.337 -0.476 201.032 0.0043 0.100 1.409 6 10.000 50.00 202.337 -0.476 201.032 0.0043 0.10 1.409 1.409 0.000 200.928 159.70 201.187 0.60 0.15 0.200 1.000 8.343 0.000 0.600 1.658 5.885
10.00 60.00 202.441 -0.476 200.984 0.0043 0.100 1.561 7 10.000 60.00 202.441 -0.476 200.984 0.0043 0.10 1.561 1.561 0.000 200.880 159.70 201.140 0.60 0.15 0.200 1.151 8.911 0.000 0.600 1.658 6.453
10.00 70.00 202.404 -0.476 200.937 0.0043 0.100 1.572 8 10.000 70.00 202.404 -0.476 200.937 0.0043 0.10 1.572 1.572 0.000 200.832 159.70 201.092 0.60 0.15 0.200 1.162 9.398 0.000 0.600 1.658 6.939
2011 2.510 72.51 202.640 -0.476 200.920 0.0043 0.100 1.824 9 2.510 72.51 202.640 -0.476 200.920 0.0043 0.10 1.824 1.824 0.000 200.816 159.70 201.075 0.60 0.15 0.050 1.415 2.557 0.000 0.151 0.416 1.940

ESQUEMA PLANIMETRICO TRAMOS 72.51 1.463 1.452 61.984 0.000 4.351 12.021 44.160
16.372

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 72.51
202,640 203.000
12.33 12.55 200,920 202.640
202.470 202.451 202.454
202.431 202.441 202.404
202.500 202.347 202.337
6.00
2010
TAS-PVC-DN150--0,476%-72.51 TB-1150 2011 202.000
PERFILCOTA TERRENO TRAMO
201.500 PERFIL COTA SOLERA TUBO RED
202,470 201.222 201.175
201,270 201.000 201.270 201.127

C.I. 2010
201.080

C.I.2011
201.032 200.984 200.937 200.920

200.500 TRAMO TB -1150

200.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -1294 DESDE C.I. : 2176 523800.830 8782253.600 202.940 201.740 LONGITUD TRAMO : 60.26 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -1294
HASTA C.I. : 2011 523862.080 8782254.160 202.640 200.920 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 60.26 ML i (%) : -1.339 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 61.26 i (°/o) TRAMO : -1.339 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2176 0.00 0.00 202.940 -1.339 201.740 0.0043 0.100 1.304 1 0.000 0.00 202.940 -1.339 201.740 0.0043 0.10 1.304 1.304 0.000 201.636 159.70 201.895 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.756
202.802
-1.339
-1.339
201.606
201.472
0.0043
0.0043
0.100
0.100
1.254
1.434
2
3
10.000
10.000
10.00
20.00
202.756
202.802
-1.339
-1.339
201.606
201.472
0.0043
0.0043
0.10
0.10
1.254
1.434
1.254
1.434
0.000
0.000
201.502
201.368
159.70
159.70
201.762
201.628
0.60
0.60
0.15
0.15
0.200
0.200
0.844
1.024
7.675
8.065
0.000
0.000
0.600
0.600
1.658
1.658
5.217
5.606
10.00 30.00 202.631 -1.339 201.338 0.0043 0.100 1.397 4 10.000 30.00 202.631 -1.339 201.338 0.0043 0.10 1.397 1.397 0.000 201.234 159.70 201.494 0.60 0.15 0.200 0.987 8.493 0.000 0.600 1.658 6.034
10.00 40.00 202.552 -1.339 201.205 0.0043 0.100 1.452 5 10.000 40.00 202.552 -1.339 201.205 0.0043 0.10 1.452 1.452 0.000 201.100 159.70 201.360 0.60 0.15 0.200 1.042 8.546 0.000 0.600 1.658 6.088
10.00 50.00 202.494 -1.339 201.071 0.0043 0.100 1.528 6 10.000 50.00 202.494 -1.339 201.071 0.0043 0.10 1.528 1.528 0.000 200.966 159.70 201.226 0.60 0.15 0.200 1.118 8.938 0.000 0.600 1.658 6.480
10.00 60.00 202.652 -1.339 200.937 0.0043 0.100 1.819 7 10.000 60.00 202.652 -1.339 200.937 0.0043 0.10 1.819 1.819 0.000 200.833 159.70 201.092 0.60 0.15 0.200 1.410 10.041 0.000 0.600 1.658 7.583
2011 0.260 60.26 202.640 -1.339 200.920 0.0043 0.100 1.824 8 0.260 60.26 202.640 -1.339 200.920 0.0043 0.10 1.824 1.824 0.000 200.816 159.70 201.075 0.60 0.15 0.005 1.415 0.284 0.000 0.016 0.043 0.220

ESQUEMA PLANIMETRICO TRAMOS 60.26 1.502 1.207 52.042 0.000 3.616 9.990 37.229
13.606

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 60.26
202,640 203.500
12.33 12.55 200,920 202.940
203.000 202.756 202.802
202.631 202.652 202.640
202.552 202.494
6.00
2176
TAS-PVC-DN150--1,339%-60,26 TB-1294 2011
202.500

202.000
PERFILCOTA TERRENO TRAMO
201.500 201.740 201.606 PERFIL COTA SOLERA TUBO RED
201.472
201.338
202,940 201.000 201.205
201.071
201,740

C.I. 2176
200.937 200.920

C.I.2011
200.500

200.000
TRAMO TB -1294

199.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -474 DESDE C.I. : 1483 523891.270 8782149.410 202.840 201.240 LONGITUD TRAMO : 73.05 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -474
HASTA C.I. : 1493 523965.290 8782150.670 201.980 199.690 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 73.05 ML i (%) : -2.093 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 74.05 i (°/o) TRAMO : -2.093 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1483 0.00 0.00 202.840 -2.093 201.240 0.0043 0.100 1.704 1 0.000 0.00 202.840 -2.093 201.240 0.0043 0.10 1.704 1.704 0.000 201.136 159.70 201.395 0.70 0.15 0.000 1.295 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.794
202.665
-2.093
-2.093
201.031
200.821
0.0043
0.0043
0.100
0.100
1.868
1.948
2
3
10.000
10.000
10.00
20.00
202.794
202.665
-2.093
-2.093
201.031
200.821
0.0043
0.0043
0.10
0.10
1.868
1.948
1.868
1.948
0.000
0.000
200.926
200.717
159.70
159.70
201.186
200.977
0.70
0.70
0.15
0.15
0.200
0.200
1.458
1.538
12.502
13.355
0.000
0.000
0.700
0.700
1.968
1.968
9.634
10.487
10.00 30.00 202.522 -2.093 200.612 0.0043 0.100 2.014 4 10.000 30.00 202.522 -2.093 200.612 0.0043 0.10 2.014 2.000 0.014 200.508 159.70 200.767 0.70 0.15 0.200 1.605 13.818 0.050 0.700 1.968 11.000
10.00 40.00 202.454 -2.093 200.403 0.0043 0.100 2.156 5 10.000 40.00 202.454 -2.093 200.403 0.0043 0.10 2.156 2.000 0.156 200.298 159.70 200.558 0.70 0.15 0.200 1.746 14.000 0.595 0.700 1.968 11.727
10.00 50.00 202.321 -2.093 200.193 0.0043 0.100 2.232 6 10.000 50.00 202.321 -2.093 200.193 0.0043 0.10 2.232 2.000 0.232 200.089 159.70 200.349 0.70 0.15 0.200 1.822 14.000 1.356 0.700 1.968 12.488
10.00 60.00 202.211 -2.093 199.984 0.0043 0.100 2.331 7 10.000 60.00 202.211 -2.093 199.984 0.0043 0.10 2.331 2.000 0.331 199.880 159.70 200.139 0.70 0.15 0.200 1.922 14.000 1.971 0.700 1.968 13.103
10.00 70.00 202.022 -2.093 199.775 0.0043 0.100 2.352 8 10.000 70.00 202.022 -2.093 199.775 0.0043 0.10 2.352 2.000 0.352 199.670 159.70 199.930 0.70 0.15 0.200 1.942 14.000 2.390 0.700 1.968 13.522
1493 3.050 73.05 201.980 -2.093 199.690 0.0043 0.100 2.394 9 3.050 73.05 201.980 -2.093 199.690 0.0043 0.10 2.394 2.000 0.394 199.586 159.70 199.845 0.70 0.15 0.061 1.985 4.270 0.796 0.214 0.600 4.192

ESQUEMA PLANIMETRICO TRAMOS 73.05 2.111 1.463 99.944 7.158 5.114 14.373 86.152
19.487

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 73.05
201,980 204.000
12.33 12.55 199,690
202.840 202.794
203.000 202.665
202.522 202.454
6.00
TB-474
202.321 202.211
TAS-PVC-DN150--2,093%-73.05 1493
202.022 201.980
1483 202.000
PERFILCOTA TERRENO TRAMO
201.000 PERFIL COTA SOLERA TUBO RED
201.240 201.031
200.821
202,840 200.612
200.403
201,240 200.000 200.193

C.I. 1483

C.I.1493
199.984
199.775 199.690
199.000 TRAMO TB -474

198.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -318 DESDE C.I. : 1504 523890.450 8782127.930 202.940 201.350 LONGITUD TRAMO : 20.50 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -318
HASTA C.I. : 1483 523891.270 8782149.410 202.840 201.240 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 20.50 ML i (%) : -0.512 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 21.50 i (°/o) TRAMO : -0.512 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1504 0.00 0.00 202.940 -0.512 201.350 0.0043 0.100 1.694 1 0.000 0.00 202.940 -0.512 201.350 0.0043 0.10 1.694 1.694 0.000 201.246 159.70 201.505 0.60 0.15 0.000 1.285 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.662
202.845
-0.512
-0.512
201.299
201.248
0.0043
0.0043
0.100
0.100
1.467
1.702
2
3
10.000
10.000
10.00
20.00
202.662
202.845
-0.512
-0.512
201.299
201.248
0.0043
0.0043
0.10
0.10
1.467
1.702
1.467
1.702
0.000
0.000
201.195
201.143
159.70
159.70
201.454
201.403
0.60
0.60
0.15
0.15
0.200
0.200
1.058
1.292
9.485
9.507
0.000
0.000
0.600
0.600
1.658
1.658
7.027
7.049
1483 0.500 20.50 202.840 -0.512 201.240 0.0043 0.100 1.704 4 0.500 20.50 202.840 -0.512 201.240 0.0043 0.10 1.704 1.704 0.000 201.136 159.70 201.395 0.60 0.15 0.010 1.295 0.511 0.000 0.030 0.083 0.388

ESQUEMA PLANIMETRICO TRAMOS 20.50 1.642 0.411 19.504 0.000 1.230 3.399 14.464
4.629

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 20.50
202,840 203.500
12.33 12.55 201,240 202.940
203.000 202.845 202.840
202.662
6.00
1504
TAS-PVC-DN150--0,512%-20.50 TB-318 1483 202.500

202.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
201.500
202,940
201,350 201.299

C.I. 1504
201.248 201.240

C.I.1483
201.000 201.350

200.500 TRAMO TB -318

200.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -1091 DESDE C.I. : 1934 523927.440 8782074.680 202.860 201.660 LONGITUD TRAMO : 63.84 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -1091
HASTA C.I. : 1504 523890.450 8782127.930 202.940 201.350 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 63.84 ML i (%) : -0.478 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 64.84 i (°/o) TRAMO : -0.478 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1934 0.00 0.00 202.860 -0.478 201.660 0.0043 0.100 1.304 1 0.000 0.00 202.860 -0.478 201.660 0.0043 0.10 1.304 1.304 0.000 201.556 159.70 201.815 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.895
202.911
-0.478
-0.478
201.612
201.564
0.0043
0.0043
0.100
0.100
1.387
1.451
2
3
10.000
10.000
10.00
20.00
202.895
202.911
-0.478
-0.478
201.612
201.564
0.0043
0.0043
0.10
0.10
1.387
1.451
1.387
1.451
0.000
0.000
201.508
201.460
159.70
159.70
201.768
201.720
0.60
0.60
0.15
0.15
0.200
0.200
0.977
1.041
8.074
8.514
0.000
0.000
0.600
0.600
1.658
1.658
5.616
6.056
10.00 30.00 202.897 -0.478 201.517 0.0043 0.100 1.485 4 10.000 30.00 202.897 -0.478 201.517 0.0043 0.10 1.485 1.485 0.000 201.412 159.70 201.672 0.60 0.15 0.200 1.075 8.807 0.000 0.600 1.658 6.349
10.00 40.00 202.890 -0.478 201.469 0.0043 0.100 1.526 5 10.000 40.00 202.890 -0.478 201.469 0.0043 0.10 1.526 1.526 0.000 201.364 159.70 201.624 0.60 0.15 0.200 1.116 9.031 0.000 0.600 1.658 6.573
10.00 50.00 203.002 -0.478 201.421 0.0043 0.100 1.685 6 10.000 50.00 203.002 -0.478 201.421 0.0043 0.10 1.685 1.685 0.000 201.317 159.70 201.576 0.60 0.15 0.200 1.276 9.633 0.000 0.600 1.658 7.175
10.00 60.00 202.963 -0.478 201.373 0.0043 0.100 1.694 7 10.000 60.00 202.963 -0.478 201.373 0.0043 0.10 1.694 1.694 0.000 201.269 159.70 201.529 0.60 0.15 0.200 1.284 10.139 0.000 0.600 1.658 7.680
1504 3.840 63.84 202.940 -0.478 201.350 0.0043 0.100 1.694 8 3.840 63.84 202.940 -0.478 201.350 0.0043 0.10 1.694 1.694 0.000 201.246 159.70 201.505 0.60 0.15 0.077 1.285 3.904 0.000 0.230 0.637 2.960

ESQUEMA PLANIMETRICO TRAMOS 63.84 1.528 1.279 58.101 0.000 3.830 10.584 42.408
14.414

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 63.84
202,940 203.500
12.33 12.55 201,350
203.002 202.963 202.940
203.000 202.860 202.895 202.911 202.897 202.890
6.00
1934
TAS-PVC-DN150--0,478%-63.84 TB-1091 1504 202.500
PERFILCOTA TERRENO TRAMO
202.000 PERFIL COTA SOLERA TUBO RED
202,860
201,660 201.500 201.612

C.I. 1934
201.564

C.I.1504
201.660 201.517 201.469 201.421 201.373 201.350
201.000 TRAMO TB -1091

200.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -49 DESDE C.I. : 2617 523993.990 8781978.890 201.940 200.590 LONGITUD TRAMO : 49.75 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -49
HASTA C.I. : 2053 523965.580 8782020.940 202.300 200.300 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 49.75 ML i (%) : -0.571 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 50.75 i (°/o) TRAMO : -0.571 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2617 0.00 0.00 201.940 -0.571 200.590 0.0043 0.100 1.454 1 0.000 0.00 201.940 -0.571 200.590 0.0043 0.10 1.454 1.454 0.000 200.486 159.70 200.745 0.60 0.15 0.000 1.045 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 201.800
201.750
-0.571
-0.571
200.533
200.476
0.0043
0.0043
0.100
0.100
1.371
1.379
2
3
10.000
10.000
10.00
20.00
201.800
201.750
-0.571
-0.571
200.533
200.476
0.0043
0.0043
0.10
0.10
1.371
1.379
1.371
1.379
0.000
0.000
200.429
200.371
159.70
159.70
200.688
200.631
0.60
0.60
0.15
0.15
0.200
0.200
0.962
0.969
8.477
8.250
0.000
0.000
0.600
0.600
1.658
1.658
6.019
5.792
10.00 30.00 201.917 -0.571 200.419 0.0043 0.100 1.603 4 10.000 30.00 201.917 -0.571 200.419 0.0043 0.10 1.603 1.603 0.000 200.314 159.70 200.574 0.60 0.15 0.200 1.193 8.944 0.000 0.600 1.658 6.486
10.00 40.00 202.193 -0.571 200.361 0.0043 0.100 1.936 5 10.000 40.00 202.193 -0.571 200.361 0.0043 0.10 1.936 1.936 0.000 200.257 159.70 200.517 0.60 0.15 0.200 1.526 10.616 0.000 0.600 1.658 8.158
2053 9.750 49.75 202.300 -0.571 200.300 0.0043 0.100 2.104 6 9.750 49.75 202.300 -0.571 200.300 0.0043 0.10 2.104 2.000 0.104 200.196 159.70 200.455 0.60 0.15 0.195 1.695 11.512 0.305 0.585 1.616 9.421

ESQUEMA PLANIMETRICO TRAMOS 49.75 1.641 0.997 47.800 0.305 2.985 8.248 35.875
11.233

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 49.75
202,300 202.500 202.300
202.193
12.33 12.55 200,300 201.940 201.917
202.000 201.800 201.750
6.00
2617
TAS-PVC-DN150--0,571%-49,75 TB-49 2053 201.500

201.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
200.500
201,940 200.590 200.533 200.476 200.419
200,590 200.361 200.300

C.I. 2617

C.I.2053
200.000

199.500 TRAMO TB -49

199.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -25 DESDE C.I. : 2498 524156.710 8782045.010 202.180 200.980 LONGITUD TRAMO : 83.66 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -25
HASTA C.I. : 2587 524072.050 8782044.370 202.680 200.580 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 83.66 ML i (%) : -0.472 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 27 DE JUNIO DIST. ESTIMADA 84.66 i (°/o) TRAMO : -0.472 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2498 0.00 0.00 202.180 -0.472 200.980 0.0043 0.100 1.304 1 0.000 0.00 202.180 -0.472 200.980 0.0043 0.10 1.304 1.304 0.000 200.876 159.70 201.135 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.321
202.222
-0.472
-0.472
200.933
200.886
0.0043
0.0043
0.100
0.100
1.493
1.441
2
3
10.000
10.000
10.00
20.00
202.321
202.222
-0.472
-0.472
200.933
200.886
0.0043
0.0043
0.10
0.10
1.493
1.441
1.493
1.441
0.000
0.000
200.828
200.781
159.70
159.70
201.088
201.041
0.60
0.60
0.15
0.15
0.200
0.200
1.083
1.031
8.391
8.800
0.000
0.000
0.600
0.600
1.658
1.658
5.932
6.342
10.00 30.00 202.379 -0.472 200.838 0.0043 0.100 1.645 4 10.000 30.00 202.379 -0.472 200.838 0.0043 0.10 1.645 1.645 0.000 200.734 159.70 200.994 0.60 0.15 0.200 1.235 9.257 0.000 0.600 1.658 6.799
10.00 40.00 202.485 -0.472 200.791 0.0043 0.100 1.798 5 10.000 40.00 202.485 -0.472 200.791 0.0043 0.10 1.798 1.798 0.000 200.687 159.70 200.946 0.60 0.15 0.200 1.389 10.330 0.000 0.600 1.658 7.872
10.00 50.00 202.544 -0.472 200.744 0.0043 0.100 1.905 6 10.000 50.00 202.544 -0.472 200.744 0.0043 0.10 1.905 1.905 0.000 200.639 159.70 200.899 0.60 0.15 0.200 1.495 11.108 0.000 0.600 1.658 8.650
10.00 60.00 202.553 -0.472 200.697 0.0043 0.100 1.961 7 10.000 60.00 202.553 -0.472 200.697 0.0043 0.10 1.961 1.961 0.000 200.592 159.70 200.852 0.60 0.15 0.200 1.551 11.596 0.000 0.600 1.658 9.138
10.00 70.00 202.424 -0.472 200.649 0.0043 0.100 1.879 8 10.000 70.00 202.424 -0.472 200.649 0.0043 0.10 1.879 1.879 0.000 200.545 159.70 200.805 0.60 0.15 0.200 1.469 11.519 0.000 0.600 1.658 9.061
10.00 80.00 202.386 -0.472 200.602 0.0043 0.100 1.888 9 10.000 80.00 202.386 -0.472 200.602 0.0043 0.10 1.888 1.888 0.000 200.498 159.70 200.757 0.60 0.15 0.200 1.479 11.302 0.000 0.600 1.658 8.844
2587 3.660 83.66 202.680 -0.472 200.580 0.0043 0.100 2.204 10 3.660 83.66 202.680 -0.472 200.580 0.0043 0.10 2.204 2.000 0.204 200.476 159.70 200.735 0.60 0.15 0.073 1.795 4.269 0.224 0.220 0.607 3.594

ESQUEMA PLANIMETRICO TRAMOS 83.66 1.752 1.676 86.573 0.224 5.020 13.870 66.232
18.890

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 83.66
202,680 203.000
12.33 12.55 200,580 202.680
202.485 202.544 202.553
202.379 202.424 202.386
202.500 202.321
202.180 202.222
6.00
2498
TAS-PVC-DN150--0,472%-83.66 TB-25 2587 202.000

201.500 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
201.000
202,180 200.933 200.886
200,980 200.980 200.838 200.791

C.I. 2498
200.744

C.I.2587
200.500 200.697 200.649 200.602
200.580

200.000 TRAMO TB -25

199.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -85 DESDE C.I. : 2632 524373.320 8782287.670 201.700 200.500 LONGITUD TRAMO : 72.16 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -85
HASTA C.I. : 2571 524373.720 8782360.830 201.840 200.150 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 72.16 ML i (%) : -0.478 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 73.16 i (°/o) TRAMO : -0.478 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2632 0.00 0.00 201.700 -0.478 200.500 0.0043 0.100 1.304 1 0.000 0.00 201.700 -0.478 200.500 0.0043 0.10 1.304 1.304 0.000 200.396 159.70 200.655 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 201.726
201.830
-0.478
-0.478
200.452
200.404
0.0043
0.0043
0.100
0.100
1.378
1.530
2
3
10.000
10.000
10.00
20.00
201.726
201.830
-0.478
-0.478
200.452
200.404
0.0043
0.0043
0.10
0.10
1.378
1.530
1.378
1.530
0.000
0.000
200.348
200.300
159.70
159.70
200.608
200.560
0.60
0.60
0.15
0.15
0.200
0.200
0.968
1.120
8.047
8.724
0.000
0.000
0.600
0.600
1.658
1.658
5.589
6.266
10.00 30.00 201.806 -0.478 200.356 0.0043 0.100 1.554 4 10.000 30.00 201.806 -0.478 200.356 0.0043 0.10 1.554 1.554 0.000 200.252 159.70 200.512 0.60 0.15 0.200 1.144 9.251 0.000 0.600 1.658 6.793
10.00 40.00 201.851 -0.478 200.309 0.0043 0.100 1.647 5 10.000 40.00 201.851 -0.478 200.309 0.0043 0.10 1.647 1.647 0.000 200.204 159.70 200.464 0.60 0.15 0.200 1.237 9.601 0.000 0.600 1.658 7.143
10.00 50.00 201.847 -0.478 200.261 0.0043 0.100 1.690 6 10.000 50.00 201.847 -0.478 200.261 0.0043 0.10 1.690 1.690 0.000 200.157 159.70 200.416 0.60 0.15 0.200 1.281 10.011 0.000 0.600 1.658 7.553
10.00 60.00 201.901 -0.478 200.213 0.0043 0.100 1.792 7 10.000 60.00 201.901 -0.478 200.213 0.0043 0.10 1.792 1.792 0.000 200.109 159.70 200.368 0.60 0.15 0.200 1.383 10.448 0.000 0.600 1.658 7.990
10.00 70.00 201.877 -0.478 200.165 0.0043 0.100 1.816 8 10.000 70.00 201.877 -0.478 200.165 0.0043 0.10 1.816 1.816 0.000 200.061 159.70 200.321 0.60 0.15 0.200 1.406 10.826 0.000 0.600 1.658 8.367
2571 2.160 72.16 201.840 -0.478 200.150 0.0043 0.100 1.794 9 2.160 72.16 201.840 -0.478 200.150 0.0043 0.10 1.794 1.794 0.000 200.046 159.70 200.305 0.60 0.15 0.043 1.385 2.340 0.000 0.130 0.358 1.809

ESQUEMA PLANIMETRICO TRAMOS 72.16 1.612 1.445 69.250 0.000 4.330 11.963 51.511
16.293

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 72.16
201,840 202.500
12.33 12.55 200,150
202.000 201.830 201.851 201.847 201.901 201.877 201.840
201.700 201.806
201.726
6.00
2632
TAS-PVC-DN150--0,478%-72.16 TB-85 2571 201.500

201.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
200.500
201,700 200.452 200.404
200.500 200.356
200,500 200.309 200.261

C.I. 2632

C.I.2571
200.000 200.213 200.165
200.150

199.500 TRAMO TB -85

199.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -509 DESDE C.I. : 2458 524637.760 8782617.830 202.560 201.360 LONGITUD TRAMO : 78.73 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -509
HASTA C.I. : 2361 524717.470 8782618.080 201.470 199.750 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 78.73 ML i (%) : -2.019 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 79.73 i (°/o) TRAMO : -2.019 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2458 0.00 0.00 202.560 -2.019 201.360 0.0043 0.100 1.304 1 0.000 0.00 202.560 -2.019 201.360 0.0043 0.10 1.304 1.304 0.000 201.256 159.70 201.515 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 202.556
202.559
-2.019
-2.019
201.158
200.956
0.0043
0.0043
0.100
0.100
1.502
1.707
2
3
10.000
10.000
10.00
20.00
202.556
202.559
-2.019
-2.019
201.158
200.956
0.0043
0.0043
0.10
0.10
1.502
1.707
1.502
1.707
0.000
0.000
201.054
200.852
159.70
159.70
201.313
201.112
0.60
0.60
0.15
0.15
0.200
0.200
1.093
1.297
8.420
9.628
0.000
0.000
0.600
0.600
1.658
1.658
5.961
7.170
10.00 30.00 202.530 -2.019 200.754 0.0043 0.100 1.880 4 10.000 30.00 202.530 -2.019 200.754 0.0043 0.10 1.880 1.880 0.000 200.650 159.70 200.910 0.60 0.15 0.200 1.470 10.762 0.000 0.600 1.658 8.304
10.00 40.00 202.428 -2.019 200.552 0.0043 0.100 1.980 5 10.000 40.00 202.428 -2.019 200.552 0.0043 0.10 1.980 1.980 0.000 200.448 159.70 200.708 0.60 0.15 0.200 1.570 11.581 0.000 0.600 1.658 9.122
10.00 50.00 202.393 -2.019 200.350 0.0043 0.100 2.147 6 10.000 50.00 202.393 -2.019 200.350 0.0043 0.10 2.147 2.000 0.147 200.246 159.70 200.506 0.60 0.15 0.200 1.737 11.940 0.441 0.600 1.658 9.923
10.00 60.00 202.303 -2.019 200.148 0.0043 0.100 2.259 7 10.000 60.00 202.303 -2.019 200.148 0.0043 0.10 2.259 2.000 0.259 200.044 159.70 200.304 0.60 0.15 0.200 1.849 12.000 1.218 0.600 1.658 10.760
10.00 70.00 202.143 -2.019 199.946 0.0043 0.100 2.301 8 10.000 70.00 202.143 -2.019 199.946 0.0043 0.10 2.301 2.000 0.301 199.842 159.70 200.102 0.60 0.15 0.200 1.891 12.000 1.679 0.600 1.658 11.221
2361 8.730 78.73 201.470 -2.019 199.750 0.0043 0.100 1.824 9 8.730 78.73 201.470 -2.019 199.750 0.0043 0.10 1.824 1.824 0.000 199.646 159.70 199.905 0.60 0.15 0.175 1.415 10.016 0.788 0.524 1.447 8.658

ESQUEMA PLANIMETRICO TRAMOS 78.73 1.878 1.577 86.346 4.126 4.724 13.053 71.119
17.776

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 78.73
201,470 203.000 202.560
202.556 202.559 202.530
12.33 12.55 199,750 202.428 202.393 202.303
202.500 202.143
202.000
6.00
2458
TAS-PVC-DN150--2,019%-78,73 TB-509 2361 201.500
201.470

201.000 201.360 201.158 PERFILCOTA TERRENO TRAMO


200.956
200.500 200.754 PERFIL COTA SOLERA TUBO RED
200.552
200.350
202,560 200.000 200.148
201,360 199.946

C.I. 2458
199.500

C.I.2361
199.750
199.000
TRAMO TB -509
198.500
198.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -200 DESDE C.I. : 2577 524716.920 8782694.470 202.980 199.750 LONGITUD TRAMO : 75.42 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -200

HASTA C.I. : 2361 524717.470 8782618.080 201.470 197.750 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.80 DN : 6" PLG LONG. : 75.42 ML i (%) : -2.617 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 76.42 i (°/o) TRAMO : -2.617 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m 4-6m m mm ml ml ml m3 ml m3 m3 m3 m3 m3 m3
2577 0.00 0.00 202.980 -2.617 199.750 0.0043 0.100 3.334 1 0.000 0.00 202.980 -2.617 199.750 0.0043 0.10 3.334 2.000 1.334 0.000 199.646 159.70 199.905 0.80 0.15 0.000 2.925 0.000 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 202.806
202.789
-2.617
-2.617
199.488
199.227
0.0043
0.0043
0.100
0.100
3.422
3.667
2
3
10.000
10.000
10.00
20.00
202.806
202.789
-2.617
-2.617
199.488
199.227
0.0043
0.0043
0.10
0.10
3.422
3.667
2.000
2.000
1.422
1.667
0.000
0.000
199.384
199.122
159.70
159.70
199.644
199.382
0.80
0.80
0.15
0.15
0.200
0.200
3.012
3.257
16.000
16.000
11.025
12.355
0.000
0.000
0.800
0.800
2.277
2.277
23.748
25.077
10.00 30.00 202.672 -2.617 198.965 0.0043 0.100 3.811 4 10.000 30.00 202.672 -2.617 198.965 0.0043 0.10 3.811 2.000 1.811 0.000 198.861 159.70 199.120 0.80 0.15 0.200 3.402 16.000 13.913 0.000 0.800 2.277 26.635
10.00 40.00 202.533 -2.617 198.703 0.0043 0.100 3.934 5 10.000 40.00 202.533 -2.617 198.703 0.0043 0.10 3.934 2.000 1.934 0.000 198.599 159.70 198.859 0.80 0.15 0.200 3.524 16.000 14.983 0.000 0.800 2.277 27.705
10.00 50.00 202.421 -2.617 198.441 0.0043 0.100 4.084 6 10.000 50.00 202.421 -2.617 198.441 0.0043 0.10 4.084 2.000 2.000 0.084 198.337 159.70 198.597 0.80 0.15 0.200 3.674 16.000 15.737 0.336 0.800 2.277 28.795
10.00 60.00 202.149 -2.617 198.180 0.0043 0.100 4.074 7 10.000 60.00 202.149 -2.617 198.180 0.0043 0.10 4.074 2.000 2.000 0.074 198.075 159.70 198.335 0.80 0.15 0.200 3.664 16.000 16.000 0.630 0.800 2.277 29.352
10.00 70.00 201.595 -2.617 197.918 0.0043 0.100 3.781 8 10.000 70.00 201.595 -2.617 197.918 0.0043 0.10 3.781 2.000 1.781 0.000 197.814 159.70 198.073 0.80 0.15 0.200 3.372 16.000 15.125 0.294 0.800 2.277 28.142
2361 5.420 75.42 201.470 -2.617 197.750 0.0043 0.100 3.824 9 5.420 75.42 201.470 -2.617 197.750 0.0043 0.10 3.824 2.000 1.824 0.000 197.646 159.70 197.905 0.80 0.15 0.109 3.415 8.672 7.817 0.000 0.434 1.234 14.713

ESQUEMA PLANIMETRICO TRAMOS 75.42 3.770 1.511 120.672 106.955 1.260 6.034 17.175 204.167
23.209

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 75.42
201,470 204.000
12.33 12.55 197,750 202.980
202.806 202.789 202.672
203.000 202.533 202.421
202.149
6.00 202.000 201.595
TB-200
201.470
TAS-PVC-DN150--2,617%-75.42 2361
2577 201.000

200.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
199.000 199.750 199.488
199.227
202,980 198.965
198.703
197,750 198.000 198.441

C.I. 2577
198.180

C.I.2361
197.918
197.000 197.750
TRAMO TB -200
196.000

195.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -279 DESDE C.I. : 2654 524787.370 8782693.670 201.280 200.080 LONGITUD TRAMO : 69.46 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -279
HASTA C.I. : 2577 524716.920 8782694.470 202.980 199.750 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 69.46 ML i (%) : -0.468 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 70.46 i (°/o) TRAMO : -0.468 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2654 0.00 0.00 201.280 -0.468 200.080 0.0043 0.100 1.304 1 0.000 0.00 201.280 -0.468 200.080 0.0043 0.10 1.304 1.304 0.000 199.976 159.70 200.235 0.70 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 201.347
202.185
-0.468
-0.468
200.033
199.986
0.0043
0.0043
0.100
0.100
1.418
2.303
2
3
10.000
10.000
10.00
20.00
201.347
202.185
-0.468
-0.468
200.033
199.986
0.0043
0.0043
0.10
0.10
1.418
2.303
1.418
2.000
0.000
0.303
199.929
199.882
159.70
159.70
200.189
200.142
0.70
0.70
0.15
0.15
0.200
0.200
1.008
1.893
9.529
11.963
0.000
1.060
0.700
0.700
1.968
1.968
6.661
10.156
10.00 30.00 202.543 -0.468 199.939 0.0043 0.100 2.708 4 10.000 30.00 202.543 -0.468 199.939 0.0043 0.10 2.708 2.000 0.708 199.835 159.70 200.095 0.70 0.15 0.200 2.298 14.000 3.538 0.700 1.968 14.670
10.00 40.00 202.722 -0.468 199.893 0.0043 0.100 2.934 5 10.000 40.00 202.722 -0.468 199.893 0.0043 0.10 2.934 2.000 0.934 199.788 159.70 200.048 0.70 0.15 0.200 2.524 14.000 5.745 0.700 1.968 16.877
10.00 50.00 202.812 -0.468 199.846 0.0043 0.100 3.070 6 10.000 50.00 202.812 -0.468 199.846 0.0043 0.10 3.070 2.000 1.070 199.742 159.70 200.001 0.70 0.15 0.200 2.661 14.000 7.015 0.700 1.968 18.147
10.00 60.00 202.924 -0.468 199.799 0.0043 0.100 3.229 7 10.000 60.00 202.924 -0.468 199.799 0.0043 0.10 3.229 2.000 1.229 199.695 159.70 199.954 0.70 0.15 0.200 2.820 14.000 8.049 0.700 1.968 19.181
2577 9.460 69.46 202.980 -0.468 199.750 0.0043 0.100 3.334 8 9.460 69.46 202.980 -0.468 199.750 0.0043 0.10 3.334 2.000 1.334 199.646 159.70 199.905 0.70 0.15 0.189 2.925 13.244 8.488 0.662 1.861 19.019

ESQUEMA PLANIMETRICO TRAMOS 69.46 2.538 1.391 90.736 33.895 4.862 13.667 104.711
18.529

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 69.46
202,980 204.000
12.33 12.55 199,750
202.924 202.980
203.000 202.722 202.812
202.543
6.00
2654
TAS-PVC-DN150--0,468%-70.46 TB-279 2577 202.000
202.185

201.280 201.347
PERFILCOTA TERRENO TRAMO
201.000 PERFIL COTA SOLERA TUBO RED
201,280
200,080 200.000

C.I. 2654

C.I.2577
200.033 199.986 199.939
200.080 199.893 199.846 199.799
199.750
199.000 TRAMO TB -279

198.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -199 DESDE C.I. : 2655 524633.690 8782694.790 202.420 201.220 LONGITUD TRAMO : 82.24 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -199
HASTA C.I. : 2577 524716.920 8782694.470 202.980 199.750 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 82.24 ML i (%) : -1.766 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 83.24 i (°/o) TRAMO : -1.766 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2655 0.00 0.00 202.420 -1.766 201.220 0.0043 0.100 1.304 1 0.000 0.00 202.420 -1.766 201.220 0.0043 0.10 1.304 1.304 0.000 201.116 159.70 201.375 0.70 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 202.512
202.678
-1.766
-1.766
201.043
200.867
0.0043
0.0043
0.100
0.100
1.573
1.915
2
3
10.000
10.000
10.00
20.00
202.512
202.678
-1.766
-1.766
201.043
200.867
0.0043
0.0043
0.10
0.10
1.573
1.915
1.573
1.915
0.000
0.000
200.939
200.763
159.70
159.70
201.199
201.022
0.70
0.70
0.15
0.15
0.200
0.200
1.163
1.506
10.070
12.209
0.000
0.000
0.700
0.700
1.968
1.968
7.202
9.341
10.00 30.00 202.840 -1.766 200.690 0.0043 0.100 2.254 4 10.000 30.00 202.840 -1.766 200.690 0.0043 0.10 2.254 2.000 0.254 200.586 159.70 200.846 0.70 0.15 0.200 1.844 13.704 0.889 0.700 1.968 11.726
10.00 40.00 202.976 -1.766 200.514 0.0043 0.100 2.567 5 10.000 40.00 202.976 -1.766 200.514 0.0043 0.10 2.567 2.000 0.567 200.409 159.70 200.669 0.70 0.15 0.200 2.157 14.000 2.873 0.700 1.968 14.005
10.00 50.00 203.013 -1.766 200.337 0.0043 0.100 2.780 6 10.000 50.00 203.013 -1.766 200.337 0.0043 0.10 2.780 2.000 0.780 200.233 159.70 200.492 0.70 0.15 0.200 2.371 14.000 4.714 0.700 1.968 15.846
10.00 60.00 203.041 -1.766 200.160 0.0043 0.100 2.985 7 10.000 60.00 203.041 -1.766 200.160 0.0043 0.10 2.985 2.000 0.985 200.056 159.70 200.316 0.70 0.15 0.200 2.575 14.000 6.178 0.700 1.968 17.310
10.00 70.00 203.027 -1.766 199.984 0.0043 0.100 3.147 8 10.000 70.00 203.027 -1.766 199.984 0.0043 0.10 3.147 2.000 1.147 199.880 159.70 200.139 0.70 0.15 0.200 2.738 14.000 7.463 0.700 1.968 18.595
10.00 80.00 203.009 -1.766 199.807 0.0043 0.100 3.306 9 10.000 80.00 203.009 -1.766 199.807 0.0043 0.10 3.306 2.000 1.306 199.703 159.70 199.963 0.70 0.15 0.200 2.896 14.000 8.587 0.700 1.968 19.719
2577 2.240 82.24 202.980 -1.766 199.750 0.0043 0.100 3.334 10 2.240 82.24 202.980 -1.766 199.750 0.0043 0.10 3.334 2.000 1.334 199.646 159.70 199.905 0.70 0.15 0.045 2.925 3.136 2.070 0.157 0.441 4.564

ESQUEMA PLANIMETRICO TRAMOS 82.24 2.517 1.647 109.120 32.774 5.757 16.181 118.308
21.938

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 82.24
202,980 204.000
12.33 12.55 199,750
202.976 203.013 203.041 203.027 203.009 202.980
203.000 202.840
202.678
202.420 202.512
6.00
2655
TAS-PVC-DN150--1,766%-82.24 TB-199 2577 202.000
PERFILCOTA TERRENO TRAMO
201.000 PERFIL COTA SOLERA TUBO RED
201.220 201.043
200.867
202,420 200.690
200.514
201,220 200.000 200.337

C.I. 2655
200.160

C.I.2577
199.984
199.807
199.750
199.000 TRAMO TB -199

198.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -233 DESDE C.I. : 2688 524452.440 8782542.830 201.280 200.080 LONGITUD TRAMO : 54.35 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -233
HASTA C.I. : 2412 524507.700 8782542.380 200.020 196.940 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 54.35 ML i (%) : -5.673 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 55.35 i (°/o) TRAMO : -5.673 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2688 0.00 0.00 201.280 -5.673 200.080 0.0043 0.100 1.304 1 0.000 0.00 201.280 -5.673 200.080 0.0043 0.10 1.304 1.304 0.000 199.976 159.70 200.235 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 200.962
200.592
-5.673
-5.673
199.513
198.945
0.0043
0.0043
0.100
0.100
1.554
1.751
2
3
10.000
10.000
10.00
20.00
200.962
200.592
-5.673
-5.673
199.513
198.945
0.0043
0.0043
0.10
0.10
1.554
1.751
1.554
1.751
0.000
0.000
199.408
198.841
159.70
159.70
199.668
199.101
0.60
0.60
0.15
0.15
0.200
0.200
1.144
1.341
8.574
9.913
0.000
0.000
0.600
0.600
1.658
1.658
6.115
7.455
10.00 30.00 200.321 -5.673 198.378 0.0043 0.100 2.047 4 10.000 30.00 200.321 -5.673 198.378 0.0043 0.10 2.047 2.000 0.047 198.274 159.70 198.534 0.60 0.15 0.200 1.637 11.253 0.142 0.600 1.658 8.936
10.00 40.00 200.058 -5.673 197.811 0.0043 0.100 2.351 5 10.000 40.00 200.058 -5.673 197.811 0.0043 0.10 2.351 2.000 0.351 197.707 159.70 197.966 0.60 0.15 0.200 1.942 12.000 1.196 0.600 1.658 10.738
10.00 50.00 200.023 -5.673 197.244 0.0043 0.100 2.884 6 10.000 50.00 200.023 -5.673 197.244 0.0043 0.10 2.884 2.000 0.884 197.139 159.70 197.399 0.60 0.15 0.200 2.474 12.000 3.706 0.600 1.658 13.247
2412 4.350 54.35 200.020 -5.673 196.940 0.0043 0.100 3.184 7 4.350 54.35 200.020 -5.673 196.940 0.0043 0.10 3.184 2.000 1.184 196.836 159.70 197.095 0.60 0.15 0.087 2.775 5.220 2.699 0.261 0.721 6.849

ESQUEMA PLANIMETRICO TRAMOS 54.35 2.154 1.089 58.960 7.742 3.261 9.011 53.341
12.272

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 54.35
200,020 202.000 201.280
12.33 12.55 196,940 200.962
201.000 200.592
200.321
200.058 200.023 200.020
6.00
2688
TAS-PVC-DN150--5,673%-54,35 TB-233 2412
200.000
200.080
199.513
199.000
198.945 PERFILCOTA TERRENO TRAMO
198.000 198.378 PERFIL COTA SOLERA TUBO RED
197.811
201,280 197.000 197.244
200,080

C.I. 2688

C.I.2412
196.940
196.000

195.000
TRAMO TB -233

194.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -232 DESDE C.I. : 2603 524402.550 8782543.160 201.940 200.640 LONGITUD TRAMO : 48.89 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -232
HASTA C.I. : 2688 524452.440 8782542.830 201.280 200.080 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 48.89 ML i (%) : -1.122 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 49.89 i (°/o) TRAMO : -1.122 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2603 0.00 0.00 201.940 -1.122 200.640 0.0043 0.100 1.404 1 0.000 0.00 201.940 -1.122 200.640 0.0043 0.10 1.404 1.404 0.000 200.536 159.70 200.795 0.60 0.15 0.000 0.995 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 201.912
201.870
-1.122
-1.122
200.528
200.416
0.0043
0.0043
0.100
0.100
1.489
1.559
2
3
10.000
10.000
10.00
20.00
201.912
201.870
-1.122
-1.122
200.528
200.416
0.0043
0.0043
0.10
0.10
1.489
1.559
1.489
1.559
0.000
0.000
200.423
200.311
159.70
159.70
200.683
200.571
0.60
0.60
0.15
0.15
0.200
0.200
1.079
1.149
8.679
9.142
0.000
0.000
0.600
0.600
1.658
1.658
6.220
6.684
10.00 30.00 201.792 -1.122 200.303 0.0043 0.100 1.593 4 10.000 30.00 201.792 -1.122 200.303 0.0043 0.10 1.593 1.593 0.000 200.199 159.70 200.459 0.60 0.15 0.200 1.183 9.455 0.000 0.600 1.658 6.997
10.00 40.00 201.573 -1.122 200.191 0.0043 0.100 1.486 5 10.000 40.00 201.573 -1.122 200.191 0.0043 0.10 1.486 1.486 0.000 200.087 159.70 200.346 0.60 0.15 0.200 1.077 9.238 0.000 0.600 1.658 6.780
2688 8.890 48.89 201.280 -1.122 200.080 0.0043 0.100 1.304 6 8.890 48.89 201.280 -1.122 200.080 0.0043 0.10 1.304 1.304 0.000 199.976 159.70 200.235 0.60 0.15 0.178 0.895 7.442 0.000 0.533 1.474 5.257

ESQUEMA PLANIMETRICO TRAMOS 48.89 1.473 0.979 43.956 0.000 2.933 8.105 31.938
11.039

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 48.89
201,280 202.500
12.33 12.55 200,080 201.940 201.912 201.870
202.000 201.792
6.00 201.573

2603
TAS-PVC-DN150--1,122%-48.89 TB-232 2688 201.500 201.280

201.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
200.500
201,940 200.640 200.528
200.416
200,640 200.303

C.I. 2603

C.I.2688
200.000 200.191
200.080

199.500 TRAMO TB -232

199.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -235 DESDE C.I. : 2689 524348.310 8782542.810 202.200 200.890 LONGITUD TRAMO : 53.24 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -235
HASTA C.I. : 2603 524402.550 8782543.160 201.940 200.640 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 53.24 ML i (%) : -0.461 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 54.24 i (°/o) TRAMO : -0.461 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2689 0.00 0.00 202.200 -0.461 200.890 0.0043 0.100 1.414 1 0.000 0.00 202.200 -0.461 200.890 0.0043 0.10 1.414 1.414 0.000 200.786 159.70 201.045 0.60 0.15 0.000 1.005 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 202.138
202.137
-0.461
-0.461
200.844
200.798
0.0043
0.0043
0.100
0.100
1.398
1.443
2
3
10.000
10.000
10.00
20.00
202.138
202.137
-0.461
-0.461
200.844
200.798
0.0043
0.0043
0.10
0.10
1.398
1.443
1.398
1.443
0.000
0.000
200.740
200.694
159.70
159.70
200.999
200.953
0.60
0.60
0.15
0.15
0.200
0.200
0.989
1.034
8.438
8.526
0.000
0.000
0.600
0.600
1.658
1.658
5.980
6.067
10.00 30.00 202.096 -0.461 200.752 0.0043 0.100 1.449 4 10.000 30.00 202.096 -0.461 200.752 0.0043 0.10 1.449 1.449 0.000 200.647 159.70 200.907 0.60 0.15 0.200 1.039 8.676 0.000 0.600 1.658 6.218
10.00 40.00 201.989 -0.461 200.706 0.0043 0.100 1.388 5 10.000 40.00 201.989 -0.461 200.706 0.0043 0.10 1.388 1.388 0.000 200.601 159.70 200.861 0.60 0.15 0.200 0.978 8.509 0.000 0.600 1.658 6.050
10.00 50.00 201.954 -0.461 200.660 0.0043 0.100 1.399 6 10.000 50.00 201.954 -0.461 200.660 0.0043 0.10 1.399 1.399 0.000 200.555 159.70 200.815 0.60 0.15 0.200 0.989 8.359 0.000 0.600 1.658 5.901
2603 3.240 53.24 201.940 -0.461 200.640 0.0043 0.100 1.404 7 3.240 53.24 201.940 -0.461 200.640 0.0043 0.10 1.404 1.404 0.000 200.536 159.70 200.795 0.60 0.15 0.065 0.995 2.725 0.000 0.194 0.537 1.928

ESQUEMA PLANIMETRICO TRAMOS 53.24 1.414 1.066 45.232 0.000 3.194 8.827 32.145
12.021

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 53.24
201,940 202.500
202.200
12.33 12.55 200,640 202.138 202.137 202.096
201.989 201.954 201.940
202.000
6.00
2689
TAS-PVC-DN150--0,461%-53.24 TB-235 2603 201.500
PERFILCOTA TERRENO TRAMO
201.000 PERFIL COTA SOLERA TUBO RED
202,200 200.890 200.844 200.798 200.752 200.706
200,890 200.500 200.660

C.I. 2689
200.640

C.I.2603
200.000 TRAMO TB -235

199.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -234 DESDE C.I. : 1993 524288.250 8782542.950 202.440 201.160 LONGITUD TRAMO : 59.06 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -234
HASTA C.I. : 2689 524348.310 8782542.810 202.200 200.890 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 59.06 ML i (%) : -0.450 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 60.06 i (°/o) TRAMO : -0.450 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 EXCAV. 6-8 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m 4-6m m mm ml ml ml m3 ml m3 m3 m3 m3 m3 m3 m3
1993 0.00 0.00 202.440 -0.450 201.160 0.0043 0.100 1.384 1 0.000 0.00 202.440 -0.450 201.160 0.0043 0.10 1.384 1.384 0.000 0.000 201.056 159.70 201.315 0.60 0.15 0.000 0.975 0.000 0.000 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 202.403
202.345
-0.450
-0.450
201.115
201.070
0.0043
0.0043
0.100
0.100
1.392
1.379
2
3
10.000
10.000
10.00
20.00
202.403
202.345
-0.450
-0.450
201.115
201.070
0.0043
0.0043
0.10
0.10
1.392
1.379
1.392
1.379
0.000
0.000
0.000
0.000
201.011
200.966
159.70
159.70
201.270
201.225
0.60
0.60
0.15
0.15
0.200
0.200
0.983
0.970
8.330
8.314
0.000
0.000
0.000
0.000
0.000
0.000
0.600
0.600
1.658
1.658
5.871
5.856
10.00 30.00 202.300 -0.450 201.025 0.0043 0.100 1.379 4 10.000 30.00 202.300 -0.450 201.025 0.0043 0.10 1.379 1.379 0.000 0.000 200.921 159.70 201.181 0.60 0.15 0.200 0.969 8.275 0.000 0.000 0.000 0.600 1.658 5.817
10.00 40.00 202.240 -0.450 200.980 0.0043 0.100 1.364 5 10.000 40.00 202.240 -0.450 200.980 0.0043 0.10 1.364 1.364 0.000 0.000 200.876 159.70 201.136 0.60 0.15 0.200 0.954 8.230 0.000 0.000 0.000 0.600 1.658 5.772
10.00 50.00 202.253 -0.450 200.935 0.0043 0.100 1.422 6 10.000 50.00 202.253 -0.450 200.935 0.0043 0.10 1.422 1.422 0.000 0.000 200.831 159.70 201.091 0.60 0.15 0.200 1.012 8.359 0.000 0.000 0.000 0.600 1.658 5.900
2689 9.060 59.06 202.200 -0.450 200.890 0.0043 0.100 1.414 7 9.060 59.06 202.200 -0.450 200.890 0.0043 0.10 1.414 1.414 0.000 0.000 200.786 159.70 201.045 0.60 0.15 0.181 1.005 7.709 0.000 0.000 0.000 0.544 1.502 5.482

ESQUEMA PLANIMETRICO TRAMOS 59.06 1.391 1.183 49.217 0.000 0.000 0.000 3.544 9.792 34.699
13.335

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 59.06
202,200 203.000
12.33 12.55 200,890
202.440
202.500 202.403 202.345 202.300 202.240 202.253
6.00 202.200

1993
TAS-PVC-DN150--0,450%-59.06 TB-234 2689
202.000
PERFILCOTA TERRENO TRAMO
201.500 PERFIL COTA SO LERA TUBO RED
202,440
201,160 201.000 201.115

C.I. 1993
201.160 201.070

C.I.2689
201.025 200.980 200.935
200.890
200.500 TRAMO TB -234

200.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -1137 DESDE C.I. : 1992 524236.990 8782542.890 202.630 201.390 LONGITUD TRAMO : 50.26 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -1137
HASTA C.I. : 1993 524288.250 8782542.950 202.440 201.160 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 50.26 ML i (%) : -0.449 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 51.26 i (°/o) TRAMO : -0.449 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1992 0.00 0.00 202.630 -0.449 201.390 0.0043 0.100 1.344 1 0.000 0.00 202.630 -0.449 201.390 0.0043 0.10 1.344 1.344 0.000 201.286 159.70 201.545 0.60 0.15 0.000 0.935 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 202.612
202.585
-0.449
-0.449
201.345
201.300
0.0043
0.0043
0.100
0.100
1.371
1.389
2
3
10.000
10.000
10.00
20.00
202.612
202.585
-0.449
-0.449
201.345
201.300
0.0043
0.0043
0.10
0.10
1.371
1.389
1.371
1.389
0.000
0.000
201.241
201.196
159.70
159.70
201.501
201.456
0.60
0.60
0.15
0.15
0.200
0.200
0.961
0.979
8.146
8.281
0.000
0.000
0.600
0.600
1.658
1.658
5.688
5.822
10.00 30.00 202.506 -0.449 201.255 0.0043 0.100 1.355 4 10.000 30.00 202.506 -0.449 201.255 0.0043 0.10 1.355 1.355 0.000 201.151 159.70 201.411 0.60 0.15 0.200 0.945 8.232 0.000 0.600 1.658 5.774
10.00 40.00 202.465 -0.449 201.211 0.0043 0.100 1.359 5 10.000 40.00 202.465 -0.449 201.211 0.0043 0.10 1.359 1.359 0.000 201.106 159.70 201.366 0.60 0.15 0.200 0.949 8.141 0.000 0.600 1.658 5.683
10.00 50.00 202.436 -0.449 201.166 0.0043 0.100 1.375 6 10.000 50.00 202.436 -0.449 201.166 0.0043 0.10 1.375 1.375 0.000 201.061 159.70 201.321 0.60 0.15 0.200 0.965 8.200 0.000 0.600 1.658 5.742
1993 0.260 50.26 202.440 -0.449 201.160 0.0043 0.100 1.384 7 0.260 50.26 202.440 -0.449 201.160 0.0043 0.10 1.384 1.384 0.000 201.056 159.70 201.315 0.60 0.15 0.005 0.975 0.215 0.000 0.016 0.043 0.151

ESQUEMA PLANIMETRICO TRAMOS 50.26 1.368 1.007 41.215 0.000 3.016 8.333 28.860
11.348

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 50.26
202,440 203.000
12.33 12.55 201,160 202.630 202.612 202.585
202.506 202.465 202.436 202.440
202.500
6.00
1992
TAS-PVC-DN150--0,449%-50.26 TB-1137 1993 202.000
PERFILCOTA TERRENO TRAMO
201.500 PERFIL COTA SOLERA TUBO RED
202,630 201.390 201.345 201.300 201.255 201.211
201,390 201.000 201.166

C.I. 1992
201.160

C.I.1993
200.500 TRAMO TB -1137

200.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -1138 DESDE C.I. : 1994 524177.010 8782543.350 202.870 201.660 LONGITUD TRAMO : 58.98 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -1138
HASTA C.I. : 1992 524236.990 8782542.890 202.630 201.390 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 58.98 ML i (%) : -0.450 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 59.98 i (°/o) TRAMO : -0.450 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1994 0.00 0.00 202.870 -0.450 201.660 0.0043 0.100 1.314 1 0.000 0.00 202.870 -0.450 201.660 0.0043 0.10 1.314 1.314 0.000 201.556 159.70 201.815 0.60 0.15 0.000 0.905 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 202.815
202.777
-0.450
-0.450
201.615
201.570
0.0043
0.0043
0.100
0.100
1.304
1.311
2
3
10.000
10.000
10.00
20.00
202.815
202.777
-0.450
-0.450
201.615
201.570
0.0043
0.0043
0.10
0.10
1.304
1.311
1.304
1.311
0.000
0.000
201.511
201.466
159.70
159.70
201.770
201.725
0.60
0.60
0.15
0.15
0.200
0.200
0.895
0.902
7.856
7.847
0.000
0.000
0.600
0.600
1.658
1.658
5.398
5.389
10.00 30.00 202.761 -0.450 201.525 0.0043 0.100 1.340 4 10.000 30.00 202.761 -0.450 201.525 0.0043 0.10 1.340 1.340 0.000 201.421 159.70 201.680 0.60 0.15 0.200 0.931 7.955 0.000 0.600 1.658 5.497
10.00 40.00 202.698 -0.450 201.480 0.0043 0.100 1.322 5 10.000 40.00 202.698 -0.450 201.480 0.0043 0.10 1.322 1.322 0.000 201.376 159.70 201.635 0.60 0.15 0.200 0.913 7.988 0.000 0.600 1.658 5.530
10.00 50.00 202.664 -0.450 201.435 0.0043 0.100 1.333 6 10.000 50.00 202.664 -0.450 201.435 0.0043 0.10 1.333 1.333 0.000 201.331 159.70 201.590 0.60 0.15 0.200 0.924 7.967 0.000 0.600 1.658 5.509
1992 8.980 58.98 202.630 -0.450 201.390 0.0043 0.100 1.344 7 8.980 58.98 202.630 -0.450 201.390 0.0043 0.10 1.344 1.344 0.000 201.286 159.70 201.545 0.60 0.15 0.180 0.935 7.214 0.000 0.539 1.489 5.006

ESQUEMA PLANIMETRICO TRAMOS 58.98 1.324 1.181 46.827 0.000 3.539 9.778 32.328
13.317

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 58.98
202,630 203.000 202.870 202.815 202.777
12.33 12.55 201,390 202.761
202.698 202.664 202.630

202.500
6.00
1994
TAS-PVC-DN150--0,450%-58.98 TB-1138 1992
202.000 PERFILCOTA TERRENO TRAMO
PERFIL COTA SOLERA TUBO RED
202,870 201.500 201.660 201.615 201.570 201.525 201.480
201,660 201.435

C.I. 1994

C.I.1992
201.390
201.000
TRAMO TB -1138

200.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -620 DESDE C.I. : 2523 524093.870 8782543.540 203.240 202.040 LONGITUD TRAMO : 82.14 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -620
HASTA C.I. : 1994 524177.010 8782543.350 202.870 201.660 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 82.14 ML i (%) : -0.457 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 83.14 i (°/o) TRAMO : -0.457 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2523 0.00 0.00 203.240 -0.457 202.040 0.0043 0.100 1.304 1 0.000 0.00 203.240 -0.457 202.040 0.0043 0.10 1.304 1.304 0.000 201.936 159.70 202.195 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 203.216
203.158
-0.457
-0.457
201.994
201.949
0.0043
0.0043
0.100
0.100
1.326
1.314
2
3
10.000
10.000
10.00
20.00
203.216
203.158
-0.457
-0.457
201.994
201.949
0.0043
0.0043
0.10
0.10
1.326
1.314
1.326
1.314
0.000
0.000
201.890
201.844
159.70
159.70
202.150
202.104
0.60
0.60
0.15
0.15
0.200
0.200
0.916
0.904
7.891
7.919
0.000
0.000
0.600
0.600
1.658
1.658
5.433
5.461
10.00 30.00 203.132 -0.457 201.903 0.0043 0.100 1.333 4 10.000 30.00 203.132 -0.457 201.903 0.0043 0.10 1.333 1.333 0.000 201.799 159.70 202.058 0.60 0.15 0.200 0.924 7.941 0.000 0.600 1.658 5.483
10.00 40.00 203.039 -0.457 201.857 0.0043 0.100 1.286 5 10.000 40.00 203.039 -0.457 201.857 0.0043 0.10 1.286 1.286 0.000 201.753 159.70 202.013 0.60 0.15 0.200 0.876 7.859 0.000 0.600 1.658 5.400
10.00 50.00 203.000 -0.457 201.811 0.0043 0.100 1.293 6 10.000 50.00 203.000 -0.457 201.811 0.0043 0.10 1.293 1.293 0.000 201.707 159.70 201.967 0.60 0.15 0.200 0.883 7.737 0.000 0.600 1.658 5.279
10.00 60.00 202.951 -0.457 201.766 0.0043 0.100 1.290 7 10.000 60.00 202.951 -0.457 201.766 0.0043 0.10 1.290 1.290 0.000 201.661 159.70 201.921 0.60 0.15 0.200 0.880 7.747 0.000 0.600 1.658 5.289
10.00 70.00 202.948 -0.457 201.720 0.0043 0.100 1.332 8 10.000 70.00 202.948 -0.457 201.720 0.0043 0.10 1.332 1.332 0.000 201.616 159.70 201.875 0.60 0.15 0.200 0.923 7.865 0.000 0.600 1.658 5.407
10.00 80.00 202.911 -0.457 201.674 0.0043 0.100 1.341 9 10.000 80.00 202.911 -0.457 201.674 0.0043 0.10 1.341 1.341 0.000 201.570 159.70 201.830 0.60 0.15 0.200 0.931 8.020 0.000 0.600 1.658 5.561
1994 2.140 82.14 202.870 -0.457 201.660 0.0043 0.100 1.314 10 2.140 82.14 202.870 -0.457 201.660 0.0043 0.10 1.314 1.314 0.000 201.556 159.70 201.815 0.60 0.15 0.043 0.905 1.705 0.000 0.128 0.355 1.179

ESQUEMA PLANIMETRICO TRAMOS 82.14 1.313 1.645 64.684 0.000 4.928 13.618 44.492
18.546

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 82.14
202,870 203.500 203.240
12.33 12.55 201,660 203.216 203.158 203.132
203.039 203.000 202.951 202.948 202.911
203.000 202.870
6.00
2523
TAS-PVC-DN150--0,457%-82.14 TB-620 1994 202.500
PERFILCOTA TERRENO TRAMO
202.000 PERFIL COTA SOLERA TUBO RED
202.040 201.994 201.949 201.903
203,240 201.857 201.811 201.766 201.720 201.674
202,040 201.500

C.I. 2523
201.660

C.I.1994
201.000 TRAMO TB -620

200.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -692 DESDE C.I. : 2562 524313.040 8782619.400 202.620 200.060 LONGITUD TRAMO : 88.91 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -692
HASTA C.I. : 2550 524402.950 8782618.620 202.710 199.650 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.80 DN : 6" PLG LONG. : 88.91 ML i (%) : -0.456 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 89.91 i (°/o) TRAMO : -0.456 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2562 0.00 0.00 202.620 -0.456 200.060 0.0043 0.100 2.664 1 0.000 0.00 202.620 -0.456 200.060 0.0043 0.10 2.664 2.000 0.664 199.956 159.70 200.215 0.80 0.15 0.000 2.255 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 202.666
202.798
-0.456
-0.456
200.014
199.969
0.0043
0.0043
0.100
0.100
2.756
2.933
2
3
10.000
10.000
10.00
20.00
202.666
202.798
-0.456
-0.456
200.014
199.969
0.0043
0.0043
0.10
0.10
2.756
2.933
2.000
2.000
0.756
0.933
199.910
199.865
159.70
159.70
200.170
200.124
0.80
0.80
0.15
0.15
0.200
0.200
2.346
2.524
16.000
16.000
5.681
6.758
0.800
0.800
2.277
2.277
18.403
19.480
10.00 30.00 202.869 -0.456 199.923 0.0043 0.100 3.050 4 10.000 30.00 202.869 -0.456 199.923 0.0043 0.10 3.050 2.000 1.050 199.819 159.70 200.079 0.80 0.15 0.200 2.640 16.000 7.934 0.800 2.277 20.657
10.00 40.00 202.911 -0.456 199.878 0.0043 0.100 3.138 5 10.000 40.00 202.911 -0.456 199.878 0.0043 0.10 3.138 2.000 1.138 199.773 159.70 200.033 0.80 0.15 0.200 2.728 16.000 8.751 0.800 2.277 21.474
10.00 50.00 202.924 -0.456 199.832 0.0043 0.100 3.196 6 10.000 50.00 202.924 -0.456 199.832 0.0043 0.10 3.196 2.000 1.196 199.728 159.70 199.987 0.80 0.15 0.200 2.787 16.000 9.336 0.800 2.277 22.058
10.00 60.00 202.910 -0.456 199.786 0.0043 0.100 3.228 7 10.000 60.00 202.910 -0.456 199.786 0.0043 0.10 3.228 2.000 1.228 199.682 159.70 199.942 0.80 0.15 0.200 2.818 16.000 9.697 0.800 2.277 22.419
10.00 70.00 202.878 -0.456 199.741 0.0043 0.100 3.241 8 10.000 70.00 202.878 -0.456 199.741 0.0043 0.10 3.241 2.000 1.241 199.637 159.70 199.896 0.80 0.15 0.200 2.832 16.000 9.878 0.800 2.277 22.600
10.00 80.00 202.617 -0.456 199.695 0.0043 0.100 3.026 9 10.000 80.00 202.617 -0.456 199.695 0.0043 0.10 3.026 2.000 1.026 199.591 159.70 199.851 0.80 0.15 0.200 2.616 16.000 9.070 0.800 2.277 21.793
2550 8.910 88.91 202.710 -0.456 199.650 0.0043 0.100 3.164 10 8.910 88.91 202.710 -0.456 199.650 0.0043 0.10 3.164 2.000 1.164 199.546 159.70 199.805 0.80 0.15 0.178 2.755 14.256 7.807 0.713 2.029 19.142

ESQUEMA PLANIMETRICO TRAMOS 88.91 3.040 1.781 142.256 74.911 7.113 20.247 188.026
27.360

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 88.91
202,710 204.000
12.33 12.55 199,650
202.798 202.869 202.911 202.924 202.910 202.878
203.000 202.620 202.666 202.617 202.710
6.00
2562
TAS-PVC-DN150--0,456%-88.91 TB-692 2550 202.000
PERFILCOTA TERRENO TRAMO
201.000 PERFIL COTA SOLERA TUBO RED
202,620
200,060 200.000

C.I. 2562
200.014 199.969

C.I.2550
200.060 199.923 199.878 199.832 199.786 199.741 199.695
199.650
199.000 TRAMO TB -692

198.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -206 DESDE C.I. : 2684 524243.120 8782619.460 202.430 200.380 LONGITUD TRAMO : 68.92 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -206
HASTA C.I. : 2562 524313.040 8782619.400 202.620 200.060 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 68.92 ML i (%) : -0.458 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 69.92 i (°/o) TRAMO : -0.458 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 EXCAV. 6-8 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m 4-6m m mm ml ml ml m3 ml m3 m3 m3 m3 m3 m3 m3
2684 0.00 0.00 202.430 -0.458 200.380 0.0043 0.100 2.154 1 0.000 0.00 202.430 -0.458 200.380 0.0043 0.10 2.154 2.000 0.154 0.000 200.276 159.70 200.535 0.70 0.15 0.000 1.745 0.000 0.000 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 202.415
202.397
-0.458
-0.458
200.334
200.288
0.0043
0.0043
0.100
0.100
2.185
2.213
2
3
10.000
10.000
10.00
20.00
202.415
202.397
-0.458
-0.458
200.334
200.288
0.0043
0.0043
0.10
0.10
2.185
2.213
2.000
2.000
0.185
0.213
0.000
0.000
200.230
200.184
159.70
159.70
200.490
200.444
0.70
0.70
0.15
0.15
0.200
0.200
1.775
1.803
14.000
14.000
1.188
1.393
0.000
0.000
0.000
0.000
0.700
0.700
1.968
1.968
12.320
12.525
10.00 30.00 202.423 -0.458 200.243 0.0043 0.100 2.285 4 10.000 30.00 202.423 -0.458 200.243 0.0043 0.10 2.285 2.000 0.285 0.000 200.138 159.70 200.398 0.70 0.15 0.200 1.875 14.000 1.741 0.000 0.000 0.700 1.968 12.873
10.00 40.00 202.599 -0.458 200.197 0.0043 0.100 2.506 5 10.000 40.00 202.599 -0.458 200.197 0.0043 0.10 2.506 2.000 0.506 0.000 200.093 159.70 200.352 0.70 0.15 0.200 2.097 14.000 2.768 0.000 0.000 0.700 1.968 13.900
10.00 50.00 202.704 -0.458 200.151 0.0043 0.100 2.657 6 10.000 50.00 202.704 -0.458 200.151 0.0043 0.10 2.657 2.000 0.657 0.000 200.047 159.70 200.307 0.70 0.15 0.200 2.247 14.000 4.072 0.000 0.000 0.700 1.968 15.204
10.00 60.00 202.780 -0.458 200.105 0.0043 0.100 2.779 7 10.000 60.00 202.780 -0.458 200.105 0.0043 0.10 2.779 2.000 0.779 0.000 200.001 159.70 200.261 0.70 0.15 0.200 2.369 14.000 5.026 0.000 0.000 0.700 1.968 16.158
2562 8.920 68.92 202.620 -0.458 200.060 0.0043 0.100 2.664 8 8.920 68.92 202.620 -0.458 200.060 0.0043 0.10 2.664 2.000 0.664 0.000 199.956 159.70 200.215 0.70 0.15 0.179 2.255 12.488 4.506 0.000 0.000 0.624 1.755 14.435

ESQUEMA PLANIMETRICO TRAMOS 68.92 2.430 1.381 96.488 20.694 0.000 0.000 4.824 13.561 97.416
18.385

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 68.92
202,620 203.000 202.704 202.780
202.599 202.620
12.33 12.55 200,060 202.430 202.415 202.397 202.423
202.500

6.00 202.000
2684
TAS-PVC-DN150--0,458%-68.92 TB-206 2562
201.500

201.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SO LERA TUBO RED
200.500
202,430 200.334 200.288 200.243
200,380 200.000 200.380 200.197 200.151

C.I. 2684
200.105

C.I.2562
200.060
199.500
TRAMO TB -206
199.000

198.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -205 DESDE C.I. : 2462 524177.400 8782619.890 202.610 200.680 LONGITUD TRAMO : 64.72 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -205
HASTA C.I. : 2684 524243.120 8782619.460 202.430 200.380 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 64.72 ML i (%) : -0.456 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 65.72 i (°/o) TRAMO : -0.456 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2462 0.00 0.00 202.610 -0.456 200.680 0.0043 0.100 2.034 1 0.000 0.00 202.610 -0.456 200.680 0.0043 0.10 2.034 2.000 0.034 200.576 159.70 200.835 0.70 0.15 0.000 1.625 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 202.781
202.501
-0.456
-0.456
200.634
200.589
0.0043
0.0043
0.100
0.100
2.251
2.017
2
3
10.000
10.000
10.00
20.00
202.781
202.501
-0.456
-0.456
200.634
200.589
0.0043
0.0043
0.10
0.10
2.251
2.017
2.000
2.000
0.251
0.017
200.530
200.484
159.70
159.70
200.790
200.744
0.70
0.70
0.15
0.15
0.200
0.200
1.841
1.607
14.000
14.000
0.998
0.936
0.700
0.700
1.968
1.968
12.130
12.068
10.00 30.00 202.451 -0.456 200.543 0.0043 0.100 2.012 4 10.000 30.00 202.451 -0.456 200.543 0.0043 0.10 2.012 2.000 0.012 200.439 159.70 200.698 0.70 0.15 0.200 1.603 14.000 0.101 0.700 1.968 11.233
10.00 40.00 202.429 -0.456 200.497 0.0043 0.100 2.036 5 10.000 40.00 202.429 -0.456 200.497 0.0043 0.10 2.036 2.000 0.036 200.393 159.70 200.653 0.70 0.15 0.200 1.626 14.000 0.168 0.700 1.968 11.301
10.00 50.00 202.428 -0.456 200.452 0.0043 0.100 2.081 6 10.000 50.00 202.428 -0.456 200.452 0.0043 0.10 2.081 2.000 0.081 200.347 159.70 200.607 0.70 0.15 0.200 1.671 14.000 0.407 0.700 1.968 11.540
10.00 60.00 202.389 -0.456 200.406 0.0043 0.100 2.087 7 10.000 60.00 202.389 -0.456 200.406 0.0043 0.10 2.087 2.000 0.087 200.302 159.70 200.562 0.70 0.15 0.200 1.677 14.000 0.587 0.700 1.968 11.719
2684 4.720 64.72 202.430 -0.456 200.380 0.0043 0.100 2.154 8 4.720 64.72 202.430 -0.456 200.380 0.0043 0.10 2.154 2.000 0.154 200.276 159.70 200.535 0.70 0.15 0.095 1.745 6.608 0.399 0.330 0.929 5.653

ESQUEMA PLANIMETRICO TRAMOS 64.72 2.084 1.296 90.608 3.598 4.530 12.734 75.644
17.265

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 64.72
202,430 203.000 202.781
202.610
12.33 12.55 200,380 202.501 202.451 202.429 202.428 202.430
202.389
202.500
6.00
2462
TAS-PVC-DN150--0,456%-64.72 TB-205 2684
202.000

201.500
PERFILCOTA TERRENO TRAMO
201.000 PERFIL COTA SOLERA TUBO RED
202,610 200.500 200.634 200.589
200,680 200.680 200.543 200.497 200.452

C.I. 2462
200.406

C.I.2684
200.380
200.000

199.500
TRAMO TB -205

199.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -267 DESDE C.I. : 2703 524127.470 8782620.190 202.760 200.910 LONGITUD TRAMO : 48.93 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -267
HASTA C.I. : 2462 524177.400 8782619.890 202.610 200.680 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 48.93 ML i (%) : -0.461 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 49.93 i (°/o) TRAMO : -0.461 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2703 0.00 0.00 202.760 -0.461 200.910 0.0043 0.100 1.954 1 0.000 0.00 202.760 -0.461 200.910 0.0043 0.10 1.954 1.954 0.000 200.806 159.70 201.065 0.60 0.15 0.000 1.545 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 202.761
202.661
-0.461
-0.461
200.864
200.818
0.0043
0.0043
0.100
0.100
2.001
1.947
2
3
10.000
10.000
10.00
20.00
202.761
202.661
-0.461
-0.461
200.864
200.818
0.0043
0.0043
0.10
0.10
2.001
1.947
2.000
1.947
0.001
0.000
200.760
200.714
159.70
159.70
201.019
200.973
0.60
0.60
0.15
0.15
0.200
0.200
1.592
1.538
11.863
11.842
0.004
0.004
0.600
0.600
1.658
1.658
9.409
9.388
10.00 30.00 202.648 -0.461 200.772 0.0043 0.100 1.980 4 10.000 30.00 202.648 -0.461 200.772 0.0043 0.10 1.980 1.980 0.000 200.668 159.70 200.927 0.60 0.15 0.200 1.571 11.784 0.000 0.600 1.658 9.326
10.00 40.00 202.525 -0.461 200.726 0.0043 0.100 1.904 5 10.000 40.00 202.525 -0.461 200.726 0.0043 0.10 1.904 1.904 0.000 200.621 159.70 200.881 0.60 0.15 0.200 1.494 11.652 0.000 0.600 1.658 9.194
2462 8.930 48.93 202.610 -0.461 200.680 0.0043 0.100 2.034 6 8.930 48.93 202.610 -0.461 200.680 0.0043 0.10 2.034 2.000 0.034 200.576 159.70 200.835 0.60 0.15 0.179 1.625 10.458 0.092 0.536 1.480 8.354

ESQUEMA PLANIMETRICO TRAMOS 48.93 1.970 0.980 57.599 0.100 2.936 8.112 45.671
11.048

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 48.93
202,610 203.000 202.760 202.761
12.33 12.55 200,680 202.661 202.648
202.525
202.610
202.500
6.00
2703
TAS-PVC-DN150--0,461%-48.93 TB-267 2462 202.000

201.500 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
201.000
202,760
200,910 200.910 200.864 200.818 200.772

C.I. 2703
200.726

C.I.2462
200.500 200.680

200.000 TRAMO TB -267

199.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -268 DESDE C.I. : 1495 524071.630 8782620.040 202.740 201.160 LONGITUD TRAMO : 54.84 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -268
HASTA C.I. : 2703 524127.470 8782620.190 202.760 200.910 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 54.84 ML i (%) : -0.448 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 55.84 i (°/o) TRAMO : -0.448 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1495 0.00 0.00 202.740 -0.448 201.160 0.0043 0.100 1.684 1 0.000 0.00 202.740 -0.448 201.160 0.0043 0.10 1.684 1.684 0.000 201.056 159.70 201.315 0.60 0.15 0.000 1.275 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 202.487
202.670
-0.448
-0.448
201.115
201.070
0.0043
0.0043
0.100
0.100
1.476
1.704
2
3
10.000
10.000
10.00
20.00
202.487
202.670
-0.448
-0.448
201.115
201.070
0.0043
0.0043
0.10
0.10
1.476
1.704
1.476
1.704
0.000
0.000
201.011
200.966
159.70
159.70
201.271
201.226
0.60
0.60
0.15
0.15
0.200
0.200
1.066
1.294
9.481
9.540
0.000
0.000
0.600
0.600
1.658
1.658
7.023
7.082
10.00 30.00 202.714 -0.448 201.026 0.0043 0.100 1.793 4 10.000 30.00 202.714 -0.448 201.026 0.0043 0.10 1.793 1.793 0.000 200.921 159.70 201.181 0.60 0.15 0.200 1.383 10.489 0.000 0.600 1.658 8.031
10.00 40.00 202.750 -0.448 200.981 0.0043 0.100 1.873 5 10.000 40.00 202.750 -0.448 200.981 0.0043 0.10 1.873 1.873 0.000 200.877 159.70 201.136 0.60 0.15 0.200 1.464 10.998 0.000 0.600 1.658 8.540
10.00 50.00 202.756 -0.448 200.936 0.0043 0.100 1.924 6 10.000 50.00 202.756 -0.448 200.936 0.0043 0.10 1.924 1.924 0.000 200.832 159.70 201.092 0.60 0.15 0.200 1.514 11.393 0.000 0.600 1.658 8.934
2703 4.840 54.84 202.760 -0.448 200.910 0.0043 0.100 1.954 7 4.840 54.84 202.760 -0.448 200.910 0.0043 0.10 1.954 1.954 0.000 200.806 159.70 201.065 0.60 0.15 0.097 1.545 5.632 0.000 0.290 0.802 4.442

ESQUEMA PLANIMETRICO TRAMOS 54.84 1.773 1.098 57.532 0.000 3.290 9.092 44.052
12.382

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 54.84
202,760 203.000 202.740 202.750 202.756 202.760
202.670 202.714
12.33 12.55 200,910 202.487
202.500
6.00
1495
TAS-PVC-DN150--0,448%-55.84 TB-268 2703 202.000

201.500 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
201.000 201.115
202,740 201.160 201.070 201.026 200.981 200.936
201,160 200.910

C.I. 1495

C.I.2703
200.500

200.000 TRAMO TB -268

199.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -1009 DESDE C.I. : 1826 524071.510 8782563.780 202.880 201.680 LONGITUD TRAMO : 55.26 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -1009
HASTA C.I. : 1495 524071.630 8782620.040 202.740 201.160 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 55.26 ML i (%) : -0.924 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 56.26 i (°/o) TRAMO : -0.924 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1826 0.00 0.00 202.880 -0.924 201.680 0.0043 0.100 1.304 1 0.000 0.00 202.880 -0.924 201.680 0.0043 0.10 1.304 1.304 0.000 201.576 159.70 201.835 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 202.746
202.733
-0.924
-0.924
201.588
201.495
0.0043
0.0043
0.100
0.100
1.263
1.342
2
3
10.000
10.000
10.00
20.00
202.746
202.733
-0.924
-0.924
201.588
201.495
0.0043
0.0043
0.10
0.10
1.263
1.342
1.263
1.342
0.000
0.000
201.483
201.391
159.70
159.70
201.743
201.651
0.60
0.60
0.15
0.15
0.200
0.200
0.853
0.932
7.701
7.815
0.000
0.000
0.600
0.600
1.658
1.658
5.243
5.356
10.00 30.00 202.743 -0.924 201.403 0.0043 0.100 1.445 4 10.000 30.00 202.743 -0.924 201.403 0.0043 0.10 1.445 1.445 0.000 201.298 159.70 201.558 0.60 0.15 0.200 1.035 8.360 0.000 0.600 1.658 5.902
10.00 40.00 202.710 -0.924 201.310 0.0043 0.100 1.504 5 10.000 40.00 202.710 -0.924 201.310 0.0043 0.10 1.504 1.504 0.000 201.206 159.70 201.466 0.60 0.15 0.200 1.094 8.846 0.000 0.600 1.658 6.388
10.00 50.00 202.733 -0.924 201.218 0.0043 0.100 1.619 6 10.000 50.00 202.733 -0.924 201.218 0.0043 0.10 1.619 1.619 0.000 201.114 159.70 201.373 0.60 0.15 0.200 1.210 9.370 0.000 0.600 1.658 6.912
1495 5.260 55.26 202.740 -0.924 201.160 0.0043 0.100 1.684 7 5.260 55.26 202.740 -0.924 201.160 0.0043 0.10 1.684 1.684 0.000 201.056 159.70 201.315 0.60 0.15 0.105 1.275 5.213 0.000 0.316 0.872 3.920

ESQUEMA PLANIMETRICO TRAMOS 55.26 1.452 1.107 47.305 0.000 3.316 9.162 33.721
12.477

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 55.26
202,740 203.500
12.33 12.55 201,160
202.880
203.000 202.746 202.743 202.740
202.733 202.710 202.733
6.00
1826
TAS-PVC-DN150--0,924%-56.26 TB-1009 1495 202.500

202.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
201.500
202,880 201.680 201.588
201.495
201.403
201,680 201.310

C.I. 1826
201.218

C.I.1495
201.000 201.160

200.500 TRAMO TB -1009

200.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -221 DESDE C.I. : 2590 523984.920 8782619.910 203.080 201.880 LONGITUD TRAMO : 85.71 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -221
HASTA C.I. : 1495 524071.630 8782620.040 202.740 201.410 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 85.71 ML i (%) : -0.542 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 86.71 i (°/o) TRAMO : -0.542 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2590 0.00 0.00 203.080 -0.542 201.880 0.0043 0.100 1.304 1 0.000 0.00 203.080 -0.542 201.880 0.0043 0.10 1.304 1.304 0.000 201.776 159.70 202.035 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 203.229
203.246
-0.542
-0.542
201.826
201.772
0.0043
0.0043
0.100
0.100
1.508
1.579
2
3
10.000
10.000
10.00
20.00
203.229
203.246
-0.542
-0.542
201.826
201.772
0.0043
0.0043
0.10
0.10
1.508
1.579
1.508
1.579
0.000
0.000
201.721
201.667
159.70
159.70
201.981
201.927
0.60
0.60
0.15
0.15
0.200
0.200
1.098
1.169
8.435
9.259
0.000
0.000
0.600
0.600
1.658
1.658
5.977
6.800
10.00 30.00 203.291 -0.542 201.717 0.0043 0.100 1.678 4 10.000 30.00 203.291 -0.542 201.717 0.0043 0.10 1.678 1.678 0.000 201.613 159.70 201.873 0.60 0.15 0.200 1.268 9.770 0.000 0.600 1.658 7.312
10.00 40.00 203.142 -0.542 201.663 0.0043 0.100 1.583 5 10.000 40.00 203.142 -0.542 201.663 0.0043 0.10 1.583 1.583 0.000 201.559 159.70 201.819 0.60 0.15 0.200 1.173 9.783 0.000 0.600 1.658 7.325
10.00 50.00 202.993 -0.542 201.609 0.0043 0.100 1.488 6 10.000 50.00 202.993 -0.542 201.609 0.0043 0.10 1.488 1.488 0.000 201.505 159.70 201.764 0.60 0.15 0.200 1.079 9.214 0.000 0.600 1.658 6.756
10.00 60.00 202.841 -0.542 201.555 0.0043 0.100 1.391 7 10.000 60.00 202.841 -0.542 201.555 0.0043 0.10 1.391 1.391 0.000 201.450 159.70 201.710 0.60 0.15 0.200 0.981 8.636 0.000 0.600 1.658 6.178
10.00 70.00 202.723 -0.542 201.501 0.0043 0.100 1.327 8 10.000 70.00 202.723 -0.542 201.501 0.0043 0.10 1.327 1.327 0.000 201.396 159.70 201.656 0.60 0.15 0.200 0.917 8.152 0.000 0.600 1.658 5.694
10.00 80.00 202.731 -0.542 201.446 0.0043 0.100 1.389 9 10.000 80.00 202.731 -0.542 201.446 0.0043 0.10 1.389 1.389 0.000 201.342 159.70 201.602 0.60 0.15 0.200 0.979 8.147 0.000 0.600 1.658 5.689
1495 5.710 85.71 202.740 -0.542 201.410 0.0043 0.100 1.434 10 5.710 85.71 202.740 -0.542 201.410 0.0043 0.10 1.434 1.434 0.000 201.306 159.70 201.565 0.60 0.15 0.114 1.025 4.836 0.000 0.343 0.947 3.433

ESQUEMA PLANIMETRICO TRAMOS 85.71 1.468 1.717 76.233 0.000 5.143 14.210 55.163
19.352

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 85.71
202,740 203.500
203.229 203.246 203.291
12.33 12.55 201,410 203.080 203.142
202.993
203.000 202.841
202.740
202.723 202.731
6.00
2590
TAS-PVC-DN150--0,542%-85.71 TB-221 1495 202.500

202.000 PERFILCOTA TERRENO TRAMO


201.826 PERFIL COTA SOLERA TUBO RED
201.880 201.772 201.717
201.500 201.663 201.609
203,080 201.555 201.501 201.446
201,880 201.410

C.I. 2590

C.I.1495
201.000

200.500 TRAMO TB -221

200.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -266 DESDE C.I. : 2702 524350.900 8782694.520 200.110 198.330 LONGITUD TRAMO : 50.43 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -266
HASTA C.I. : 2601 524402.330 8782694.560 200.100 197.900 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 50.43 ML i (%) : -0.836 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 51.43 i (°/o) TRAMO : -0.836 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2702 0.00 0.00 200.110 -0.836 198.330 0.0043 0.100 1.884 1 0.000 0.00 200.110 -0.836 198.330 0.0043 0.10 1.884 1.884 0.000 198.226 159.70 198.485 0.70 0.15 0.000 1.475 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 200.228
200.316
-0.836
-0.836
198.246
198.163
0.0043
0.0043
0.100
0.100
2.086
2.258
2
3
10.000
10.000
10.00
20.00
200.228
200.316
-0.836
-0.836
198.246
198.163
0.0043
0.0043
0.10
0.10
2.086
2.258
2.000
2.000
0.086
0.258
198.142
198.058
159.70
159.70
198.402
198.318
0.70
0.70
0.15
0.15
0.200
0.200
1.676
1.848
13.595
14.000
0.301
1.202
0.700
0.700
1.968
1.968
11.028
12.334
10.00 30.00 200.313 -0.836 198.079 0.0043 0.100 2.338 4 10.000 30.00 200.313 -0.836 198.079 0.0043 0.10 2.338 2.000 0.338 197.975 159.70 198.235 0.70 0.15 0.200 1.928 14.000 2.085 0.700 1.968 13.217
10.00 40.00 200.249 -0.836 197.996 0.0043 0.100 2.358 5 10.000 40.00 200.249 -0.836 197.996 0.0043 0.10 2.358 2.000 0.358 197.891 159.70 198.151 0.70 0.15 0.200 1.948 14.000 2.435 0.700 1.968 13.568
10.00 50.00 200.171 -0.836 197.912 0.0043 0.100 2.363 6 10.000 50.00 200.171 -0.836 197.912 0.0043 0.10 2.363 2.000 0.363 197.808 159.70 198.067 0.70 0.15 0.200 1.954 14.000 2.524 0.700 1.968 13.656
2601 0.430 50.43 200.100 -0.836 197.900 0.0043 0.100 2.304 7 0.430 50.43 200.100 -0.836 197.900 0.0043 0.10 2.304 2.000 0.304 197.796 159.70 198.055 0.70 0.15 0.009 1.895 0.602 0.100 0.030 0.085 0.579

ESQUEMA PLANIMETRICO TRAMOS 50.43 2.227 1.010 70.197 8.647 3.530 9.923 64.381
13.453

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 50.43
200,100 201.000
12.33 12.55 197,900
200.500 200.228 200.316 200.313 200.249
200.110 200.171 200.100
6.00 200.000
2702
TAS-PVC-DN150--0,836%-50.43 TB-266 2601 199.500

199.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
198.500
200,110
198,330 198.000 198.330 198.246 198.163

C.I. 2702

C.I.2601
198.079 197.996 197.912
197.500 197.900
TRAMO TB -266
197.000

196.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -265 DESDE C.I. : 1533 524291.130 8782694.050 199.800 198.600 LONGITUD TRAMO : 58.77 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -265
HASTA C.I. : 2702 524350.900 8782694.520 200.110 198.330 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 58.77 ML i (%) : -0.452 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 59.77 i (°/o) TRAMO : -0.452 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3

opcional
1533 0.00 0.00 199.800 -0.452 198.600 0.0043 0.100 1.304 1 0.000 0.00 199.800 -0.452 198.600 0.0043 0.10 1.304 1.304 0.000 198.496 159.70 198.755 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00 10.00 199.648 -0.452 198.555 0.0043 0.100 1.197 2 10.000 10.00 199.648 -0.452 198.555 0.0043 0.10 1.197 1.197 0.000 198.451 159.70 198.710 0.60 0.15 0.200 0.788 7.505 0.000 0.600 1.658 5.047
10.00 20.00 199.660 -0.452 198.510 0.0043 0.100 1.255 3 10.000 20.00 199.660 -0.452 198.510 0.0043 0.10 1.255 1.255 0.000 198.405 159.70 198.665 0.60 0.15 0.200 0.845 7.356 0.000 0.600 1.658 4.898
10.00 30.00 199.465 -0.452 198.464 0.0043 0.100 1.105 4 10.000 30.00 199.465 -0.452 198.464 0.0043 0.10 1.105 1.105 0.000 198.360 159.70 198.620 0.60 0.15 0.200 0.695 7.078 0.000 0.600 1.658 4.620
10.00 40.00 199.687 -0.452 198.419 0.0043 0.100 1.372 5 10.000 40.00 199.687 -0.452 198.419 0.0043 0.10 1.372 1.372 0.000 198.315 159.70 198.575 0.60 0.15 0.200 0.962 7.430 0.000 0.600 1.658 4.972
10.00 50.00 199.866 -0.452 198.374 0.0043 0.100 1.596 6 10.000 50.00 199.866 -0.452 198.374 0.0043 0.10 1.596 1.596 0.000 198.270 159.70 198.530 0.60 0.15 0.200 1.186 8.904 0.000 0.600 1.658 6.446
2702 8.770 58.77 200.110 -0.452 198.330 0.0043 0.100 1.884 7 8.770 58.77 200.110 -0.452 198.330 0.0043 0.10 1.884 1.884 0.000 198.226 159.70 198.485 0.60 0.15 0.176 1.475 9.157 0.000 0.526 1.454 7.001

ESQUEMA PLANIMETRICO TRAMOS 58.77 1.388 1.177 47.432 0.000 3.526 9.743 32.985
13.270

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 58.77
200,110 200.500
12.33 12.55 198,330 200.110
200.000 199.800 199.866
199.648 199.660 199.687
6.00
1533
TAS-PVC-DN150--0,452%-58.77 TB-265 2702 199.500
199.465

199.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
198.500
199,800 198.600 198.555 198.510 198.464 198.419 198.374
198,600

C.I. 1533

C.I.2702
198.000 198.330

197.500 TRAMO TB -265

197.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -262 DESDE C.I. : 2700 524227.370 8782695.300 202.320 200.830 LONGITUD TRAMO : 62.81 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -262
HASTA C.I. : 1533 524291.130 8782694.050 199.800 198.600 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 62.81 ML i (%) : -3.495 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 63.81 i (°/o) TRAMO : -3.495 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2700 0.00 0.00 202.320 -3.495 200.830 0.0043 0.100 1.594 1 0.000 0.00 202.320 -3.495 200.830 0.0043 0.10 1.594 1.594 0.000 200.726 159.70 200.985 0.60 0.15 0.000 1.185 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.161
201.895
-3.495
-3.495
200.481
200.131
0.0043
0.0043
0.100
0.100
1.785
1.868
2
3
10.000
10.000
10.00
20.00
202.161
201.895
-3.495
-3.495
200.481
200.131
0.0043
0.0043
0.10
0.10
1.785
1.868
1.785
1.868
0.000
0.000
200.376
200.027
159.70
159.70
200.636
200.286
0.60
0.60
0.15
0.15
0.200
0.200
1.375
1.459
10.137
10.959
0.000
0.000
0.600
0.600
1.658
1.658
7.679
8.501
10.00 30.00 201.530 -3.495 199.782 0.0043 0.100 1.853 4 10.000 30.00 201.530 -3.495 199.782 0.0043 0.10 1.853 1.853 0.000 199.677 159.70 199.937 0.60 0.15 0.200 1.443 11.163 0.000 0.600 1.658 8.705
10.00 40.00 200.977 -3.495 199.432 0.0043 0.100 1.649 5 10.000 40.00 200.977 -3.495 199.432 0.0043 0.10 1.649 1.649 0.000 199.328 159.70 199.588 0.60 0.15 0.200 1.239 10.506 0.000 0.600 1.658 8.047
10.00 50.00 200.582 -3.495 199.083 0.0043 0.100 1.604 6 10.000 50.00 200.582 -3.495 199.083 0.0043 0.10 1.604 1.604 0.000 198.978 159.70 199.238 0.60 0.15 0.200 1.194 9.758 0.000 0.600 1.658 7.300
10.00 60.00 200.312 -3.495 198.733 0.0043 0.100 1.683 7 10.000 60.00 200.312 -3.495 198.733 0.0043 0.10 1.683 1.683 0.000 198.629 159.70 198.889 0.60 0.15 0.200 1.273 9.860 0.000 0.600 1.658 7.402
1533 2.810 62.81 199.800 -3.495 198.600 0.0043 0.100 1.304 8 2.810 62.81 199.800 -3.495 198.600 0.0043 0.10 1.304 1.304 0.000 198.496 159.70 198.755 0.60 0.15 0.056 0.895 2.518 0.000 0.169 0.466 1.828

ESQUEMA PLANIMETRICO TRAMOS 62.81 1.668 1.258 64.902 0.000 3.769 10.413 49.462
14.182

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 62.81
199,800 203.000
202.320
12.33 12.55 198,600 202.161
201.895
202.000 201.530
6.00
2700
TAS-PVC-DN150--3,495%-62.81 TB-262 1533 201.000
200.977
200.582
200.312
200.830 200.481 199.800
200.000 PERFILCOTA TERRENO TRAMO
200.131
199.782 PERFIL COTA SOLERA TUBO RED
199.000 199.432
202,320 199.083
200,830 198.733

C.I. 2700

C.I.1533
198.000 198.600

197.000 TRAMO TB -262

196.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -261 DESDE C.I. : 2463 524177.390 8782695.470 202.280 201.070 LONGITUD TRAMO : 48.98 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -261
HASTA C.I. : 2700 524227.370 8782695.300 202.320 200.830 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 48.98 ML i (%) : -0.480 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 49.98 i (°/o) TRAMO : -0.480 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2463 0.00 0.00 202.280 -0.480 201.070 0.0043 0.100 1.314 1 0.000 0.00 202.280 -0.480 201.070 0.0043 0.10 1.314 1.314 0.000 200.966 159.70 201.225 0.60 0.15 0.000 0.905 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.245
202.319
-0.480
-0.480
201.022
200.974
0.0043
0.0043
0.100
0.100
1.327
1.449
2
3
10.000
10.000
10.00
20.00
202.245
202.319
-0.480
-0.480
201.022
200.974
0.0043
0.0043
0.10
0.10
1.327
1.449
1.327
1.449
0.000
0.000
200.918
200.870
159.70
159.70
201.177
201.129
0.60
0.60
0.15
0.15
0.200
0.200
0.918
1.040
7.925
8.330
0.000
0.000
0.600
0.600
1.658
1.658
5.467
5.872
10.00 30.00 202.330 -0.480 200.926 0.0043 0.100 1.508 4 10.000 30.00 202.330 -0.480 200.926 0.0043 0.10 1.508 1.508 0.000 200.822 159.70 201.081 0.60 0.15 0.200 1.099 8.873 0.000 0.600 1.658 6.415
10.00 40.00 202.305 -0.480 200.878 0.0043 0.100 1.531 5 10.000 40.00 202.305 -0.480 200.878 0.0043 0.10 1.531 1.531 0.000 200.774 159.70 201.033 0.60 0.15 0.200 1.122 9.119 0.000 0.600 1.658 6.661
2700 8.980 48.98 202.320 -0.480 200.830 0.0043 0.100 1.594 6 8.980 48.98 202.320 -0.480 200.830 0.0043 0.10 1.594 1.594 0.000 200.726 159.70 200.985 0.60 0.15 0.180 1.185 8.421 0.000 0.539 1.489 6.213

ESQUEMA PLANIMETRICO TRAMOS 48.98 1.454 0.981 42.668 0.000 2.939 8.120 30.627
11.059

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 48.98
202,320 202.500 202.280 202.319 202.330 202.305 202.320
12.33 12.55 200,830 202.245

202.000
6.00
2463
TAS-PVC-DN150--0,480%-48.98 TB-261 2700
201.500 PERFILCOTA TERRENO TRAMO
PERFIL COTA SOLERA TUBO RED
202,280 201.000
201.022
201.070 200.974
201,070 200.926

C.I. 2463

C.I.2700
200.878
200.830
200.500
TRAMO TB -261

200.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -204 DESDE C.I. : 2683 524177.510 8782645.510 202.510 201.310 LONGITUD TRAMO : 48.96 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -204
HASTA C.I. : 2463 524177.390 8782695.470 202.280 201.070 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 48.96 ML i (%) : -0.480 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 49.96 i (°/o) TRAMO : -0.480 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2683 0.00 0.00 202.510 -0.480 201.310 0.0043 0.100 1.304 1 0.000 0.00 202.510 -0.480 201.310 0.0043 0.10 1.304 1.304 0.000 201.206 159.70 201.465 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.481
202.435
-0.480
-0.480
201.262
201.214
0.0043
0.0043
0.100
0.100
1.323
1.325
2
3
10.000
10.000
10.00
20.00
202.481
202.435
-0.480
-0.480
201.262
201.214
0.0043
0.0043
0.10
0.10
1.323
1.325
1.323
1.325
0.000
0.000
201.158
201.110
159.70
159.70
201.417
201.369
0.60
0.60
0.15
0.15
0.200
0.200
0.914
0.916
7.883
7.946
0.000
0.000
0.600
0.600
1.658
1.658
5.425
5.488
10.00 30.00 202.360 -0.480 201.166 0.0043 0.100 1.298 4 10.000 30.00 202.360 -0.480 201.166 0.0043 0.10 1.298 1.298 0.000 201.062 159.70 201.321 0.60 0.15 0.200 0.889 7.871 0.000 0.600 1.658 5.413
10.00 40.00 202.287 -0.480 201.118 0.0043 0.100 1.273 5 10.000 40.00 202.287 -0.480 201.118 0.0043 0.10 1.273 1.273 0.000 201.014 159.70 201.273 0.60 0.15 0.200 0.864 7.716 0.000 0.600 1.658 5.257
2463 8.960 48.96 202.280 -0.480 201.070 0.0043 0.100 1.314 6 8.960 48.96 202.280 -0.480 201.070 0.0043 0.10 1.314 1.314 0.000 200.966 159.70 201.225 0.60 0.15 0.179 0.905 6.956 0.000 0.538 1.485 4.753

ESQUEMA PLANIMETRICO TRAMOS 48.96 1.307 0.981 38.372 0.000 2.938 8.117 26.337
11.055

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 48.96
202,280 203.000
12.33 12.55 201,070
202.510
202.481 202.435
202.500 202.360 202.287 202.280
6.00
2683
TAS-PVC-DN150--0,480%-48.96 TB-204 2463 202.000
PERFILCOTA TERRENO TRAMO
201.500 PERFIL COTA SOLERA TUBO RED
202,510 201.262 201.214
201.310 201.166
201,310 201.000 201.118

C.I. 2683

C.I.2463
201.070

200.500 TRAMO TB -204

200.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -716 DESDE C.I. : 2575 523921.280 8782543.750 202.430 201.200 LONGITUD TRAMO : 58.43 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -716
HASTA C.I. : 2472 523861.860 8782544.210 201.780 200.550 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 58.43 ML i (%) : -1.094 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 59.43 i (°/o) TRAMO : -1.094 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2575 0.00 0.00 202.430 -1.094 201.200 0.0043 0.100 1.334 1 0.000 0.00 202.430 -1.094 201.200 0.0043 0.10 1.334 1.334 0.000 201.096 159.70 201.355 0.60 0.15 0.000 0.925 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.039 -1.094 201.091 0.0043 0.100 1.053 2 10.000 10.00 202.039 -1.094 201.091 0.0043 0.10 1.053 1.053 0.000 200.986 159.70 201.246 0.60 0.15 0.200 0.643 7.161 0.000 0.600 1.658 4.703
10.00
10.00
20.00
30.00
opcional 201.864
201.757
-1.094
-1.094
200.981
200.872
0.0043
0.0043
0.100
0.100
0.987
0.989
3
4
10.000
10.000
20.00
30.00
201.864
201.757
-1.094
-1.094
200.981
200.872
0.0043
0.0043
0.10
0.10
0.987
0.989
0.987
0.989
0.000
0.000
200.877
200.768
159.70
159.70
201.137
201.027
0.60
0.60
0.15
0.15
0.200
0.200
0.577
0.580
6.119
5.930
0.000
0.000
0.600
0.600
1.658
1.658
3.661
3.471
10.00 40.00 201.787 -1.094 200.762 0.0043 0.100 1.129 5 10.000 40.00 201.787 -1.094 200.762 0.0043 0.10 1.129 1.129 0.000 200.658 159.70 200.918 0.60 0.15 0.200 0.719 6.355 0.000 0.600 1.658 3.897
10.00 50.00 201.780 -1.094 200.653 0.0043 0.100 1.231 6 10.000 50.00 201.780 -1.094 200.653 0.0043 0.10 1.231 1.231 0.000 200.549 159.70 200.808 0.60 0.15 0.200 0.822 7.080 0.000 0.600 1.658 4.622
2472 8.430 58.43 201.780 -1.094 200.550 0.0043 0.100 1.334 7 8.430 58.43 201.780 -1.094 200.550 0.0043 0.10 1.334 1.334 0.000 200.446 159.70 200.705 0.60 0.15 0.169 0.925 6.488 0.000 0.506 1.398 4.416

ESQUEMA PLANIMETRICO TRAMOS 58.43 1.151 1.170 39.133 0.000 3.506 9.687 24.769
13.193

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 58.43
201,775 203.000
12.33 12.55 200,550 202.430
202.500
6.00 202.039
2575
TAS-PVC-DN150--1,094%-58.43 TB-716 2472 202.000 201.864
201.757 201.787 201.780 201.780

201.500 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
201.000
202,259 201.200 201.091
200.981
200.872
201,200

C.I. 2472
200.762

C.I. 2575
200.500 200.653
200.550

200.000 TRAMO TB -716

199.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -246 DESDE C.I. : 2241 523967.230 8782543.970 203.100 201.420 LONGITUD TRAMO : 44.95 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -246
HASTA C.I. : 2575 523921.280 8782543.750 202.430 201.200 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 44.95 ML i (%) : -0.479 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 45.95 i (°/o) TRAMO : -0.479 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2241 0.00 0.00 203.100 -0.479 201.420 0.0043 0.100 1.784 1 0.000 0.00 203.100 -0.479 201.420 0.0043 0.10 1.784 1.784 0.000 201.316 159.70 201.575 0.60 0.15 0.000 1.375 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.917 -0.479 201.372 0.0043 0.100 1.649 2 10.000 10.00 202.917 -0.479 201.372 0.0043 0.10 1.649 1.649 0.000 201.268 159.70 201.528 0.60 0.15 0.200 1.239 10.300 0.000 0.600 1.658 7.842
10.00
10.00
20.00
30.00
opcional 202.922
202.843
-0.479
-0.479
201.324
201.276
0.0043
0.0043
0.100
0.100
1.702
1.671
3
4
10.000
10.000
20.00
30.00
202.922
202.843
-0.479
-0.479
201.324
201.276
0.0043
0.0043
0.10
0.10
1.702
1.671
1.702
1.671
0.000
0.000
201.220
201.172
159.70
159.70
201.480
201.432
0.60
0.60
0.15
0.15
0.200
0.200
1.292
1.261
10.054
10.119
0.000
0.000
0.600
0.600
1.658
1.658
7.595
7.661
10.00 40.00 202.668 -0.479 201.228 0.0043 0.100 1.544 5 10.000 40.00 202.668 -0.479 201.228 0.0043 0.10 1.544 1.544 0.000 201.124 159.70 201.384 0.60 0.15 0.200 1.134 9.644 0.000 0.600 1.658 7.186
2575 4.950 44.95 202.430 -0.479 201.200 0.0043 0.100 1.334 6 4.950 44.95 202.430 -0.479 201.200 0.0043 0.10 1.334 1.334 0.000 201.096 159.70 201.355 0.60 0.15 0.099 0.925 4.274 0.000 0.297 0.821 3.057

ESQUEMA PLANIMETRICO TRAMOS 44.95 1.614 0.900 44.391 0.000 2.697 7.452 33.342
10.149

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 44.95
202,430 203.500
12.33 12.55 201,200 203.100
202.917 202.922
203.000 202.843
202.668
6.00
2241
TAS-PVC-DN150--0,479%-44,95 TB-246 2575 202.500
202.430

202.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
201.500
203,100
201.372
201,420 201.324

C.I. 2575
201.420 201.276

C.I. 2241
201.228 201.200
201.000

200.500 TRAMO TB -246

200.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -608 DESDE C.I. : 2517 524054.880 8782543.520 203.030 201.830 LONGITUD TRAMO : 86.65 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -608
HASTA C.I. : 2241 523967.230 8782543.970 203.100 201.420 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 86.65 ML i (%) : -0.468 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 87.65 i (°/o) TRAMO : -0.468 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2517 0.00 0.00 203.030 -0.468 201.830 0.0043 0.100 1.304 1 0.000 0.00 203.030 -0.468 201.830 0.0043 0.10 1.304 1.304 0.000 201.726 159.70 201.985 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.917 -0.468 201.783 0.0043 0.100 1.238 2 10.000 10.00 202.917 -0.468 201.783 0.0043 0.10 1.238 1.238 0.000 201.679 159.70 201.939 0.60 0.15 0.200 0.828 7.627 0.000 0.600 1.658 5.169
10.00
10.00
20.00
30.00
opcional 202.880
202.940
-0.468
-0.468
201.736
201.690
0.0043
0.0043
0.100
0.100
1.248
1.355
3
4
10.000
10.000
20.00
30.00
202.880
202.940
-0.468
-0.468
201.736
201.690
0.0043
0.0043
0.10
0.10
1.248
1.355
1.248
1.355
0.000
0.000
201.632
201.585
159.70
159.70
201.892
201.845
0.60
0.60
0.15
0.15
0.200
0.200
0.838
0.945
7.458
7.807
0.000
0.000
0.600
0.600
1.658
1.658
5.000
5.349
10.00 40.00 203.009 -0.468 201.643 0.0043 0.100 1.470 5 10.000 40.00 203.009 -0.468 201.643 0.0043 0.10 1.470 1.470 0.000 201.539 159.70 201.798 0.60 0.15 0.200 1.061 8.475 0.000 0.600 1.658 6.017
10.00 50.00 202.987 -0.468 201.596 0.0043 0.100 1.495 6 10.000 50.00 202.987 -0.468 201.596 0.0043 0.10 1.495 1.495 0.000 201.492 159.70 201.752 0.60 0.15 0.200 1.085 8.897 0.000 0.600 1.658 6.439
10.00 60.00 203.003 -0.468 201.549 0.0043 0.100 1.558 7 10.000 60.00 203.003 -0.468 201.549 0.0043 0.10 1.558 1.558 0.000 201.445 159.70 201.705 0.60 0.15 0.200 1.148 9.159 0.000 0.600 1.658 6.701
10.00 70.00 203.008 -0.468 201.503 0.0043 0.100 1.610 8 10.000 70.00 203.008 -0.468 201.503 0.0043 0.10 1.610 1.610 0.000 201.398 159.70 201.658 0.60 0.15 0.200 1.200 9.503 0.000 0.600 1.658 7.045
10.00 80.00 203.019 -0.468 201.456 0.0043 0.100 1.668 9 10.000 80.00 203.019 -0.468 201.456 0.0043 0.10 1.668 1.668 0.000 201.351 159.70 201.611 0.60 0.15 0.200 1.258 9.832 0.000 0.600 1.658 7.374
2241 6.650 86.65 203.100 -0.468 201.420 0.0043 0.100 1.784 10 6.650 86.65 203.100 -0.468 201.420 0.0043 0.10 1.784 1.784 0.000 201.316 159.70 201.575 0.60 0.15 0.133 1.375 6.886 0.000 0.399 1.102 5.252

ESQUEMA PLANIMETRICO TRAMOS 86.65 1.473 1.736 75.645 0.000 5.199 14.366 54.344
19.565

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 86.65
203,100 203.500
12.33 12.55 201,420 203.030 203.100
203.009 202.987 203.003 203.008 203.019
202.917 202.880 202.940
203.000
6.00
2517
TAS-PVC-DN150--0,468%-86.65 TB-608 2241 202.500
PERFILCOTA TERRENO TRAMO
202.000 PERFIL COTA SOLERA TUBO RED
203,030 201.830 201.783 201.736 201.690
201,830 201.500 201.643

C.I. 2241
201.596

C.I. 2517
201.549 201.503 201.456
201.420
201.000 TRAMO TB -608

200.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -1411 DESDE C.I. : 2291 523781.220 8782466.390 201.860 200.660 LONGITUD TRAMO : 79.88 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -1411
HASTA C.I. : 2290 523862.100 8782466.870 201.860 200.290 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 79.88 ML i (%) : -0.457 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 80.88 i (°/o) TRAMO : -0.457 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2291 0.00 0.00 201.860 -0.457 200.660 0.0043 0.100 1.304 1 0.000 0.00 201.860 -0.457 200.660 0.0043 0.10 1.304 1.304 0.000 200.556 159.70 200.815 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00 10.00 201.896 -0.457 200.614 0.0043 0.100 1.386 2 10.000 10.00 201.896 -0.457 200.614 0.0043 0.10 1.386 1.386 0.000 200.510 159.70 200.770 0.60 0.15 0.200 0.976 8.071 0.000 0.600 1.658 5.613
10.00
10.00
20.00
30.00
opcional 201.863
201.904
-0.457
-0.457
200.569
200.523
0.0043
0.0043
0.100
0.100
1.399
1.486
3
4
10.000
10.000
20.00
30.00
201.863
201.904
-0.457
-0.457
200.569
200.523
0.0043
0.0043
0.10
0.10
1.399
1.486
1.399
1.486
0.000
0.000
200.464
200.418
159.70
159.70
200.724
200.678
0.60
0.60
0.15
0.15
0.200
0.200
0.989
1.076
8.355
8.653
0.000
0.000
0.600
0.600
1.658
1.658
5.896
6.195
10.00 40.00 201.898 -0.457 200.477 0.0043 0.100 1.525 5 10.000 40.00 201.898 -0.457 200.477 0.0043 0.10 1.525 1.525 0.000 200.373 159.70 200.632 0.60 0.15 0.200 1.116 9.032 0.000 0.600 1.658 6.574
10.00 50.00 201.927 -0.457 200.431 0.0043 0.100 1.600 6 10.000 50.00 201.927 -0.457 200.431 0.0043 0.10 1.600 1.600 0.000 200.327 159.70 200.587 0.60 0.15 0.200 1.190 9.376 0.000 0.600 1.658 6.918
10.00 60.00 201.959 -0.457 200.386 0.0043 0.100 1.678 7 10.000 60.00 201.959 -0.457 200.386 0.0043 0.10 1.678 1.678 0.000 200.281 159.70 200.541 0.60 0.15 0.200 1.268 9.833 0.000 0.600 1.658 7.375
10.00 70.00 201.976 -0.457 200.340 0.0043 0.100 1.741 8 10.000 70.00 201.976 -0.457 200.340 0.0043 0.10 1.741 1.741 0.000 200.235 159.70 200.495 0.60 0.15 0.200 1.331 10.255 0.000 0.600 1.658 7.797
2290 9.880 79.88 201.860 -0.457 200.290 0.0043 0.100 1.674 9 9.880 79.88 201.860 -0.457 200.290 0.0043 0.10 1.674 1.674 0.000 200.186 159.70 200.445 0.60 0.15 0.198 1.265 10.122 0.000 0.593 1.638 7.693

ESQUEMA PLANIMETRICO TRAMOS 79.88 1.533 1.600 73.697 0.000 4.793 13.243 54.061
18.036

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 79.88
201,860 202.500
12.33 12.55 200,290
201.860 201.904 201.898 201.927 201.959 201.976
202.000 201.896 201.863 201.860

6.00
2291
TAS-PVC-DN150--0,457%-79,88 TB-1411 2290 201.500

201.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
200.500 200.614
201,860 200.660 200.569 200.523 200.477 200.431 200.386
200,660 200.340

C.I. 2290
C.I. 2291
200.000 200.290

199.500 TRAMO TB -1411

199.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -148 DESDE C.I. : 2492 523756.860 8782466.860 201.330 199.390 LONGITUD TRAMO : 55.97 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -148
HASTA C.I. : 2671 523757.450 8782409.890 202.750 199.210 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 55.97 ML i (%) : -0.316 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : SAN PEDRO DIST. ESTIMADA 56.97 i (°/o) TRAMO : -0.316 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2492 0.00 0.00 201.330 -0.316 199.390 0.0043 0.100 2.044 1 0.000 0.00 201.326 -0.316 199.390 0.0043 0.10 2.040 2.000 0.040 199.286 159.70 199.545 0.70 0.15 0.000 1.631 0.000 0.000 0.000 0.000 0.000
10.00 10.00 201.212 -0.316 199.358 0.0043 0.100 1.958 2 10.000 10.00 201.212 -0.316 199.358 0.0043 0.10 1.958 1.958 0.000 199.254 159.70 199.514 0.70 0.15 0.200 1.548 13.852 0.141 0.700 1.968 11.126
10.00 20.00 201.917 -0.316 199.327 0.0043 0.100 2.694 3 10.000 20.00 201.917 -0.316 199.327 0.0043 0.10 2.694 2.000 0.694 199.223 159.70 199.482 0.70 0.15 0.200 2.285 13.852 2.430 0.700 1.968 13.415
10.00
10.00
30.00
40.00 opcional 202.156
202.491
-0.316
-0.316
199.295
199.264
0.0043
0.0043
0.100
0.100
2.965
3.332
4
5
10.000
10.000
30.00
40.00
202.156
202.491
-0.316
-0.316
199.295
199.264
0.0043
0.0043
0.10
0.10
2.965
3.331
2.000
2.000
0.965
1.331
199.191
199.160
159.70
159.70
199.451
199.419
0.70
0.70
0.15
0.15
0.200
0.200
2.555
2.922
14.000
14.000
5.807
8.037
0.700
0.700
1.968
1.968
16.939
19.169
10.00 50.00 202.526 -0.316 199.232 0.0043 0.100 3.398 6 10.000 50.00 202.526 -0.316 199.232 0.0043 0.10 3.398 2.000 1.398 199.128 159.70 199.388 0.70 0.15 0.200 2.988 14.000 9.552 0.700 1.968 20.685
2671 5.970 55.97 202.750 -0.316 199.210 0.0043 0.100 3.644 7 5.970 55.97 202.751 -0.316 199.210 0.0043 0.10 3.645 2.000 1.645 199.106 159.70 199.365 0.70 0.15 0.120 3.236 8.358 6.359 0.418 1.175 13.005

ESQUEMA PLANIMETRICO TRAMOS 55.97 2.862 1.121 78.063 32.326 3.918 11.013 94.337
14.931

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 55.97
202,750 204.000
12.33 12.55 199,210
203.000 202.751
202.491 202.526
6.00 202.156

2492
TAS-PVC-DN150--0,316%-55.97 TB-148 2671 202.000
201.326
201.212
201.917

201.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
200.000
201,330
199,390

C.I. 2492

C.I. 2671
199.000 199.358 199.327 199.295 199.264 199.232 199.210
199.390

198.000 TRAMO TB -148

197.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________