slabs height

ft MM Diff
1st slab 14.50 4420
2nd slab 10.58 3226 1194
3rd typical 9.33 2845 381

Height of u jack 600 mm

details of 1st slab details of 2nd slab details of 3rd & typical slabs Typical beam
clear height 4420 mm clear height 3226 mm clear height 2845 mm latak 450
thickness of farma 35 mm thickness of farma 35 mm thickness of farma 35 mm bottom top 2395
Hybrid pipe 60 mm Hybrid pipe 60 mm Hybrid pipe 60 mm Actual 2575
U jack- clear open 450 mm U jack- clear open 555 mm U jack- clear open 174 mm ply 12 mm
U jack- lap 150 mm U jack- lap 45 mm U jack- lap 426 mm Hybrid pipe 60 mm
base jack - clear open 450 mm U jack- clear open 530 mm
base jack - lap 150 mm U jack- lap 70 mm
box pipe 3425 mm box pipe 2576 mm box pipe 2576 mm

Wastage calc Wastage calc Wastage calc box pipe req 1793 mm
L of single pipe 6000 mm L of single pipe 2575 mm L of single pipe 2575 mm 5.88189 ft
required cut 3425 mm required 2576 mm required 2576 mm
11.24 Ft 8.45 Ft 8.45 Ft cut 783 wastage
Remain 2575 mm Remain 0 mm Remain 0 mm 2.57 ft
8.449475 ft -0.00131 ft -0.00131 ft

expecting props in 1st slab 1200 nos


beam 800 nos
so, the wastage will be 2000 nos
2575 size
8.449475 ft
which is wallplate & bottom prop 2000