You are on page 1of 2

MAINTENANCE AND ENGINEERING DIVISION

CONSTRUCTION LAYOUT MONITORING FORM

Project Title: TCPI 6000t/d Cement Clinker Production Line Project Date:

Building Structure:

Subject:

Item Coordinates Overall Deviation


Description Remarks
No. Northing Easting Elevation (mm)

Plan
1 Actual
Difference
Plan
2 Actual
Difference
Plan
3 Actual
Difference
Plan
4 Actual
Difference
Plan
5 Actual
Difference
Plan
6 Actual
Difference
Plan
7 Actual
Difference
Plan
8 Actual
Difference
Plan
9 Actual
Difference
Plan
10 Actual
Difference
Plan
11 Actual
Difference
Plan
12 Actual
Difference
Plan
13 Actual
Difference
Plan
14 Actual
Difference
Plan
15 Actual
Difference
Note: For allowable tolerances, refer to TABLE 4-11-3-7 and 4-11-3-8 in the Civil Works Tender Document

Prepared by: Acknowledged by:

SINOMA HD - Project In-charge / CONCH - Project In-charge Staff Engineer/Project In-Charge


MAINTENANCE AND ENGINEERING DIVISION

CONSTRUCTION LAYOUT MONITORING FORM

Project Title: TCPI 6000t/d Cement Clinker Production Line Project Date:

Building Structure:

Subject:

Item Coordinates Overall Deviation


Description Remarks
No. Northing Easting Elevation (mm)

Noted by:
Hiroshi Terashima / Rey L. Gentiles / Rodrigo L. Tan / Rolando G. Buhisan
Civil Project Dept. Manager / Dep. Dept Manager / Dept. Manager / AVP/APM/Division Manager

You might also like