You are on page 1of 2

No.

Task Name Duration Start Finish


1 Outfitting Engineering
1.1 Equipment Number
1.2 Manhole Arrangement
1.3 Hull Marking
1.4 Mast Detail
1.5 Whell House Arrangement
1.6 ECR Arrangement
1.7 Whell House Top Arrangement
1.8 Painting Boundary
1.9 Railing Arrangement
1.10 Fender Arrangement
1.11 Bordes Arrangement
1.12 Ladder Arrangement
1.13 Ceiling Arrangement
1.14 Linning Arrangement
1.15 Hatch Arrangement
1.16 Hawse Pipe Detail
1.17 Flooring Arrangement
1.18 Eye Plate For Overhul
1.19 Air Vnet Construction
1.20 Portable Tank
1.21 Safety Foundation
1.22 Ship Name
1.23 Emergency Genset Layout
1.24 Tiller Stopper
1.25 Funnel Accessories
1.26 Chain Locker Detail
1.27 Boom Rest
1.28 CCTV Position
1.29 Dry Store General Layout
1.30 Rescue Boat Arrangement
1.31 Accomodation Arrangement
2 Outfitting Work
2.1 Install Doors, Windows, and Scuttles
2.2 Watertight Door
2.3 Weathertight Door
2.4 Cabin Door
2.5 Toilet Door
2.6 Accessories
2.7 Windows
2.8 Scuttles
2.9 Install AC and Mechanical Ventilation
2.10 AC Split
2.11 Cold Storage
2.12 Mechanical Ventilation
2.13 Install Accomodation, Linning, Ceiling, and Insulation
2.14 Accommodation
2.15 Lining
2.16 Ceiling
2.17 Insulation
2.18 Galley and Laudry Equipment
3 Outfitting Steel Work
3.1 Fabrication
3.2 Bollard
3.3 Manhole
3.4 Small Hatch
3.5 Railing Arrangement
3.6 Tiang Mast
3.7 Tangga dengan Railing
3.8 Pelat Nama dan Tanda Tanda
3.9 Pondasi Infilitable LifeRaft
3.10 Hawse Pipe and Bellmouth
3.11 Bordes Engine Room
3.12 Independent Tank
3.13 Install
3.14 Bottom Plug
3.15 Boollard
3.16 Manhole
3.17 Small Hatch
3.18 Railing
3.19 Fender depan
3.20 Tiang Mast
3.21 Tangga dengan Railing
3.22 Pelat Nama dan Tanda Tanda
3.23 Pondasi Infilitable LifeRaft
3.24 Hawse Pipe and Bellmouth
3.25 Bordes Engine Room
3.26 Fairlead and Close Chock
3.27 Tire Fender
3.28 Skylight Window
3.29 Independent Tank
3.30 Misscelleneous

You might also like