40 m
Intermediate cross
550 50 50 550 girders
mm 1500 mm 7500 mm mm 1500 mm
mm mm Crash Barrier
275
mm
2500 mm
STEP 1: DIMENSIONING
115 4@ 115
mm 150 mm mm
2600 mm 2600 mm
250 250 mm
mm
Yt Yt
This load being symmetrical should be equally divided in all the girders.
Load of portion of deck slab not covered in flange per girder = 8.125/4
= 2.031 kN/m
This load being symmetrical should be equally divided in all the girders.
550 50 50 550
mm 1500 mm 7500 mm mm 1500 mm
mm mm
275
mm
2500 mm
210 210
mm 2600 2600 2600 mm
mm mm mm
11700 mm
TRANSVERSE SECTION AT END CROSS GIRDER
This load being symmetrical should be equally divided in all the girders.
40.289 kN 40.289 kN
300
mm
275 mm
KERB
75
1175 mm mm
Since longitudinal girders are connected through 5 cross girders and deck slab and loads are placed
symmetrically; the SIDL would be shared equally by all the 4 girders.
A B 41.513+2.031
= 43.544 kN/m
0.4 40 m 0.4
m m
RA = (43.544*(40+0.4+0.4))/2 RB = (43.544*(40+0.4+0.4))-888.293
888.293 kN 888.293 kN
(400+2500)/1000 73.313-41.513
= 2.9 m 2.5 m = 31.800 kN/m
0.4 2.5
m m
40 m
A B
R A = RB = (2.9*31.800)+(2.5*31.800/2)
= 131.97 kN
40 m
RA RB
R A = RB = (40.289+34.828+34.828+34.828+40.289)/2
= 92.531 kN
3.9 kN/m
40 m
1.95 kN/m
40 m
APPROACH - I
In the transverse direction the live load is placed in most eccentric position and symmetrically about centre line of carriageway.
In the longitudinal direction loads are placed so as to cause maximum BM/SF at the section considered.
For transverse distribution of loads among the longitudinal 4 girders for the purpose of calculation of
BM & SF due to loads placed more than 5.5 m away from support, Courbon's method is used.
For distribution of shear force to longitudinal girders due consideration is also given to Clause 305.12.2 of IRC-21:2000, according to which
for loads at or within 5.5 m of either supports the reaction on the longitudinal beams shall be greater of the results obtained by assuming
deck slab as continuous with the supports assumed as un-yielding and Courbon's method.
APPROACH - II
Analysis is done by grid analysis/grillage analysis with standard (STAAD) computer program.
CL
CLASS - A - 2 LANES
RA = 554*16.425/(20+20)
= 227.486 kN [Placing the 11.4 T load marked as C at mid span.]
L= 40 m
CL
CLASS 70R WHEELED VEHICLE
RB = 1000*19.3/(20+20)
= 482.5 kN [Placing the 17 T load marked as C at mid span.]
Impact factor = 9%
CLASS - A - 2 LANES
Date: 15-07-2020 Note No.
RA = 554*21.425/(15+25)
= 296.736 kN [Placing the 11.4 T load marked as C at 3L/8.]
L= 40 m
RB = 1000*24.3/(15+25)
= 607.5 kN [Placing the 17 T load marked as C at 3L/8.]
Impact factor = 9%
CLASS - A - 2 LANES
RA = 554*26.425/(10+30)
= 365.986 kN [Placing the 11.4 T load marked as C at L/4.]
L= 40 m
CLASS - A - 2 LANES
RA = 554*30.175/(5+35)
= 417.924 kN [Placing the 11.4 T load marked as C at L/8.]
L= 40 m
Impact factor = 9%
CG of loads, W
7.5 m
0.4
m 1.8 1.7 1.8 m
CL OF CARRIAGEWAY
As per Courbon's method for estimating distribution of live load among longitudinal girders, the transverse distribution of the load W
among the various longitudinal beams will be such that the reaction on the longitudinal beam is equal to:-
Where x1 = the distance of that beam from the centroid of longitudinal beams.
Σx2 = sum of the squares of the distances of various longitudinal beams from the centroid.
n = number of longitudinal girders.
e = eccentricity of load W with respect to centroid of longitudinal beams.
CL OF CARRIAGEWAY
Date: 15-07-2020 Note No.
e = eccentricity = 0m
CG of loads, W
7.5 m
1.63 1.93 m
CL OF CARRIAGEWAY
CG of loads, W
7.5 m
2.785 m 1.93 m
CL OF CARRIAGEWAY
e = eccentricity = 0m
Date: 15-07-2020 Note No.
MAXIMUM CASES 3500.900 2689.351 3276.352 2516.856 2529.600 1974.483 1560.347 1198.641
STEP 3: MATERIAL
3.1.1] Temporary stress (i.e. At transfer) in concrete after accounting for all losses except due to relaxation of steel, residual shrinkage &
creep of concrete:
Strength of concrete at jth day is obtained as follows: (Refer Design of Prestressed Concrete, Volume 1 by Greyson)
Rj = R7(2.93-(1.77/(logj)^(1/2)))
where Rj is the concrete strength of jth day after casting and R 7 is calculated by:
R7 = R28/(2.93-(1.77/(log28)^(1/2)))
R7 = 60/(2.93-(1.77/(LOG(28,10))^(1/2)))
= 41.134 N/mm2
For j = 10 days
R10 = 41.134*(2.93-(1.77/(LOG(10,10))^(1/2)))
= 47.715 N/mm2 = fcj = fct
fcj/fck = 0.79525
= 79.525 %
i.e. fcj = 79.525 % fck at 10 days
Ecj = 5700√fcj
= 5700*SQRT(47.715)
= 39373.46 N/mm2 at 10 days
Date: 15-07-2020 Note No.
For j = 28 days
R28 = 41.134*(2.93-(1.77/(LOG(28,10))^(1/2)))
= 60.000 N/mm2 = fcj = fct
fcj/fck = 1.00000
= 100.000 %
i.e. fcj = 100.000 % fck at 28 days
Ecj = 5700√fcj
= 5700*SQRT(60.000)
= 44152.01 N/mm2 at 28 days
10 20.000 2.000
28 20.000 2.000
fcw = 0.33*60
= 19.8 N/mm2
ftw = 0 N/mm2
fcw
Days (N/mm2) ftw (N/mm )
2
28 19.800 0.000
Modulus of Elasticity:
Ec (28) = 5700*SQRT(60.000)
= 44152.01 N/mm2
Ec (10) = 5700*SQRT(47.715)
= 39373.46 N/mm2
85 mm
Average slip = 6 mm
Stage - II: at 28 th day after casting of girder and deck. SIDL is placed after 2nd stage stressing.
STEP 4: DETERMINATION OF MINIMUM REQUIRED PRESTRESSING FORCE AND LIMITING ZONE FOR THE PRESTRESSING FORCES (i.e.
ECCENTRICITY OF PRESTRESSING CABLES)
Assume losses:
For the purpose of determining tentative prestressing forces, losses as assumed are:
Instantaneous loss due to elastic shortening, anchorage slip & friction loss = 12 %
Long term loss due to creep in concrete, shrinkage & steel relaxation = 15 %
Four fundamental conditions for stresses: [Refer to Chapter 12 of Prestressed Concrete by N. Krishna Raju]
e
- -
fbott = (P/A)+(Pe/zb) ɳ((P/A)+(Pe/zb)) Mg/zb Mq/zb
Section Initial prestress Prestress after loss Dead load stress SIDL & Live load stress
At transfer:
At working load:
A= 1660500 mm2
ftop/((1/A)-(e/zt)) = fbott/((1/A)+(e/zb))
e= (1.633E+09*1.047E+09)*(18.008--7.920)/1660500/((-7.920*1.633E+09)+(18.008*1.047E+09))
= 4509.573 mm
4509.573 mm = e 1828.12 mm = Yb
So, e >= Yb
Therefore, prestressing force is to be increased so that the bottom fibre stress is maintained with possible eccentricity.
Possible eccentricity:
Diameter of a cable = 85 mm
170
mm
117.5 mm
117.5 117.5 mm
mm 830 mm
170 mm
117.5 mm
117.5
mm 170
mm 117.5 mm
830 mm
Possible e = 1828.12-174.167
= 1653.953 mm
or, P = fbott*A*zb/(zb+(A*e))
P= 18.008*1660500*1.047E+09/(1.047E+09+(1660500*1653.953))
= 8253138.3 N
= 8253.1383 kN (After assumed instantaneous loss of prestress of 12 %)
170 mm
117.5 mm
117.5
mm 170
mm 117.5 mm
830 mm
Prestressing force after initial (instantaneous) loss of prestressing force at the mid section = P
Limiting zone of prestressing forces (at mid span): [Refer 12.1.3 of Prestressed Concrete by N. Krishna Raju]
emax = MIN(1710.620,2211.721,2276.161)
= 1710.620
emin = MAX(-838.476,1159.955)
= 1159.9545
Mg = 0 kN-m
Mq = 0 kN-m
Md = 0 kN-m
A= 2932500 mm2
zb = 1.511E+09 mm3
zt = 1.996E+09 mm3
P0 = jack end force = 11966.13 kN
Initial loss assumed = 6%
P= (1-(6/100))*11966.13
= 11248.162 kN
emax = MIN(1710.620,1035.55,2171.401)
= 1035.550
emin = MAX(-3452.921,-515.26)
= -515.260
250
b= 250-30
= 220 mm
190 190
CL of symmetry of mid
span
h1 B
H
h2 C E O
h3 D h3
Soffit of beam
Cable Profile in Elevation
E O
A B C
D
a b c d
LEGEND:
= Point A, i.e. anchorage point
400 20000
5 5 3
3 3
2
2 2 2500 2500 5
1, 4
1 4 170 170
250 1 , 4 117.5 117.5
225 225 4 ELEVATION 7500
a = 1000 1 2 3 5 1
straight 6900 2500 2500 2500 2 3
4 170
4
2, 3, 5 4
3
1 5
4 2 PLAN 2
*All dimensions are in mm. 1 4 2 3 3 1
1
*h1 & h2 are not known as it depends on inclination of straight portion (a).
Profile Dimensions: (all dimensions are in mm) Solution is given in upcoming calculation following the table below:
h3 (known)
y
H = known H = h 1 + h 2 + h3 h = H - h3 (known) h2 = e
h = h1 + h2
= 1000 X tanα + e
= 1000 X α + e (α being small)
Date: 15-07-2020 Note No.
For parabola,
y = (4e/L^2) * x(L-x)
dy/dx = (4e/L^2) * (L-2x)
At x = 0,
dy/dx = 4e/L
=> α = 4e/L Eccentricity from beam soffit: (obtained from AutoCAD)
At
h= 1000 X α + e Cable No. anchorage At L/8 At L/4 At 3L/8 At L/2
= 1000 X (4e/L) + e
= e(( 4000 /L)+1) 1 250 203.54 160.52 117.5 117.5
=>e = hL/( 4000 /L) = h2 2 1000 690.55 404.03 117.5 117.5
3 1750 1177.56 647.53 117.5 117.5
Here, L = 2b 4 250 203.54 160.52 117.5 117.5
5 2500 1724.19 1494.16 287.5 287.5
h = H - h3 h1 = h - h2
CABLE NO. (mm) L = 2b (mm) e = h2 (mm) (mm) α = 4e/L
Friction losses are given by the following formula: (Refer Clause 11.6 of IRC-18:2000)
P0
P(x)
x
θ = Cumulative angle in radians through which the tangent to the cable profile has turned between the points of operation of P 0 & P(x)
2500 mm = L
REVERSE PARABOLA
Deviation = 85 mm
Length of reverse curve, L = 2500 mm
α = 4e/L = 4*(85/2)/2500
= 0.068 radian
A
B
X2
1433.415 mm = e X1
α C
14400 mm = b
L = 2 X b = 2*14400
= 28800 mm
α = 4e/L = 4*1433.415/28800
= 0.199 radian
SEGMENT θ (radian)
AB 0
BC 0.199
CE 0.136
EO 0
TOTAL 0.335
A
B
X2
1433.415 mm = e X1
α C (Sec 2-2)
14400 mm = b
SEGMENT θ (radian)
AB 0
BC 0.199
TOTAL 0.199
A
B
X2
1.433 α - αx α X1 (Sec 3-3)
m=e αx C
x= 10.4 m
1.00 m x'
14400 mm = b
L = 2*b = 28800 mm = 28.8 m
x' = 10.4-1.00
= 9.40 m
x = x' + 1.00 m
= 9.40+1.00
= 10.40 m (From A to X1)
A
B
X2 (Sec 4-4)
1.433 X1
m=e C
1.00 m x'
x= 5.4 m
L = 2*b = 28800 mm = 28.8 m
x' = 5.4-1.00
= 4.40 m
Date: 15-07-2020 Note No.
x = x' + 1.00 m
= 4.40+1.00
= 5.40 m (From A to X2)
2393.226
kN 2306.280 3.633 %
kN 2222.895 7.117 %
kN 2152.404 10.063 % Loss wrt jack end force
kN 2037.626 14.859 %
0 L/8 L/4 3L/8 kN L/2
FORCE FLOW DIAGRAM
Refer STEP 5.
A
B
X2 (Sec 4-4)
102.725 mm = e X1
α C
6900 mm = b
e= 102.725 mm
L= 13800 mm
α = 4e/L = 4*102.725/13800
= 0.030 radian
Deviation = 170+(170/2)-225
= 30 mm (Refer cable profile drawing in STEP 5)
Date: 15-07-2020 Note No.
E O (Sec 1-1)
α = e
D 30 mm
α = e
C
= =
2500 mm = L
α = 4e/L = 4*(30/2)/2500
= 0.024 radian
A
B
X2 (Sec 4-4)
0.103 X1
m=e C
1.00 m x'
x= 5.4 m
L = 2*b = 13800 mm = 13.8 m
x' = 5.4-1.00
= 4.40 m
μ= 0.2
k= 0.0046
P0 = 2393.226 kN
NOTE: Horizontal curve is located beyond Section 4-4. αx = (4e/L^2) * (L-2x') x' = x-1.0
Sec 1-1 Sec 2-2 Sec 3-3 Sec 4-4
Unit
at L/2 at 3L/8 at L/4 at L/8
x = distance of the section from anchorage m 20.4 15.4 10.4 5.4
αh = Change in angle due to horizontal sway radian 0.048 0.048 0.048 0
α = Slope at the end of vertical curve radian 0.030 0.030 0.030 0.030
Change in angle due to
vertical curve. αx = Slope at the section considered radian 0 0 0 0.011
α - αx = Change in angle due to vertical curve radian 0.030 0.030 0.030 0.019
θ = Total change in angle = αh + α - αx radian 0.078 0.078 0.078 0.019
e-(μθ + kx) --- 0.896 0.917 0.939 0.972
P(x) = P0 e-(μθ + kx) kN 2145.231 2195.143 2246.216 2325.662
Date: 15-07-2020 Note No.
Cable No. 2
A
B
X2 (Sec 4-4)
727.675 mm = e X1
α C
9400 mm = b
e= 727.675 mm
L= 18800 mm
α = 4e/L = 4*727.675/18800
= 0.155 radian
E O (Sec 1-1)
α = e
D 85 mm
α = e
C
= =
2500 mm = L
α = 4e/L = 4*(85/2)/2500
= 0.068 radian
A
B
X2 (Sec 4-4)
0.728 X1
m=e C
1.00 m x'
x= 5.4 m
L = 2*b = 18800 mm = 18.8 m
Date: 15-07-2020 Note No.
x' = 5.4-1.00
= 4.40 m
μ= 0.2
k= 0.0046
P0 = 2393.226 kN
NOTE: Horizontal curve is located beyond Section 3-3. αx = (4e/L^2) * (L-2x') x' = x-1.0
Sec 1-1 Sec 2-2 Sec 3-3 Sec 4-4
Unit
at L/2 at 3L/8 at L/4 at L/8
x = distance of the section from anchorage m 20.4 15.4 10.4 5.4
αh = Change in angle due to horizontal sway radian 0.136 0.136 0 0
α = Slope at the end of vertical curve radian 0.155 0.155 0.155 0.155
Change in angle due to
vertical curve. αx = Slope at the section considered radian 0 0 0 0.082
α - αx = Change in angle due to vertical curve radian 0.155 0.155 0.155 0.072
θ = Total change in angle = αh + α - αx radian 0.291 0.291 0.155 0.072
e-(μθ + kx) --- 0.859 0.879 0.924 0.961
P(x) = P0 e-(μθ + kx) kN 2055.74299 2103.573 2211.868 2300.918
Cable No. 5
A
B
X2 (Sec 4-4)
1978.373 mm = e X1
α C
16900 mm = b
e= 1978.373 mm
L= 33800 mm
α = 4e/L = 4*1978.373/33800
= 0.234 radian
E O (Sec 1-1)
α = e
D 0 mm
α = e
C
= =
2500 mm = L
α = 4e/L = 4*(0/2)/2500
= 0 radian
A
B
X2 Sec 2-2
1978.373 mm = e X1
α C
1.00 m x'
16900 mm = b
x' = 15.4-1.00
14.40 m
A
B
X2 Sec 3-3
1978.373 mm = e X1
α C
1.00 m x'
16900 mm = b
x' = 10.4-1.00
9.40 m
A
B
X2 (Sec 4-4)
1.978 X1
m=e C
1.00 m x'
x= 5.4 m
L = 2*b = 33800 mm = 33.8 m
x' = 5.4-1.00
= 4.40 m
μ= 0.2
k= 0.0046
P0 = 2393.226 kN
P0
A P4
B P3
C P2
D P1
E
Sec - 4-4 Sec - 3-3 Sec - 2-2 Sec - 1-1
At at L/8 at L/4 at 3L/8 at L/2
anchorage
FORCE FLOW DIAGRAM
Change in slope of forces depends on change in curvature. So, above figure does not represent change in slope of forces.
Cable No. P0 P4 P3 P2 P1
2393.226 2325.662 2246.216 2195.143 2145.231
1
0.000 2.823 6.143 8.277 10.362 %**
2393.226 2300.918 2211.86784 2103.57301 2055.74299
2
0.000 3.857 7.578 12.103 14.102 %**
2393.226 2306.280 2222.895 2152.404 2037.626
3
0.000 3.633 7.117 10.063 14.859 %**
2393.226 2325.662 2246.216 2195.143 2145.231
4
0.000 2.823 6.143 8.277 10.362 %**
2393.226 2306.223 2222.77708 2142.3507 2079.18679
5
0.000 3.635 7.122 10.483 13.122 %**
Ta' Tx'
Tm
T
Ta Tx
x dx
lk
As = 12*140
= 1680 mm2
Es = 195000 N/mm2
Total loss due to slip = (1/ 327600000 )∫(Tx' - Tx)xdx = 6 mm = Shaded area / 327600000
(As per standard Manufacturer’s recommendations 6 mm
reverse slip of tendons is considered.)
Shaded area = 6 X 327600000 N-mm
= 1965600000 N-mm
= 1965.6 kN-m
Half area = 1965.6/2
= 982.8 kN-m
Force after seating of anchorage = Force before seating of anchorage - 2 X (Force before seating of anchorage - Force at l k)
PK = PQ-((PQ-PR)/l2)*lk
Constant = C1 = (PQ-PR)/l2
PK = PQ-(C1*lk)
C1*lk2+2C1l1lk-2Δ = 0
Δ (known) PQ (known)
PK (unknown)
PR (known)
l1 (known) lk (unknown)
l2 (known)
Constant = C1 = (PQ-PR)/l2
= (2246.216-2145.231)/10
= 10.099
l1 = 7.9+2.5
= 10.4 m
PK = PQ-(C1*lk)
= 2246.216-(10.099*1.356)
= 2232.527 kN
Force after seating of anchorage = Force before seating of anchorage - 2 X (Force before seating of anchorage - P K), upto lk
Cable No. 2
Force after seating of anchorage = Force before seating of anchorage - 2 X (Force before seating of anchorage - Force at l k)
PK = PQ-((PQ-PR)/l2)*lk
Constant = C1 = (PQ-PR)/l2
PK = PQ-(C1*lk)
C1*lk2+2C1l1lk-2Δ = 0
Δ (known) PQ (known)
PK (unknown)
PR (known)
l1 (known) lk (unknown)
l2 (known)
Constant = C1 = (PQ-PR)/l2
= (2211.868-2157.720)/2.5
= 21.659
l1 = 10.4 m
PK = PQ-(C1*lk)
= 2211.868-(21.659*0.175)
= 2208.079 kN
Force after seating of anchorage = Force before seating of anchorage - 2 X (Force before seating of anchorage - P K), upto lk
Cable No. 3
Force after seating of anchorage = Force before seating of anchorage - 2 X (Force before seating of anchorage - Force at l k)
PK = PQ-((PQ-PR)/l2)*lk
Constant = C1 = (PQ-PR)/l2
PK = PQ-(C1*lk)
C1*lk2+2C1l1lk-2Δ = 0
Δ (known) PQ (known)
PK (unknown)
PR (known)
l1 (known) lk (unknown)
l2 (known)
Constant = C1 = (PQ-PR)/l2
= (2393.226-2152.404)/15.4
= 15.638
Date: 15-07-2020 Note No.
l1 = 0m
PK = PQ-(C1*lk)
= 2393.226-(15.638*11.211)
= 2217.904 kN
Force after seating of anchorage = Force before seating of anchorage - 2 X (Force before seating of anchorage - P K), upto lk
Cable No. 5
PQ =
2393.226
(I) 2306.223
2222.777 PK = PR =
2217.111 2142.351 2110.769 2079.187
2211.444
At anchorage 2040.995 2127.998 lk 5
*All force units are in kN & all length Sec 4-4 5 2.5
units are in m. l2 = 17.9 Sec 3-3 Sec 2-2 Sec 1-1
5.4
l1 = 0 10.4 10
20.4 Middle of Sec 2-2 & 1-1
Force after seating of anchorage = Force before seating of anchorage - 2 X (Force before seating of anchorage - Force at l k)
PK = PQ-((PQ-PR)/l2)*lk
Constant = C1 = (PQ-PR)/l2
PK = PQ-(C1*lk)
C1*lk2+2C1l1lk-2Δ = 0
Δ (known) PQ (known)
PK (unknown)
PR (known)
l1 (known) lk (unknown)
l2 (known)
Constant = C1 = (PQ-PR)/l2
= (2393.226-2110.769)/17.9
= 15.780
l1 = 0m
PK = PQ-(C1*lk)
= 2393.226-(15.780*11.161)
= 2217.111 kN
Force after seating of anchorage = Force before seating of anchorage - 2 X (Force before seating of anchorage - P K), upto lk
Date: 15-07-2020 Note No.
Stage - I: Stressing of cables 2, 3 & 5 at 10 days after casting insitu girders along with deck.
Stage - II: Stressing of cables 1 & 4 are to be done after 28 days of casting and SIDL is placed after 2nd stage concrete.
Modular ratio, m = Es/Ec,Es = modulus of elasticity of steel in strand, E c = modulus of elasticity of concrete.
Sectional properties:
Stress in concrete at the level of cable a due to stressing of cable b = (P/A c) + (Pecable b) * (ecable a / I)
NOTE: No loss of stress due to elastic shortening will occur in the cable which is being stressed.
Average stress in concrete, σC (Mpa) = σsupport + ((2/3)*(σspan - N.A. 0.000 N.A. N.A. N.A.
σsupport))
Loss of stress in steel (Mpa) = m10 * σC N.A. 0.000 N.A. N.A. N.A.
Average stress in concrete, σC (Mpa) = σsupport + ((2/3)*(σspan - N.A. 3.119 0.000 N.A. N.A.
σsupport))
Loss of stress in steel (Mpa) = m10 * σC N.A. 15.448 0.000 N.A. N.A.
Average stress in concrete, σC (Mpa) = σsupport + ((2/3)*(σspan - N.A. 2.827 2.984 N.A. 0.000
σsupport))
Loss of stress in steel (Mpa) = m10 * σC N.A. 14.003 14.780 N.A. 0.000
Total loss of stress in stage - I N.A. 29.451 14.780 N.A. 0.000
Date: 15-07-2020 Note No.
Average stress in concrete, σC (Mpa) = σsupport + ((2/3)*(σspan - 0.000 3.559 3.267 N.A. 2.757
σsupport))
II - Loss of stress in steel (Mpa) = m28 * σC 0.000 15.720 14.428 N.A. 12.176
Sequence
of
prestressin Due to stressing of cable 4
g: 1 -> 4 At support (anchorage)
Prestressing force after friction and slip loss, P (kN) N.A. N.A. N.A. 2071.828 N.A.
P * ecable 4 (kN-m) N.A. N.A. N.A. 3019.690 N.A.
Stress in concrete at the level of cable, σsupport (Mpa) 2.412 1.535 0.657 0.000 -0.221
At span
Prestressing force after friction and slip loss, P (kN) N.A. N.A. N.A. 2145.231 N.A.
P * ecable 4 (kN-m) N.A. N.A. N.A. 3669.675 N.A.
Stress in concrete at the level of cable, σspan (Mpa) 4.572 4.572 4.572 0.000 4.246
Average stress in concrete, σC (Mpa) = σsupport + ((2/3)*(σspan - 3.852 3.559 3.267 0.000 2.757
σsupport))
Loss of stress in steel (Mpa) = m28 * σC 17.012 15.720 14.428 0.000 12.176
Total loss of stress in stage - II 17.012 31.440 28.855 0.000 24.351
Summary of prestressing force after friction, wobble, slip & elastic shortening losses
Sectional properties:
Ac = 1660500 mm2
Yb = 1828.12 mm
Yt = 1171.88 mm
Zb = 1.047E+09 mm3
Zt = 1.633E+09 mm3
I= 1.914E+12 mm4
C.G. Of cables:
170 mm 287.5
117.5 mm mm
170
mm
830 mm
Y̅2,3,5 = 1828.12-(((2*117.5)+287.5)/3)
= 1653.953 mm
117.5 mm
830 mm
Date: 15-07-2020 Note No.
Y̅1,4 = 1828.12-((2*117.5)/2)
= 1710.62 mm
170 mm
117.5 mm
117.5
mm 170
mm 117.5 mm
830 mm
Y̅ = ((3*1653.953)+(2*1710.62))/5
= 1676.62 mm
STAGE I:
Prestressing force after seating of anchorage, friction loss and elastic shortening =
2055.743+2037.626+2079.187-
24.769-24.769-24.769
= 6098.248 kN
@ 1.654
m from centroid of the
section.
Shrinkage strain after 10 days = 0.0003 for stage - I stressing at 10 days after casting insitu girders along with deck.
Shrinkage strain after 28 days = 0.00019
for stage - II stressing after 28 days of casting and SIDL is placed after 2nd stage concrete.
Average force in stage - I cables after seating of anchorages [Refer step no. 6.2 summary] and elastic shortening [Refer step no. 6.3
summary]
= 6098.248/3
= 2032.749 kN
Initial stress Relaxation loss for low relaxation steel (%) Relaxation loss for long term (%)
0.6 UTS 1.25 1.25*3 = 3.75
0.7 UTS 2.5 2.5*3 = 7.5
Maturity of concrete at the time of stressing as a percentage of f ck Creep strain per 10 Mpa
75 0.00056
80 0.00051
100 0.00040
Total prestressing force of Stage - I cables after initial loss = 6098.248 kN (P)
(initial loss = seating of anchorage loss, friction loss and elastic shortening loss)
Es = 195000 N/mm2
No. of cables stressed in Stage - I= 3
No. of strands per cable = 12
Area of one strand = 140 mm2
Area of steel = 3*12*140
= 5040 mm2
Final force in cables (total after shrinkage, relaxation & creep losses)= 6098.248-108.108-342.507-45.491
= 5602.142 kN
= 5602142 N (P)
Stage - I prestressing force after 3.673 --- P/A 3.673 --- P/A
initial losses, P = 6098.248 kN
Y̅2,3,5 = 1653.953 mm = 1.654 m
9.634 13.306 PY̅2,3,5Yb/I -6.175 -2.503 -PY̅2,3,5Yt/I
PY̅2,3,5 = 6098.248*1.654 = 10086.2173 kN-m
Dead load moment, Mg
-9.234 4.072 -MDLYb/I 5.919 3.417 MDLYt/I
=
9668.048 kN-m
(Psh/A) +
(Psh/A) -
Shrinkage loss, Psh = -108.108 kN -0.236 3.836 (PshY̅2,3,5Yb/I 0.044 3.461
(PshY̅2,3,5Yt/I)
)
(Pr/A) + (Pr/A) -
Relaxation loss, Pr = -342.507 kN -0.747 3.089 0.141 3.601
(PrY̅2,3,5Yb/I) (PrY̅2,3,5Yt/I)
(Pcr/A) + (Pcr/A) -
Creep loss, Pcr = -39.808 kN -0.087 3.002 0.016 3.618
(PcrY̅2,3,5Yb/I) (PcrY̅2,3,5Yt/I)
STAGE II:
Prestressing force after seating of anchorage, friction loss and elastic shortening = 2145.231+2145.231-34.157-34.157
= 4222.148 kN
@ 1.711 m from centroid of the
section.
Shrinkage strain after 10 days = 0.00030 for stage - I stressing at 10 days after casting insitu girders along with deck.
Shrinkage strain after 28 days = 0.00019 for stage - II stressing after 28 days of casting and SIDL is placed after 2nd stage concrete.
Average force in stage - II cables after seating of anchorages [Refer step no. 6.2 summary] and elastic shortening [Refer step no. 6.3
summary]
= 4222.148/2
= 2111.074 kN
Initial stress Relaxation loss for low relaxation steel (%) Relaxation loss for long term (%)
0.6 UTS 1.25 1.25*2 = 2.5
0.7 UTS 2.5 2.5*2 = 5
Maturity of concrete at the time of stressing as a percentage of f ck Creep strain per 10 Mpa
75 0.00056
80 0.00051
100 0.00040
Total prestressing force of Stage - I cables after initial loss = 4222.148 kN (P)
(initial loss = seating of anchorage loss, friction loss and elastic shortening loss)
P= 4222.148 kN
= 4222147.6 N
A= 1660500 mm2
Y̅1,4 = 1710.620 mm
Y̅ = 1676.620
I= 1.914E+12 mm4
Mq1 = 2077.419 kN-m
= 2.077E+09 N-mm (SIDL)
Mq2 = 3500.900 kN-m
= 3.501E+09 N-mm (LL)
M= 779.688 kN-m
= 779688000 N-mm (FPLL)
Creep strain of stage - I cables due to creep beyond 28 days including the stress due to stage - II cable stressing
= Initial creep strain for the period after 28 days for stage - II cable stressing + Creep strain for final creep stress at the CG of the stage - I
cables at 28 days for stage - I cable stressing
= (0.000400*7.013/10)+(0.000400*3.026/10)
= 0.0004016 per 10.039 Mpa
Es = 195000 N/mm2
No. of cables stressed in Stage - I= 3
No. of cables stressed in Stage- II= 2
No. of strands per cable = 12
Area of one strand = 140 mm2
Area of steel in Stage - I = 3*12*140
= 5040 mm2
Area of steel in Stage - II = 2*12*140
= 3360 mm2
Final force in cables (total after shrinkage, relaxation & creep losses)= 4222.148-311.220-184.518-578.437
= 3147.973 kN
= 3147973 N (P)
Stress after Stage - I prestressing --- 3.002 --- --- 3.618 ---
Stage - II Prestressing force after 2.543 5.545 P/A 2.543 6.160 P/A
initial losses, P = 4222.148 kN
Y̅1,4 = 1710.620 mm = 1.711 m
6.898 12.443 PY̅1,4Yb/I -4.422 1.738 -PY̅1,4Yt/I
PY̅1,4 = 4222.148*1.711 = 7222.4901 kN-m
Elastic shortening of Stage - I cables due to stressing of Stage - (Pes/A) + (Pes/A) -
II cables: -0.189 12.254 0.038 1.776
(PesY̅1,4Yb/I) (PesY̅1,4Yt/I)
Loss, Pes = -31.440-28.855-24.351= -84.646 kN
(Psh/A) + (Psh/A) -
Shrinkage loss, Psh = -311.22 kN -0.696 11.558 0.139 1.915
(PshY̅1,4Yb/I) (PshY̅1,4Yt/I)
(Pr/A) + (Pr/A) -
Relaxation loss, Pr = -184.518 kN -0.413 11.145 0.082 1.997
(PrY̅1,4Yb/I) (PrY̅1,4Yt/I)
(Pcr/A) + (Pcr/A) -
Creep loss, Pcr = -578.437 kN -1.293 9.852 0.257 2.254
(PcrY̅1,4Yb/I) (PcrY̅1,4Yt/I)
SIDL moment, Mq1 = 2077.419 kN-m -1.984 7.868 -Mq1Yb/I 1.272 3.526 Mq1Yt/I
LL moment, Mq2 = 3500.900 kN-m -3.344 4.524 -Mq2Yb/I 2.143 5.670 Mq2Yt/I
FPLL moment, M = 779.688 kN-m -0.745 3.779 -MYb/I 0.477 6.147 MYt/I
Date: 15-07-2020 Note No.
Sectional properties:
Ac = 1660500 mm2
Yb = 1828.12 mm
Yt = 1171.88 mm
Zb = 1.047E+09 mm3
Zt = 1.633E+09 mm3
I= 1.914E+12 mm4
170 mm 287.5
117.5 mm mm
170
mm
830 mm
Y̅2,3,5 = 1828.12-(((2*117.5)+287.5)/3)
= 1653.953 mm
117.5 mm
830 mm
Y̅1,4 = 1828.12-((2*117.5)/2)
= 1710.62 mm
170 mm
117.5 mm
117.5
mm 170
mm 117.5 mm
830 mm
Y̅ = ((3*1653.953)+(2*1710.62))/5
= 1676.62 mm
Date: 15-07-2020 Note No.
STAGE I:
Prestressing force after seating of anchorage, friction loss and elastic shortening =
2103.573+2152.404+2142.351-
24.769-24.769-24.769
= 6324.020 kN
@ 1.654
m from centroid of the
section.
Shrinkage strain after 10 days = 0.0003 for stage - I stressing at 10 days after casting insitu girders along with deck.
Shrinkage strain after 28 days = 0.00019
for stage - II stressing after 28 days of casting and SIDL is placed after 2nd stage concrete.
Average force in stage - I cables after seating of anchorages [Refer step no. 6.2 summary] and elastic shortening [Refer step no. 6.3
summary]
= 6324.020/3
= 2108.007 kN
Initial stress Relaxation loss for low relaxation steel (%) Relaxation loss for long term (%)
0.6 UTS 1.25 1.25*3 = 3.75
0.7 UTS 2.5 2.5*3 = 7.5
Maturity of concrete at the time of stressing as a percentage of f ck Creep strain per 10 Mpa
75 0.00056
80 0.00051
100 0.00040
Total prestressing force of Stage - I cables after initial loss = 6324.020 kN (P)
(initial loss = seating of anchorage loss, friction loss and elastic shortening loss)
Es = 195000 N/mm2
No. of cables stressed in Stage - I= 3
No. of strands per cable = 12
Area of one strand = 140 mm2
Area of steel = 3*12*140
= 5040 mm2
Final force in cables (total after shrinkage, relaxation & creep losses)= 6324.020-108.108-412.237-56.816
= 5746.859 kN
= 5746859 N (P)
Date: 15-07-2020 Note No.
Stage - I prestressing force after 3.809 --- P/A 3.809 --- P/A
initial losses, P = 6324.020 kN
Y̅2,3,5 = 1653.953 mm = 1.654 m
9.990 13.799 PY̅2,3,5Yb/I -6.404 -2.596 -PY̅2,3,5Yt/I
PY̅2,3,5 = 6324.020*1.654 = 10459.6337 kN-m
Dead load moment, Mg
-8.631 5.168 -MDLYb/I 5.533 2.937 MDLYt/I
= 9036.681 kN-m
(Psh/A) +
(Psh/A) -
Shrinkage loss, Psh = -108.108 kN -0.236 4.932 (PshY̅2,3,5Yb/I 0.044 2.982
(PshY̅2,3,5Yt/I)
)
(Pr/A) + (Pr/A) -
Relaxation loss, Pr = -412.237 kN -0.899 4.032 0.169 3.151
(PrY̅2,3,5Yb/I) (PrY̅2,3,5Yt/I)
(Pcr/A) + (Pcr/A) -
Creep loss, Pcr = -50.205 kN -0.110 3.923 0.021 3.171
(PcrY̅2,3,5Yb/I) (PcrY̅2,3,5Yt/I)
STAGE II:
Prestressing force after seating of anchorage, friction loss and elastic shortening = 2195.143+2195.143-34.157-34.157
= 4321.972 kN
@ 1.711
m from centroid of the
section.
Date: 15-07-2020 Note No.
Shrinkage strain after 10 days = 0.00030 for stage - I stressing at 10 days after casting insitu girders along with deck.
Shrinkage strain after 28 days = 0.00019
for stage - II stressing after 28 days of casting and SIDL is placed after 2nd stage concrete.
Average force in stage - II cables after seating of anchorages [Refer step no. 6.2 summary] and elastic shortening [Refer step no. 6.3
summary]
= 4321.972/2
= 2160.986 kN
Initial stress Relaxation loss for low relaxation steel (%) Relaxation loss for long term (%)
0.6 UTS 1.25 1.25*2 = 2.5
0.7 UTS 2.5 2.5*2 = 5
Maturity of concrete at the time of stressing as a percentage of f ck Creep strain per 10 Mpa
75 0.00056
80 0.00051
100 0.00040
Total prestressing force of Stage - I cables after initial loss = 4321.972 kN (P)
(initial loss = seating of anchorage loss, friction loss and elastic shortening loss)
P= 4321.972 kN
= 4321971.8 N
A= 1660500 mm2
Y̅1,4 = 1710.620 mm
Y̅ = 1676.620
I= 1.914E+12 mm4
Mq1 = 1947.528 kN-m
= 1.948E+09 N-mm (SIDL)
Mq2 = 3276.352 kN-m
= 3.276E+09 N-mm (LL)
M= 730.938 kN-m
= 730938000 N-mm (FPLL)
Creep strain of stage - I cables due to creep beyond 28 days including the stress due to stage - II cable stressing
= Initial creep strain for the period after 28 days for stage - II cable stressing + Creep strain for final creep stress at the CG of the stage - I
cables at 28 days for stage - I cable stressing
= (0.000400*7.339/10)+(0.000400*3.866/10)
= 0.0004482 per 11.204 Mpa
Es = 195000 N/mm2
No. of cables stressed in Stage - I= 3
No. of cables stressed in Stage- II= 2
No. of strands per cable = 12
Area of one strand = 140 mm2
Area of steel in Stage - I = 3*12*140
= 5040 mm2
Area of steel in Stage - II = 2*12*140
= 3360 mm2
Final force in cables (total after shrinkage, relaxation & creep losses)= 4321.972-311.220-206.119-632.788
= 3171.845 kN
= 3171845 N (P)
Stress after Stage - I prestressing --- 3.923 --- --- 3.171 ---
Stage - II Prestressing force after 2.603 6.526 P/A 2.603 5.774 P/A
initial losses, P = 4321.972 kN
Y̅1,4 = 1710.620 mm = 1.711 m
7.062 13.587 PY̅1,4Yb/I -4.527 1.248 -PY̅1,4Yt/I
PY̅1,4 = 4321.972*1.711 = 7393.25137 kN-m
Elastic shortening of Stage - I cables due to stressing of Stage - (Pes/A) + (Pes/A) -
II cables: -0.189 13.398 0.038 1.285
(PesY̅1,4Yb/I) (PesY̅1,4Yt/I)
Loss, Pes = -31.440-28.855-24.351= -84.646 kN
(Psh/A) + (Psh/A) -
Shrinkage loss, Psh = -311.22 kN -0.696 12.702 0.139 1.424
(PshY̅1,4Yb/I) (PshY̅1,4Yt/I)
(Pr/A) + (Pr/A) -
Relaxation loss, Pr = -206.119 kN -0.461 12.241 0.092 1.516
(PrY̅1,4Yb/I) (PrY̅1,4Yt/I)
(Pcr/A) + (Pcr/A) -
Creep loss, Pcr = -632.788 kN -1.415 10.826 0.282 1.797
(PcrY̅1,4Yb/I) (PcrY̅1,4Yt/I)
SIDL moment, Mq1 = 1947.528 kN-m -1.860 8.966 -Mq1Yb/I 1.192 2.990 Mq1Yt/I
LL moment, Mq2 = 3276.352 kN-m -3.129 5.836 -Mq2Yb/I 2.006 4.996 Mq2Yt/I
FPLL moment, M = 730.938 kN-m -0.698 5.138 -MYb/I 0.448 5.443 MYt/I
Date: 15-07-2020 Note No.
Sectional properties:
Ac = 1660500 mm2
Yb = 1828.12 mm
Yt = 1171.88 mm
Zb = 1.047E+09 mm3
Zt = 1.633E+09 mm3
I= 1.914E+12 mm4
Date: 15-07-2020 Note No.
846.63 mm
830 mm
Y̅2,3,5 = 1828.12-((404.03+647.53+1494.16)/3)
= 979.547 mm
160.52 mm
830 mm
Y̅1,4 = 1828.12-((2*160.52)/2)
= 1667.6 mm
846.63 mm
243.50 mm
243.51 mm
160.52 mm
830 mm
Y̅ = ((3*979.547)+(2*1667.6))/5
= 1254.768 mm
STAGE I:
Prestressing force after seating of anchorage, friction loss and elastic shortening =
2204.290+2212.913+2211.444-
24.769-24.769-24.769
= 6554.340 kN
@ 0.980
m from centroid of the
section.
Date: 15-07-2020 Note No.
Shrinkage strain after 10 days = 0.0003 for stage - I stressing at 10 days after casting insitu girders along with deck.
Shrinkage strain after 28 days = 0.00019
for stage - II stressing after 28 days of casting and SIDL is placed after 2nd stage concrete.
Average force in stage - I cables after seating of anchorages [Refer step no. 6.2 summary] and elastic shortening [Refer step no. 6.3
summary]
= 6554.340/3
= 2184.780 kN
Initial stress Relaxation loss for low relaxation steel (%) Relaxation loss for long term (%)
0.6 UTS 1.25 1.25*3 = 3.75
0.7 UTS 2.5 2.5*3 = 7.5
Maturity of concrete at the time of stressing as a percentage of f ck Creep strain per 10 Mpa
75 0.00056
80 0.00051
100 0.00040
Total prestressing force of Stage - I cables after initial loss = 6554.340 kN (P)
(initial loss = seating of anchorage loss, friction loss and elastic shortening loss)
Es = 195000 N/mm2
No. of cables stressed in Stage - I= 3
No. of strands per cable = 12
Area of one strand = 140 mm2
Area of steel = 3*12*140
= 5040 mm2
Final force in cables (total after shrinkage, relaxation & creep losses)= 6554.340-108.108-487.568-38.314
= 5920.349 kN
= 5920349 N (P)
Stage - I prestressing force after 3.947 --- P/A 3.947 --- P/A
initial losses, P = 6554.340 kN
Y̅2,3,5 = 979.547 mm = 0.980 m
6.132 10.079 PY̅2,3,5Yb/I -3.931 0.016 -PY̅2,3,5Yt/I
PY̅2,3,5 = 6554.340*0.980 = 6420.2815 kN-m
Dead load moment, Mg
= -7.158 2.921 -MDLYb/I 4.589 4.605 MDLYt/I
7494.378 kN-m
(Psh/A) +
(Psh/A) -
Shrinkage loss, Psh = -108.108 kN -0.166 2.755 (PshY̅2,3,5Yb/I -0.000269 4.605
(PshY̅2,3,5Yt/I)
)
(Pr/A) + (Pr/A) -
Relaxation loss, Pr = -487.568 kN -0.750 2.005 -0.001211 4.603
(PrY̅2,3,5Yb/I) (PrY̅2,3,5Yt/I)
(Pcr/A) + (Pcr/A) -
Creep loss, Pcr = -34.369 kN -0.053 1.952 -0.000085 4.603
(PcrY̅2,3,5Yb/I) (PcrY̅2,3,5Yt/I)
STAGE II:
Prestressing force after seating of anchorage, friction loss and elastic shortening = 2218.838+2218.838-34.157-34.157
= 4369.361 kN
@ 1.668
m from centroid of the
section.
Shrinkage strain after 10 days = 0.00030 for stage - I stressing at 10 days after casting insitu girders along with deck.
Shrinkage strain after 28 days = 0.00019
for stage - II stressing after 28 days of casting and SIDL is placed after 2nd stage concrete.
Average force in stage - II cables after seating of anchorages [Refer step no. 6.2 summary] and elastic shortening [Refer step no. 6.3
summary]
= 4369.361/2
= 2184.681 kN
Initial stress Relaxation loss for low relaxation steel (%) Relaxation loss for long term (%)
0.6 UTS 1.25 1.25*2 = 2.5
0.7 UTS 2.5 2.5*2 = 5
Maturity of concrete at the time of stressing as a percentage of f ck Creep strain per 10 Mpa
75 0.00056
80 0.00051
100 0.00040
Total prestressing force of Stage - I cables after initial loss = 4369.361 kN (P)
(initial loss = seating of anchorage loss, friction loss and elastic shortening loss)
P= 4369.361 kN
= 4369361.3 N
A= 1660500 mm2
Y̅1,4 = 1667.600 mm
Y̅ = 1254.768
I= 1.914E+12 mm4
Mq1 = 1600.253 kN-m
= 1.6E+09 N-mm (SIDL)
Mq2 = 2529.600 kN-m
= 2.53E+09 N-mm (LL)
M= 600.600 kN-m
= 600600000 N-mm (FPLL)
Date: 15-07-2020 Note No.
Creep strain of stage - I cables due to creep beyond 28 days including the stress due to stage - II cable stressing
= Initial creep strain for the period after 28 days for stage - II cable stressing + Creep strain for final creep stress at the CG of the stage - I
cables at 28 days for stage - I cable stressing
= (0.000400*6.014/10)+(0.000400*2.698/10)
= 0.0003485 per 8.712 Mpa
Es = 195000 N/mm2
No. of cables stressed in Stage - I= 3
No. of cables stressed in Stage- II= 2
No. of strands per cable = 12
Area of one strand = 140 mm2
Area of steel in Stage - I = 3*12*140
= 5040 mm2
Area of steel in Stage - II = 2*12*140
= 3360 mm2
Final force in cables (total after shrinkage, relaxation & creep losses)= 4369.361-311.220-216.653-500.086
= 3341.403 kN
= 3341403 N (P)
Stress after Stage - I prestressing --- 1.952 --- --- 4.603 ---
Stage - II Prestressing force after 2.631 4.584 P/A 2.631 7.235 P/A
initial losses, P = 4369.361 kN
Y̅1,4 = 1667.600 mm = 1.668 m
6.959 11.543 PY̅1,4Yb/I -4.461 2.773 -PY̅1,4Yt/I
PY̅1,4 = 4369.361*1.668 = 7286.34692 kN-m
Elastic shortening of Stage - I cables due to stressing of Stage - (Pes/A) + (Pes/A) -
II cables: -0.186 11.357 0.035 2.809
(PesY̅1,4Yb/I) (PesY̅1,4Yt/I)
Loss, Pes = -31.440-28.855-24.351= -84.646 kN
(Psh/A) + (Psh/A) -
Shrinkage loss, Psh = -311.22 kN -0.683 10.674 0.130 2.939
(PshY̅1,4Yb/I) (PshY̅1,4Yt/I)
(Pr/A) + (Pr/A) -
Relaxation loss, Pr = -216.653 kN -0.476 10.199 0.091 3.030
(PrY̅1,4Yb/I) (PrY̅1,4Yt/I)
(Pcr/A) + (Pcr/A) -
Creep loss, Pcr = -500.086 kN -1.098 9.101 0.209 3.239
(PcrY̅1,4Yb/I) (PcrY̅1,4Yt/I)
SIDL moment, Mq1 = 1600.253 kN-m -1.528 7.573 -Mq1Yb/I 0.980 4.219 Mq1Yt/I
LL moment, Mq2 = 2529.600 kN-m -2.416 5.156 -Mq2Yb/I 1.549 5.768 Mq2Yt/I
FPLL moment, M = 600.600 kN-m -0.574 4.583 -MYb/I 0.368 6.136 MYt/I
Sectional properties:
Ac = 1660500 mm2
Yb = 1828.12 mm
Yt = 1171.88 mm
Zb = 1.047E+09 mm3
Zt = 1.633E+09 mm3
I= 1.914E+12 mm4
Date: 15-07-2020 Note No.
546.63 mm
830 mm
Y̅2,3,5 = 1828.12-((690.55+1177.56+1724.19)/3)
= 630.687 mm
203.54 mm
830 mm
Y̅1,4 = 1828.12-((2*203.54)/2)
= 1624.58 mm
546.63 mm
487.01 mm
487.01 mm
203.54 mm
830 mm
Y̅ = ((3*630.687)+(2*1624.58))/5
= 1028.244 mm
STAGE I:
Prestressing force after seating of anchorage, friction loss and elastic shortening =
2115.240+2129.528+2127.998-
24.769-24.769-24.769
= 6298.459 kN
@ 0.631
m from centroid of the
section.
Date: 15-07-2020 Note No.
Shrinkage strain after 10 days = 0.0003 for stage - I stressing at 10 days after casting insitu girders along with deck.
Shrinkage strain after 28 days = 0.00019
for stage - II stressing after 28 days of casting and SIDL is placed after 2nd stage concrete.
Average force in stage - I cables after seating of anchorages [Refer step no. 6.2 summary] and elastic shortening [Refer step no. 6.3
summary]
= 6298.459/3
= 2099.486 kN
Initial stress Relaxation loss for low relaxation steel (%) Relaxation loss for long term (%)
0.6 UTS 1.25 1.25*3 = 3.75
0.7 UTS 2.5 2.5*3 = 7.5
Maturity of concrete at the time of stressing as a percentage of f ck Creep strain per 10 Mpa
75 0.00056
80 0.00051
100 0.00040
Total prestressing force of Stage - I cables after initial loss = 6298.459 kN (P)
(initial loss = seating of anchorage loss, friction loss and elastic shortening loss)
Es = 195000 N/mm2
No. of cables stressed in Stage - I= 3
No. of strands per cable = 12
Area of one strand = 140 mm2
Area of steel = 3*12*140
= 5040 mm2
Final force in cables (total after shrinkage, relaxation & creep losses)= 6298.459-108.108-404.138-41.095
= 5745.118 kN
= 5745118 N (P)
Stage - I prestressing force after 3.793 --- P/A 3.793 --- P/A
initial losses, P = 6298.459 kN
Y̅2,3,5 = 630.687 mm = 0.631 m
3.794 7.587 PY̅2,3,5Yb/I -2.432 1.361 -PY̅2,3,5Yt/I
PY̅2,3,5 = 6298.459*0.631 = 3972.35424 kN-m
Dead load moment, Mg
= -4.226 3.361 -MDLYb/I 2.709 4.070 MDLYt/I
4424.596 kN-m
(Psh/A) +
(Psh/A) -
Shrinkage loss, Psh = -108.108 kN -0.130 3.231 (PshY̅2,3,5Yb/I -0.023 4.047
(PshY̅2,3,5Yt/I)
)
(Pr/A) + (Pr/A) -
Relaxation loss, Pr = -404.138 kN -0.487 2.744 -0.087 3.959
(PrY̅2,3,5Yb/I) (PrY̅2,3,5Yt/I)
(Pcr/A) + (Pcr/A) -
Creep loss, Pcr = -38.568 kN -0.046 2.698 -0.008 3.951
(PcrY̅2,3,5Yb/I) (PcrY̅2,3,5Yt/I)
STAGE II:
Prestressing force after seating of anchorage, friction loss and elastic shortening = 2139.392+2139.392-34.157-34.157
= 4210.470 kN
@ 1.625
m from centroid of the
section.
Shrinkage strain after 10 days = 0.00030 for stage - I stressing at 10 days after casting insitu girders along with deck.
Shrinkage strain after 28 days = 0.00019
for stage - II stressing after 28 days of casting and SIDL is placed after 2nd stage concrete.
Average force in stage - II cables after seating of anchorages [Refer step no. 6.2 summary] and elastic shortening [Refer step no. 6.3
summary]
= 4210.470/2
= 2105.235 kN
Initial stress Relaxation loss for low relaxation steel (%) Relaxation loss for long term (%)
0.6 UTS 1.25 1.25*2 = 2.5
0.7 UTS 2.5 2.5*2 = 5
Maturity of concrete at the time of stressing as a percentage of f ck Creep strain per 10 Mpa
75 0.00056
80 0.00051
100 0.00040
Total prestressing force of Stage - I cables after initial loss = 4210.470 kN (P)
(initial loss = seating of anchorage loss, friction loss and elastic shortening loss)
P= 4210.470 kN
= 4210469.6 N
A= 1660500 mm2
Y̅1,4 = 1624.580 mm
Y̅ = 1028.244
I= 1.914E+12 mm4
Mq1 = 930.017 kN-m
= 930016875 N-mm (SIDL)
Mq2 = 1560.347 kN-m
= 1.56E+09 N-mm (LL)
M= 349.050 kN-m
= 349050000 N-mm (FPLL)
Date: 15-07-2020 Note No.
Creep strain of stage - I cables due to creep beyond 28 days including the stress due to stage - II cable stressing
= Initial creep strain for the period after 28 days for stage - II cable stressing + Creep strain for final creep stress at the CG of the stage - I
cables at 28 days for stage - I cable stressing
= (0.000400*5.421/10)+(0.000400*3.196/10)
= 0.0003447 per 8.617 Mpa
Es = 195000 N/mm2
No. of cables stressed in Stage - I= 3
No. of cables stressed in Stage- II= 2
No. of strands per cable = 12
Area of one strand = 140 mm2
Area of steel in Stage - I = 3*12*140
= 5040 mm2
Area of steel in Stage - II = 2*12*140
= 3360 mm2
Final force in cables (total after shrinkage, relaxation & creep losses)= 4210.470-311.220-182.043-480.820
= 3236.387 kN
= 3236387 N (P)
Stress after Stage - I prestressing --- 2.698 --- --- 3.951 ---
Stage - II Prestressing force after 2.536 5.233 P/A 2.536 6.487 P/A
initial losses, P = 4210.470 kN
Y̅1,4 = 1624.580 mm = 1.625 m
6.533 11.767 PY̅1,4Yb/I -4.188 2.299 -PY̅1,4Yt/I
PY̅1,4 = 4210.470*1.625 = 6840.24477 kN-m
Elastic shortening of Stage - I cables due to stressing of Stage - (Pes/A) + (Pes/A) -
II cables: -0.182 11.584 0.033 2.332
(PesY̅1,4Yb/I) (PesY̅1,4Yt/I)
Loss, Pes = -31.440-28.855-24.351= -84.646 kN
(Psh/A) + (Psh/A) -
Shrinkage loss, Psh = -311.22 kN -0.670 10.914 0.122 2.454
(PshY̅1,4Yb/I) (PshY̅1,4Yt/I)
(Pr/A) + (Pr/A) -
Relaxation loss, Pr = -182.043 kN -0.392 10.522 0.071 2.525
(PrY̅1,4Yb/I) (PrY̅1,4Yt/I)
(Pcr/A) + (Pcr/A) -
Creep loss, Pcr = -480.820 kN -1.036 9.486 0.189 2.714
(PcrY̅1,4Yb/I) (PcrY̅1,4Yt/I)
SIDL moment, Mq1 = 930.017 kN-m -0.888 8.598 -Mq1Yb/I 0.569 3.284 Mq1Yt/I
LL moment, Mq2 = 1560.347 kN-m -1.490 7.108 -Mq2Yb/I 0.955 4.239 Mq2Yt/I
FPLL moment, M = 349.050 kN-m -0.333 6.774 -MYb/I 0.214 4.453 MYt/I
Sectional properties:
Ac = 2932500 mm2
Yb = 1707.5 mm
Yt = 1292.5 mm
Zb = 1.511E+09 mm3
Zt = 1.996E+09 mm3
I= 2.58E+12 mm4
Date: 15-07-2020 Note No.
C.G. Of cables:
750 mm
830 mm
Y̅2,3,5 = 1707.5-((1000+1750+2500)/3)
= -42.500 mm
250 mm
830 mm
Y̅1,4 = 1707.5-((2*250)/2)
= 1457.5 mm
750 mm
750 mm
750 mm
250 mm
830 mm
Y̅ = ((3*-42.500)+(2*1457.5))/5
= 557.5 mm
STAGE I:
Prestressing force after seating of anchorage, friction loss and elastic shortening =
2022.932+2042.583+2040.995-
24.769-24.769-24.769
= 6032.202 kN
@ -0.043
m from centroid of the
section.
Date: 15-07-2020 Note No.
Shrinkage strain after 10 days = 0.0003 for stage - I stressing at 10 days after casting insitu girders along with deck.
Shrinkage strain after 28 days = 0.00019
for stage - II stressing after 28 days of casting and SIDL is placed after 2nd stage concrete.
Initial stress Relaxation loss for low relaxation steel (%) Relaxation loss for long term (%)
0.6 UTS 1.25 1.25*3 = 3.75
0.7 UTS 2.5 2.5*3 = 7.5
Maturity of concrete at the time of stressing as a percentage of f ck Creep strain per 10 Mpa
75 0.00056
80 0.00051
100 0.00040
Total prestressing force of Stage - I cables after initial loss = 6032.202 kN (P)
(initial loss = seating of anchorage loss, friction loss and elastic shortening loss)
Es = 195000 N/mm2
No. of cables stressed in Stage - I= 3
No. of strands per cable = 12
Area of one strand = 140 mm2
Area of steel = 3*12*140
= 5040 mm2
Final force in cables (total after shrinkage, relaxation & creep losses)= 6032.202-108.108-322.879-23.245
= 5577.970 kN
= 5577970 N (P)
= 1.906 N/mm2
Stage - I prestressing force after 2.057 --- P/A 2.057 --- P/A
initial losses, P = 6032.202 kN
Y̅2,3,5 = -42.500 mm = -0.043 m
-0.170 1.887 PY̅2,3,5Yb/I 0.128 2.185 -PY̅2,3,5Yt/I
PY̅2,3,5 = 6032.202*-0.043 = -256.368578 kN-m
Dead load moment, Mg
= 0.000 1.887 -MDLYb/I 0.000 2.185 MDLYt/I
0.000 kN-m
(Psh/A) +
(Psh/A) -
Shrinkage loss, Psh = -108.108 kN -0.034 1.854 (PshY̅2,3,5Yb/I -0.039 2.146
(PshY̅2,3,5Yt/I)
)
(Pr/A) + (Pr/A) -
Relaxation loss, Pr = -322.879 kN -0.101 1.753 -0.117 2.029
(PrY̅2,3,5Yb/I) (PrY̅2,3,5Yt/I)
(Pcr/A) + (Pcr/A) -
Creep loss, Pcr = -22.370 kN -0.007 1.746 -0.008 2.021
(PcrY̅2,3,5Yb/I) (PcrY̅2,3,5Yt/I)
STAGE II:
Prestressing force after seating of anchorage, friction loss and elastic shortening = 2071.828+2071.828-34.157-34.157
= 4075.342 kN
@ 1.458
m from centroid of the
section.
Shrinkage strain after 10 days = 0.00030 for stage - I stressing at 10 days after casting insitu girders along with deck.
Shrinkage strain after 28 days = 0.00019
for stage - II stressing after 28 days of casting and SIDL is placed after 2nd stage concrete.
Average force in stage - II cables after seating of anchorages [Refer step no. 6.2 summary] and elastic shortening [Refer step no. 6.3
summary]
= 4075.342/2
= 2037.671 kN
Initial stress Relaxation loss for low relaxation steel (%) Relaxation loss for long term (%)
0.6 UTS 1.25 1.25*2 = 2.5
0.7 UTS 2.5 2.5*2 = 5
Maturity of concrete at the time of stressing as a percentage of f ck Creep strain per 10 Mpa
75 0.00056
80 0.00051
100 0.00040
Total prestressing force of Stage - I cables after initial loss = 4075.342 kN (P)
(initial loss = seating of anchorage loss, friction loss and elastic shortening loss)
P= 4075.342 kN
= 4075342.1 N
A= 2932500 mm2
Y̅1,4 = 1457.500 mm
Y̅ = 557.500
I= 2.58E+12 mm4
Mq1 = 0.000 kN-m
= 0 N-mm (SIDL)
Mq2 = 0.000 kN-m
= 0 N-mm (LL)
M= 0.000 kN-m
= 0 N-mm (FPLL)
Date: 15-07-2020 Note No.
Creep strain of stage - I cables due to creep beyond 28 days including the stress due to stage - II cable stressing
= Initial creep strain for the period after 28 days for stage - II cable stressing + Creep strain for final creep stress at the CG of the stage - I
cables at 28 days for stage - I cable stressing
= (0.000400*2.673/10)+(0.000400*1.906/10)
= 0.0001832 per 4.579 Mpa
Es = 195000 N/mm2
No. of cables stressed in Stage - I= 3
No. of cables stressed in Stage- II= 2
No. of strands per cable = 12
Area of one strand = 140 mm2
Area of steel in Stage - I = 3*12*140
= 5040 mm2
Area of steel in Stage - II = 2*12*140
= 3360 mm2
Final force in cables (total after shrinkage, relaxation & creep losses)= 4075.342-311.220-154.197-250.079
= 3359.846 kN
= 3359846 N (P)
Stress after Stage - I prestressing --- 1.746 --- --- 2.021 ---
Stage - II Prestressing force after 1.390 3.135 P/A 1.390 3.411 P/A
initial losses, P = 4075.342 kN
Y̅1,4 = 1457.500 mm = 1.458 m
3.931 7.066 PY̅1,4Yb/I -2.976 0.435 -PY̅1,4Yt/I
PY̅1,4 = 4075.342*1.458 = 5939.81105 kN-m
Elastic shortening of Stage - I cables due to stressing of Stage - (Pes/A) + (Pes/A) -
II cables: -0.111 6.956 0.033 0.468
(PesY̅1,4Yb/I) (PesY̅1,4Yt/I)
Loss, Pes = -31.440-28.855-24.351= -84.646 kN
(Psh/A) + (Psh/A) -
Shrinkage loss, Psh = -311.22 kN -0.406 6.549 0.121 0.589
(PshY̅1,4Yb/I) (PshY̅1,4Yt/I)
(Pr/A) + (Pr/A) -
Relaxation loss, Pr = -154.197 kN -0.201 6.348 0.060 0.649
(PrY̅1,4Yb/I) (PrY̅1,4Yt/I)
(Pcr/A) + (Pcr/A) -
Creep loss, Pcr = -250.079 kN -0.327 6.022 0.097 0.747
(PcrY̅1,4Yb/I) (PcrY̅1,4Yt/I)
SIDL moment, Mq1 = 0.000 kN-m 0.000 6.022 -Mq1Yb/I 0.000 0.747 Mq1Yt/I
LL moment, Mq2 = 0.000 kN-m 0.000 6.022 -Mq2Yb/I 0.000 0.747 Mq2Yt/I
FPLL moment, M = 0.000 kN-m 0.000 6.022 -MYb/I 0.000 0.747 MYt/I
Summary of total long term losses: (for 5 cables, both Stages I & II)
at
at L/2 at 3L/8 at L/4 at L/8 anchorage
Shrinkage loss (kN) 419.328 419.328 419.328 419.328 419.328
Relaxation loss (kN) 527.025 618.356 704.221 586.181 477.075
Creep loss (kN) 618.245 682.992 534.455 519.388 272.449
Force
η wrt jack end force (JF) η wrt UTS
kN
UTS 15642.000 --- x JF 1.000 x UTS
Jack end force 11966.130 1.000 x JF 0.765 x UTS
After wobble, friction & slip loss 10463.017 0.874 x JF 0.669 x UTS
Initial loss
After elastic shortening 10217.924 0.854 x JF 0.653 x UTS
After shrinkage loss 9798.596 0.819 x JF 0.626 x UTS
Long term
loss After relaxation loss 9271.571 0.775 x JF 0.593 x UTS
After creep loss 8653.326 0.723 x JF 0.553 x UTS
Force
η wrt jack end force (JF) η wrt UTS
kN
UTS 15642.000 --- x JF 1.000 x UTS
Jack end force 11966.130 1.000 x JF 0.765 x UTS
After wobble, friction & slip loss 10788.613 0.902 x JF 0.690 x UTS
Initial loss
After elastic shortening 10543.520 0.881 x JF 0.674 x UTS
After shrinkage loss 10124.192 0.846 x JF 0.647 x UTS
Long term
loss After relaxation loss 9505.836 0.794 x JF 0.608 x UTS
After creep loss 8822.844 0.737 x JF 0.564 x UTS
Force
η wrt jack end force (JF) η wrt UTS
kN
UTS 15642.000 --- x JF 1.000 x UTS
Jack end force 11966.130 1.000 x JF 0.765 x UTS
After wobble, friction & slip loss 11066.323 0.925 x JF 0.707 x UTS
Initial loss
After elastic shortening 10821.230 0.904 x JF 0.692 x UTS
After shrinkage loss 10401.902 0.869 x JF 0.665 x UTS
Long term
loss After relaxation loss 9697.681 0.810 x JF 0.620 x UTS
After creep loss 9163.225 0.766 x JF 0.586 x UTS
Force
η wrt jack end force (JF) η wrt UTS
kN
UTS 15642.000 --- x JF 1.000 x UTS
Jack end force 11966.130 1.000 x JF 0.765 x UTS
After wobble, friction & slip loss 10651.551 0.890 x JF 0.681 x UTS
Initial loss
After elastic shortening 10406.458 0.870 x JF 0.665 x UTS
After shrinkage loss 9987.130 0.835 x JF 0.638 x UTS
Long term
loss After relaxation loss 9400.949 0.786 x JF 0.601 x UTS
After creep loss 8881.561 0.742 x JF 0.568 x UTS
Force
η wrt jack end force (JF) η wrt UTS
kN
UTS 15642.000 --- x JF 1.000 x UTS
Jack end force 11966.130 1.000 x JF 0.765 x UTS
After wobble, friction & slip loss 10250.166 0.857 x JF 0.655 x UTS
Initial loss
After elastic shortening 10005.073 0.836 x JF 0.640 x UTS
After shrinkage loss 9585.745 0.801 x JF 0.613 x UTS
Long term
loss After relaxation loss 9108.669 0.761 x JF 0.582 x UTS
After creep loss 8836.220 0.738 x JF 0.565 x UTS
Temperature stresses are calculated using design temperature differences given in Cl 215.3 of IRC 6:2014. Analysis is done for positive
temperature difference and reverse temperature difference.
fck = 60 Mpa
Analysis for temperature load is presented in this document as per the procedure given in Dr.V.K.Raina's Concrete Bridge Design.
eo S A - q S Ay = a S At ------ Eq. 1
eo S Ay - q S Ay2 = a S Ayt ------ Eq. 2
As per Cl 215.4 of IRC:6 - 2014,
α = Coefficient of Thermal expansion = 1.170E-05
Ec = 5000*SQRT(60)*1000
= 3.87E+07 kN/m2 (Long term Ec)
Date: 15-07-2020 Note No.
2600 mm
250
mm
Yt
3000 mm 300 mm
Yb
142.95
200
mm
250
mm
830 mm
AT SPAN
From above values stresses at different height (y) can be calculated as follow.
fci = -Ec(ε0-yθ-αt)
From above values stresses at different height (y) can be calculated as follow.
fci = -Ec(ε0-yθ-αt)
Stress
Stress Top Stress Web Stress Web
Bottom
flange top bottom
flange
2600 mm
250 mm
Yt
3000 mm
Yb
830
mm
NEAR SUPPORT
From above values stresses at different height (y) can be calculated as follow.
fci = -Ec(ε0-yθ-αt)
From above values stresses at different height (y) can be calculated as follow.
fci = -Ec(ε0-yθ-αt)
Stress
Stress Top Stress Web Stress Web
Bottom
flange top bottom
flange