ZHEJIANG PROVINCIAL NO.

1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

PLANILLA RESUMEN DE VOLUMENES DE EXCAVACION Y RELLENO - RED DE TUBERIAS ALCANTARILLADO SANITARIO

DESDE 1/1/2020 HASTA 8/31/2020

TRAMO CAMARA CAMARA INSPECCION TUBERIA TUBERIA TUBERIA TUBERIA TUBERIA TUBERIA VOLUMEN ZANJA VOLUMENES EXCAVACION VOLUMENES EXCAVACION CON AGOTAMIENTO
N° TRAMO NUEVO NUEVO DESDE COORD. COORD. COTA COTA HASTA REPLANTEO 6" 8" 10" 12" 14" 16" DEL TUBO CON EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 EXCAV. 6-8 EXCAV. 8-10 EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 EXCAV. 6-8 EXCAV. 8-10
PLANILLA NOMBRE NOMBRE TERRENO SOLERA ml ml ml ml ml ml m3 AGOTAMIENTO m3 m3 m3 m3 m3 m3 m3 m3 m3 m3
1 TB -1303 OK OK 2185 523560.740 8782727.620 203.200 202.000 2186 79.28 78.28 0.00 0.00 0.00 0.00 0.00 1.57 NO 72.35 0.28 0.00 0.00 0.00 0.00 0.00 0.00
2 TB -271 OK OK 2186 523605.240 8782662.010 203.080 201.630 2429 73.43 72.43 0.00 0.00 0.00 0.00 0.00 1.45 NO 80.72 2.01 0.00 0.00 0.00 0.00 0.00 0.00
3 TB -273 OK OK 2576 523477.270 8782717.750 202.780 201.580 2705 57.40 56.40 0.00 0.00 0.00 0.00 0.00 1.13 NO 56.35 0.10 0.00 0.00 0.00 0.00 0.00 0.00
4 TB -272 OK OK 2705 523509.780 8782670.440 203.260 201.310 2429 62.61 61.61 0.00 0.00 0.00 0.00 0.00 1.23 NO 86.25 10.04 0.00 0.00 0.00 0.00 0.00 0.00
5 TB -586 OK OK 2429 523545.640 8782619.120 203.320 201.020 2502 81.37 80.37 0.00 0.00 0.00 0.00 0.00 1.61 NO 112.52 31.42 0.00 0.00 0.00 0.00 0.00 0.00
6 TB -585 OK OK 2502 523592.210 8782552.400 203.130 200.640 2399 80.65 79.65 0.00 0.00 0.00 0.00 0.00 1.60 NO 111.51 54.17 0.00 0.00 0.00 0.00 0.00 0.00
7 TB -238 OK OK 2672 523627.280 8782631.200 203.130 201.930 2690 52.36 51.36 0.00 0.00 0.00 0.00 0.00 1.03 NO 39.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 TB -239 OK OK 2690 523657.350 8782588.340 202.910 201.680 1797 71.94 70.94 0.00 0.00 0.00 0.00 0.00 1.42 NO 48.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 TB -237 OK OK 1797 523698.970 8782529.680 201.490 200.290 2399 74.35 73.35 0.00 0.00 0.00 0.00 0.00 1.47 NO 75.98 10.79 0.00 0.00 0.00 0.00 0.00 0.00
10 TB -607 OK OK 2399 523638.530 8782486.380 202.950 199.940 2516 79.65 78.65 0.00 0.00 0.00 0.00 0.00 1.58 NO 110.11 27.02 0.00 0.00 0.00 0.00 0.00 0.00
11 TB -572 OK OK 2420 523756.930 8782537.040 200.920 199.720 2492 70.18 69.18 0.00 0.00 0.00 0.00 0.00 1.39 NO 74.71 0.12 0.00 0.00 0.00 0.00 0.00 0.00
12 TB -533 OK OK 2471 523778.090 8782695.090 201.180 199.980 2464 84.50 83.50 0.00 0.00 0.00 0.00 0.00 1.67 NO 114.24 34.10 0.00 0.00 0.00 0.00 0.00 0.00
13 TB -142 OK OK 2604 523966.900 8782695.440 202.060 200.860 2667 54.27 53.27 0.00 0.00 0.00 0.00 0.00 1.07 NO 44.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14 TB -143 OK OK 2667 523912.630 8782695.280 202.220 200.610 2464 50.05 49.05 0.00 0.00 0.00 0.00 0.00 0.98 NO 67.37 7.27 0.00 0.00 0.00 0.00 0.00 0.00
15 TB -521 OK OK 2464 523862.590 8782694.920 202.030 199.700 2439 75.17 74.17 0.00 0.00 0.00 0.00 0.00 1.49 NO 103.84 54.43 0.00 0.00 0.00 0.00 0.00 0.00
16 TB -477 OK OK 2440 523782.950 8782620.830 201.770 200.570 2439 79.83 78.83 0.00 0.00 0.00 0.00 0.00 1.58 NO 107.47 48.43 0.00 0.00 0.00 0.00 0.00 0.00
17 TB -48 OK OK 2616 523951.520 8782620.120 203.020 201.820 2439 88.79 87.79 0.00 0.00 0.00 0.00 0.00 1.76 NO 115.28 21.90 0.00 0.00 0.00 0.00 0.00 0.00
18 TB -536 OK OK 2439 523862.760 8782619.750 202.770 199.440 2472 75.55 74.55 0.00 0.00 0.00 0.00 0.00 1.49 NO 104.37 54.02 0.00 0.00 0.00 0.00 0.00 0.00
19 TB -258 OK OK 2698 524854.100 8782694.920 201.510 200.310 2450 51.99 50.99 0.00 0.00 0.00 0.00 0.00 1.02 NO 55.35 1.46 0.00 0.00 0.00 0.00 0.00 0.00
20 TB -497 OK OK 2450 524906.070 8782693.690 201.890 200.070 2434 79.42 78.42 0.00 0.00 0.00 0.00 0.00 1.57 NO 109.52 39.11 0.00 0.00 0.00 0.00 0.00 0.00
21 TB -79 OK OK 2628 523782.480 8782544.080 201.460 200.260 2472 79.39 78.39 0.00 0.00 0.00 0.00 0.00 1.57 NO 86.87 6.06 0.00 0.00 0.00 0.00 0.00 0.00
22 TB -734 OK OK 2584 524977.640 8782716.400 201.630 200.430 2213 81.78 80.78 0.00 0.00 0.00 0.00 0.00 1.62 NO 83.15 5.52 0.00 0.00 0.00 0.00 0.00 0.00
23 TB -1333 OK OK 2213 524957.640 8782637.110 202.600 200.070 1976 59.81 58.81 0.00 0.00 0.00 0.00 0.00 1.18 NO 82.33 34.20 0.00 0.00 0.00 0.00 0.00 0.00
24 TB -385 OK OK 2366 524775.010 8782469.860 202.220 201.020 1643 74.62 73.62 0.00 0.00 0.00 0.00 0.00 1.47 NO 74.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00

23.995 1718.39 1694.39 0.00 0.00 0.00 0.00 0.00 33.94 2017.46 442.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CAO 13 1725.17 1725.16 0.00 0.00 0.00 0.00 0.00 34.56 2043.11 456.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00

24.02315 1718.35 1694.33 0.00 0 0 0 0 33.93898 2017.326 443.4915 0 0 0 0 0 0 0

Por el CONTRATISTA _______________________ Revisado por el SUPERVISOR____________________


O

MAT. : PVC SDR41 D3034 AG Y PEAD CON J.E.

VOLUMENES ANCHO ALTURA ENTIBADO ENTIBADO ENTIBADO ENTIBADO DIFERENCIA ALTURA PLANILLA OBSERVACION
CCLASIFICACION
RITERIO CAIDA DE ACUERDO A LA ALTURA
ASIENTO RELL. CER. RELL. COM. ENTIBADO DE PROMEDIO 0.00<H<2.00 2.01<H<4.00 4.01<H<6.00 H>6.00 BARRIO MATERIAL CAO13 COTAS TOTAL COBRADA ALTURA 0,00 1,51
m3 m3 m3 ZANJA m2 m2 m2 m2 0,20+0,05 (LOSA Y POBRE) 1,50 2,00
4.70 12.98 53.39 NO 0.60 1.53 0.000 0.000 0.000 0.000 SAN PEDRO TIERRA 72.63 76.65 4.02 1.20 1.45 14 ARRANQUE SIN 1.45 1.45 0.00
4.35 12.01 64.92 NO 0.60 1.95 0.000 0.000 0.000 0.000 SAN PEDRO TIERRA 82.73 84.04 1.31 1.45 1.70 14 DOBLE SIN 1.70 0.00 1.70
3.38 9.35 42.59 NO 0.60 1.69 0.000 0.000 0.000 0.000 SAN PEDRO TIERRA 56.46 60.69 4.23 1.20 1.45 14 ARRANQUE SIN 1.45 1.45 0.00
4.31 12.12 78.62 NO 0.70 2.25 0.000 0.000 0.000 0.000 SAN PEDRO TIERRA 96.29 97.96 1.67 1.95 2.20 14 DOBLE SIN 2.20 0.00 0.00
5.63 15.81 120.89 NO 0.70 2.56 0.000 0.000 0.000 0.000 SAN PEDRO TIERRA 143.93 155.88 11.94 2.30 2.55 14 TRIPLE SIN 2.55 0.00 0.00
5.58 15.67 142.84 NO 0.70 2.96 0.000 0.000 0.000 0.000 SAN PEDRO TIERRA 165.68 156.35 -9.33 2.49 2.74 14 DOBLE SIN 2.74 0.00 0.00
3.08 8.51 27.36 NO 0.60 1.30 0.000 0.000 0.000 0.000 SAN PEDRO TIERRA 39.99 40.75 0.76 1.20 1.45 14 ARRANQUE SIN 1.45 1.45 0.00
4.26 11.76 31.18 NO 0.60 1.17 0.000 0.000 0.000 0.000 SAN PEDRO TIERRA 48.62 45.84 -2.78 1.23 1.48 14 DOBLE SIN 1.48 1.48 0.00
4.40 12.16 68.74 NO 0.60 2.07 0.000 0.000 0.000 0.000 SAN PEDRO TIERRA 86.77 82.12 -4.66 1.20 1.45 14 DOBLE SIN 1.45 1.45 0.00
5.51 15.48 114.58 NO 0.70 2.52 0.000 0.000 0.000 0.000 SAN PEDRO TIERRA 137.13 140.82 3.69 3.01 3.26 14 TRIPLE SIN 3.26 0.00 0.00
4.15 11.47 57.82 NO 0.60 1.79 0.000 0.000 0.000 0.000 SAN PEDRO TIERRA 74.83 75.94 1.11 1.20 1.45 14 ARRANQUE SIN 1.45 1.45 0.00
5.85 16.43 124.40 NO 0.70 2.47 0.000 0.000 0.000 0.000 AMISTAD TIERRA 148.35 150.21 1.86 1.20 1.45 16 ARRANQUE SIN 1.45 1.45 0.00
3.20 8.83 31.11 NO 0.60 1.43 0.000 0.000 0.000 0.000 AMISTAD TIERRA 44.21 45.21 1.00 1.20 1.45 16 ARRANQUE SIN 1.45 1.45 0.00
3.43 9.65 60.57 NO 0.70 2.16 0.000 0.000 0.000 0.000 AMISTAD TIERRA 74.64 76.63 1.99 1.61 1.86 16 DOBLE SIN 1.86 0.00 1.86
5.19 14.59 136.99 NO 0.70 3.06 0.000 0.000 0.000 0.000 AMISTAD TIERRA 158.26 160.27 2.00 2.33 2.58 16 TRIPLE SIN 2.58 0.00 0.00
5.52 15.51 133.29 NO 0.70 2.78 0.000 0.000 0.000 0.000 AMISTAD TIERRA 155.90 163.72 7.82 1.20 1.45 16 ARRANQUE SIN 1.45 1.45 0.00
6.15 17.27 112.00 NO 0.70 2.27 0.000 0.000 0.000 0.000 AMISTAD TIERRA 137.18 140.26 3.08 1.20 1.45 16 ARRANQUE SIN 1.45 1.45 0.00
5.22 14.67 137.01 NO 0.70 3.02 0.000 0.000 0.000 0.000 AMISTAD TIERRA 158.39 161.26 2.87 3.33 3.58 16 TRIPLE SIN 3.58 0.00 0.00
3.06 8.45 44.28 NO 0.60 1.84 0.000 0.000 0.000 0.000 AMISTAD TIERRA 56.81 57.97 1.16 1.20 1.45 14 ARRANQUE SIN 1.45 1.45 0.00
5.49 15.43 126.14 NO 0.70 2.67 0.000 0.000 0.000 0.000 AMISTAD TIERRA 148.63 150.79 2.16 1.82 2.07 14 DOBLE SIN 2.07 0.00 0.00
4.70 13.00 73.66 NO 0.60 1.99 0.000 0.000 0.000 0.000 AMISTAD TIERRA 92.93 94.42 1.49 1.20 1.45 16 ARRANQUE SIN 1.45 1.45 0.00
4.85 13.39 68.82 NO 0.60 1.92 0.000 0.000 0.000 0.000 1° DE MAYO TIERRA 88.68 87.07 -1.61 1.20 1.45 14 ARRANQUE SIN 1.45 1.45 0.00
4.12 11.57 99.67 NO 0.70 2.85 0.000 0.000 0.000 0.000 1° DE MAYO TIERRA 116.54 119.91 3.38 2.53 2.78 14 DOBLE SIN 2.78 0.00 0.00
4.42 12.21 56.24 NO 0.60 1.66 0.000 0.000 0.000 0.000 1° DE MAYO TIERRA 74.34 75.28 0.95 1.20 1.45 14 ARRANQUE SIN 1.45 1.45 0.00
40.13
110.52 308.33 2007.13 2459.92 2459.92 0.00 0.00 0.00 0.00 0.00 24.00 14.00 2.00

112.50 313.85 2039.14 2500.05 2500.05 0.00 0.00 0.00 0.00 0.00 cao14 16.00 9.00 1.00
cao16 8.00 5.00 1.00
110.51 308.32164 2008.0436 2460.8178 2460.8178 0 0.00 0.00 0.00 0.00
2,5*2,5 6.25
1,8*1,8 3.24

CLASIFICACION DE ACUERDO A LA ALTURA PROF. PROF. PROF. PROF. PROF. VOLUMENES AREA 6.25 VOLUMENES MATERIAL RELLENO ENTIBADO LADO 2.5
2,01 2,51 3,01 3,51 4,01 4,51 5,01 5,51 6,01 8.01 ALTURA 0,00 1,51 2,01 2,51 3,01 3,51 4,01 4,51 5,01 5,51 6,01 8.01 EXCAV. EXCAV. EXCAV. EXCAV. EXCAV.
AGOTAMIENTOEXCAV. EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. EXCEDENTE COMPACTADO 0,00<H<2.00 2.01<H<4.00
2.50 3,00 3,50 4,00 4,50 5,00 5,50 6,00 8,00 10.00 1,50 2,00 2.50 3,00 3,50 4,00 4,50 5,00 5,50 6,00 8,00 10.00 0-2m 2-4m 4-6m 6-8m 8-10m 0-2m 2-4m 4-6m 6-8m 8-10m 0-2m 2-4m 4-6m 6-8m 8-10m M3 M3
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.70 1.70 0.00 0.00 0.00 0.00 NO 10.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.57 8.06 NO 0.000 0.000
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000
2.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.20 2.00 0.20 0.00 0.00 0.00 NO 12.50 1.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.38 10.37 NO 0.000 0.000
0.00 2.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.55 2.00 0.55 0.00 0.00 0.00 NO 12.50 3.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.95 11.99 NO 0.000 0.000
0.00 2.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.74 2.00 0.74 0.00 0.00 0.00 NO 12.50 4.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.26 12.87 NO 0.000 0.000
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.48 1.48 0.00 0.00 0.00 0.00 NO 9.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.21 7.04 NO 0.000 0.000
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000
0.00 0.00 3.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.26 2.00 1.26 0.00 0.00 0.00 NO 12.50 7.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.11 15.27 NO 0.000 0.000
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.86 1.86 0.00 0.00 0.00 0.00 NO 11.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.83 8.80 NO 0.000 0.000
0.00 2.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.58 2.00 0.58 0.00 0.00 0.00 NO 12.50 3.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 12.13 NO 0.000 0.000
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000
0.00 0.00 0.00 3.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.58 2.00 1.58 0.00 0.00 0.00 NO 12.50 9.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.63 16.75 NO 0.000 0.000
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000
2.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.07 2.00 0.07 0.00 0.00 0.00 NO 12.50 0.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.17 9.77 NO 0.000 0.000
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000
0.00 2.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.78 2.00 0.78 0.00 0.00 0.00 NO 12.50 4.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.32 13.05 NO 0.000 0.000
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 1.45 0.00 0.00 0.00 0.00 NO 9.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.16 6.90 NO 0.000 0.000

2.00 4.00 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 249.31 36.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 69.48 215.84 0.00 0.00

2.00 3.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 167.38 22.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 46.23 143.64 0.00 0.00
0.00 1.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 81.94 13.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.25 72.19 0.00 0.00
2.01<H<6.00 H>6.01

0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000

0.00 0.00

0.00 0.00
0.00 0.00
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -385 DESDE C.I. : 2366 524775.010 8782469.860 202.220 201.020 LONGITUD TRAMO : 73.62 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -385
HASTA C.I. : 1643 524849.630 8782469.280 202.260 200.670 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 73.62 ML i (%) : -0.469 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 1° DE MAYO DIST. ESTIMADA 74.62 i (°/o) TRAMO : -0.469 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2366 0.00 0.00 202.220 -0.469 201.020 0.0043 0.100 1.304 1 0.000 0.00 202.220 -0.469 201.020 0.0043 0.10 1.304 1.304 0.000 200.916 159.70 201.175 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 202.307
202.551
-0.469
-0.469
200.973
200.926
0.0043
0.0043
0.100
0.100
1.438
1.729
2
3
10.000
10.000
10.00
20.00
202.307
202.551
-0.469
-0.469
200.973
200.926
0.0043
0.0043
0.10
0.10
1.438
1.729
1.438
1.729
0.000
0.000
200.869
200.822
159.70
159.70
201.128
201.082
0.60
0.60
0.15
0.15
0.200
0.200
1.029
1.319
8.228
9.502
0.000
0.000
0.600
0.600
1.658
1.658
5.769
7.044
10.00 30.00 202.665 -0.469 200.879 0.0043 0.100 1.890 4 10.000 30.00 202.665 -0.469 200.879 0.0043 0.10 1.890 1.890 0.000 200.775 159.70 201.035 0.60 0.15 0.200 1.480 10.857 0.000 0.600 1.658 8.399
10.00 40.00 202.525 -0.469 200.832 0.0043 0.100 1.797 5 10.000 40.00 202.525 -0.469 200.832 0.0043 0.10 1.797 1.797 0.000 200.728 159.70 200.988 0.60 0.15 0.200 1.387 11.061 0.000 0.600 1.658 8.603
10.00 50.00 202.507 -0.469 200.785 0.0043 0.100 1.826 6 10.000 50.00 202.507 -0.469 200.785 0.0043 0.10 1.826 1.826 0.000 200.681 159.70 200.941 0.60 0.15 0.200 1.416 10.868 0.000 0.600 1.658 8.410
10.00 60.00 202.367 -0.469 200.739 0.0043 0.100 1.733 7 10.000 60.00 202.367 -0.469 200.739 0.0043 0.10 1.733 1.733 0.000 200.634 159.70 200.894 0.60 0.15 0.200 1.323 10.676 0.000 0.600 1.658 8.217
10.00 70.00 202.082 -0.469 200.692 0.0043 0.100 1.495 8 10.000 70.00 202.082 -0.469 200.692 0.0043 0.10 1.495 1.495 0.000 200.587 159.70 200.847 0.60 0.15 0.200 1.085 9.682 0.000 0.600 1.658 7.224
1643 3.620 73.62 202.260 -0.469 200.670 0.0043 0.100 1.694 9 3.620 73.62 202.260 -0.469 200.670 0.0043 0.10 1.694 1.694 0.000 200.566 159.70 200.825 0.60 0.15 0.073 1.285 3.463 0.000 0.217 0.600 2.573

ESQUEMA PLANIMETRICO TRAMOS 73.62 1.656 1.475 74.336 0.000 4.417 12.205 56.239
16.623

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 73.62
202,260 203.000
12.33 12.55 200,670 202.551
202.665
202.525 202.507
202.500 202.307 202.367
202.220 202.260
6.00 202.082

2366
TAS-PVC-DN150--0,469%-73.62 TB-385 1643 202.000

201.500 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
201.000
202,220 200.973 200.926
201.020 200.879
201,020 200.832 200.785

C.I. 2366
200.739

C.I.1643
200.500 200.692
200.670

200.000 TRAMO TB -
385
199.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -1333 DESDE C.I. : 2213 524957.640 8782637.110 202.600 200.070 LONGITUD TRAMO : 58.81 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -1333
HASTA C.I. : 1976 525015.670 8782622.660 202.230 199.150 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 58.81 ML i (%) : -1.538 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 1° DE MAYO DIST. ESTIMADA 59.81 i (°/o) TRAMO : -1.538 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2213 0.00 0.00 202.600 -1.538 200.070 0.0043 0.100 2.634 1 0.000 0.00 202.600 -1.538 200.070 0.0043 0.10 2.634 2.000 0.634 199.966 159.70 200.225 0.70 0.15 0.000 2.225 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 202.478
202.372
-1.538
-1.538
199.916
199.762
0.0043
0.0043
0.100
0.100
2.666
2.714
2
3
10.000
10.000
10.00
20.00
202.478
202.372
-1.538
-1.538
199.916
199.762
0.0043
0.0043
0.10
0.10
2.666
2.714
2.000
2.000
0.666
0.714
199.812
199.658
159.70
159.70
200.072
199.918
0.70
0.70
0.15
0.15
0.200
0.200
2.256
2.304
14.000
14.000
4.551
4.830
0.700
0.700
1.968
1.968
15.684
15.962
10.00 30.00 202.319 -1.538 199.609 0.0043 0.100 2.815 4 10.000 30.00 202.319 -1.538 199.609 0.0043 0.10 2.815 2.000 0.815 199.504 159.70 199.764 0.70 0.15 0.200 2.405 14.000 5.350 0.700 1.968 16.483
10.00 40.00 202.262 -1.538 199.455 0.0043 0.100 2.912 5 10.000 40.00 202.262 -1.538 199.455 0.0043 0.10 2.912 2.000 0.912 199.350 159.70 199.610 0.70 0.15 0.200 2.502 14.000 6.042 0.700 1.968 17.174
10.00 50.00 202.197 -1.538 199.301 0.0043 0.100 3.000 6 10.000 50.00 202.197 -1.538 199.301 0.0043 0.10 3.000 2.000 1.000 199.197 159.70 199.456 0.70 0.15 0.200 2.591 14.000 6.692 0.700 1.968 17.824
1976 8.810 58.81 202.230 -1.538 199.150 0.0043 0.100 3.184 7 8.810 58.81 202.230 -1.538 199.150 0.0043 0.10 3.184 2.000 1.184 199.046 159.70 199.305 0.70 0.15 0.176 2.775 12.334 6.737 0.617 1.733 16.544

ESQUEMA PLANIMETRICO TRAMOS 58.81 2.846 1.178 82.334 34.203 4.117 11.571 99.671
15.688

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 58.81
202,230 203.000 202.600
202.478
12.33 12.55 199,150 202.372 202.319 202.262 202.197 202.230
202.000
6.00
2213
TAS-PVC-DN150--1,538%-58,81 TB-1333 1976 201.000
PERFILCOTA TERRENO TRAMO
200.000 PERFIL COTA SOLERA TUBO RED
200.070 199.916
199.762
202,600 199.609
199.455
200,070 199.000 199.301

C.I. 2213

C.I.1976
199.150

198.000 TRAMO TB -1333

197.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -734 DESDE C.I. : 2584 524977.640 8782716.400 201.630 200.430 LONGITUD TRAMO : 80.78 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -734
HASTA C.I. : 2213 524957.600 8782637.110 202.600 200.070 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 80.78 ML i (%) : -0.440 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : 1° DE MAYO DIST. ESTIMADA 81.78 i (°/o) TRAMO : -0.440 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2584 0.00 0.00 201.630 -0.440 200.430 0.0043 0.100 1.304 1 0.000 0.00 201.630 -0.440 200.430 0.0043 0.10 1.304 1.304 0.000 200.326 159.70 200.585 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00
opcional 201.647
201.684
-0.440
-0.440
200.386
200.342
0.0043
0.0043
0.100
0.100
1.365
1.446
2
3
10.000
10.000
10.00
20.00
201.647
201.684
-0.440
-0.440
200.386
200.342
0.0043
0.0043
0.10
0.10
1.365
1.446
1.365
1.446
0.000
0.000
200.282
200.238
159.70
159.70
200.541
200.497
0.60
0.60
0.15
0.15
0.200
0.200
0.956
1.037
8.009
8.435
0.000
0.000
0.600
0.600
1.658
1.658
5.551
5.977
10.00 30.00 201.760 -0.440 200.298 0.0043 0.100 1.566 4 10.000 30.00 201.760 -0.440 200.298 0.0043 0.10 1.566 1.566 0.000 200.194 159.70 200.453 0.60 0.15 0.200 1.157 9.038 0.000 0.600 1.658 6.580
10.00 40.00 201.881 -0.440 200.254 0.0043 0.100 1.731 5 10.000 40.00 201.881 -0.440 200.254 0.0043 0.10 1.731 1.731 0.000 200.150 159.70 200.409 0.60 0.15 0.200 1.322 9.893 0.000 0.600 1.658 7.435
10.00 50.00 202.047 -0.440 200.210 0.0043 0.100 1.941 6 10.000 50.00 202.047 -0.440 200.210 0.0043 0.10 1.941 1.941 0.000 200.106 159.70 200.365 0.60 0.15 0.200 1.532 11.018 0.000 0.600 1.658 8.560
10.00 60.00 202.245 -0.440 200.166 0.0043 0.100 2.183 7 10.000 60.00 202.245 -0.440 200.166 0.0043 0.10 2.183 2.000 0.183 200.062 159.70 200.321 0.60 0.15 0.200 1.774 11.824 0.550 0.600 1.658 9.916
10.00 70.00 202.394 -0.440 200.122 0.0043 0.100 2.376 8 10.000 70.00 202.394 -0.440 200.122 0.0043 0.10 2.376 2.000 0.376 200.018 159.70 200.277 0.60 0.15 0.200 1.967 12.000 1.680 0.600 1.658 11.221
10.00 80.00 202.597 -0.440 200.078 0.0043 0.100 2.623 9 10.000 80.00 202.597 -0.440 200.078 0.0043 0.10 2.623 2.000 0.623 199.974 159.70 200.233 0.60 0.15 0.200 2.214 12.000 3.000 0.600 1.658 12.541
2213 0.780 80.78 202.600 -0.440 200.070 0.0043 0.100 2.634 10 0.780 80.78 202.600 -0.440 200.070 0.0043 0.10 2.634 2.000 0.634 199.966 159.70 200.225 0.60 0.15 0.016 2.225 0.936 0.294 0.047 0.129 1.039

ESQUEMA PLANIMETRICO TRAMOS 80.78 1.917 1.618 83.154 5.524 4.847 13.392 68.820
18.239

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 80.78
202,600 203.000
202.597 202.600
12.33 12.55 200,070 202.394
202.500 202.245
202.047
202.000 201.881
6.00 201.760
2584
TAS-PVC-DN150--0,440%-80,78 TB-734 2213 201.500
201.630 201.647 201.684

201.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
200.500
201,630 200.386 200.342
200.430 200.298 200.254
200,430 200.000 200.210 200.166 200.122

C.I. 2584
200.078

C.I.2213
200.070
199.500
TRAMO TB -734
199.000

198.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -79 DESDE C.I. : 2628 523782.480 8782544.080 201.460 200.260 LONGITUD TRAMO : 78.39 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -79
HASTA C.I. : 2472 523861.860 8782544.210 201.780 199.200 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 78.39 ML i (%) : -1.335 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 79.39 i (°/o) TRAMO : -1.335 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2628 0.00 0.00 201.460 -1.335 200.260 0.0043 0.100 1.304 1 0.000 0.00 201.460 -1.335 200.260 0.0043 0.10 1.304 1.304 0.000 200.156 159.70 200.415 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00 10.00 201.536 -1.335 200.126 0.0043 0.100 1.514 2 10.000 10.00 201.536 -1.335 200.126 0.0043 0.10 1.514 1.514 0.000 200.022 159.70 200.282 0.60 0.15 0.200 1.104 8.454 0.000 0.600 1.658 5.996
10.00
10.00
20.00
30.00
opcional 201.620
201.658
-1.335
-1.335
199.993
199.859
0.0043
0.0043
0.100
0.100
1.731
1.903
3
4
10.000
10.000
20.00
30.00
201.620
201.658
-1.335
-1.335
199.993
199.859
0.0043
0.0043
0.10
0.10
1.731
1.903
1.731
1.903
0.000
0.000
199.889
199.755
159.70
159.70
200.148
200.015
0.60
0.60
0.15
0.15
0.200
0.200
1.322
1.493
9.736
10.903
0.000
0.000
0.600
0.600
1.658
1.658
7.277
8.444
10.00 40.00 201.680 -1.335 199.726 0.0043 0.100 2.058 5 10.000 40.00 201.680 -1.335 199.726 0.0043 0.10 2.058 2.000 0.058 199.622 159.70 199.881 0.60 0.15 0.200 1.649 11.709 0.175 0.600 1.658 9.426
10.00 50.00 201.583 -1.335 199.592 0.0043 0.100 2.095 6 10.000 50.00 201.583 -1.335 199.592 0.0043 0.10 2.095 2.000 0.095 199.488 159.70 199.748 0.60 0.15 0.200 1.685 12.000 0.460 0.600 1.658 10.002
10.00 60.00 201.581 -1.335 199.459 0.0043 0.100 2.226 7 10.000 60.00 201.581 -1.335 199.459 0.0043 0.10 2.226 2.000 0.226 199.355 159.70 199.614 0.60 0.15 0.200 1.817 12.000 0.964 0.600 1.658 10.506
10.00 70.00 201.594 -1.335 199.325 0.0043 0.100 2.373 8 10.000 70.00 201.594 -1.335 199.325 0.0043 0.10 2.373 2.000 0.373 199.221 159.70 199.481 0.60 0.15 0.200 1.963 12.000 1.798 0.600 1.658 11.340
2472 8.390 78.39 201.780 -1.335 199.200 0.0043 0.100 2.684 9 8.390 78.39 201.780 -1.335 199.200 0.0043 0.10 2.684 2.000 0.684 199.096 159.70 199.355 0.60 0.15 0.168 2.275 10.068 2.661 0.503 1.391 10.667

ESQUEMA PLANIMETRICO TRAMOS 78.39 1.988 1.570 86.869 6.058 4.703 12.996 73.658
17.700

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 78.39
201,780 202.000
201.658 201.680 201.780
201.620 201.583 201.581 201.594
12.33 12.55 199,200 201.460 201.536
201.500

6.00 201.000
2628
TAS-PVC-DN150--1,335%-78.39 TB-79 2472 200.500

200.000 PERFILCOTA TERRENO TRAMO


200.260 200.126
199.993 PERFIL COTA SOLERA TUBO RED
199.859
199.500 199.726
199.592
201,460 199.459
199.325
200,260 199.000 199.200

C.I. 2472
C.I. 2628
198.500
TRAMO TB -79
198.000

197.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -497 DESDE C.I. : 2450 524906.070 8782693.690 201.890 200.070 LONGITUD TRAMO : 78.42 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -497
HASTA C.I. : 2434 524886.330 8782616.760 202.320 199.710 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 78.42 ML i (%) : -0.453 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 79.42 i (°/o) TRAMO : -0.453 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2450 0.00 0.00 201.890 -0.453 200.070 0.0043 0.100 1.924 1 0.000 0.00 201.890 -0.453 200.070 0.0043 0.10 1.924 1.924 0.000 199.966 159.70 200.225 0.70 0.15 0.000 1.515 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 202.330
202.505
-0.453
-0.453
200.025
199.979
0.0043
0.0043
0.100
0.100
2.410
2.630
2
3
10.000
10.000
10.00
20.00
202.330
202.505
-0.453
-0.453
200.025
199.979
0.0043
0.0043
0.10
0.10
2.410
2.630
2.000
2.000
0.410
0.630
199.920
199.875
159.70
159.70
200.180
200.135
0.70
0.70
0.15
0.15
0.200
0.200
2.000
2.220
13.735
14.000
1.434
3.639
0.700
0.700
1.968
1.968
12.301
14.771
10.00 30.00 202.592 -0.453 199.934 0.0043 0.100 2.762 4 10.000 30.00 202.592 -0.453 199.934 0.0043 0.10 2.762 2.000 0.762 199.830 159.70 200.089 0.70 0.15 0.200 2.353 14.000 4.873 0.700 1.968 16.005
10.00 40.00 202.637 -0.453 199.889 0.0043 0.100 2.853 5 10.000 40.00 202.637 -0.453 199.889 0.0043 0.10 2.853 2.000 0.853 199.784 159.70 200.044 0.70 0.15 0.200 2.443 14.000 5.652 0.700 1.968 16.784
10.00 50.00 202.671 -0.453 199.843 0.0043 0.100 2.932 6 10.000 50.00 202.671 -0.453 199.843 0.0043 0.10 2.932 2.000 0.932 199.739 159.70 199.999 0.70 0.15 0.200 2.522 14.000 6.246 0.700 1.968 17.378
10.00 60.00 202.618 -0.453 199.798 0.0043 0.100 2.924 7 10.000 60.00 202.618 -0.453 199.798 0.0043 0.10 2.924 2.000 0.924 199.694 159.70 199.953 0.70 0.15 0.200 2.515 14.000 6.497 0.700 1.968 17.629
10.00 70.00 202.491 -0.453 199.753 0.0043 0.100 2.843 8 10.000 70.00 202.491 -0.453 199.753 0.0043 0.10 2.843 2.000 0.843 199.648 159.70 199.908 0.70 0.15 0.200 2.433 14.000 6.184 0.700 1.968 17.316
2434 8.420 78.42 202.320 -0.453 199.710 0.0043 0.100 2.714 9 8.420 78.42 202.320 -0.453 199.710 0.0043 0.10 2.714 2.000 0.714 199.606 159.70 199.865 0.70 0.15 0.169 2.305 11.788 4.588 0.589 1.657 13.961

ESQUEMA PLANIMETRICO TRAMOS 78.42 2.666 1.571 109.523 39.112 5.489 15.430 126.145
20.919

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 78.42
202,320 203.000 202.637 202.671 202.618
202.592
12.33 12.55 199,710 202.330
202.505 202.491
202.320
202.500
201.890
202.000
6.00
2450
TAS-PVC-DN150--0,453%-78.42 TB-497 2434 201.500
201.000 PERFILCOTA TERRENO TRAMO
200.500 PERFIL COTA SOLERA TUBO RED
201,890 200.000
200.025 199.979
200,070 200.070 199.934 199.889 199.843

C.I. 2450
199.500 199.798 199.753

C.I.2434
199.710
199.000
TRAMO TB -497
198.500
198.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -258 DESDE C.I. : 2698 524854.100 8782694.920 201.510 200.310 LONGITUD TRAMO : 50.99 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -258
HASTA C.I. : 2450 524906.070 8782693.690 201.890 200.070 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 50.99 ML i (%) : -0.462 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 51.99 i (°/o) TRAMO : -0.462 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2698 0.00 0.00 201.510 -0.462 200.310 0.0043 0.100 1.304 1 0.000 0.00 201.510 -0.462 200.310 0.0043 0.10 1.304 1.304 0.000 200.206 159.70 200.465 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00
10.00
10.00
20.00 opcional 201.640
202.018
-0.462
-0.462
200.264
200.218
0.0043
0.0043
0.100
0.100
1.480
1.905
2
3
10.000
10.000
10.00
20.00
201.640
202.018
-0.462
-0.462
200.264
200.218
0.0043
0.0043
0.10
0.10
1.480
1.905
1.480
1.905
0.000
0.000
200.160
200.113
159.70
159.70
200.419
200.373
0.60
0.60
0.15
0.15
0.200
0.200
1.071
1.495
8.354
10.155
0.000
0.000
0.600
0.600
1.658
1.658
5.896
7.697
10.00 30.00 202.168 -0.462 200.171 0.0043 0.100 2.101 4 10.000 30.00 202.168 -0.462 200.171 0.0043 0.10 2.101 2.000 0.101 200.067 159.70 200.327 0.60 0.15 0.200 1.691 11.714 0.302 0.600 1.658 9.558
10.00 40.00 202.163 -0.462 200.125 0.0043 0.100 2.142 5 10.000 40.00 202.163 -0.462 200.125 0.0043 0.10 2.142 2.000 0.142 200.021 159.70 200.281 0.60 0.15 0.200 1.732 12.000 0.728 0.600 1.658 10.270
10.00 50.00 201.964 -0.462 200.079 0.0043 0.100 1.989 6 10.000 50.00 201.964 -0.462 200.079 0.0043 0.10 1.989 1.989 0.000 199.975 159.70 200.235 0.60 0.15 0.200 1.579 11.967 0.426 0.600 1.658 9.935
2450 0.990 50.99 201.890 -0.462 200.070 0.0043 0.100 1.924 7 0.990 50.99 201.890 -0.462 200.070 0.0043 0.10 1.924 1.924 0.000 199.966 159.70 200.225 0.60 0.15 0.020 1.515 1.162 0.000 0.059 0.164 0.919

ESQUEMA PLANIMETRICO TRAMOS 50.99 1.835 1.021 55.353 1.457 3.059 8.454 44.275
11.513

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 50.99
201,890 202.500
12.33 12.55 200,070 202.018
202.168 202.163
201.964 201.890
202.000
201.640
6.00 201.510

2698
TAS-PVC-DN150--0,462%-50.98 TB-258 2450 201.500

201.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
200.500
201,510
200,310 200.264

C.I. 2698
200.218

C.I.2450
200.000 200.310 200.171 200.125 200.079
200.070
199.500 TRAMO TB -258

199.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -536 DESDE C.I. : 2439 523862.760 8782619.750 202.770 199.440 LONGITUD TRAMO : 74.55 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -536
HASTA C.I. : 2472 523861.860 8782544.210 201.780 199.200 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 74.55 ML i (%) : -0.318 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 75.55 i (°/o) TRAMO : -0.318 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2439 0.00 0.00 202.770 -0.318 199.440 0.0043 0.100 3.434 1 0.000 0.00 202.770 -0.318 199.440 0.0043 0.10 3.434 2.000 1.434 199.336 159.70 199.595 0.70 0.15 0.000 3.025 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.756 -0.318 199.408 0.0043 0.100 3.452 2 10.000 10.00 202.756 -0.318 199.408 0.0043 0.10 3.452 2.000 1.452 199.304 159.70 199.564 0.70 0.15 0.200 3.042 14.000 10.102 0.700 1.968 21.234
10.00
10.00
20.00
30.00
opcional 202.589
202.349
-0.318
-0.318
199.376
199.345
0.0043
0.0043
0.100
0.100
3.317
3.109
3
4
10.000
10.000
20.00
30.00
202.589
202.349
-0.318
-0.318
199.376
199.345
0.0043
0.0043
0.10
0.10
3.317
3.109
2.000
2.000
1.317
1.109
199.272
199.240
159.70
159.70
199.532
199.500
0.70
0.70
0.15
0.15
0.200
0.200
2.907
2.699
14.000
14.000
9.691
8.489
0.700
0.700
1.968
1.968
20.823
19.621
10.00 40.00 202.192 -0.318 199.313 0.0043 0.100 2.983 5 10.000 40.00 202.192 -0.318 199.313 0.0043 0.10 2.983 2.000 0.983 199.209 159.70 199.468 0.70 0.15 0.200 2.574 14.000 7.322 0.700 1.968 18.454
10.00 50.00 201.972 -0.318 199.281 0.0043 0.100 2.795 6 10.000 50.00 201.972 -0.318 199.281 0.0043 0.10 2.795 2.000 0.795 199.177 159.70 199.437 0.70 0.15 0.200 2.385 14.000 6.225 0.700 1.968 17.357
10.00 60.00 201.851 -0.318 199.249 0.0043 0.100 2.706 7 10.000 60.00 201.851 -0.318 199.249 0.0043 0.10 2.706 2.000 0.706 199.145 159.70 199.405 0.70 0.15 0.200 2.296 14.000 5.254 0.700 1.968 16.386
10.00 70.00 201.776 -0.318 199.218 0.0043 0.100 2.663 8 10.000 70.00 201.776 -0.318 199.218 0.0043 0.10 2.663 2.000 0.663 199.113 159.70 199.373 0.70 0.15 0.200 2.253 14.000 4.790 0.700 1.968 15.922
2472 4.550 74.55 201.780 -0.318 199.200 0.0043 0.100 2.684 9 4.550 74.55 201.780 -0.318 199.200 0.0043 0.10 2.684 2.000 0.684 199.096 159.70 199.355 0.70 0.15 0.091 2.275 6.370 2.145 0.319 0.895 7.210

ESQUEMA PLANIMETRICO TRAMOS 74.55 3.016 1.493 104.370 54.018 5.219 14.668 137.008
19.887

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 74.55
201,780 204.000
12.33 12.55 199,200
202.770 202.756
203.000 202.589
202.349
6.00 202.192

2439
TAS-PVC-DN150--0,318%-74,55 TB-536 2472 202.000
201.972 201.851 201.776 201.780

201.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
200.000
202,770
199,440

C.I. 2472
C.I. 2439
199.000 199.408 199.376 199.345 199.313 199.281 199.249
199.440 199.218 199.200

198.000 TRAMO TB -536

197.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -48 DESDE C.I. : 2616 523951.520 8782620.120 203.020 201.820 LONGITUD TRAMO : 87.79 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -48
HASTA C.I. : 2439 523862.760 8782619.750 202.770 199.440 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 87.79 ML i (%) : -2.680 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 88.79 i (°/o) TRAMO : -2.680 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2616 0.00 0.00 203.020 -2.680 201.820 0.0043 0.100 1.304 1 0.000 0.00 203.020 -2.680 201.820 0.0043 0.10 1.304 1.304 0.000 201.716 159.70 201.975 0.70 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.933 -2.680 201.552 0.0043 0.100 1.485 2 10.000 10.00 202.933 -2.680 201.552 0.0043 0.10 1.485 1.485 0.000 201.448 159.70 201.707 0.70 0.15 0.200 1.076 9.764 0.000 0.700 1.968 6.896
10.00
10.00
20.00
30.00
opcional 202.952
202.914
-2.680
-2.680
201.284
201.016
0.0043
0.0043
0.100
0.100
1.772
2.002
3
4
10.000
10.000
20.00
30.00
202.952
202.914
-2.680
-2.680
201.284
201.016
0.0043
0.0043
0.10
0.10
1.772
2.002
1.772
2.000
0.000
0.002
201.180
200.912
159.70
159.70
201.439
201.171
0.70
0.70
0.15
0.15
0.200
0.200
1.363
1.593
11.402
13.203
0.000
0.008
0.700
0.700
1.968
1.968
8.534
10.344
10.00 40.00 202.819 -2.680 200.748 0.0043 0.100 2.175 5 10.000 40.00 202.819 -2.680 200.748 0.0043 0.10 2.175 2.000 0.175 200.644 159.70 200.903 0.70 0.15 0.200 1.766 14.000 0.623 0.700 1.968 11.755
10.00 50.00 202.668 -2.680 200.480 0.0043 0.100 2.293 6 10.000 50.00 202.668 -2.680 200.480 0.0043 0.10 2.293 2.000 0.293 200.375 159.70 200.635 0.70 0.15 0.200 1.883 14.000 1.638 0.700 1.968 12.770
10.00 60.00 202.611 -2.680 200.212 0.0043 0.100 2.504 7 10.000 60.00 202.611 -2.680 200.212 0.0043 0.10 2.504 2.000 0.504 200.107 159.70 200.367 0.70 0.15 0.200 2.094 14.000 2.786 0.700 1.968 13.918
10.00 70.00 202.566 -2.680 199.944 0.0043 0.100 2.727 8 10.000 70.00 202.566 -2.680 199.944 0.0043 0.10 2.727 2.000 0.727 199.839 159.70 200.099 0.70 0.15 0.200 2.317 14.000 4.305 0.700 1.968 15.438
10.00 80.00 202.549 -2.680 199.676 0.0043 0.100 2.978 9 10.000 80.00 202.549 -2.680 199.676 0.0043 0.10 2.978 2.000 0.978 199.571 159.70 199.831 0.70 0.15 0.200 2.568 14.000 5.965 0.700 1.968 17.097
2439 7.790 87.79 202.770 -2.680 199.440 0.0043 0.100 3.434 10 7.790 87.79 202.770 -2.680 199.440 0.0043 0.10 3.434 2.000 1.434 199.336 159.70 199.595 0.70 0.15 0.156 3.025 10.906 6.576 0.545 1.533 15.248

ESQUEMA PLANIMETRICO TRAMOS 87.79 2.267 1.759 115.275 21.901 6.145 17.273 111.999
23.419

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 87.79
202,770 204.000
12.33 12.55 199,440 203.020
202.933 202.952 202.914 202.819
203.000 202.668 202.611 202.770
202.566 202.549
6.00
2616
TAS-PVC-DN150--2,680%-87,79 TB-48 2439 202.000
201.820 201.552
201.000 201.284 PERFILCOTA TERRENO TRAMO
201.016
200.748 PERFIL COTA SOLERA TUBO RED
200.480
200.000 200.212
203,020 199.944
201,820 199.676

C.I. 2439
C.I. 2616
199.000 199.440

198.000 TRAMO TB -48

197.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -477 DESDE C.I. : 2440 523782.950 8782620.830 201.770 200.570 LONGITUD TRAMO : 78.83 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -477
HASTA C.I. : 2439 523862.760 8782619.750 202.770 199.440 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 78.83 ML i (%) : -1.416 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 79.83 i (°/o) TRAMO : -1.416 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2440 0.00 0.00 201.770 -1.416 200.570 0.0043 0.100 1.304 1 0.000 0.00 201.770 -1.416 200.570 0.0043 0.10 1.304 1.304 0.000 200.466 159.70 200.725 0.70 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.259 -1.416 200.428 0.0043 0.100 1.935 2 10.000 10.00 202.259 -1.416 200.428 0.0043 0.10 1.935 1.935 0.000 200.324 159.70 200.584 0.70 0.15 0.200 1.525 11.337 0.000 0.700 1.968 8.469
10.00
10.00
20.00
30.00
opcional 202.718
202.966
-1.416
-1.416
200.287
200.145
0.0043
0.0043
0.100
0.100
2.535
2.925
3
4
10.000
10.000
20.00
30.00
202.718
202.966
-1.416
-1.416
200.287
200.145
0.0043
0.0043
0.10
0.10
2.535
2.925
2.000
2.000
0.535
0.925
200.183
200.041
159.70
159.70
200.442
200.301
0.70
0.70
0.15
0.15
0.200
0.200
2.126
2.515
13.772
14.000
1.874
5.111
0.700
0.700
1.968
1.968
12.778
16.243
10.00 40.00 202.972 -1.416 200.004 0.0043 0.100 3.073 5 10.000 40.00 202.972 -1.416 200.004 0.0043 0.10 3.073 2.000 1.073 199.899 159.70 200.159 0.70 0.15 0.200 2.663 14.000 6.991 0.700 1.968 18.123
10.00 50.00 202.948 -1.416 199.862 0.0043 0.100 3.190 6 10.000 50.00 202.948 -1.416 199.862 0.0043 0.10 3.190 2.000 1.190 199.758 159.70 200.018 0.70 0.15 0.200 2.780 14.000 7.919 0.700 1.968 19.051
10.00 60.00 202.884 -1.416 199.721 0.0043 0.100 3.268 7 10.000 60.00 202.884 -1.416 199.721 0.0043 0.10 3.268 2.000 1.268 199.616 159.70 199.876 0.70 0.15 0.200 2.858 14.000 8.602 0.700 1.968 19.734
10.00 70.00 202.850 -1.416 199.579 0.0043 0.100 3.375 8 10.000 70.00 202.850 -1.416 199.579 0.0043 0.10 3.375 2.000 1.375 199.475 159.70 199.734 0.70 0.15 0.200 2.966 14.000 9.250 0.700 1.968 20.382
2439 8.830 78.83 202.770 -1.416 199.440 0.0043 0.100 3.434 9 8.830 78.83 202.770 -1.416 199.440 0.0043 0.10 3.434 2.000 1.434 199.336 159.70 199.595 0.70 0.15 0.177 3.025 12.362 8.683 0.618 1.737 18.512

ESQUEMA PLANIMETRICO TRAMOS 78.83 2.782 1.579 107.471 48.431 5.518 15.511 133.294
21.029

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 78.83
202,770 204.000
12.33 12.55 199,440 202.966 202.972 202.948 202.884 202.850
203.000 202.718 202.770
202.259
6.00
2440
TAS-PVC-DN150--1,416%-78,83 TB-477 2439 202.000
201.770

201.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
200.000 200.570 200.428 200.287
201,770 200.145 200.004 199.862
200,570 199.721

C.I. 2439
199.579

C.I. 2440
199.000 199.440

198.000 TRAMO TB -477

197.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -521 DESDE C.I. : 2464 523862.590 8782694.920 202.030 199.700 LONGITUD TRAMO : 74.17 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -521
HASTA C.I. : 2439 523862.760 8782619.750 202.770 199.440 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 74.17 ML i (%) : -0.346 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 75.17 i (°/o) TRAMO : -0.346 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2464 0.00 0.00 202.030 -0.346 199.700 0.0043 0.100 2.434 1 0.000 0.00 202.030 -0.346 199.700 0.0043 0.10 2.434 2.000 0.434 199.596 159.70 199.855 0.70 0.15 0.000 2.025 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.237 -0.346 199.665 0.0043 0.100 2.676 2 10.000 10.00 202.237 -0.346 199.665 0.0043 0.10 2.676 2.000 0.676 199.561 159.70 199.821 0.70 0.15 0.200 2.266 14.000 3.886 0.700 1.968 15.018
10.00
10.00
20.00
30.00
opcional 202.371
202.505
-0.346
-0.346
199.631
199.596
0.0043
0.0043
0.100
0.100
2.844
3.013
3
4
10.000
10.000
20.00
30.00
202.371
202.505
-0.346
-0.346
199.631
199.596
0.0043
0.0043
0.10
0.10
2.844
3.013
2.000
2.000
0.844
1.013
199.527
199.492
159.70
159.70
199.786
199.752
0.70
0.70
0.15
0.15
0.200
0.200
2.435
2.603
14.000
14.000
5.321
6.501
0.700
0.700
1.968
1.968
16.453
17.633
10.00 40.00 202.572 -0.346 199.562 0.0043 0.100 3.115 5 10.000 40.00 202.572 -0.346 199.562 0.0043 0.10 3.115 2.000 1.115 199.457 159.70 199.717 0.70 0.15 0.200 2.705 14.000 7.447 0.700 1.968 18.579
10.00 50.00 202.605 -0.346 199.527 0.0043 0.100 3.182 6 10.000 50.00 202.605 -0.346 199.527 0.0043 0.10 3.182 2.000 1.182 199.423 159.70 199.682 0.70 0.15 0.200 2.773 14.000 8.039 0.700 1.968 19.171
10.00 60.00 202.819 -0.346 199.492 0.0043 0.100 3.431 7 10.000 60.00 202.819 -0.346 199.492 0.0043 0.10 3.431 2.000 1.431 199.388 159.70 199.648 0.70 0.15 0.200 3.021 14.000 9.146 0.700 1.968 20.278
10.00 70.00 202.762 -0.346 199.458 0.0043 0.100 3.408 8 10.000 70.00 202.762 -0.346 199.458 0.0043 0.10 3.408 2.000 1.408 199.354 159.70 199.613 0.70 0.15 0.200 2.999 14.000 9.937 0.700 1.968 21.069
2439 4.170 74.17 202.770 -0.346 199.440 0.0043 0.100 3.434 9 4.170 74.17 202.770 -0.346 199.440 0.0043 0.10 3.434 2.000 1.434 199.336 159.70 199.595 0.70 0.15 0.084 3.025 5.838 4.149 0.292 0.820 8.791

ESQUEMA PLANIMETRICO TRAMOS 74.17 3.060 1.486 103.838 54.426 5.192 14.594 136.993
19.786

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 74.17
202,770 204.000
12.33 12.55 199,440
202.819 202.762 202.770
203.000 202.505 202.572 202.605
202.237 202.371
6.00 202.030

2464
TAS-PVC-DN150--0,346%-74.17 TB-521 2439 202.000

201.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
200.000
202,030
199,700 199.665 199.631 199.596

C.I. 2439
199.562 199.527

C.I. 2464
199.700 199.492 199.458 199.440
199.000

198.000 TRAMO TB -521

197.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -143 DESDE C.I. : 2667 523912.630 8782695.280 202.220 200.610 LONGITUD TRAMO : 49.05 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -143
HASTA C.I. : 2464 523862.590 8782694.920 202.030 199.700 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 49.05 ML i (%) : -1.818 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 50.05 i (°/o) TRAMO : -1.818 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2667 0.00 0.00 202.220 -1.818 200.610 0.0043 0.100 1.714 1 0.000 0.00 202.220 -1.818 200.610 0.0043 0.10 1.714 1.714 0.000 200.506 159.70 200.765 0.70 0.15 0.000 1.305 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.281 -1.818 200.428 0.0043 0.100 1.957 2 10.000 10.00 202.281 -1.818 200.428 0.0043 0.10 1.957 1.957 0.000 200.324 159.70 200.584 0.70 0.15 0.200 1.547 12.850 0.000 0.700 1.968 9.982
10.00
10.00
20.00
30.00
opcional 202.292
202.281
-1.818
-1.818
200.246
200.065
0.0043
0.0043
0.100
0.100
2.150
2.321
3
4
10.000
10.000
20.00
30.00
202.292
202.281
-1.818
-1.818
200.246
200.065
0.0043
0.0043
0.10
0.10
2.150
2.321
2.000
2.000
0.150
0.321
200.142
199.960
159.70
159.70
200.402
200.220
0.70
0.70
0.15
0.15
0.200
0.200
1.740
1.911
13.850
14.000
0.525
1.647
0.700
0.700
1.968
1.968
11.507
12.780
10.00 40.00 202.168 -1.818 199.883 0.0043 0.100 2.390 5 10.000 40.00 202.168 -1.818 199.883 0.0043 0.10 2.390 2.000 0.390 199.778 159.70 200.038 0.70 0.15 0.200 1.980 14.000 2.486 0.700 1.968 13.618
2464 9.050 49.05 202.030 -1.818 199.700 0.0043 0.100 2.434 6 9.050 49.05 202.030 -1.818 199.700 0.0043 0.10 2.434 2.000 0.434 199.596 159.70 199.855 0.70 0.15 0.181 2.025 12.670 2.610 0.634 1.781 12.684

ESQUEMA PLANIMETRICO TRAMOS 49.05 2.161 0.983 67.370 7.268 3.434 9.651 60.571
13.085

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 49.05
202,030 203.000
12.33 12.55 199,700 202.220 202.292
202.500 202.281 202.281 202.168
202.030
202.000
6.00
2667
TAS-PVC-DN150--1,818%-49,05 TB-143 2464 201.500
201.000 PERFILCOTA TERRENO TRAMO
200.500 PERFIL COTA SOLERA TUBO RED
200.610 200.428
202,220 200.000 200.246
200.065
200,610 199.883

C.I. 2667

C.I. 2464
199.500 199.700

199.000
TRAMO TB -143
198.500
198.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -142 DESDE C.I. : 2604 523966.900 8782695.440 202.060 200.860 LONGITUD TRAMO : 53.27 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -142
HASTA C.I. : 2667 523912.630 8782695.280 202.220 200.610 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 53.27 ML i (%) : -0.461 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 54.27 i (°/o) TRAMO : -0.461 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2604 0.00 0.00 202.060 -0.461 200.860 0.0043 0.100 1.304 1 0.000 0.00 202.060 -0.461 200.860 0.0043 0.10 1.304 1.304 0.000 200.756 159.70 201.015 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.011 -0.461 200.814 0.0043 0.100 1.301 2 10.000 10.00 202.011 -0.461 200.814 0.0043 0.10 1.301 1.301 0.000 200.710 159.70 200.969 0.60 0.15 0.200 0.892 7.817 0.000 0.600 1.658 5.359
10.00
10.00
20.00
30.00
opcional 201.828
201.978
-0.461
-0.461
200.768
200.722
0.0043
0.0043
0.100
0.100
1.164
1.360
3
4
10.000
10.000
20.00
30.00
201.828
201.978
-0.461
-0.461
200.768
200.722
0.0043
0.0043
0.10
0.10
1.164
1.360
1.164
1.360
0.000
0.000
200.664
200.618
159.70
159.70
200.923
200.877
0.60
0.60
0.15
0.15
0.200
0.200
0.755
0.951
7.397
7.575
0.000
0.000
0.600
0.600
1.658
1.658
4.939
5.117
10.00 40.00 202.099 -0.461 200.676 0.0043 0.100 1.528 5 10.000 40.00 202.099 -0.461 200.676 0.0043 0.10 1.528 1.528 0.000 200.571 159.70 200.831 0.60 0.15 0.200 1.118 8.664 0.000 0.600 1.658 6.206
10.00 50.00 202.156 -0.461 200.630 0.0043 0.100 1.631 6 10.000 50.00 202.156 -0.461 200.630 0.0043 0.10 1.631 1.631 0.000 200.525 159.70 200.785 0.60 0.15 0.200 1.221 9.475 0.000 0.600 1.658 7.016
2667 3.270 53.27 202.220 -0.461 200.610 0.0043 0.100 1.714 7 3.270 53.27 202.220 -0.461 200.610 0.0043 0.10 1.714 1.714 0.000 200.506 159.70 200.765 0.60 0.15 0.066 1.305 3.281 0.000 0.196 0.542 2.478

ESQUEMA PLANIMETRICO TRAMOS 53.27 1.429 1.067 44.209 0.000 3.196 8.832 31.114
12.028

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 53.27
202,220 202.500
12.33 12.55 200,610 202.156 202.220
202.060 202.099
202.011 201.978
202.000 201.828
6.00
2604
TAS-PVC-DN150--0,461%-53.27 TB-142 2667 201.500
PERFILCOTA TERRENO TRAMO
201.000 PERFIL COTA SOLERA TUBO RED
202,060 200.860 200.814 200.768 200.722 200.676
200,860 200.500 200.630 200.610

C.I. 2604

C.I. 2667
200.000 TRAMO TB -142

199.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -533 DESDE C.I. : 2471 523778.090 8782695.090 201.180 199.980 LONGITUD TRAMO : 83.50 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -533
HASTA C.I. : 2464 523862.590 8782694.920 202.030 199.700 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 83.50 ML i (%) : -0.331 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : AMISTAD DIST. ESTIMADA 84.50 i (°/o) TRAMO : -0.331 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2471 0.00 0.00 201.180 -0.331 199.980 0.0043 0.100 1.304 1 0.000 0.00 201.180 -0.331 199.980 0.0043 0.10 1.304 1.304 0.000 199.876 159.70 200.135 0.70 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00 10.00 201.811 -0.331 199.947 0.0043 0.100 1.968 2 10.000 10.00 201.811 -0.331 199.947 0.0043 0.10 1.968 1.968 0.000 199.843 159.70 200.102 0.70 0.15 0.200 1.559 11.455 0.000 0.700 1.968 8.587
10.00
10.00
20.00
30.00
opcional 202.278
202.376
-0.331
-0.331
199.914
199.881
0.0043
0.0043
0.100
0.100
2.469
2.600
3
4
10.000
10.000
20.00
30.00
202.278
202.376
-0.331
-0.331
199.914
199.881
0.0043
0.0043
0.10
0.10
2.469
2.600
2.000
2.000
0.469
0.600
199.809
199.776
159.70
159.70
200.069
200.036
0.70
0.70
0.15
0.15
0.200
0.200
2.059
2.190
13.890
14.000
1.640
3.739
0.700
0.700
1.968
1.968
12.662
14.871
10.00 40.00 202.610 -0.331 199.847 0.0043 0.100 2.867 5 10.000 40.00 202.610 -0.331 199.847 0.0043 0.10 2.867 2.000 0.867 199.743 159.70 200.003 0.70 0.15 0.200 2.457 14.000 5.133 0.700 1.968 16.265
10.00 50.00 202.632 -0.331 199.814 0.0043 0.100 2.922 6 10.000 50.00 202.632 -0.331 199.814 0.0043 0.10 2.922 2.000 0.922 199.710 159.70 199.970 0.70 0.15 0.200 2.512 14.000 6.261 0.700 1.968 17.393
10.00 60.00 202.519 -0.331 199.781 0.0043 0.100 2.842 7 10.000 60.00 202.519 -0.331 199.781 0.0043 0.10 2.842 2.000 0.842 199.677 159.70 199.937 0.70 0.15 0.200 2.432 14.000 6.174 0.700 1.968 17.306
10.00 70.00 202.374 -0.331 199.748 0.0043 0.100 2.730 8 10.000 70.00 202.374 -0.331 199.748 0.0043 0.10 2.730 2.000 0.730 199.644 159.70 199.903 0.70 0.15 0.200 2.321 14.000 5.503 0.700 1.968 16.635
10.00 80.00 202.153 -0.331 199.715 0.0043 0.100 2.542 9 10.000 80.00 202.153 -0.331 199.715 0.0043 0.10 2.542 2.000 0.542 199.611 159.70 199.870 0.70 0.15 0.200 2.133 14.000 4.454 0.700 1.968 15.586
2464 3.500 83.50 202.030 -0.331 199.700 0.0043 0.100 2.434 10 3.500 83.50 202.030 -0.331 199.700 0.0043 0.10 2.434 2.000 0.434 199.596 159.70 199.855 0.70 0.15 0.070 2.025 4.900 1.196 0.245 0.689 5.093

ESQUEMA PLANIMETRICO TRAMOS 83.50 2.468 1.673 114.244 34.101 5.845 16.429 124.398
22.274

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 83.50
202,030 203.000
202.610 202.632
12.33 12.55 199,700 202.376
202.519
202.374
202.500 202.278
202.153
202.030
202.000 201.811
6.00
2471
TAS-PVC-DN150--0,331%-83.50 TB-533 2464 201.500 201.180

201.000 PERFILCOTA TERRENO TRAMO


200.500 PERFIL COTA SOLERA TUBO RED
201,180 200.000
199,980 199.947 199.914 199.881

C.I. 2464
199.847 199.814

C.I. 2471
199.500 199.980 199.781 199.748 199.715
199.700
199.000
TRAMO TB -533
198.500
198.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0 N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -572 DESDE C.I. : 2420 523756.930 8782537.040 200.920 199.720 LONGITUD TRAMO : 69.18 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -572

HASTA C.I. : 2492 523756.860 8782466.860 201.330 199.390 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 69.18 ML i (%) : -0.470 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : SAN PEDRO DIST. ESTIMADA 70.18 i (°/o) TRAMO : -0.470 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m 4-6m m mm ml ml ml m3 ml m3 m3 m3 m3 m3 m3
2420 0.00 0.00 200.920 -0.470 199.720 0.0043 0.100 1.304 1 0.000 0.00 200.925 -0.470 199.620 0.0043 0.10 1.409 1.409 0.000 0.000 199.516 159.70 199.775 0.60 0.15 0.000 1.000 0.000 0.000 0.000 0.000 0.000 0.000
10.00 10.00 201.123 -0.470 199.673 0.0043 0.100 1.554 2 10.000 10.00 201.123 -0.470 199.590 0.0043 0.10 1.637 1.637 0.000 0.000 199.486 159.70 199.746 0.60 0.15 0.200 1.227 9.139 0.000 0.000 0.600 1.658 6.681
10.00 20.00 201.247 -0.470 199.626 0.0043 0.100 1.725 3 10.000 20.00 201.247 -0.470 199.560 0.0043 0.10 1.791 1.791 0.000 0.000 199.456 159.70 199.716 0.60 0.15 0.200 1.381 10.284 0.000 0.000 0.600 1.658 7.826
10.00
10.00
30.00
40.00 opcional 201.218
201.255
-0.470
-0.470
199.579
199.532
0.0043
0.0043
0.100
0.100
1.743
1.827
4
5
10.000
10.000
30.00
40.00
201.218
201.255
-0.470
-0.470
199.531
199.501
0.0043
0.0043
0.10
0.10
1.792
1.859
1.792
1.859
0.000
0.000
0.000
0.000
199.426
199.396
159.70
159.70
199.686
199.656
0.60
0.60
0.15
0.15
0.200
0.200
1.382
1.449
10.748
10.951
0.000
0.000
0.000
0.000
0.600
0.600
1.658
1.658
8.290
8.493
10.00 50.00 201.309 -0.470 199.485 0.0043 0.100 1.928 6 10.000 50.00 201.309 -0.470 199.471 0.0043 0.10 1.942 1.942 0.000 0.000 199.367 159.70 199.626 0.60 0.15 0.200 1.533 11.403 0.000 0.000 0.600 1.658 8.945
10.00 60.00 201.222 -0.470 199.438 0.0043 0.100 1.888 7 10.000 60.00 201.222 -0.470 199.441 0.0043 0.10 1.885 1.885 0.000 0.000 199.337 159.70 199.597 0.60 0.15 0.200 1.475 11.483 0.000 0.000 0.600 1.658 9.024
2492 9.180 69.18 201.330 -0.470 199.390 0.0043 0.100 2.044 8 9.180 69.18 201.329 -0.470 199.390 0.0043 0.10 2.043 2.000 0.043 0.000 199.286 159.70 199.545 0.60 0.15 0.184 1.634 10.700 0.119 0.000 0.551 1.522 8.562

ESQUEMA PLANIMETRICO TRAMOS 69.18 1.795 1.386 74.707 0.119 0.000 4.151 11.469 57.821
15.620

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 69.18
201,330 201.500 201.247 201.255 201.309 201.222
201.329
201.218
12.33 12.55 199,390 201.123
200.925
201.000
6.00
2420
TAS-PVC-DN150--0,470%-69,18 TB-572 2492 200.500

200.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
199.500 199.590
200,920 199.620 199.560 199.531 199.501 199.471 199.441 199.390
199,720

C.I. 2420

C.I. 2492
199.000

198.500 TRAMO TB -572

198.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0

N
AL EJE DE VIA CON CHIMENEA = 0
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -607 DESDE C.I. : 2399 523638.530 8782486.380 202.950 199.940 LONGITUD TRAMO : 78.65 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -607
HASTA C.I. : 2516 523684.340 8782421.220 201.830 199.560 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 78.65 ML i (%) : -0.477 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : SAN PEDRO DIST. ESTIMADA 79.65 i (°/o) TRAMO : -0.477 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2399 0.00 0.00 202.950 -0.477 199.940 0.0043 0.100 3.114 1 0.000 0.00 202.950 -0.477 199.940 0.0043 0.10 3.114 2.000 1.114 199.836 159.70 200.095 0.70 0.15 0.000 2.705 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.637 -0.477 199.892 0.0043 0.100 2.849 2 10.000 10.00 202.637 -0.477 199.892 0.0043 0.10 2.849 2.000 0.849 199.788 159.70 200.048 0.70 0.15 0.200 2.439 14.000 6.872 0.700 1.968 18.004
10.00 20.00 202.433 -0.477 199.845 0.0043 0.100 2.693 3 10.000 20.00 202.433 -0.477 199.845 0.0043 0.10 2.693 2.000 0.693 199.740 159.70 200.000 0.70 0.15 0.200 2.283 14.000 5.396 0.700 1.968 16.528
10.00
10.00
30.00
40.00 opcional 202.152
201.964
-0.477
-0.477
199.797
199.749
0.0043
0.0043
0.100
0.100
2.459
2.319
4
5
10.000
10.000
30.00
40.00
202.152
201.964
-0.477
-0.477
199.797
199.749
0.0043
0.0043
0.10
0.10
2.459
2.319
2.000
2.000
0.459
0.319
199.693
199.645
159.70
159.70
199.952
199.905
0.70
0.70
0.15
0.15
0.200
0.200
2.050
1.909
14.000
14.000
4.032
2.725
0.700
0.700
1.968
1.968
15.165
13.857
10.00 50.00 201.848 -0.477 199.701 0.0043 0.100 2.251 6 10.000 50.00 201.848 -0.477 199.701 0.0043 0.10 2.251 2.000 0.251 199.597 159.70 199.857 0.70 0.15 0.200 1.841 14.000 1.995 0.700 1.968 13.127
10.00 60.00 201.824 -0.477 199.654 0.0043 0.100 2.275 7 10.000 60.00 201.824 -0.477 199.654 0.0043 0.10 2.275 2.000 0.275 199.549 159.70 199.809 0.70 0.15 0.200 1.865 14.000 1.839 0.700 1.968 12.971
10.00 70.00 201.819 -0.477 199.606 0.0043 0.100 2.317 8 10.000 70.00 201.819 -0.477 199.606 0.0043 0.10 2.317 2.000 0.317 199.502 159.70 199.761 0.70 0.15 0.200 1.908 14.000 2.071 0.700 1.968 13.203
2516 8.650 78.65 201.830 -0.477 199.560 0.0043 0.100 2.374 9 8.650 78.65 201.830 -0.477 199.560 0.0043 0.10 2.374 2.000 0.374 199.456 159.70 199.715 0.70 0.15 0.173 1.965 12.110 2.094 0.606 1.702 11.723

ESQUEMA PLANIMETRICO TRAMOS 78.65 2.517 1.575 110.110 27.024 5.506 15.475 114.578
20.981

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 78.65
201,830 204.000
12.33 12.55 199,560 202.950
203.000 202.637
202.433
6.00 202.152

2399
TAS-PVC-DN150--0,477%-78.65 TB-607 2516 202.000
201.964 201.848 201.824 201.819 201.830

201.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
200.000
202,950 199.892 199.845 199.797 199.749
199,940 199.940 199.701 199.654 199.606

C.I. 2399

C.I. 2516
199.000 199.560

198.000 TRAMO TB -607

197.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0

N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -237 DESDE C.I. : 1797 523698.970 8782529.680 201.490 200.290 LONGITUD TRAMO : 73.35 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -237
HASTA C.I. : 2399 523638.530 8782486.380 202.950 199.940 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 73.35 ML i (%) : -0.471 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : SAN PEDRO DIST. ESTIMADA 74.35 i (°/o) TRAMO : -0.471 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
1797 0.00 0.00 201.490 -0.471 200.290 0.0043 0.100 1.304 1 0.000 0.00 201.490 -0.471 200.290 0.0043 0.10 1.304 1.304 0.000 200.186 159.70 200.445 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00 10.00 201.450 -0.471 200.243 0.0043 0.100 1.311 2 10.000 10.00 201.450 -0.471 200.243 0.0043 0.10 1.311 1.311 0.000 200.139 159.70 200.398 0.60 0.15 0.200 0.902 7.847 0.000 0.600 1.658 5.389
10.00 20.00 201.410 -0.471 200.196 0.0043 0.100 1.318 3 10.000 20.00 201.410 -0.471 200.196 0.0043 0.10 1.318 1.318 0.000 200.092 159.70 200.351 0.60 0.15 0.200 0.909 7.889 0.000 0.600 1.658 5.431
10.00
10.00
30.00
40.00 opcional 201.756
202.052
-0.471
-0.471
200.149
200.102
0.0043
0.0043
0.100
0.100
1.712
2.055
4
5
10.000
10.000
30.00
40.00
201.756
202.052
-0.471
-0.471
200.149
200.102
0.0043
0.0043
0.10
0.10
1.712
2.055
1.712
2.000
0.000
0.055
200.044
199.997
159.70
159.70
200.304
200.257
0.60
0.60
0.15
0.15
0.200
0.200
1.302
1.645
9.090
11.135
0.000
0.164
0.600
0.600
1.658
1.658
6.632
8.840
10.00 50.00 202.346 -0.471 200.055 0.0043 0.100 2.396 6 10.000 50.00 202.346 -0.471 200.055 0.0043 0.10 2.396 2.000 0.396 199.950 159.70 200.210 0.60 0.15 0.200 1.986 12.000 1.351 0.600 1.658 10.893
10.00 60.00 202.518 -0.471 200.008 0.0043 0.100 2.615 7 10.000 60.00 202.518 -0.471 200.008 0.0043 0.10 2.615 2.000 0.615 199.903 159.70 200.163 0.60 0.15 0.200 2.205 12.000 3.031 0.600 1.658 12.573
10.00 70.00 202.676 -0.471 199.960 0.0043 0.100 2.820 8 10.000 70.00 202.676 -0.471 199.960 0.0043 0.10 2.820 2.000 0.820 199.856 159.70 200.116 0.60 0.15 0.200 2.410 12.000 4.304 0.600 1.658 13.845
2399 3.350 73.35 202.950 -0.471 199.940 0.0043 0.100 3.114 9 3.350 73.35 202.950 -0.471 199.940 0.0043 0.10 3.114 2.000 1.114 199.836 159.70 200.095 0.60 0.15 0.067 2.705 4.020 1.944 0.201 0.555 5.140

ESQUEMA PLANIMETRICO TRAMOS 73.35 2.072 1.469 75.981 10.793 4.401 12.161 68.743
16.562

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 73.35
202,950 204.000
12.33 12.55 199,940
202.950
203.000 202.676
202.518
6.00 202.346
1797
TAS-PVC-DN150--0,471%-73,35 TB-237 2399 202.000 201.490
201.756
202.052

201.450 201.410
PERFILCOTA TERRENO TRAMO
201.000 PERFIL COTA SOLERA TUBO RED
202,490
200,290 200.000 200.243 200.196

C.I. 1797

C.I. 2399
200.290 200.149 200.102 200.055 200.008 199.960 199.940

199.000 TRAMO TB -237

198.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0
N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -239 DESDE C.I. : 2690 523657.350 8782588.340 202.910 201.680 LONGITUD TRAMO : 70.94 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -239
HASTA C.I. : 1797 523698.970 8782529.680 201.490 200.290 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 70.94 ML i (%) : -1.932 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : SAN PEDRO DIST. ESTIMADA 71.94 i (°/o) TRAMO : -1.932 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2690 0.00 0.00 202.910 -1.932 201.680 0.0043 0.100 1.334 1 0.000 0.00 202.910 -1.932 201.680 0.0043 0.10 1.334 1.334 0.000 201.576 159.70 201.835 0.60 0.15 0.000 0.925 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.685 -1.932 201.487 0.0043 0.100 1.303 2 10.000 10.00 202.685 -1.932 201.487 0.0043 0.10 1.303 1.303 0.000 201.382 159.70 201.642 0.60 0.15 0.200 0.893 7.910 0.000 0.600 1.658 5.452
10.00 20.00 202.538 -1.932 201.294 0.0043 0.100 1.349 3 10.000 20.00 202.538 -1.932 201.294 0.0043 0.10 1.349 1.349 0.000 201.189 159.70 201.449 0.60 0.15 0.200 0.939 7.954 0.000 0.600 1.658 5.496
10.00
10.00
30.00
40.00 opcional 202.360
202.047
-1.932
-1.932
201.100
200.907
0.0043
0.0043
0.100
0.100
1.364
1.244
4
5
10.000
10.000
30.00
40.00
202.360
202.047
-1.932
-1.932
201.100
200.907
0.0043
0.0043
0.10
0.10
1.364
1.244
1.364
1.244
0.000
0.000
200.996
200.803
159.70
159.70
201.256
201.063
0.60
0.60
0.15
0.15
0.200
0.200
0.954
0.834
8.138
7.824
0.000
0.000
0.600
0.600
1.658
1.658
5.680
5.366
10.00 50.00 201.526 -1.932 200.714 0.0043 0.100 0.916 6 10.000 50.00 201.526 -1.932 200.714 0.0043 0.10 0.916 0.916 0.000 200.610 159.70 200.869 0.60 0.15 0.200 0.507 6.482 0.000 0.600 1.658 4.024
10.00 60.00 201.043 -1.932 200.521 0.0043 0.100 0.627 7 10.000 60.00 201.043 -1.932 200.521 0.0043 0.10 0.627 0.627 0.000 200.416 159.70 200.676 0.60 0.15 0.200 0.217 4.629 0.000 0.600 1.658 2.171
10.00 70.00 201.270 -1.932 200.327 0.0043 0.100 1.047 8 10.000 70.00 201.270 -1.932 200.327 0.0043 0.10 1.047 1.047 0.000 200.223 159.70 200.483 0.60 0.15 0.200 0.637 5.020 0.000 0.600 1.658 2.562
1797 0.940 70.94 201.490 -1.932 200.290 0.0043 0.100 1.304 9 0.940 70.94 201.490 -1.932 200.290 0.0043 0.10 1.304 1.304 0.000 200.186 159.70 200.445 0.60 0.15 0.019 0.895 0.663 0.000 0.056 0.156 0.432

ESQUEMA PLANIMETRICO TRAMOS 70.94 1.165 1.421 48.621 0.000 4.256 11.761 31.183
16.017

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 70.94
201,490 203.500
12.33 12.55 200,290 202.910
203.000 202.685
202.538
202.500 202.360
6.00
2690
TAS-PVC-DN150--1,932%-70,94 TB-239 1797 202.000
202.047

201.526 201.490
201.500 201.270 PERFILCOTA TERRENO TRAMO
201.680 201.487 201.043
201.000 201.294 PERFIL COTA SOLERA TUBO RED
201.100
200.907
202,910 200.500 200.714
200.521
201,680 200.327

C.I. 2690
200.000 200.290

C.I. 1797
199.500
TRAMO TB -239
199.000
198.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0

N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -238 DESDE C.I. : 2672 523627.280 8782631.200 203.130 201.930 LONGITUD TRAMO : 51.36 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -238
HASTA C.I. : 2690 523657.350 8782588.340 202.910 201.680 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 51.36 ML i (%) : -0.477 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : SAN PEDRO DIST. ESTIMADA 52.36 i (°/o) TRAMO : -0.477 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2672 0.00 0.00 203.130 -0.477 201.930 0.0043 0.100 1.304 1 0.000 0.00 203.130 -0.477 201.930 0.0043 0.10 1.304 1.304 0.000 201.826 159.70 202.085 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000
10.00 10.00 203.094 -0.477 201.882 0.0043 0.100 1.316 2 10.000 10.00 203.094 -0.477 201.882 0.0043 0.10 1.316 1.316 0.000 201.778 159.70 202.038 0.60 0.15 0.200 0.906 7.861 0.000 0.600 1.658 5.403
10.00 20.00 202.911 -0.477 201.835 0.0043 0.100 1.181 3 10.000 20.00 202.911 -0.477 201.835 0.0043 0.10 1.181 1.181 0.000 201.730 159.70 201.990 0.60 0.15 0.200 0.771 7.491 0.000 0.600 1.658 5.032
10.00
10.00
30.00
40.00 opcional 203.033
202.968
-0.477
-0.477
201.787
201.739
0.0043
0.0043
0.100
0.100
1.351
1.333
4
5
10.000
10.000
30.00
40.00
203.033
202.968
-0.477
-0.477
201.787
201.739
0.0043
0.0043
0.10
0.10
1.351
1.333
1.351
1.333
0.000
0.000
201.682
201.635
159.70
159.70
201.942
201.894
0.60
0.60
0.15
0.15
0.200
0.200
0.941
0.924
7.594
8.052
0.000
0.000
0.600
0.600
1.658
1.658
5.136
5.593
10.00 50.00 202.891 -0.477 201.691 0.0043 0.100 1.304 6 10.000 50.00 202.891 -0.477 201.691 0.0043 0.10 1.304 1.304 0.000 201.587 159.70 201.847 0.60 0.15 0.200 0.894 7.912 0.000 0.600 1.658 5.454
2690 1.360 51.36 202.910 -0.477 201.680 0.0043 0.100 1.334 7 1.360 51.36 202.910 -0.477 201.680 0.0043 0.10 1.334 1.334 0.000 201.576 159.70 201.835 0.60 0.15 0.027 0.925 1.076 0.000 0.082 0.225 0.742

ESQUEMA PLANIMETRICO TRAMOS 51.36 1.303 1.029 39.986 0.000 3.082 8.515 27.360
11.597

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 51.36
202,910 203.500
12.33 12.55 201,680 203.130
203.094 203.033 202.968
203.000 202.911 202.891 202.910
6.00
2672
TAS-PVC-DN150--0,477%-52.36 TB-238 2690 202.500
PERFILCOTA TERRENO TRAMO
202.000 PERFIL COTA SOLERA TUBO RED
201.882
203,130 201.930 201.835 201.787 201.739 201.691 201.680
201,930 201.500

C.I. 2672

C.I. 2690
201.000 TRAMO TB -238

200.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0

N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -585 DESDE C.I. : 2502 523592.210 8782552.400 203.130 200.640 LONGITUD TRAMO : 79.65 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -585
HASTA C.I. : 2399 523638.530 8782486.380 202.950 199.940 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 79.65 ML i (%) : -0.868 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : SAN PEDRO DIST. ESTIMADA 80.65 i (°/o) TRAMO : -0.868 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2502 0.00 0.00 203.130 -0.868 200.640 0.0043 0.100 2.594 1 0.000 0.00 203.130 -0.868 200.640 0.0043 0.10 2.594 2.000 0.594 200.536 159.70 200.795 0.70 0.15 0.000 2.185 0.000 0.000 0.000 0.000 0.000
10.00 10.00 203.205 -0.868 200.553 0.0043 0.100 2.756 2 10.000 10.00 203.205 -0.868 200.553 0.0043 0.10 2.756 2.000 0.756 200.449 159.70 200.709 0.70 0.15 0.200 2.346 14.000 4.726 0.700 1.968 15.858
10.00 20.00 203.251 -0.868 200.466 0.0043 0.100 2.889 3 10.000 20.00 203.251 -0.868 200.466 0.0043 0.10 2.889 2.000 0.889 200.362 159.70 200.622 0.70 0.15 0.200 2.479 14.000 5.757 0.700 1.968 16.890
10.00
10.00
30.00
40.00 opcional 203.266
203.211
-0.868
-0.868
200.380
200.293
0.0043
0.0043
0.100
0.100
2.991
3.022
4
5
10.000
10.000
30.00
40.00
203.266
203.211
-0.868
-0.868
200.380
200.293
0.0043
0.0043
0.10
0.10
2.991
3.022
2.000
2.000
0.991
1.022
200.275
200.189
159.70
159.70
200.535
200.448
0.70
0.70
0.15
0.15
0.200
0.200
2.581
2.613
14.000
14.000
6.578
7.046
0.700
0.700
1.968
1.968
17.711
18.178
10.00 50.00 203.075 -0.868 200.206 0.0043 0.100 2.973 6 10.000 50.00 203.075 -0.868 200.206 0.0043 0.10 2.973 2.000 0.973 200.102 159.70 200.361 0.70 0.15 0.200 2.564 14.000 6.985 0.700 1.968 18.117
10.00 60.00 203.113 -0.868 200.119 0.0043 0.100 3.098 7 10.000 60.00 203.113 -0.868 200.119 0.0043 0.10 3.098 2.000 1.098 200.015 159.70 200.275 0.70 0.15 0.200 2.688 14.000 7.250 0.700 1.968 18.382
10.00 70.00 203.124 -0.868 200.032 0.0043 0.100 3.196 8 10.000 70.00 203.124 -0.868 200.032 0.0043 0.10 3.196 2.000 1.196 199.928 159.70 200.188 0.70 0.15 0.200 2.786 14.000 8.029 0.700 1.968 19.161
2399 9.650 79.65 202.950 -0.868 199.940 0.0043 0.100 3.114 9 9.650 79.65 202.950 -0.868 199.940 0.0043 0.10 3.114 2.000 1.114 199.836 159.70 200.095 0.70 0.15 0.193 2.705 13.510 7.803 0.676 1.899 18.545

ESQUEMA PLANIMETRICO TRAMOS 79.65 2.959 1.595 111.510 54.174 5.576 15.672 142.841
21.247
CONEX.

VIA 2
PERFIL LONGITUDINAL
DOMIC.
VIA 1

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 79.65


202,950 204.000
12.33 12.55 199,940 203.130 203.205 203.251 203.266 203.211 203.113 203.124
203.075 202.950
203.000
6.00
2502
TAS-PVC-DN150--0,868%-79,65 TB-585 2399 202.000
PERFILCOTA TERRENO TRAMO
201.000 PERFIL COTA SOLERA TUBO RED
203,130 200.640 200.553 200.466 200.380
201,640 200.000 200.293 200.206

C.I. 2502

C.I. 2399
200.119 200.032 199.940

199.000 TRAMO TB -585

198.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0

N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -586 DESDE C.I. : 2429 523545.640 8782619.120 203.320 201.020 LONGITUD TRAMO : 80.37 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -586
HASTA C.I. : 2502 523592.210 8782552.400 203.130 200.640 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 80.37 ML i (%) : -0.467 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : SAN PEDRO DIST. ESTIMADA 81.37 i (%) TRAMO : -0.467 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2429 0.00 0.00 203.320 -0.467 201.020 0.0043 0.100 2.404 1 0.000 0.00 203.320 -0.467 201.020 0.0043 0.10 2.404 2.000 0.404 200.916 159.70 201.175 0.70 0.15 0.000 1.995 0.000 0.000 0.000 0.000 0.000
10.00 10.00 203.377 -0.467 200.973 0.0043 0.100 2.508 2 10.000 10.00 203.377 -0.467 200.973 0.0043 0.10 2.508 2.000 0.508 200.869 159.70 201.129 0.70 0.15 0.200 2.098 14.000 3.193 0.700 1.968 14.325
10.00 20.00 203.372 -0.467 200.927 0.0043 0.100 2.550 3 10.000 20.00 203.372 -0.467 200.927 0.0043 0.10 2.550 2.000 0.550 200.822 159.70 201.082 0.70 0.15 0.200 2.140 14.000 3.702 0.700 1.968 14.834
10.00
10.00
30.00
40.00 opcional 203.313
203.336
-0.467
-0.467
200.880
200.833
0.0043
0.0043
0.100
0.100
2.537
2.607
4
5
10.000
10.000
30.00
40.00
203.313
203.336
-0.467
-0.467
200.880
200.833
0.0043
0.0043
0.10
0.10
2.537
2.607
2.000
2.000
0.537
0.607
200.776
200.729
159.70
159.70
201.035
200.989
0.70
0.70
0.15
0.15
0.200
0.200
2.128
2.197
14.000
14.000
3.805
4.006
0.700
0.700
1.968
1.968
14.937
15.138
10.00 50.00 203.302 -0.467 200.786 0.0043 0.100 2.620 6 10.000 50.00 203.302 -0.467 200.786 0.0043 0.10 2.620 2.000 0.620 200.682 159.70 200.942 0.70 0.15 0.200 2.210 14.000 4.294 0.700 1.968 15.426
10.00 60.00 203.178 -0.467 200.740 0.0043 0.100 2.543 7 10.000 60.00 203.178 -0.467 200.740 0.0043 0.10 2.543 2.000 0.543 200.635 159.70 200.895 0.70 0.15 0.200 2.133 14.000 4.068 0.700 1.968 15.200
10.00 70.00 203.184 -0.467 200.693 0.0043 0.100 2.595 8 10.000 70.00 203.184 -0.467 200.693 0.0043 0.10 2.595 2.000 0.595 200.589 159.70 200.848 0.70 0.15 0.200 2.186 14.000 3.982 0.700 1.968 15.114
10.00 80.00 203.150 -0.467 200.646 0.0043 0.100 2.608 9 10.000 80.00 203.150 -0.467 200.646 0.0043 0.10 2.608 2.000 0.608 200.542 159.70 200.802 0.70 0.15 0.200 2.198 14.000 4.211 0.700 1.968 15.343
2502 0.370 80.37 203.130 -0.467 200.640 0.0043 0.100 2.594 10 0.370 80.37 203.130 -0.467 200.640 0.0043 0.10 2.594 2.000 0.594 200.536 159.70 200.795 0.70 0.15 0.007 2.185 0.518 0.156 0.026 0.073 0.568

ESQUEMA PLANIMETRICO TRAMOS 80.37 2.557 1.610 112.518 31.417 5.626 15.814 120.886
21.439

VIA 2
CONEX. PERFIL LONGITUDINAL
DOMIC.
VIA 1

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 80.37
203,130 204.000
12.33 12.55 200,640 203.320 203.377 203.372 203.313 203.336 203.302
203.500 203.178 203.184 203.150 203.130
203.000
6.00
2429
TAS-PVC-DN150--0,467%-80,37 TB-586 2502 202.500
202.000 PERFILCOTA TERRENO TRAMO
201.500 PERFIL COTA SOLERA TUBO RED
203,320 201.000
200.973
201,020 201.020 200.927 200.880 200.833

C.I. 2429

C.I. 2502
200.500 200.786 200.740 200.693 200.646
200.640
200.000
TRAMO TB -586
199.500
199.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0

N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -272 DESDE C.I. : 2705 523509.780 8782670.440 203.260 201.310 LONGITUD TRAMO : 61.61 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -272

HASTA C.I. : 2429 523545.640 8782619.120 203.320 201.020 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.70 DN : 6" PLG LONG. : 61.61 ML i (%) : -0.463 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : SAN PEDRO DIST. ESTIMADA 62.61 i (%) TRAMO : -0.463 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 EXCAV. 6-8 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3 m3 m3
2705 0.00 0.00 203.260 -0.463 201.310 0.0043 0.100 2.054 1 0.000 0.00 203.260 -0.463 201.310 0.0043 0.10 2.054 2.000 0.054 201.206 159.70 201.465 0.70 0.15 0.000 1.645 0.000 0.000 0.000 0.000 0.000 0.000 0.000
10.00 10.00 203.344 -0.463 201.264 0.0043 0.100 2.185 2 10.000 10.00 203.344 -0.463 201.264 0.0043 0.10 2.185 2.000 0.185 201.159 159.70 201.419 0.70 0.15 0.200 1.775 14.000 0.836 0.000 0.000 0.700 1.968 11.968
10.00 20.00 203.352 -0.463 201.217 0.0043 0.100 2.239 3 10.000 20.00 203.352 -0.463 201.217 0.0043 0.10 2.239 2.000 0.239 201.113 159.70 201.373 0.70 0.15 0.200 1.829 14.000 1.482 0.000 0.000 0.700 1.968 12.615
10.00
10.00
30.00
40.00 opcional 203.231
203.275
-0.463
-0.463
201.171
201.125
0.0043
0.0043
0.100
0.100
2.164
2.255
4
5
10.000
10.000
30.00
40.00
203.231
203.275
-0.463
-0.463
201.171
201.125
0.0043
0.0043
0.10
0.10
2.164
2.255
2.000
2.000
0.164
0.255
201.067
201.020
159.70
159.70
201.326
201.280
0.70
0.70
0.15
0.15
0.200
0.200
1.755
1.845
14.000
14.000
1.411
1.466
0.000
0.000
0.000
0.000
0.700
0.700
1.968
1.968
12.543
12.598
10.00 50.00 203.267 -0.463 201.078 0.0043 0.100 2.293 6 10.000 50.00 203.267 -0.463 201.078 0.0043 0.10 2.293 2.000 0.293 200.974 159.70 201.234 0.70 0.15 0.200 1.883 14.000 1.916 0.000 0.000 0.700 1.968 13.048
10.00 60.00 203.340 -0.463 201.032 0.0043 0.100 2.412 7 10.000 60.00 203.340 -0.463 201.032 0.0043 0.10 2.412 2.000 0.412 200.928 159.70 201.187 0.70 0.15 0.200 2.003 14.000 2.468 0.000 0.000 0.700 1.968 13.600
2429 1.610 61.61 203.320 -0.463 201.020 0.0043 0.100 2.404 8 1.610 61.61 203.320 -0.463 201.020 0.0043 0.10 2.404 2.000 0.404 200.916 159.70 201.175 0.70 0.15 0.032 1.995 2.254 0.460 0.000 0.000 0.113 0.317 2.252

ESQUEMA PLANIMETRICO TRAMOS 61.61 2.251 1.234 86.254 10.040 0.000 0.000 4.313 12.122 78.625
16.435

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 61.61
203,320 204.000
12.33 12.55 201,020 203.344 203.352 203.340
203.500 203.260 203.231 203.275 203.267 203.320

6.00 203.000
2705
TAS-PVC-DN150--0,463%-61,61 TB-272 2429 202.500

202.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
201.500
203,260
201,310 201.000 201.264 201.217 201.171
201.310 201.125

C.I. 2705

C.I. 2429
201.078 201.032 201.020
200.500
TRAMO TB -272
200.000

199.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0

N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -273 DESDE C.I. : 2576 523477.270 8782717.750 202.780 201.580 LONGITUD TRAMO : 56.40 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -273

HASTA C.I. : 2705 523509.780 8782670.440 203.260 201.310 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 56.40 ML i (%) : -0.470 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : SAN PEDRO DIST. ESTIMADA 57.40 i (%) TRAMO : -0.470 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 EXCAV. 6-8 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3 m3 m3
2576 0.00 0.00 202.780 -0.470 201.580 0.0043 0.100 1.304 1 0.000 0.00 202.780 -0.470 201.580 0.0043 0.10 1.304 1.304 0.000 201.476 159.70 201.735 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000 0.000 0.000
10.00 10.00 202.834 -0.470 201.533 0.0043 0.100 1.405 2 10.000 10.00 202.834 -0.470 201.533 0.0043 0.10 1.405 1.405 0.000 201.429 159.70 201.688 0.60 0.15 0.200 0.996 8.129 0.000 0.000 0.000 0.600 1.658 5.671
10.00 20.00 202.941 -0.470 201.486 0.0043 0.100 1.559 3 10.000 20.00 202.941 -0.470 201.486 0.0043 0.10 1.559 1.559 0.000 201.382 159.70 201.641 0.60 0.15 0.200 1.150 8.894 0.000 0.000 0.000 0.600 1.658 6.436
10.00
10.00
30.00
40.00 opcional 203.054
203.119
-0.470
-0.470
201.439
201.392
0.0043
0.0043
0.100
0.100
1.719
1.831
4
5
10.000
10.000
30.00
40.00
203.054
203.119
-0.470
-0.470
201.439
201.392
0.0043
0.0043
0.10
0.10
1.719
1.831
1.719
1.831
0.000
0.000
201.335
201.288
159.70
159.70
201.594
201.547
0.60
0.60
0.15
0.15
0.200
0.200
1.310
1.422
9.836
10.653
0.000
0.000
0.000
0.000
0.000
0.000
0.600
0.600
1.658
1.658
7.378
8.194
10.00 50.00 203.173 -0.470 201.345 0.0043 0.100 1.932 6 10.000 50.00 203.173 -0.470 201.345 0.0043 0.10 1.932 1.932 0.000 201.241 159.70 201.500 0.60 0.15 0.200 1.523 11.292 0.000 0.000 0.000 0.600 1.658 8.834
2705 6.400 56.40 203.260 -0.470 201.310 0.0043 0.100 2.054 7 6.400 56.40 203.260 -0.470 201.310 0.0043 0.10 2.054 2.000 0.054 201.206 159.70 201.465 0.60 0.15 0.128 1.645 7.550 0.104 0.000 0.000 0.384 1.061 6.081

ESQUEMA PLANIMETRICO TRAMOS 56.40 1.687 1.130 56.354 0.104 0.000 0.000 3.384 9.351 42.594
12.735

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 56.40
203,260 203.500 203.260
12.33 12.55 201,310 203.119 203.173
203.054
202.941
203.000 202.780 202.834
6.00
2576
TAS-PVC-DN150--0,470%-56,40 TB-273 2705 202.500

202.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
201.500
202,780 201.580 201.533 201.486 201.439 201.392
201,580 201.345 201.310

C.I. 2576

C.I. 2705
201.000

200.500 TRAMO TB -273

200.000

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0

N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -271 DESDE C.I. : 2186 523605.240 8782662.010 203.080 201.630 LONGITUD TRAMO : 72.43 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -271
HASTA C.I. : 2429 523545.640 8782619.120 203.320 201.020 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 72.43 ML i (%) : -0.831 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM

BARRIO : SAN PEDRO DIST. ESTIMADA 73.43 i (%) TRAMO : -0.831 % FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3
2186 0.00 0.00 203.080 -0.831 201.630 0.0043 0.100 1.554 1 0.000 0.00 203.080 -0.831 201.630 0.0043 0.10 1.554 1.554 0.000 201.526 159.70 201.785 0.60 0.15 0.000 1.145 0.000 0.000 0.000 0.000 0.000
10.00 10.00 203.119 -0.831 201.547 0.0043 0.100 1.676 2 10.000 10.00 203.119 -0.831 201.547 0.0043 0.10 1.676 1.676 0.000 201.443 159.70 201.702 0.60 0.15 0.200 1.267 9.692 0.000 0.600 1.658 7.234
10.00 20.00 203.152 -0.831 201.464 0.0043 0.100 1.792 3 10.000 20.00 203.152 -0.831 201.464 0.0043 0.10 1.792 1.792 0.000 201.360 159.70 201.619 0.60 0.15 0.200 1.383 10.406 0.000 0.600 1.658 7.948
10.00
10.00
30.00
40.00 opcional 203.115
203.090
-0.831
-0.831
201.381
201.298
0.0043
0.0043
0.100
0.100
1.839
1.897
4
5
10.000
10.000
30.00
40.00
203.115
203.090
-0.831
-0.831
201.381
201.298
0.0043
0.0043
0.10
0.10
1.839
1.897
1.839
1.897
0.000
0.000
201.276
201.193
159.70
159.70
201.536
201.453
0.60
0.60
0.15
0.15
0.200
0.200
1.429
1.487
10.893
11.205
0.000
0.000
0.600
0.600
1.658
1.658
8.435
8.747
10.00 50.00 203.097 -0.831 201.215 0.0043 0.100 1.987 6 10.000 50.00 203.097 -0.831 201.215 0.0043 0.10 1.987 1.987 0.000 201.110 159.70 201.370 0.60 0.15 0.200 1.577 11.650 0.000 0.600 1.658 9.192
10.00 60.00 203.105 -0.831 201.132 0.0043 0.100 2.078 7 10.000 60.00 203.105 -0.831 201.132 0.0043 0.10 2.078 2.000 0.078 201.027 159.70 201.287 0.60 0.15 0.200 1.668 11.960 0.233 0.600 1.658 9.735
10.00 70.00 203.278 -0.831 201.049 0.0043 0.100 2.334 8 10.000 70.00 203.278 -0.831 201.049 0.0043 0.10 2.334 2.000 0.334 200.944 159.70 201.204 0.60 0.15 0.200 1.924 12.000 1.235 0.600 1.658 10.776
2429 2.430 72.43 203.320 -0.831 201.020 0.0043 0.100 2.404 9 2.430 72.43 203.320 -0.831 201.020 0.0043 0.10 2.404 2.000 0.404 200.916 159.70 201.175 0.60 0.15 0.049 1.995 2.916 0.538 0.146 0.403 2.857

ESQUEMA PLANIMETRICO TRAMOS 72.43 1.951 1.451 80.722 2.006 4.346 12.008 64.923
16.354

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 72.43
203,320 204.000
12.33 12.55 201,020
203.500 203.278 203.320
203.080 203.119 203.152 203.115 203.090 203.097 203.105
6.00 203.000
2186
TAS-PVC-DN150--0,831%-72,43 TB-271 2429 202.500

202.000 PERFILCOTA TERRENO TRAMO


PERFIL COTA SOLERA TUBO RED
201.500
203,080 201.630 201.547 201.464 201.381 201.298
201,630 201.000 201.215 201.132

C.I. 2186

C.I. 2429
201.049 201.020
200.500
TRAMO TB -271
200.000

199.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0
N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________
ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA) ZHEJIANG PROVINCIAL NO.1 WATER CONSERVANCY & ELECTRIC POWER CONSTRUCTION GROUP HOLDINGS CO LTDA (SUCURSAL BOLIVIA)

Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija Construcción Sistemas de Agua Potable y Mejoramiento Alcantarillado Sanitario Cobija
PLANILLA DE REPLANTEO CATASTRO Y CENSO - RED ALCANTARILLADO SANITARIO PLANILLA DE CALCULO DE VOLUMENES DE EXCAVACION Y RELLENO - RED ALCANTARILLADO SANITARIO
TRAMO : TB -1303 DESDE C.I. : 2185 523560.740 8782727.620 203.200 202.000 LONGITUD TRAMO : 78.28 ML ESPESOR TUBO : 0.0043 ZONA 1 TRAMO: TB -1303

HASTA C.I. : 2186 523605.240 8782662.010 203.080 201.630 MATERIAL TUBO RED: PVC 6" SDR41 D3034 AG ANCHO DE ZANJA : 0.60 DN : 6" PLG LONG. : 78.28 ML i (%) : -0.467 MAT. : PVC 6" SDR41 D3034 AG DIAMETRO EXT. TUB.. 159.70 MM
BARRIO : SAN PEDRO DIST. ESTIMADA 79.28 i (%) TRAMO : -0.467 % 0.46670993357 FECHA : lunes, 26 de marzo de 2018 ALT. ENCAPE : 0.15 ML
DN : 6" PLG ASIENTO TUBERIA 0.10 ML
PTO LONG. LONGITUD COTA PEND. COTA PARED ALT. PROF. PROF. PROF. COTA DIAM. EXT. COTA ANCHO ALTURA VOLUMEN ALTURA VOLUMENES
DISTANCIA DISTANCIA ALTURA COTA PEND. (i) COTA PARED ALTURA ALTURA
LECTURAS
ENTRE PARCIAL ACUMULADA INSTRUM. TERRENO SOLERA TUBO ASIENTO EXCAVACION N° PARCIAL ACUMUL. TERRENO % SOLERA TUBO ASIENTO EXCAV. EXCAV. EXCAV. EXCAV. TUBERIA CLAVE ZANJA RELL.CERN. DEL TUBO RELL. COM. EXCAV. 0-2 EXCAV. 2-4 EXCAV. 4-6 EXCAV. 6-8 ASIENTO RELL.CER RELL. COM.
NUDOS
m m ATRÁS INTERM. ADELANTE m m °/o m m m m ml ml m m m ml ml 0-2m 2-4m m mm ml ml ml m3 ml m3 m3 m3 m3 m3 m3 m3
2185 0.00 0.00 203.200 -0.467 202.000 0.0043 0.100 1.304 1 0.000 0.00 203.200 -0.467 202.000 0.0043 0.10 1.304 1.304 0.000 201.896 159.70 202.155 0.60 0.15 0.000 0.895 0.000 0.000 0.000 0.000 0.000 0.000 0.000
10.00 10.00 203.321 -0.467 201.953 0.0043 0.100 1.472 2 10.000 10.00 203.321 -0.467 201.953 0.0043 0.10 1.472 1.472 0.000 201.849 159.70 202.109 0.60 0.15 0.200 1.062 8.329 0.000 0.000 0.000 0.600 1.658 5.871
10.00 20.00 203.849 -0.467 201.907 0.0043 0.100 2.047 3 10.000 20.00 203.849 -0.467 201.907 0.0043 0.10 2.047 2.000 0.047 201.802 159.70 202.062 0.60 0.15 0.200 1.637 10.416 0.140 0.000 0.000 0.600 1.658 8.098
10.00
10.00
30.00
40.00 opcional 203.235
203.261
-0.467
-0.467
201.860
201.813
0.0043
0.0043
0.100
0.100
1.479
1.552
4
5
10.000
10.000
30.00
40.00
203.235
203.261
-0.467
-0.467
201.860
201.813
0.0043
0.0043
0.10
0.10
1.479
1.552
1.479
1.552
0.000
0.000
201.756
201.709
159.70
159.70
202.015
201.969
0.60
0.60
0.15
0.15
0.200
0.200
1.070
1.142
10.438
9.094
0.140
0.000
0.000
0.000
0.000
0.000
0.600
0.600
1.658
1.658
8.120
6.636
10.00 50.00 203.234 -0.467 201.767 0.0043 0.100 1.572 6 10.000 50.00 203.234 -0.467 201.767 0.0043 0.10 1.572 1.572 0.000 201.662 159.70 201.922 0.60 0.15 0.200 1.162 9.371 0.000 0.000 0.000 0.600 1.658 6.913
10.00 60.00 202.866 -0.467 201.720 0.0043 0.100 1.250 7 10.000 60.00 202.866 -0.467 201.720 0.0043 0.10 1.250 1.250 0.000 201.616 159.70 201.875 0.60 0.15 0.200 0.841 8.466 0.000 0.000 0.000 0.600 1.658 6.008
10.00 70.00 203.142 -0.467 201.673 0.0043 0.100 1.573 8 10.000 70.00 203.142 -0.467 201.673 0.0043 0.10 1.573 1.573 0.000 201.569 159.70 201.829 0.60 0.15 0.200 1.163 8.470 0.000 0.000 0.000 0.600 1.658 6.012
2186 8.280 78.28 203.080 -0.467 201.630 0.0043 0.100 1.554 9 8.280 78.28 203.080 -0.467 201.630 0.0043 0.10 1.554 1.554 0.000 201.526 159.70 201.785 0.60 0.15 0.166 1.145 7.768 0.000 0.000 0.000 0.497 1.373 5.733

ESQUEMA PLANIMETRICO TRAMOS 78.28 1.534 1.568 72.352 0.280 0.000 0.000 4.697 12.978 53.389
17.675

VIA 2
VIA 1

CONEX. PERFIL LONGITUDINAL


DOMIC.
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 78.28
203,080 204.500
12.33 12.55 201,630
204.000 203.849

6.00
2185
TAS-PVC-DN150--0,467%-78.28 TB-1303 2186
203.500 203.200 203.321 203.235 203.261 203.234
202.866
203.142 203.080
203.000
PERFILCOTA TERRENO TRAMO
202.500 PERFIL CO TA SOLERA TUBO RED
203,200 202.000
202,030 201.953

C.I. 2185

C.I. 2186
202.000 201.907 201.860 201.813 201.767 201.720
201.500 201.673
201.630
201.000
TRAMO TB -1303

200.500

CONEXIONES DOMICILIARIAS REGISTRADAS: OBSERVACIONES:


AL EJE DE VIA SIN CHIMENEA = 0
AL EJE DE VIA CON CHIMENEA = 0

N
EN LA ACERA (CONDOMINIAL) = 0

POR EL CONTRATISTA………………………………….. POR EL SUPERVISOR…………………………………….


Fecha……………………… Fecha………………………. Por el CONTRATISTA_______________________ Revisado por el SUPERVISOR____________________