RENCANA MAINTENANCE AKHIR TAHUN 2022 (24 DES 2022 - 2 JAN 2023)

PT. ASTRA HONDA MOTOR


PED PLANT 4&5, KARAWANG

1. SEKSI PAINTING STEEL PLANT 4


2021
Sabtu Minggu Senin Selasa Rabu Kamis Juma
24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-De
NO LINE EQUIPMENT STATION ITEM PEKERJAAN TARGET
A B C D A B C D A B C D A B C D A B C D A B C D A B

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2. SEKSI PAINTING PLASTIK PLANT 4
2021
Sabtu Minggu Senin Selasa Rabu Kamis Juma
24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-De
NO LINE EQUIPMENT STATION ITEM PEKERJAAN TARGET
A B C D A B C D A B C D A B C D A B C D A B C D A B

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3. SEKSI UPL PLANT 4 2021
Sabtu Minggu Senin Selasa Rabu Kamis Juma
24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-De
NO LINE EQUIPMENT STATION ITEM PEKERJAAN TARGET
A B C D A B C D A B C D A B C D A B C D A B C D A B

TOTAL MAN POWER 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0


4. SEKSI PAINTING PLASTIK PLANT 5
2021
Sabtu Minggu Senin Selasa Rabu Kamis Juma
24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-De
NO LINE EQUIPMENT STATION ITEM PEKERJAAN TARGET
A B C D A B C D A B C D A B C D A B C D A B C D A B
1

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5. SEKSI UPL PLANT 5 2021


Sabtu Minggu Senin Selasa Rabu Kamis Juma
24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-De
NO LINE EQUIPMENT STATION ITEM PEKERJAAN TARGET
A B C D A B C D A B C D A B C D A B C D A B C D A B

TOTAL MAN POWER 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0


6. SEKSI PAINTING STEEL PLANT 5 2021
Sabtu Minggu Senin Selasa Rabu Kamis Juma
24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-De
NO LINE EQUIPMENT STATION ITEM PEKERJAAN TARGET
A B C D A B C D A B C D A B C D A B C D A B C D A B

TOTAL KEBUTUHAN MAN POWER 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

A B C D A B C D A B C D A B C D A B C D A B C D A B
TOTAL MAN POWER 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

KETERANGAN :
A = Man Power Process 0
B = Man Power Produksi 0
C = Man Power Manufactur / Provider 0
D = Man Power Sub Kontraktor 0

Dibuat Dibuat Dibuat Dibuat Dibuat Dibuat

Anas Fajar Dede Andryan Dewita N Andhi Sunaryo Irfan Wahyu F Fransiska M P
Koord PEPT4 Koord PEPP4 Koord PEUP4 Koord PEPT5 Koord PEPP5 Koord PEUP5 PE
2021
Jumat Sabtu Minggu Senin
KEBUTUHAN JUMLAH SATUAN KETERANGAN
30-Dec 31-Dec 1-Jan 2-Jan
C D A B C D A B C D A B C D A B C D A B C D

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2021
Jumat Sabtu Minggu Senin Dec-99 Dec-99
KEBUTUHAN JUMLAH SATUAN KETERANGAN
30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
C D A B C D A B C D A B C D A B C D A B C D

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2021
Jumat Sabtu Minggu Senin Dec-99 Dec-99
KEBUTUHAN JUMLAH SATUAN KETERANGAN
30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
C D A B C D A B C D A B C D A B C D A B C D

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2021
Jumat Sabtu Minggu Senin Dec-99 Dec-99
KEBUTUHAN JUMLAH SATUAN KETERANGAN
30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
C D A B C D A B C D A B C D A B C D A B C D

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2021
Jumat Sabtu Minggu Senin Dec-99 Dec-99
KEBUTUHAN JUMLAH SATUAN KETERANGAN
30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
C D A B C D A B C D A B C D A B C D A B C D

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2021
Jumat Sabtu Minggu Senin Dec-99 Dec-99
KEBUTUHAN JUMLAH SATUAN KETERANGAN
30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
C D A B C D A B C D A B C D A B C D A B C D

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

C D A B C D A B C D A B C D A B C D A B C D
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

uat Dibuat Diperiksa Diperiksa Diperiksa Disetujui Disetujui

ahyu F Fransiska M Petrus Jati K Williamdy Susianti Herybertus Gaby Steve Kurniawan
PEPP5 Koord PEUP5 PED3 Sub Dept PED4 Sub Dept PED5 Sub Dept PED Dept Head Engineering Div. Head
KESEDIAAN MASUK MAN POWER
RENCANA MAINTENANCE AKHIR TAHUN 2022 (24 DES 2022 - 2 JAN 2023)
PT. ASTRA HONDA MOTOR
PED PLANT 4&5, KARAWANG

1. PEPT4
2021
No Nama No Telp NRP GOL KJ Sabtu Minggu Senin Selasa Rabu Kamis Jumat Sabtu Minggu Senin Total/MP Inisial MP
24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan
1 Anas Fajar 0856 - 3533 - 382 21776 4 7 0 AF
2 Diniung Ery 0821 -1013 - 8979 31198 4 7 0 DE
3 Abi S 0877 - 9766 - 3397 56840 3 5 0 AB
4 Niko Pambudi 0813 - 3125 - 8160 68909 3 5 0 NK
5 M Zainudin 0857 - 1003 - 1243 21110 2 4 0 ZN
6 Rudi S 0812 - 1981 - 8606 25178 2 4 0 RD
7 Yosep Supriadi 0812 - 1019 - 0404 23755 2 4 0 YS
8 Cecep D 0812 - 1019 - 0404 22469 2 4 0 CE
Total MP/Day 0 0 0 0 0 0 0 0 0 0 0 0 0
Keterangan : 1 Diseting di PEPT4 1 Diseting di PEPP4 1 Diseting di PEUP4
1 Diseting di PEPT5 1 Diseting di PEPP5 1 Diseting di PEUP5 Bersedia Masuk / tidak disetting
2.PEPT5
2021
No Nama No Telp NRP GOL KJ Sabtu Minggu Senin Selasa Rabu Kamis Jumat Sabtu Minggu Senin Dec-99 Dec-99 Total/MP Inisial MP
24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
1 Andhi Sunaryo 0856-9412-2015 19085 4 7 0 ANS
2 Fungki Setyo Y 0856-4937-9976 54348 4 7 0 FSE
3 M Syafiq Azmi 0858-8017-1102 88519 4 7 0 APA
4 Yusuf Hasyim 0817-4307-85 21672 4 7 0 YHA
5 Aryo Pasaribu 0812-9381-2608 21505 4 7 0 MSY
6 Puguh Hernowo 0899-8029-397 17124 3 5 0 PHE
7 Theodorus Eko 0812-1518-4918 48939 3 5 0 TEK
8 Iqbal M 0852-2348-6923 67874 3 5 0 IQM
9 Astomo 0857-1475-5548 61774 3 5 0 AST
10 Mukit Almalik 85724200916 54825 3 5 0 MAL
11 Ade Roidin 0899-8029-397 24950 2 2 0 ARO
12 Fuad Surono 0822-9839-0292 21317 2 4 0 FSU
13 Hedi Rohaedi 0815-1116-4969 26583 2 3 0 HRO
14 Bambang Supardi 0878-0453-3320 24081 2 4 0 BSU
15 Ahmad Syafei 0889-7795-6186 24223 2 4 0 ASY
16 Abdul Fadillah 0857-1139-8994 18975 2 4 0 AFA
Total MP/Day 0 0 0 0 0 0 0 0 0 0 0 0 0
Keterangan : 1 Diseting di PEPT4 1 Diseting di PEPP4 1 Diseting di PEUP4
1 Diseting di PEPT5 1 Diseting di PEPP5 1 Diseting di PEUP5 Bersedia Masuk / tidak disetting
3. PEPP4
2021
No Nama No Telp NRP GOL KJ Sabtu Minggu Senin Selasa Rabu Kamis Jumat Sabtu Minggu Senin Dec-99 Dec-99 Total/MP Inisial MP
24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
1 DEDE ANDRYAN BUDIMAN 0819-3242-5253 35584 4 7 0 DAN
2 HARMADI MANURUNG 0813-1022-2356 21515 4 7 0 HMA
3 AHMAD GURNITO 0857-9123-9545 72928 4 7 0 AGU
4 MILADIA MALINDA 0812-1333-0012 93567 4 7 0 MMA
5 SAMUEL 0812-9059-7416 98300 4 7 0 SAM
6 HANA AFIFAH RAHMAN 0857-2052-0939 61555 3 5 0 HAF
7 WAHYU GUSTIAWAN 0812-9869-3765 43075 2 2 0 WGU
8 SAEFULLOH 0812-1055-8910 22107 2 4 0 SAE
9 ANDHI DJOKO SUSILO 0852-1887-0852 19973 3 4 0 ADJ
10 PAULUS JOKO MUJONO 0877-2686-4810 20074 2 4 0 PJO
11 EKO SUSILO 0812-9482-8384 19908 2 4 0 ESU
12 AGUS SUJARWANTO 0813-8170-2678 48944 3 5 0 AGS
13 HANIFFUDIN 0831-8024-8163 61556 3 5 0 HAN
14 GIGIH YOGIHATMOKO 0897-8421-440 62341 3 5 0 GYO
15 HEPPY DWI YUTANTO 0857-3600-1056 67871 3 5 0 HDW
16 RAGIL SURYANING F. 0857-3366-8533 93025 3 5 0 RSU
17 VENO IVANTO 0896-7048-3884 96352 3 5 0 VIV
18 0
Total MP/Day 0 0 0 0 0 0 0 0 0 0 0 0 0
Keterangan : 1 Diseting di PEPT4 1 Diseting di PEPP4 1 Diseting di PEUP4
1 Diseting di PEPT5 1 Diseting di PEPP5 1 Diseting di PEUP5 Bersedia Masuk / tidak disetting
4. PEUP4
2021
No Nama No Telp NRP GOL KJ Sabtu Minggu Senin Selasa Rabu Kamis Jumat Sabtu Minggu Senin Dec-99 Dec-99 Total/MP Inisial MP
24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
1 DEWITA NURAINY 081219200133 22295 4 7 0 DNA
2 YUDI MULYADI 081213149500 22522 4 7 0 YMY
3 SYAMHANI 081283731617 21449 2 4 0 SYA
4 NUR HIDAYAT 085692266411 21102 2 4 0 NHD
5 GANANG SYAHWALI 081510455001 26117 2 3 0 GSW
6 ROBINSON 081223289494 20019 2 3 0 RBS
8 RULLY SETIAJI 083816166383 20633 2 3 0 RST
9 DEDE SYARIF 081315046947 20757 2 3 0 DSY
10 AZIS TONE 081388764816 19424 2 3 0 AZT
11 YUDHI RIZAL P. 081314973971 19301 2 2 0 YRP
12 INDRA BAYU 081294418439 25592 2 2 0 IBY
13 NUR HERYAJI 082112852218 35550 2 2 0 NHR
13 0
14 0
Total MP/Day 0 0 0 0 0 0 0 0 0 0 0 0 0
Keterangan : 1 Diseting di PEPT4 1 Diseting di PEPP4 1 Diseting di PEUP4
1 Diseting di PEPT5 1 Diseting di PEPP5 1 Diseting di PEUP5 Bersedia Masuk / tidak disetting

5. PEPP5
2021
No Nama No Telp NRP GOL KJ Sabtu Minggu Senin Selasa Rabu Kamis Jumat Sabtu Minggu Senin Dec-99 Dec-99 Total/MP Inisial MP
24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
1 Irfan Wahyu Firmansyah 85710361613 20316 4 7 0 IWA
2 Ade Rustendi 8567993790 18860 4 7 0 ARU
3 Setiawan Romadhan 85712791547 65835 4 7 0 SRO
4 Muhammad Zulfikar Fauzi 81316484302 83248 4 7 0 MZU
5 Bambang Purbo Prasodjo 85749141667 44015 4 7 0 BPU
6 Putu Dharmawan Adi Prasetyo 85727774067 54817 3 5 0 PTD
7 Juniarsah 82374436111 56837 3 5 0 JUN
8 Syahril hanafi 85280350857 58745 3 5 0 SHA
9 Matra Kilasani Anikawa 89633340265 61771 3 5 0 MKI
10 Doni Kurniawan 81392104072 63330 3 5 0 DKU
11 Onesimus Tandy Triyanto 81329842290 68907 3 5 0 OTA
12 Abim Ridha Gautama 85815136419 97486 3 5 0 ARI
13 Ade Nirma Khusnul Khotimah 83899429818 100394 3 5 0 ANI
14 Hendra Supriatna 83875979473 14008 2 4 0 HSU
15 Satriadi 81282066350 18623 2 4 0 SAT
16 Supangat 81380520865 21565 2 4 0 SUP
17 Nanda Pujiatmiko 87834051010 37774 2 3 0 NPU
Total MP/Day 0 0 0 0 0 0 0 0 0 0 0 0 0
Keterangan : 1 Diseting di PEPT4 1 Diseting di PEPP4 1 Diseting di PEUP4
1 Diseting di PEPT5 1 Diseting di PEPP5 1 Diseting di PEUP5 Bersedia Masuk / tidak disetting

6. PEUP5
2021
No Nama No Telp NRP GOL KJ Sabtu Minggu Senin Selasa Rabu Kamis Jumat Sabtu Minggu Senin Dec-99 Dec-99 Total/MP Inisial MP
24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
1 Fransiska M 87739183829 61799 4 7 0 FMU
2 Rini Sihimbing 8987875497 67870 3 5 0 RSI
3 Ricky Surya W 81291851813 88533 3 5 0 RSU
4 Ali Usman 81284232882 21605 2 4 0 AUS
5 Kardi 81386174719 21594 2 3 0 KAR
6 Khasib Muttaqin 85291511402 32142 2 3 0 KHM
7 Khairul Umam 81380072092 32141 2 3 0 FER
8 Baidillah 85959114117 20072 2 3 0 ASA
9 Anggar 8128834188 21314 2 3 0 BAI
10 Mustopa 87848463948 24957 2 3 0 MUS
11 Ferdi 87875498686 33060 2 3 0 KUM
12 Ahamd Saefudin 85218627642 21732 2 3 0 ANE
13 Cecep W 82246141973 33521 2 3 0 CEW
Total MP/Day 0 0 0 0 0 0 0 0 0 0 0 0 0
Keterangan : 1 Diseting di PEPT4 1 Diseting di PEPP4 1 Diseting di PEUP4
1 Diseting di PEPT5 1 Diseting di PEPP5 1 Diseting di PEUP5 Bersedia Masuk / tidak disetting

Dibuat Dibuat Dibuat Dibuat Dibuat Dibuat Diperiksa Diperiksa Diperiksa Disetujui

Anas Fajar Dede Andryan Dewita N Andhi Sunaryo Irfan Wahyu F Fransiska M Petrus Jati K Williamdy Susianti Herybertus Gaby
Koord PEPT4 Koord PEPP4 Koord PEUP4 Koord PEPT5 Koord PEPP5 Koord PEUP5 PED3 Sub Dept PED4 Sub Dept PED5 Sub Dept PED Dept Head
BUDGET OVER TIME
RENCANA MAINTENANCE AKHIR TAHUN 2022 (24 DES 2022 - 2 JAN 2023)
PT. ASTRA HONDA MOTOR
PED PLANT 4&5, KARAWANG

No Nama GOL KJ Sabtu Minggu Senin Selasa Rabu Kamis Jumat Sabtu Minggu Senin Dec-99 Dec-99 Total/MP Inisial MP
24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
1 4 7 0
2 3 5 0
3 PEPP4 2 4 0
4 2 3 0
5 2 2 0
Total MP/Day 0 0 0 0 0 0 0 0 0 0 0 0 0

No Nama GOL KJ Sabtu Minggu Senin Selasa Rabu Kamis Jumat Sabtu Minggu Senin Dec-99 Dec-99 Total/MP Inisial MP
24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
1 4 7 0
2 3 5 0
3
PINJAMAN - PE 2 4 0
4 PEPP4 2 3 0
5 2 2 0
Total MP/Day 0 0 0 0 0 0 0 0 0 0 0 0 0

No Nama GOL KJ Sabtu Minggu Senin Selasa Rabu Kamis Jumat Sabtu Minggu Senin Dec-99 Dec-99 Total/MP Inisial MP
24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
1 4 7 0
2 3 5 0
3 PEPT4 2 4 0
4 2 3 0
5 2 2 0
Total MP/Day 0 0 0 0 0 0 0 0 0 0 0 0 0

No Nama GOL KJ Sabtu Minggu Senin Selasa Rabu Kamis Jumat Sabtu Minggu Senin Dec-99 Dec-99 Total/MP Inisial MP
24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
1 4 7 0
2 3 5 0
3 PEUP4 2 4 0
4 2 3 0
5 2 2 0
Total MP/Day 0 0 0 0 0 0 0 0 0 0 0 0 0

No Nama GOL KJ Sabtu Minggu Senin Selasa Rabu Kamis Jumat Sabtu Minggu Senin Dec-99 Dec-99 Total/MP Inisial MP
24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
1 4 7 0
2 3 5 0
3 PEPT5 2 4 0
4 2 3 0
5 2 2 0
Total MP/Day 0 0 0 0 0 0 0 0 0 0 0 0 0

No Nama GOL KJ Sabtu Minggu Senin Selasa Rabu Kamis Jumat Sabtu Minggu Senin Dec-99 Dec-99 Total/MP Inisial MP
24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
1 4 7 0
2 3 5 0
3 PEPP5 2 4 0
4 2 3 0
5 2 2 0
Total MP/Day 0 0 0 0 0 0 0 0 0 0 0 0 0

No Nama GOL KJ Sabtu Minggu Senin Selasa Rabu Kamis Jumat Sabtu Minggu Senin Dec-99 Dec-99 Total/MP Inisial MP
24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
1 4 7 0
2 3 5 0
3 PEUP5 2 4 0
4 2 3 0
5 2 2 0
Total MP/Day 0 0 0 0 0 0 0 0 0 0 0 0 0

No Nama GOL KJ Sabtu Minggu Senin Selasa Rabu Kamis Jumat Sabtu Minggu Senin Dec-99 Dec-99 Total/MP Inisial MP
24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
1 4 7 0
2 3 5 0
3 PIKET 2 4 0
4 2 3 0
5 2 2 0
Total MP/Day 0 0 0 0 0 0 0 0 0 0 0 0 0

KJ Jumlah MP Estimation Cost Total KJ Jumlah MP Estimation Cost Total


PEPP4 KJ - 7 0 Rp 450,000 Rp - PEPT4 KJ - 7 0 Rp 450,000 Rp -
KJ - 5 0 Rp 1,847,536 Rp - KJ - 5 0 Rp 1,847,536 Rp -
KJ - 4 0 Rp 1,644,384 Rp - KJ - 4 0 Rp 1,644,384 Rp -
KJ - 3 0 Rp 1,564,048 Rp - KJ - 3 0 Rp 1,564,048 Rp -
KJ - 2 0 Rp 1,367,088 Rp - KJ - 2 0 Rp 1,367,088 Rp -
Rp - Rp -

KJ Jumlah MP Estimation Cost Total KJ Jumlah MP Estimation Cost Total


PINJAMAN - PE PEPP4 KJ - 7 0 Rp 450,000 Rp - PEUP4 KJ - 7 0 Rp 450,000 Rp -
KJ - 5 0 Rp 1,847,536 Rp - KJ - 5 0 Rp 1,847,536 Rp -
KJ - 4 0 Rp 1,644,384 Rp - KJ - 4 0 Rp 1,644,384 Rp -
KJ - 3 0 Rp 1,564,048 Rp - KJ - 3 0 Rp 1,564,048 Rp -
KJ - 2 0 Rp 1,367,088 Rp - KJ - 2 0 Rp 1,367,088 Rp -
Rp - Rp -

KJ Jumlah MP Estimation Cost Total KJ Jumlah MP Estimation Cost Total


PEPT5 KJ - 7 0 Rp 450,000 Rp - PEPP5 KJ - 7 0 Rp 450,000 Rp -
KJ - 5 0 Rp 1,847,536 Rp - KJ - 5 0 Rp 1,847,536 Rp -
KJ - 4 0 Rp 1,644,384 Rp - KJ - 4 0 Rp 1,644,384 Rp -
KJ - 3 0 Rp 1,564,048 Rp - KJ - 3 0 Rp 1,564,048 Rp -
KJ - 2 0 Rp 1,367,088 Rp - KJ - 2 0 Rp 1,367,088 Rp -
Rp - Rp -

KJ Jumlah MP Estimation Cost Total KJ Jumlah MP Estimation Cost Total


PEUP5 KJ - 7 0 Rp 450,000 Rp - PIKET KJ - 7 0 Rp 450,000 Rp -
KJ - 5 0 Rp 1,847,536 Rp - KJ - 5 0 Rp 1,847,536 Rp -
KJ - 4 0 Rp 1,644,384 Rp - KJ - 4 0 Rp 1,644,384 Rp -
KJ - 3 0 Rp 1,564,048 Rp - KJ - 3 0 Rp 1,564,048 Rp -
KJ - 2 0 Rp 1,367,088 Rp - KJ - 2 0 Rp 1,367,088 Rp -
Rp - Rp -

Estimasi budget
Total MP MP Eng MP Prod MP EHS Budget Estimasi budget Eng Estimasi budget Prod
EHS

PEPP4 0 0 0 PEPP4 Rp - Rp - Rp -
PEPT4 0 0 0 PEPT4 Rp - Rp - Rp -
PEUP4 0 0 0 PEUP4 Rp - Rp - Rp -
PEPP5 0 0 0 PEPP5 Rp - Rp - Rp -
PEPT5 0 0 0 PEPT5 Rp - Rp - Rp -
PEUP5 0 0 0 PEUP5 Rp - Rp - Rp -
PIKET 0 PIKET Rp -
TOTAL 0 0 0 Total Rp - Rp - Rp -
RENCANA MAINTENANCE AKHIR TAHUN 2022 (24 DES 2022 - 2 JAN 2023)
PT. ASTRA HONDA MOTOR
PED PLANT 4&5, KARAWANG

ABS PLANT 4
No Station Detail Chemical Content 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
1 Pretreatment

2 Sludge Pool

ABS PLANT 5
No Station Detail Chemical Content 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
1 Pretreatment Degreasing
Water rinse 1
Water Rinse 2
Pembilasan

2 Sludge Pool

CED PLANT 4
No Station Detail Chemical Content 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
1 UG - Degreasing
UG - Rinsing / Phospat
UG - ED

CED PLANT 5
No Station Detail Chemical Content 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
1 UG - Degreasing ( CED )
UG - Rinsing ( CED )
UG - ED ( CED )
UG - Phospating ( CED )
2 UG - Phospating ( SPC )

Dibuat Dibuat Dibuat Dibuat Dibuat Dibuat Diperiksa Diperiksa Diperiksa Disetujui

Anas Fajar Dede Andryan Dewita N Andhi Sunaryo Irfan Wahyu F Fransiska M Petrus Jati K Williamdy Susianti Herybertus Gaby
Koord PEPT4 Koord PEPP4 Koord PEUP4 Koord PEPT5 Koord PEPP5 Koord PEUP5 PED3 Sub Dept PED4 Sub Dept PED5 Sub Dept PED Dept Head
SETTING PIKET GOL. 4
RENCANA MAINTENANCE AKHIR TAHUN 2022 (24 DES 2022 - 2 JAN 2023)
PT. ASTRA HONDA MOTOR
PED PLANT 4&5, KARAWANG

2021
Inisial
No Nama No Telp NRP GOL Sabtu Minggu Senin Selasa Rabu Kamis Jumat Sabtu Minggu Senin Dec-99 Dec-99 Total/MP
MP
24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 30-Dec 30-Dec
1 Anas Fajar 8563533382 21776 4 0
2 Diniung Ery 82110138979 31198 4 0
3 Andhi Sunaryo 0856-9412-2015 19085 4 0
4 Fungki Setyo Y 0856-4937-9976 54348 4 0
5 Aryo Pasaribu 81293812608 21505 4 0
6 Yusuf Hasyim 0817-4307-85 21572 4 0
7 M. Syafiq 85880171102 88519 4 0
8 Dede Andryan Budiman 0819-3242-5253 35584 4 0
9 Harmadi Manurung 0813-1022-2356 21515 4 0
10 Ahmad Gurnito 0857-9123-9545 72928 4 0
11 Miladia Malinda 0812-1333-0012 93567 4 0
12 Samuel 0812-9059-7416 98300 4 0
13 Dewita Nurainy 081219200133 22295 4 0
14 Yudi Mulyadi 081213149500 22522 4 0
15 Irfan Wahyu Firmansyah 85710361613 20316 4 0
16 Ade Rustendi 8567993790 18860 4 0
17 Setiawan Romadhan 85712791547 65835 4 0
18 Muhammad Zulfikar Fauzi 81316484302 83248 4 0
19 Bambang Purbo 85749141667 44015 4 0
20 Fransiska Mulyani 87739183829 61799 4 0
21 0
22 0
23 0
24 0
25 0
26 0
Total MP/Day 0 0 0 0 0 0 0 0 0 0 0 0 0

Contact Person: Keterangan :


Koordinator PEPT5 : Andhi Sunaryo 0856-9412-2015
Koordinator PEPP5 : Irfan Wahyu F 0857-1036-1613 = Kesediaan Masuk 1 = Piket S1
Koordinator PEUP5 : Fransiska Mulyani 0877-3918-3829
Koordinator PEPT4 : Anas F 0856-3533-382
Koordinator PEPP4 : Dede Andryan 0819-3242-5253
Koordinator PEUP4 : Dewita N 0812-1920-0133

Dibuat Dibuat Dibuat Dibuat Dibuat Dibuat Diperiksa Diperiksa Diperiksa Disetujui

Anas Fajar Dede Andryan Dewita N Andhi Sunaryo Irfan Wahyu F Fransiska M Petrus Jati K Williamdy Susianti Herybertus Gaby
Koord PEPT4 Koord PEPP4 Koord PEUP4 Koord PEPT5 Koord PEPP5 Koord PEUP5 PED3 Sub Dept PED4 Sub Dept PED5 Sub Dept PED Dept Head
RENCANA MAINTENANCE AKHIR TAHUN 2022 (24 DES 2022 - 2 JAN 2023)
PT. ASTRA HONDA MOTOR
PED PLANT 4&5, KARAWANG

24-Dec 25-Dec 26-Dec


No PED Plant
S1 S2 S3 S1 S2 S3 S1 S2 S3
Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar

1 PAINTING STEEL 4 (PEPT4) 4

2 PAINTING PLASTIC 4 (PEPP4) 4

3 UPL PLANT 4 ( PEUP4 ) 4

4 PAINTING STEEL 5 (PEPT5) 5

5 PAINTING PLASTIC 5 ( PEPP5 ) 5

6 UPL PLANT 5 ( PEUP5 ) 5

27-Dec 28-Dec 29-Dec


No PED Plant
S1 S2 S3 S1 S2 S3 S1 S2 S3
Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar

1 PAINTING STEEL 4 (PEPT4) 4

2 PAINTING PLASTIC 4 (PEPP4) 4

3 UPL PLANT 4 ( PEUP4 ) 4

4 PAINTING STEEL 5 (PEPT5) 5

5 PAINTING PLASTIC 5 ( PEPP5 ) 5

6 UPL PLANT 5 ( PEUP5 ) 5

30-Dec 31-Dec 1-Jan


No PED Plant
S1 S2 S3 S1 S2 S3 S1 S2 S3
Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar

1 PAINTING STEEL 4 (PEPT4) 4

2 PAINTING PLASTIC 4 (PEPP4) 4

3 UPL PLANT 4 ( PEUP4 ) 4

4 PAINTING STEEL 5 (PEPT5) 5

5 PAINTING PLASTIC 5 ( PEPP5 ) 5

6 UPL PLANT 5 ( PEUP5 ) 5

2-Jan
No PED Plant
S1 S2 S3 S1 S2 S3 S1 S2 S3
Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar Listrik Angin Air Steam Gas Solar

1 PAINTING STEEL 4 (PEPT4) 4

2 PAINTING PLASTIC 4 (PEPP4) 4

3 UPL PLANT 4 ( PEUP4 ) 4

4 PAINTING STEEL 5 (PEPT5) 5

5 PAINTING PLASTIC 5 ( PEPP5 ) 5

6 UPL PLANT 5 ( PEUP5 ) 5

Dibuat Dibuat Dibuat Dibuat Dibuat Dibuat Diperiksa Diperiksa Diperiksa Disetujui

Anas Fajar Dede Andryan Dewita N Andhi Sunaryo Irfan Wahyu F Fransiska M Petrus Jati K Williamdy Susianti Herybertus Gaby
Koord PEPT4 Koord PEPP4 Koord PEUP4 Koord PEPT5 Koord PEPP5 Koord PEUP5 PED3 Sub Dept PED4 Sub Dept PED5 Sub Dept PED Dept Head
RENCANA MAINTENANCE LEBARAN 2021 (8 May 2021 - 19 May 2021)
PT. ASTRA HONDA MOTOR
PED PLANT 4&5, KARAWANG

No PED Plant 8-May 9-May 10-May 11-May 12-May 13-May 14-May 15-May 16-May 17-May 18-May 19-May
S1 S2 S3 S1 S2 S3 S1 S2 S3 S1 S2 S3 S1 S2 S3 S1 S2 S3 S1 S2 S3 S1 S2 S3 S1 S2 S3 S1 S2 S3 S1 S2 S3 S1 S2 S3
1 PAINTING STEEL 4 (PEPT4) 4

2 PAINTING PLASTIC 4 (PEPP4) 4

3 UPL PLANT 4 ( PEUP4 ) 4

4 PAINTING STEEL 5 (PEPT5) 5

5 PAINTING PLASTIC 5 ( PEPP5 ) 5

6 UPL PLANT 5 ( PEUP5 ) 5

KEBUTUHAN UTILITY :

Listrik, Angin, Air, Steam, Gas

Listrik, Angin, Air, Gas

Listrik, Angin, Air

Listrik, Air

Listrik, Angin

Listrik, Gas

Listrik

Listrik, Angin, Air, Steam, Solar


Dibuat Dibuat Dibuat Dibuat Dibuat Dibuat Diperiksa Diperiksa Diperiksa Disetujui

Anas Fajar Dede Andryan Dewita N Andhi Sunaryo Irfan Wahyu F Fransiska M Petrus Jati K Williamdy Susianti Herybertus Gaby
Koord PEPT4 Koord PEPP4 Koord PEUP4 Koord PEPT5 Koord PEPP5 Koord PEUP5 PED3 Sub Dept PED4 Sub Dept PED5 Sub Dept PED Dept Head
PETA KEBUTUHAN SUPPORT EHS PADA MAINTENANCE LEBARAN 2021
RENCANA MAINTENANCE AKHIR TAHUN 2022 (24 DES 2022 - 2 JAN 2023)
PT. ASTRA HONDA MOTOR
PED PLANT 4&5, KARAWANG

PLANT 4
2021
No PED Plant 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan
S1 S2 S3 S1 S2 S3 S1 S2 S3 S1 S2 S3 S1 S2 S3 S1 S2 S3 S1 S2 S3 S1 S2 S3 S1 S2 S3

1 PAINTING STEEL 4 (PEPT4) 4

2 PAINTING PLASTIC 4 (PEPP4) 4

3 UPL PLANT 4 ( PEUP4 ) 4

Keterangan : Menggunakan budget seki terkait

PLANT 5
2021
No PED Plant 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan
S1 S2 S3 S1 S2 S3 S1 S2 S3 S1 S2 S3 S1 S2 S3 S1 S2 S3 S1 S2 S3 S1 S2 S3 S1 S2 S3

1 PAINTING STEEL 5 (PEPT5) 4

2 PAINTING PLASTIC 5 (PEPP5) 4

3 UPL PLANT 5 ( PEUP5) 4

Keterangan : Menggunakan budget seki terkait


EMERGENCY RESPONS MAINTENANCE LEBARAN
PED PLANT KARAWANG

HERYBERTUS GABY
PED DEPT HEAD
+628128441797

PETRUS JATI WILLIAMDY N SUSIANTI


PED 3 SUBDEPT PED 4 SUBDEPT PED 5 SUBDEPT
+628129955270 +628128665376 +6281291648430

ANAS FAJAR DEDE ANDRYAN DEWITA NURAINY ANDHI SUNARYO IRFAN WAHYU FRANSISKA M
KOOR PEPT4 KOOR PEPP4 KOOR PEUP4 KOOR PEPT5 KOOR PEPP5 KOOR PEUP5
+628563533382 +6281932425253 +6281219200133 +628129074649 +6285710361613 +6287739183829

M SYAFIQ MILADIA M FRANSISKA M SAMUEL AHMAD GURNITO ARYO PASARIBU


MP PIKET 8-9 MEI MP PIKET 10-11 MEI MP PIKET 12-13 MEI MP PIKET 14-15 MEI MP PIKET 16-17 MEI MP PIKET 18-19 MEI
+6285880171102 +6281213330012 +6287739183829 +6281290597416 +6285791239545 +6281293812608

NIKO PAMBUDI HANIFFUDIN ALDO H THEODORUS EKO ABIM RIDHA RICKY SURYA
PIC MTC PEPT4 PIC MTC PEPP4 PIC MTC PEUP4 PIC MTC PEPT5 PIC MTC PEPP5 PIC MTC PEUP5
+6281331258160 +6283180248163 +628561614040 +6281215184918 +6285815316419 +6281291851813
Dibuat Dibuat Dibuat Dibuat Dibuat

Anas Fajar Dede Andryan Dewita N Andhi Sunaryo Irfan Wahyu F


Koord PEPT4 Koord PEPP4 Koord PEUP4 Koord PEPT5 Koord PEPP5

Dibuat Dibuat Dibuat Dibuat Dibuat

Anas Fajar Dede Andryan Dewita N Andhi Sunaryo Irfan Wahyu F


Koord PEPT4 Koord PEPP4 Koord PEUP4 Koord PEPT5 Koord PEPP5
Dibuat Diperiksa Diperiksa Diperiksa Disetujui

Fransiska M Petrus Jati K Williamdy Susianti Herybertus Gaby


Koord PEUP5 PED3 Sub Dept PED4 Sub Dept PED5 Sub Dept PED Dept Head

Dibuat Diperiksa Diperiksa Diperiksa Disetujui

Fransiska M Petrus Jati K Williamdy Susianti Herybertus Gaby


Koord PEUP5 PED3 Sub Dept PED4 Sub Dept PED5 Sub Dept PED Dept Head
Disetujui

Steve Kurniawan
Engineering Div. Head