Abutment Design Specifications and Calculations
Abutment Design Specifications and Calculations
Design of Abutment
1.0 INTRODUCTION
Major Bridge Chainage
SN. CA Existing DESIGN
1 25+500 25+500
Abutment-A1 Abutment A-2
S.N Description
LHS LHS
1 Chainage 25+500 25500
2 FRL 64.700 64.7
3 Camber % 2.50 2.50
WC + Deck Slab + Girder
4 1.985 1.985
depth
5 Total Width 12 12
6 Bearing spacing 3.00 3.00
7 Total number of Bearing 4.00 4.00
8 Min bearing+Pedestal 0.35 0.35
9 Max bearing+Pedestal 0.575 0.575
10 Soffit Level 62.590 62.715 Minimum Required Soffit Level
11 Cap Top Level 62.240 62.37 62.487
12 Ground level 59.161 59.161
13 Scour Level 53.307 53.307
14 HFL 61.022 61.022
15 Depth Below Ground Level 0.500 0.500
16 Pile cap top level 58.661 58.661
17 Pile cap bottom level 56.861 56.861
18 Total pile length 25.00 25.00
19 Pile capacity 250 38
This note pertain to design of Abutment A1. Design of Abutment has been done for critical Abutment.
1. Input sheet
Design Levels
Skew Angle = 0.00 º No of Bearings = 4
Finished Road Level = 64.700 m Overall C/C span (Exp Gap to Exp Gap) = 25.00 m
Overall width of road = 12.000 m Clear carriageway = 11.00 m
Soffit Level = 62.590 m Depth below gl = 0.50 m
Abutment Cap Top Level = 62.240 m Foundation top level = 58.661 m
Pile cap top level = 58.661 m Pile cap depth = 1.80 m
HFL = 61.022 m Spacing of Pile = 3.6 m
Scour Level = 53.307 m Dia of Pile = 1.200 m
Ground level = 59.161 m No. of Pile = 8 Nos
Thickness of Abutment cap at st portion = 0.40 m Abutment Cap Bottom Level(Uniform Portion Ends) = 61.84 m
Thickness of abutment cap at Tapered portion = 0.60 m Abutment Cap Bottom Level(Tapered Portion Ends) = 61.24 m
From Girder
0 0.15
0 0.25
0.750 0.75
Crosssectional Area = 1.2825 m ² Crosssectional Area = 0.756 m ²
Total DL 201.59
39.870 15.530 39.87 0.00 11.08 5.54 14.09 -3.01 19.63 19.63
Class 70R Wheel - 1 lane reactions
Fh- Fh/2 + Governing
R1 R2 P ML Fh-Span Fh/2 μ(Rg+Rq)
μ(Rg+Rq) μ(Rg+Rq) Braking load
75.680 24.320 75.68 0.00 20.00 10.00 15.88 4.12 25.88 25.88
Class A 1 Lane reactions+Class 70R WHEEL
Fh- Fh/2 + Governing
R1 R2 P ML Fh-Span Fh/2 μ(Rg+Rq)
μ(Rg+Rq) μ(Rg+Rq) Braking load
115.55 39.85 115.55 0.00 22.77 11.39 17.87 4.90 29.26 29.26
SV Loading
Fh- Fh/2 + Governing
R1 R2 P ML Fh-Span Fh/2 μ(Rg+Rq) μ(Rg+Rq) μ(Rg+Rq) Braking load
162.88 143.42 162.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Class A 3 Lane reactions
Fh- Fh/2 + Governing
R1 R2 P ML Fh-Span Fh/2 μ(Rg+Rq) μ(Rg+Rq) μ(Rg+Rq) Braking load
119.61 46.59 119.61 0.00 17.94 8.97 18.07 -0.13 27.05 27.05
SEISMIC CASE
Class A - 1 lane
Fh/2 + Governing Net Horizontal
R1 R2 P ML Fh-Span Fh/2 μ(Rg+Rq) Braking load force
μ(Rg+Rq) LL Factor= 20%
7.97 3.11 7.97 0.00 2.22 1.11 12.49 13.60 13.60 13.60
Class 70R Wheel - 1 lane reactions
Fh/2 + Governing Net Horizontal
R1 R2 P ML Fh-Span Fh/2 μ(Rg+Rq) Braking load force
μ(Rg+Rq)
15.14 4.86 15.14 0.00 5.00 2.50 12.85 15.35 15.35 15.35
Class A 1 Lane reactions+Class 70R WHEEL
Fh/2 + Governing Net Horizontal
R1 R2 P ML Fh-Span Fh/2 μ(Rg+Rq) Braking load force
μ(Rg+Rq)
23.11 7.97 23.11 0.00 7.77 3.89 13.25 17.13 17.13 17.13
Class 70R Track - 1 lane reactions
Fh/2 + Governing Net Horizontal
R1 R2 P ML Fh-Span Fh/2 μ(Rg+Rq) Braking load force
μ(Rg+Rq)
0.00 0.00 0.00 0.00 0.00 0.00 12.09 12.09 12.09 12.09
Class A 3 Lane reactions
Fh/2 + Governing Net Horizontal
R1 R2 P ML Fh-Span Fh/2 μ(Rg+Rq) Braking load force
μ(Rg+Rq)
23.92 9.32 23.92 0.00 8.31 4.16 13.29 17.44 17.44 17.44
Summary Ht (m)= 3.929 (Height from bearing to pile cap top) For non seismic case
Eccentrici
R1 R2 P ML Hz Tr. Mt Fh Ml Mt
ty
Class A 3 Lane reactions
119.610 46.590 119.610 0.000 17.445 0.950 113.630 27.045 106.260 113.630
SV Loading
162.880 143.420 162.880 0.000 0.000 0.300 48.864 0.000 0.000 48.864
Summary Ht (m)= 3.929 (Height from bearing to pile cap top) For Seismic case
Eccentrici Net Horizontal
R1 R2 P ML Fh Tr. Mt force Ml Mt
ty
Class A 3 Lane reactions
23.922 9.318 23.922 0.000 8.310 0.950 22.73 17.445 68.541 22.726
Seismic Coefficients
Abutment height above pile cap = 3.58 m
TRANSVERSE SEISMIC COEFFICIENTS
Rocky 1+15T 0.0<=T<=0.10
Sa/g= 2.500 0.1<= T <=0.40
1.00/T 0.40<= T <=4.0
Medium Soil 1+15T 0.0<= T <=0.10
Sa/g= 2.500 0.1<= T <=0.55
1.36/T 0.550<= T <=4.0
Soft Soil 1+15T 0.0<=T<=0.10
Sa/g= 2.500 0.1<= T <=0.670
1.67/T 0.670<= T <=4.0
width 12.0 m depth 0.9 m
Length = 3.58 m
Grade of Concrete= 35 DL Reactions = 987 t
Modulus of elasticity E= 32000.000 LL Reactions = 24 t
Moment of Inertia I = 5.468E+11
Response Reduction Factor = 1.0
Importance Factor = 1.2 ZONE FACTOR
Zone No = V From Addendum
Zone Factor = 0.36 to IRC: 6 - 2017
D.L & L.L of Super Structure = 9919 KN Zone No a
Period (T) = 0.224 II 0.1
P= 793891 from staad analysis III 0.16
Type of Soil = Soft Soil IV 0.24
Sa/g = 2.500 V 0.36
Horizontal Coefficients = 0.5400
DESIGN OF ABUTMENTS
The GA of abutment is as below (All Dimensions in mm) Total Width of Abutment = 12.00 m
300 Cut out for span = 25.00 m
Surcharge load 300 Exp. Joint RL 64.700
Approach Slab 300
300
Tr. Moment from Superstructure
300
8
height
2110
6
P = In table below
300 CL of Bearing
300 750 570
1560
Hzl. Force = In table below
Bearing and
350
Pedestal height RL 62.240
400
400
270 HFL RL 61.022
4
3
5539 mm
600
5
1
600
2
Formation Level
12
3079 mm
Overall Height
600
above GL to
750
7715 mm
11
RL 59.161 Ground Level
1a
13
1.950 m 500
14
900 RL 58.661
1800 mm 1800 mm
10 1800
0 mm RL 56.86
9
A
Pile diameter
1.20 m Φ 1.20 m Φ 3554 mm
1.80 m 1.80 m RL 53.307 SCOUR
0.75 m 0.75 m
5.1
DESIGN DATA
a) SOIL DATA
ê1 + ú
ê
ë sin(a - d ) sin(a + b ) ûú
Normal Case:
P1 = 4.049 T
P1 = 10.189 T 7.839 m
4.820 m
4.336 m GL
3.374t/m
Seismic Case:
P1 = 4.049 T
P1 = 10.189 T 7.839 m
3.020 m
2.536 m GL
3.374t/m
Scour Level
Total Horizontal Load due to Surcharge Pressure = 5.256 T At Lever arm = 3.92 m
Total Horizobntal load - all loads upto pilecap bottom = 269.092 T
Total Overturning moment of all loads upto pile cap bottom = 925.51 t-m
STABILISING LOADS:
Long TransHoriz
Vertical Trans
HZL. Dist. From Vertical Horizontal Horizontal ontal
Area No. Width Description Length Height Density Vertical Load Moment at A seismic Horizontal
A seismic seismic seismic seismic
moment seismic
moment moment
1 12.00 m Vertical Wall 0.600 3.579 2.500 64.422 2.550 164.276 7.731 19.713 11.596 41.624 34.788 124.871
1a 12.00 m Vertical Wall 0.300 2.579 2.500 11.606 2.150 24.950 1.393 2.994 2.089 7.498 6.267 22.495
2 12.00 m Dirtwall Haunch 0.750 0.600 2.500 6.750 3.250 21.938 0.810 2.633 1.215 5.806 3.645 17.419
3 12.00 m Dirtwall Haunch 0.750 0.400 2.500 9.000 3.375 30.375 1.080 3.645 1.620 8.390 4.860 25.170
4 12.00 m Corbel for bearing 0.270 0.400 2.500 3.240 1.965 6.367 0.389 0.764 0.583 3.020 1.750 9.061
5 12.00 m Corbel for bearing 0.270 0.600 2.500 2.430 2.010 4.884 0.292 0.586 0.437 2.090 1.312 6.271
6 12.00 m Dirtwall 0.300 2.460 2.500 22.140 3.600 79.704 2.657 9.564 3.985 25.740 11.956 77.221
7 12.00 m Approach slab corbel 0.300 0.300 2.500 2.700 3.900 10.530 0.324 1.264 0.486 3.591 1.458 10.773
8 12.00 m Approach slab corbel 0.300 0.300 2.500 1.350 3.850 5.198 0.162 0.624 0.243 1.735 0.729 5.204
9 12.30 m Heel of pilecap 2.250 1.800 2.500 124.538 4.050 504.377 14.945 60.525 22.417 20.175 67.250 60.525
10 12.30 m Toe of pile cap 1.950 1.800 2.500 107.933 0.825 89.044 12.952 10.685 19.428 17.485 58.284 52.455
11 11.30 m Soil Fill on heel 0.750 2.579 2.000 43.714 3.375 147.535 5.246 17.704 0.000 0.000 23.606 72.929
12 11.30 m Soil Fill on heel 0.750 0.600 2.000 5.085 3.250 16.526 0.610 1.983 0.000 0.000 2.746 12.573
13 11.30 m Soil Fill on heel 1.500 6.039 2.000 204.722 4.050 829.125 24.567 99.495 0.000 0.000 110.550 532.795
14 12.30 m soil fill on toe 1.950 0.500 2.000 23.985 0.825 19.788 2.878 2.375 0.000 0.000 12.952 26.551
15 12.30 m Reduce area 7 & 8 2.000 -3.240 - -12.582 -0.389 -1.510 -0.583 -1.750 -
16 12.30 m VC normal of EP 97.941 3.000 293.824 - - - -
17 12.30 m VC seismic of EP 97.941 3.000 293.824 11.753 35.259 - -
18 0.50 m Retaining wall Load 2.250 6.039 2.500 16.985 3.825 64.966 2.038 7.796 3.057 14.734 9.1717313 44.203
Total Stabilising Loads Normal 745.30 2300.82
1 12.00 m Vertical Wall up to HFL 0.600 1.218 2.500 21.924 2.550 55.906
1 12.00 m Vertical Wall below HFL 0.600 2.361 1.500 25.499 2.550 65.022
1a 12.00 m Vertical Wall up to HFL 0.300 0.218 2.500 0.981 2.150 2.109
1a 12.00 m Vertical Wall below HFL 0.300 2.361 1.500 6.375 2.150 13.704
2 12.00 m Dirtwall Haunch 0.750 0.600 2.500 13.500 3.250 43.875
3 12.00 m Dirtwall Haunch 0.750 0.400 2.500 9.000 3.375 30.375
4 12.00 m Corbel for bearing 0.270 0.400 2.500 1.620 1.965 3.183
5 12.00 m Corbel for bearing 0.270 0.600 2.500 4.860 2.010 9.769
6 12.00 m Dirtwall 0.300 2.460 2.500 22.140 3.600 79.704
7 12.00 m Approach slab corbel 0.300 0.300 2.500 1.350 3.900 5.265
8 12.00 m Approach slab corbel 0.300 0.300 2.500 2.700 3.850 10.395
9 12.30 m Heel of pilecap 2.250 1.800 1.500 74.723 4.050 302.626
10 12.30 m Toe of pile cap 1.950 1.800 1.500 64.760 0.825 53.427
11 12.30 m Soil Fill on heel above HFL 0.750 0.218 2.000 2.011 3.375 6.787
11 12.30 m Soil Fill on heel below HFL 0.750 2.361 1.000 21.780 3.375 73.508
12 12.30 m Soil Fill on heel 0.750 0.600 2.000 11.070 3.375 37.361
13 12.30 m Soil Fill on heel above HFL 1.500 3.678 2.000 67.859 4.050 274.829
13 12.30 m Soil Fill on heel below HFL 1.500 2.361 1.000 21.780 4.050 88.210
14 12.30 m soil fill on toe 1.950 0.500 2.000 11.993 0.825 9.894
15 12.30 m Reduce area 7 & 8 2.000 -3.240 - -12.528
16 12.30 m VC normal of EP 87.378 3.000 262.133
18 12.30 m Retaining wall Load above HFL 2.250 3.678 2.500 254.472 3.825 973.354
18 12.30 m Retaining wall Load below HFL 2.250 2.361 1.500 98.011 3.825 374.892
Total Stabilising Loads Normal 822.54 2763.80
Normal Case:
Final Loads and Bending Moments at the centre of base are as below
Total Vertical Load = 745.300 T
Total Moment = -1373.4 t-m Against OTM
SUMMARY OF LOADS AT CENTRE OF BASE FOR ENTIRE WIDTH OF ABUTMENTS SKEW ANGLE= 0
Vertical Horizontal Horizontal Transverse
Sl. No. Description Long. Moment
Load load-long. load-trans. moment
1 Overturning & stabilsing loads 745.30 269.09 0.00
2 Dead loads from superstructure
Girder+slab loads 201.59 0.00
SIDL 20.63 0.00
WC 19.66 0.00
Live loads (Max load) 119.61 0.00 113.63
SV Load 162.88 0.00 48.86
(Max Long Moment) 115.55 0.00 86.66
(Max Trans Moment) 75.68 0.00 223.26
Braking loads 3.87 29.26 0.00 157.37 0.00
TRAFFIC DIRECTION
Totals 1153.93 298.35 0.00 157.37 223.26
Θ
Seismic Case:
Final Loads and Bending Moments at the centre of base are as below
Total Vertical Load = 745.300 T
Total Moment = -970.2 t-m Against OTM
SUMMARY OF LOADS AT CENTRE OF BASE FOR ENTIRE WIDTH OF ABUTMENTS SKEW ANGLE= 0
Vertical Horizontal Horizontal Transverse
Sl. No. Description Long. Moment
Load load-long. load-trans. moment
1 Overturning & stabilsing loads 745.30 362.70 0.00
2 Dead loads from superstructure
Girder+slab loads 201.59 0.00
SIDL 20.63 0.00
WC 19.66 0.00
Live loads (Max load) 23.92 0.00 22.73
(Max Long Moment) 23.92 0.00 22.73
(Max Trans Moment) 15.14 0.00 44.65
Braking loads 2.31 17.44 0.00 93.84 0.00 Considering 20% of live load and braking
1 for design of foundation as per irc 6
4 Seismic (Horizontal-long) 150.63 247.26 0.00 650.75 0.000 (increase in seismic force)
5 Seismic (Horizontal-trans) 364.83 0.000 493.11 0.000 1848.81 1 Load Factor in Transverse direction
Long+0.3*Trans+0.3*vertical 260.08 247.26 147.93 650.75 554.64 (refer IRC 6 2017, 219.7)
Totals Comb
0.3*Long+Trans+0.3*vertical 410.02 74.18 493.11 195.22 1848.81
0.3*Long+0.3*Trans+vertical 154.64 74.18 147.93 195.22 554.64
DL+SIDL+0.2LL+0.2Breaking+Seismic Vertical 1147.06 440.37 147.93 213.99 563.57
DL+SIDL+0.2Breaking+Seismic Long 1252.51 613.45 147.93 669.52 563.57
DL+SIDL+0.2LL+0.2Breaking+Seismic Trans 1402.44 440.37 493.11 213.99 1857.74
HFl Case:
Final Loads and Bending Moments at the centre of base are as below
Total Vertical Load = 822.544 T
Total Moment = -1372.9 t-m Against OTM
Total Ixx = 26
Total Iyy = 130
Normal Case
Pile Group Analysis Applied Load kN Length (X) Width (Y)
Sno X Y Xi^2 yi^2 Normal HFL SEISMIC 1 SEISMIC 2 SEISMIC 3 SIZE OF PILE CAP = 5.1 12
1 -1.8 5.4 3 29.16 143 152 152 134 238
2 -1.8 1.8 3 3.24 136 146 136 118 186
3 -1.8 -1.8 3 3.24 130 140 121 102 135
4 -1.8 -5.4 3 29.16 124 134 105 87 83
5 1.8 5.4 3 29.16 164 174 182 227 268
6 1.8 1.8 3 3.24 158 168 166 211 216
7 1.8 -1.8 3 3.24 152 162 150 195 164
8 1.8 -5.4 3 29.16 146 156 135 180 113
9
10
11
12
13
14
15
16
Total 26 129.6
Y (TRANSVERSE)
Origin
X (LONGITUDINAL)
-1.8, -1.8 1.8, -1.8
Stem
Sign convention: above diagram shows the positive direction
Pile Arrangement
Horizontal
Case Max capacity
load per pile
Normal 37.29 38.00 t
HFL 33.67
Seismic 1 58.07
Seismic 2 78.88
Seismic3 82.64
Normal Seismic
Normal Case: Permissible
Case Case
Max. Load on pile from distribution = 174.128 t 214.057 t
Min. Load on pile from distribution = 124.011 t 66.431 t
Normal Seismic
Selfweight of pile = 39.584 t Case Case
Total max. axial load = 174.13 t 214.06 t 250.00 t < Hence OK < Hence OK
Total min. axial load = 124.01 t 66.43 t
Moment on Pile = 145.42 t-m
Required Actual pile capacity = 134.54 t
L = L1 + Lf = 9.75 m
Ht. of scour level from fixity point = 6.19 m
Actual horizontal load on piles at top of pile = 37.294 t
Deflection due to horizontal load on piles = 2.27 mm
Perm = 12.00 mm
Total Deflection = 2.268 mm < Hence OK
F
MOMENTS HORIZONTAL FORCE
At Abutment Shaft Bottom At Footing Bottom At Footing Bottom
At Abutment Shaft Bottom
kN-m kN-m kN kN
Due to active Earth Pressure(Static) 3088.07 6426.67 1974.82 1218.64
dsubmerged= d dry
1/2 = 10.0 o
o
i = Surcharge angle = 0
a = Angle of wall face with horizontal = 90 o
Kadry = 0.297
Kasubmerged = 0.308
F3 p2 p1 F2
F1
2
surcharge pressure intensity p2 = 0.370 t/m LWL : 59.16
p2
LWL condition : F2
Surcharge pressure F1 = 0.714 x 5.539 x 12 x Cos(20) Shaft bottom : 58.66
= 44.568 t
Lever arm from base = 3.2695 m
p2 p1
Dynamic Increment of Earth Pressure :
Dynamic Increment of Earth Considered = Yes
ah = 0.18
av = 0.12
l Formula used For +av -av
l dry = ah 9.130 11.560 o
1 ± av
(gsat - 1) (1 ± av)
Ca =
(1 av)* Sin2 (a + f − l)
2
2 é sin(f + d ).sin(f − i − l) ù
Cosl * Sin a. sin(a − d − l). ê1 + ú
êë sin(a − d − l).sin(a + i) úû
2
(1 + av) * Sin (a − f + l )
Cp =
2
2 é sin(f + d ).sin(f + i − l ) ù
Cosl * Sin a . sin(a + d + l ). ê1 − ú
êë sin(a + d + l ).sin(a + i) úû
Seismic case Ca Cp
For Seismic downward dry condition 0.401 5.828
For Seismic downward submerged condition 0.515 3.434
3.02
Dynamic earth pressure/m width = 3.77 t/m width *(Area of above paraboal)
Total Dynamic earth pressure = 3.77 x 12 x COS(20)
= 42.54 Tonne
Lever arm from base = 3.02 m *(cg. of above paraboal)
2
surcharge pressure intensity p2 = 0.041 t/m
LWL : 59.16
2 p3 p2
surcharge pressure intensity p3 = 0.041 t/m
LWL condition : F2
Surcharge pressure F1 = 16.79 t Shaft bottom : 58.66
p2p1
3.02
Dynamic earth pressure/m width = 1.46 t/m width *(Area of above paraboal)
Total Dynamic earth pressure = 1.46 x 12 x COS(20)
= 16.42 Tonne
Lever arm from base = 2.96 m *(cg. of above paraboal)
2
surcharge pressure intensity p2 = 0.015 t/m
LWL : 59.16
2 p3 p2
surcharge pressure intensity p3 = 0.035 t/m
LWL condition : F2
Surcharge pressure F1 = 6.33 t Shaft bottom : 58.66
p2p1
HFL CONDITION
Active earth pressure 121.86 308.81 43.37 128.73 17.12 48.77
Surcharge pressure 46.66 146.24 20.39 79.55 10.30 39.75
dsubmerged= d dry
1/2 = 10 o
o
i = Surcharge angle = 0
a = Angle of wall face with horizontal = 90 o
Kadry = 0.297
Kasubmerged = 0.308
1 ± av
(gsat - 1) (1 ± av)
Ca =
(1 av)* Sin2 (a + f − l)
2
2 é sin(f + d ).sin(f − i − l) ù
Cosl * Sin a. sin(a − d − l). ê1 + ú
êë sin(a − d − l).sin(a + i) úû
2
(1 + av) * Sin (a − f + l )
Cp =
2
2 é sin(f + d ).sin(f + i − l ) ù
Cosl * Sin a. sin(a + d + l ). ê1 − ú
êë sin(a + d + l ).sin(a + i) úû
Seismic case Ca Cp
For Seismic downward dry condition 0.401 5.828
For Seismic downward submerged condition 0.515 3.434
3.92
Found : 56.861
Variation of Earth
pressure coefficent Dynamic Increment
Dynamic earth pressure/m width = 6.36 t/m width *(Area of above paraboal)
Total Dynamic earth pressure = 6.36 x 12 x COS(20)
= 71.67 Tonne
Lever arm from base = 3.92 m *(cg. of above paraboal)
2
surcharge pressure intensity p2 = 0.14569 t/m
LWL : 59.16
p3 p2
surcharge pressure intensity p3 = 0.146 t/m2
F2
LWL condition : Foundi. Lvl : 56.86
Surcharge pressure F1 = 20.06 t
p2p1
3.92
Found : 56.861
Variation of Earth
pressure coefficent Dynamic Increment
Dynamic earth pressure/m width = 3.02 t/m width *(Area of above paraboal)
Total Dynamic earth pressure = 3.02 x 12 x COS(20)
= 34.02 Tonne
Lever arm from base = 3.42 m *(cg. of above paraboal)
p2p1
p2p1
SUMMERY OF ACTIVE EARTH PRESSURE : Dynamic Increment/Decrement
Static forces Seismic Downward Seismic Upward
Loads HL MTT HL MTT HL MTT
LWL CONDITION
Active earth pressure 197.48 642.67 71.67 280.94 34.02 116.30
Surcharge pressure 54.17 236.98 21.94 122.32 9.16 47.45
The GA of abutment is as below (All Dimensions in mm) Total Width of Abutment = 12.00 m
300 Cut out for span = 25.00 m
Surcharge load 300 Exp. Joint RL 64.700
Approach Slab 300
300
Tr. Moment from Superstructure
300
8
height
2110
6
P = In table below
300 CL of Bearing
300 750 570
1560
Hzl. Force = In table below
Bearing and
350
Pedestal height
400
400
270 HFL RL 61.022 scour depth in abut = 1.27dsm =
4
3
5539 mm
600
5
1
600
2
Formation Level
12
3079 mm
Overall Height
600
above GL to
750
7715 mm
11
RL 59.161 Ground Level
13
1 1.950 m 500
14
900 RL 58.661
1800 mm 1800 mm
10 1800
9
0 mm RL 56.86
A
Pile diameter
1.20 m Φ 1.20 m Φ 3554 mm
1.80 m 1.80 m RL 53.307 SCOUR
0.75 m 0.75 m
5.1
DESIGN DATA
a) SOIL DATA
Total Area = 5.5637
Density of Soil Fill = 2.00 t/m3 above pile cap
Angle of Internal Friction = f = 30 º
Surcharge Angle = b = 0º
Wall Angle = a = 90 º
Angle of Wall Friction = d = 20 º Surcharge Height = 1.20 m
Friction Coefficient = m = 0.50
sin2 (a + f ) cosd 1
Normal: Ka = x = 0.279
sin2 a sin(a - d ) é sin(f + d ) sin(f - b ) ù
2
ê1 + ú
ê
ë sin(a - d ) sin(a + b ) ú
û
b) CONCRETE DATA
Density of Concrete = 2.5 t/m3
Grade of Concrete = M 35
Normal Case:
P1 = 4.049 T
P1 = 10.189 T 7.839 m
4.820 m
4.336 m GL
3.374t/m
Seismic Case:
P1 = 4.049 T
P1 = 10.189 T 7.839 m
3.020 m
2.536 m GL
3.374t/m
Total Horizontal Load due to Surcharge Pressure = 5.256 T At Lever arm = 3.92 m
Total Horizobntal load - all loads upto pilecap bottom = 269.092 T
Total Overturning moment of all loads upto pile cap bottom = 925.51 t-m
STABILISING LOADS:
Long Trans TransHori
Vertical
Vertical HZL. Dist. From Vertical Horizontal Horizontal Horizont zontal
Area No. Width Description Length Height Density Moment at A seismic Factor
Load A seismic seismic seismic al seismic
moment
moment seismic moment
1 12.00 m Vertical Wall 0.600 3.579 2.500 86.970 2.550 221.773 10.436 26.613 15.655 56.192 46.9636 168.576 1.35
1a 12.00 m Vertical Wall 0.300 2.579 2.500 15.667 2.150 33.682 1.880 4.042 2.820 10.123 8.46041 30.369 1.35
2 12.00 m Dirtwall Haunch 0.750 0.600 2.500 9.113 3.100 28.249 1.094 3.390 1.640 7.839 4.92075 23.516 1.35
3 12.00 m Dirtwall Haunch 0.750 0.400 2.500 12.150 3.225 39.184 1.458 4.702 2.187 11.326 6.561 33.979 1.35
4 12.00 m Corbel for bearing 0.270 0.400 2.500 4.374 2.115 9.251 0.525 1.110 0.787 4.078 2.36196 12.233 1.35
5 12.00 m Corbel for bearing 0.270 0.600 2.500 3.281 2.160 7.086 0.394 0.850 0.590 2.822 1.77147 8.466 1.35
6 12.00 m Dirtwall 0.300 2.460 2.500 29.889 3.450 103.117 3.587 12.374 5.380 34.750 16.1401 104.249 1.35
7 12.00 m Approach slab corbel 0.300 0.300 2.500 3.645 3.750 13.669 0.437 1.640 0.656 4.848 1.9683 14.544 1.35
8 12.00 m Approach slab corbel 0.300 0.300 2.500 1.823 3.700 6.743 0.219 0.809 0.328 2.342 0.98415 7.026 1.35
9 12.30 m Heel of pilecap 2.250 1.800 2.500 168.126 3.975 668.299 20.175 80.196 30.263 27.236 90.7878 81.709 1.35
10 12.30 m Toe of pile cap 1.950 1.800 2.500 145.709 0.975 142.066 17.485 17.048 26.228 23.605 78.6828 70.815 1.35
11 11.30 m Soil Fill on heel 0.750 2.579 2.000 65.571 3.225 211.467 7.869 25.376 0.000 0.000 23.6056 72.929 1.5
12 11.30 m Soil Fill on heel 0.750 0.600 2.000 7.628 3.100 23.645 0.915 2.837 0.000 0.000 2.7459 12.573 1.5
13 11.30 m Soil Fill on heel 1.500 6.039 2.000 307.083 3.975 1220.656 36.850 146.479 0.000 0.000 110.55 532.795 1.5
14 12.30 m soil fill on toe 1.950 0.500 2.000 35.978 0.975 35.078 4.317 4.209 0.000 0.000 12.9519 26.551 1.5
15 12.30 m Reduce area 7 & 8 2.000 -6.561 - -16.330 -0.787 -1.960 -1.181 -3.5429 - 1.5
16 12.30 m VC normal of EP 146.912 2.850 418.699 - - - - 1.5
17 12.30 m VC seismic of EP 146.912 2.850 418.699 17.629 50.244 - - 1.5
18 0.50 m Retaining wall Load 2.250 6.039 2.500 22.929 3.525 80.826 2.752 9.699 4.127 19.891 12.3818 59.674 1.35
1 12.00 m Vertical Wall up to HFL 0.600 1.218 2.500 29.597 2.550 75.473
1 12.00 m Vertical Wall below HFL 0.600 2.361 1.500 34.423 2.550 87.780
1a 12.00 m Vertical Wall up to HFL 0.300 0.218 2.500 1.324 2.150 2.847
1a 12.00 m Vertical Wall below HFL 0.300 2.361 1.500 8.606 2.150 18.501
3 12.00 m Dirtwall Haunch 0.750 0.600 2.500 18.225 3.100 56.498
4 12.00 m Dirtwall Haunch 0.750 0.400 2.500 12.150 3.225 39.184
5 12.00 m Corbel for bearing 0.270 0.400 2.500 2.187 2.115 4.626
6 12.00 m Corbel for bearing 0.270 0.600 2.500 6.561 2.160 14.172
7 12.00 m Dirtwall 0.300 2.460 2.500 29.889 3.450 103.117
8 12.00 m Approach slab corbel 0.300 0.300 2.500 1.823 3.750 6.834
9 12.00 m Approach slab corbel 0.300 0.300 2.500 3.645 3.700 13.487
10 12.30 m Heel of pilecap 2.250 1.800 1.500 100.875 3.975 400.980
11 12.30 m Toe of pile cap 1.950 1.800 1.500 97.139 0.975 94.711
12 12.30 m Soil Fill on heel above HFL 0.750 0.218 2.000 3.017 3.225 9.728
13 12.30 m Soil Fill on heel below HFL 0.750 2.361 1.000 32.670 3.225 105.362
14 11.30 m Soil Fill on heel 0.750 0.600 2.000 15.255 3.225 49.197
15 11.30 m Soil Fill on heel above HFL 1.500 1.218 2.000 61.935 3.975 246.193
16 11.30 m Soil Fill on heel below HFL 1.500 2.361 1.000 60.028 3.975 238.613
17 12.30 m soil fill on toe 1.950 0.500 2.000 35.978 0.975 35.078
18 12.30 m Reduce area 7 & 8 2.000 -6.561 - -16.257
19 12.30 m VC normal of EP 131.067 2.850 373.540
20 12.30 m Retaining wall Load above HFL 2.250 1.218 2.500 113.765 3.525 401.022
21 12.30 m Retaining wall Load below HFL 2.250 2.361 1.500 132.315 3.525 466.410
Total Stabilising Loads Normal 925.91 2827.09
Normal Case:
Final Loads and Bending Moments at the centre of base are as below
Total Vertical Load = 1060.285 T
Total Moment = -1856.2 t-m Against OTM
SUMMARY OF LOADS AT CENTRE OF BASE FOR ENTIRE WIDTH OF ABUTMENTS SKEW ANGLE= 0
Horizontal Horizontal Transverse
Sl. No. Description Vertical Load Long. Moment
load-long. load-trans. moment
1 Overturning & stabilsing loads 1060.28 403.64 0.00
2 Dead loads from superstructure
Girder+Deck slab 272.15 0.00
SIDL 27.84 0.00
WC 34.41 0.00
Live loads (Max load) 179.42 170.44 0.00
(Max Long Moment) 173.33 129.99 0.00
(Max Trans Moment) 113.52 129.99 0.00
Braking loads 8.72 43.88 0.00 236.06 0.00
Totals 1582.82 447.52 0.00 236.06 0.00
Seismic Case:
Final Loads and Bending Moments at the centre of base are as below
Total Vertical Load = 1060.285 T
Total Moment = -2318.9 t-m Against OTM
SKEW ANGLE= 0
SUMMARY OF LOADS AT CENTRE OF BASE FOR ENTIRE WIDTH OF ABUTMENTS
Horizontal Horizontal Transverse
Sl. No. Description Vertical Load Long. Moment
load-long. load-trans. moment
1 Overturning & stabilsing loads 1060.28 269.09 0.00
2 Dead loads from superstructure
Girder+Deck slab 272.15 0.00
SIDL 27.84 0.00
TRAFFIC DIRECTION
WC 34.41 0.00
3 Live loads (Max load) 23.92 0.00 22.73 Θ
(Max Long Moment) 23.92 0.00 22.73
(Max Trans Moment) 15.14 0.00 44.65
Braking loads 0.46 3.49 31.47 Considering 20% of live load and braking
1 for design of foundation as per irc 6
4 Seismic (Horizontal-long) 172.66 341.93 0 1421.99 0 (increase in seismic force)
5 Seismic (Horizontal-trans) 510.86 0 644.04 0 2460.94 1 Load Factor in Transverse direction
Long+0.3*Trans+0.3*vertical 325.92 341.93 193.21 1421.99 738.28 (refer IRC 6 2017, 219.7)
Totals Comb
0.3*Long+Trans+0.3*vertical 562.66 102.58 644.04 426.60 2460.94
0.3*Long+0.3*Trans+vertical 205.06 102.58 193.21 426.60 738.28
1.35DL+1.35SIDL+1.75 WC+0.2LL+0.2Breaking+1.5Seismic
1624.13 375.16 193.21 432.89 747.21
Vertical
HFl Case:
Final Loads and Bending Moments at the centre of base are as below
Total Vertical Load = 925.914 T
Total Moment = -1436.0 t-m Against OTM
Normal Case
Max. Load on pile from distribution = 214.245 t
Min. Load on pile from distribution = 164.663 t
Seismic Case
Max. Load on pile from distribution = 380.690 t
Min. Load on pile from distribution = 87.804 t
Design of Pile & Pile Cap - ULS
Origin
SECTION A SECTION A
SECTION A
Materials
Grade of Concrete, fck = M 35
Grade of Steel, fyk = Fe 500
0.90
1.715
0.00
1.80
0.75 0.75
5.10
SECTION A-A
Case 1-ML
Q lim =0.36 f ck X umax /d (1-0.42*Xu max/ d) 4.645
Effective depth required d req =Sqrt (Mu lim / Q lim b) 523.8
Safe
Compression Reinforcement Spacing of Bars 160
Dia. of Rebars, mm f 16
Area of Steel, mm2 Asc 15072.0
Effective cover, mm d' 83.0
2d 2d
Punching Shear Reistance vRd = 0.12K(80ρ 1 f ck )
1/3
≥ v min
a a
The GA of abutment is as below (All Dimensions in mm) Total Width of Abutment = 12.00 m
300 Cut out for span = 25.00 m
Surcharge load 300 Exp. Joint RL 64.700
Approach Slab 300 6.039
300
Tr. Moment from Superstructure
300
8
height
2110
6
P = In table below
300 CL of Bearing
300 750 570
1560
Hzl. Force = In table below 61.24
Bearing
350
and
400
400
270 HF
RL 61.022
4
3
5539 mm
600
5
1
600
2
12
3079 mm
Formation Level
Overall Height
600
above GL to
750
7715 mm
11
RL 59.161 Ground Level
13
1.950 m 500
14
900 RL 58.661
1800 mm 1800 mm
10 1800
0 mm RL 56.86
9
A
Pile diameter
1.20 m Φ 1.20 m Φ 3554 mm
1.80 m 1.80 m RL 53.307 SCOUR
0.75 m 0.75 m
5.1
DESIGN DATA
a) SOIL DATA
Assumed SBC = 15.00 t/m² Total Area = 4.1213
Density of Soil Fill = 2.00 t/m3 above pile cap
Angle of Internal Friction = f = 30 º
Surcharge Angle = b = 0º
Wall Angle = a = 90 º
Angle of Wall Friction = d = 20 º Surcharge Height = 1.20 m
Friction Coefficient = m = 0.50
sin2 (a + f ) cosd 1
Normal: Ka = x = 0.279
sin2 a sin(a - d ) é sin(f + d ) sin(f - b ) ù
2
ê1 + ú
ê
ë sin(a - d ) sin(a + b ) ú
û
Normal Case:
P1 = 4.05 T
P1 = 10.189 T 7.839 m
4.820 m
4.336 m GL
3.374t/m
Seismic Case:
P1 = 4.049 T
P1 = 10.189 T 7.839 m
3.020 m
2.536 m GL
3.374t/m
Total Horizontal Load due to Surcharge Pressure = 5.256 T At Lever arm = 3.92 m
Total Horizobntal load - all loads upto pilecap bottom = 269.092 T
Total Overturning moment of all loads upto pile cap bottom = 925.51 t-m
STABILISING LOADS:
Long Trans TransHor
HZL. Vertical
Moment Vertical Horizontal Horizontal Horizont izontal
Area No. Width Description Length Height Density Vertical Load Dist. seismic Factor
at A seismic seismic seismic al seismic
From A moment
moment seismic moment
1 12.00 m Vertical Wall 0.600 3.579 2.500 64.422 2.550 164.276 7.731 19.713 11.596 41.624 34.7879 124.871 1
1a 12.00 m Vertical Wall 0.300 2.579 2.500 11.606 2.150 24.950 1.393 2.994 2.089 7.498 6.26697 22.495 1
2 12.00 m Dirtwall Haunch 0.750 0.600 2.500 6.750 3.100 20.925 0.810 2.511 1.215 5.806 3.645 17.419 1
3 12.00 m Dirtwall Haunch 0.750 0.400 2.500 9.000 3.225 29.025 1.080 3.483 1.620 8.390 4.86 25.170 1
4 12.00 m Corbel for bearing 0.270 0.400 2.500 3.240 2.115 6.853 0.389 0.822 0.583 3.020 1.7496 9.061 1
5 12.00 m Corbel for bearing 0.270 0.600 2.500 2.430 2.160 5.249 0.292 0.630 0.437 2.090 1.3122 6.271 1
6 12.00 m Dirtwall 0.300 2.460 2.500 22.140 3.450 76.383 2.657 9.166 3.985 25.740 11.9556 77.221 1
7 12.00 m Approach slab corbel 0.300 0.300 2.500 2.700 3.750 10.125 0.324 1.215 0.486 3.591 1.458 10.773 1
8 12.00 m Approach slab corbel 0.300 0.300 2.500 1.350 3.700 4.995 0.162 0.599 0.243 1.735 0.729 5.204 1
9 12.30 m Heel of pilecap 2.550 1.800 2.500 141.143 3.975 561.041 16.937 67.325 25.406 22.865 76.217 68.595 1
10 12.30 m Toe of pile cap 2.550 1.800 2.500 141.143 0.975 137.614 16.937 16.514 25.406 22.865 76.217 68.595 1
11 12.30 m Soil Fill on heel 0.750 2.579 2.000 47.583 3.225 153.454 5.710 18.414 8.565 26.461 25.6946 79.383 1
12 12.30 m Soil Fill on heel 0.750 0.600 2.000 5.535 3.100 17.159 0.664 2.059 0.996 4.562 2.9889 13.686 1
13 12.30 m Soil Fill on heel 1.500 6.039 2.000 222.839 3.975 885.785 26.741 106.294 40.111 193.315 120.333 579.945 1
14 12.30 m soil fill on toe 1.950 0.500 2.000 23.985 0.975 23.385 2.878 2.806 4.317 8.850 12.9519 26.551 1
15 12.30 m Reduce area 7 & 8 2.000 -3.240 - -12.096 -0.389 -1.452 -0.583 -1.7496 - 1
16 12.30 m VC normal of EP 97.941 2.850 279.133 - - - - 1
17 12.30 m VC seismic of EP 97.941 2.850 279.133 11.753 33.496 - - 1
18 0.50 m Retaining wall Load 2.250 6.039 2.500 16.985 3.525 59.871 2.038 7.185 3.057 14.734 9.17173 44.203 1
Total Stabilising Loads Normal 817.55 2448.13
HZL.
Moment
Area No. Width Description Length Height Density Vertical Load Dist. Factor
at A
From A
1 12.00 m Vertical Wall up to HFL 0.600 1.218 2.500 21.924 2.550 55.906 1
1 12.00 m Vertical Wall below HFL 0.600 2.361 1.500 25.499 2.550 65.022 1
1a 12.00 m Vertical Wall up to HFL 0.300 0.218 2.500 0.981 2.150 2.109 1
1a 12.00 m Vertical Wall below HFL 0.300 2.361 1.500 6.375 2.150 13.704 1
2 12.00 m Dirtwall Haunch 0.750 0.600 2.500 13.500 3.100 41.850 1
3 12.00 m Dirtwall Haunch 0.750 0.400 2.500 9.000 3.225 29.025 1
4 12.00 m Corbel for bearing 0.270 0.400 2.500 1.620 2.115 3.426 1
5 12.00 m Corbel for bearing 0.270 0.600 2.500 4.860 2.160 10.498 1
6 12.00 m Dirtwall 0.300 2.460 2.500 22.140 3.450 76.383 1
7 12.00 m Approach slab corbel 0.300 0.300 2.500 1.350 3.750 5.063 1
8 12.00 m Approach slab corbel 0.300 0.300 2.500 2.700 3.700 9.990 1
9 12.30 m Heel of pilecap 2.550 1.800 1.500 84.686 3.975 336.625 1
10 12.30 m Toe of pile cap 2.550 1.800 1.500 84.686 0.975 82.568 1
11 12.30 m Soil Fill on heel above HFL 0.750 0.218 2.000 2.011 3.225 6.486 1
11 12.30 m Soil Fill on heel below HFL 0.750 2.361 1.000 21.780 3.225 70.241 1
11 12.30 m Soil Fill on heel 0.750 0.600 2.000 11.070 3.225 35.701 1
11 12.30 m Soil Fill on heel above HFL 1.500 1.218 2.000 44.944 3.975 178.653 1
11 12.30 m Soil Fill on heel below HFL 1.500 2.361 1.000 43.560 3.975 173.153 1
14 12.30 m soil fill on toe 1.950 0.500 2.000 23.985 0.975 23.385 1
15 12.30 m Reduce area 7 & 8 2.000 -3.240 - -12.042 1
16 12.30 m VC normal of EP 87.378 2.850 249.027 1
18 12.30 m Retaining wall Load above HFL2.250 1.218 2.500 84.270 3.525 297.053 1
18 12.30 m Retaining wall Load below HFL2.250 2.361 1.500 98.011 3.525 345.489 1
Total Stabilising Loads Normal 693.09 2099.31
Normal Case:
Final Loads and Bending Moments at the centre of base are as below
Total Vertical Load = 817.550 T
Total Moment = -1520.5 t-m Against OTM
HFl Case:
Final Loads and Bending Moments at the centre of base are as below
Total Vertical Load = 693.090 T
Total Moment = -708.8 t-m Against OTM
Horizont Transvers
Vertical Horizontal Long.
Applied Load kN Case al load- e
Load load-long. Moment
trans. moment
X Y Xi^2 yi^2 Normal HFL Seismic 1 Seismic 2 Seismic3 Normal 1059.43 298.35 0.00 157.37 0.00
1 -1.8 5.4 3 29.16 121.50 117 168 113 244 HFL 934.97 298.35 0.00 0.00 0.00
2 -1.8 1.8 3 3.24 121.50 117 147 91 172 Seismic 1 1287.34 356.82 210.28 361.26 780.73
3 -1.8 -1.8 3 3.24 121.50 117 125 70 100 Seismic 2 1312.66 561.51 210.28 1204.21 780.73
4 -1.8 -5.4 3 29.16 121.50 117 103 48 27 Seismic3 1287.34 356.82 700.92 361.26 2602.44
5 1.8 5.4 3 29.16 143.36 117 219 280 294 N 8
6 1.8 1.8 3 3.24 143.36 117 197 259 222 Total Ixx = 26
7 1.8 -1.8 3 3.24 143.36 117 175 237 150 Total Iyy = 130
8 1.8 -5.4 3 29.16 143.36 117 153 215 78
9
10
11
12
13
14
15
16
17
18
19
20
Horizont
Moment in Vertical Load Load Load Case Load Case
Case al load Case Load Case 2
pile load
Case 1 Case 3 4 5
per pile
Normal 37.29 145.42 143.36 Max Total load in row 1 486 467 543 322 543
HFL 37.29 145.42 116.87 Min Total load in row 2 573 467 744 991 744
Seismic 1 51.77 201.87 Total load in row 3 0 0 0 0 0
Seismic 2 74.95 292.24 Total load in row 4
Seismic3 98.31 383.35
The GA of abutment is as below (All Dimensions in mm) Total Width of Abutment = 12.00 m
300 Cut out for span = 25.00 m
Surcharge load 300 Exp. Joint RL 64.700
Approach Slab 300 6.039
300
Tr. Moment from Superstructure
300
8
height
2110
6
P = In table below
300 CL of Bearing
300 750 570
1560
Hzl. Force = In table below 61.24
Bearing and
350
Pedestal height
400
400
270 HFL RL 61.022
4
3
5539 mm
600
5
600 1
2
12
Formation Level
3079 mm
Overall Height
600
above GL to
750
7715 mm
11
RL 59.161 Ground Level
13
1.950 m 500
14
900 RL 58.661
1800 mm 1800 mm
10 1800
0 mm RL 56.86
9
A
Pile diameter
1.20 m Φ 1.20 m Φ 3554 mm
1.80 m 1.80 m RL 53.307 SCOUR
0.75 m 0.75 m
5.1
DESIGN DATA
a) SOIL DATA
Assumed SBC = 15.00 t/m²
Density of Soil Fill = 2.00 t/m3
Angle of Internal Friction = f = 30 º
Surcharge Angle = b = 0º
Wall Angle = a = 90 º
Angle of Wall Friction = d = 20 º Surcharge Height = 1.20 m
Friction Coefficient = m = 0.50
sin2 (a + f ) cosd 1
Normal: Ka = x = 0.279
sin2 a sin(a - d ) é sin(f + d ) sin(f - b ) ù
2
ê1 + ú
ê
ë sin(a - d ) sin(a + b ) ú
û
Normal Case:
P1 = 4.049 T
P1 = 10.189 T 7.839 m
4.820 m
4.336 m GL
3.374t/m
Seismic Case:
P1 = 4.049 T
P1 = 10.189 T 7.839 m
3.020 m
2.536 m GL
3.374t/m
Total Horizontal Load due to Surcharge Pressure = 5.256 T At Lever arm = 3.92 m
Total Horizobntal load - all loads upto pilecap bottom = 269.092 T
Total Overturning moment of all loads upto pile cap bottom = 925.51 t-m
STABILISING LOADS:
Long
Trans TransHori
Vertical Horizont Horizont
HZL. Dist. From Vertical Horizont zontal
Area No. Width Description Length Height Density Vertical Load Moment at A seismic al al Factor
A seismic al seismic
moment seismic seismic
seismic moment
moment
1 12.00 m Vertical Wall 0.600 3.579 2.500 64.422 2.550 164.276 7.731 19.713 11.596 41.624 34.7879 124.871 1
1a 12.00 m Vertical Wall 0.300 2.579 2.500 11.606 2.150 24.950 1.393 2.994 2.089 7.498 6.26697 22.495 1
2 12.00 m Dirtwall Haunch 0.750 0.600 2.500 6.750 3.100 20.925 0.810 2.511 1.215 5.806 3.645 17.419 1
3 12.00 m Dirtwall Haunch 0.750 0.400 2.500 9.000 3.225 29.025 1.080 3.483 1.620 8.390 4.86 25.170 1
4 12.00 m Corbel for bearing 0.270 0.400 2.500 3.240 2.115 6.853 0.389 0.822 0.583 3.020 1.7496 9.061 1
5 12.00 m Corbel for bearing 0.270 0.600 2.500 2.430 2.160 5.249 0.292 0.630 0.437 2.090 1.3122 6.271 1
6 12.00 m Dirtwall 0.300 2.460 2.500 22.140 3.450 76.383 2.657 9.166 3.985 25.740 11.9556 77.221 1
7 12.00 m Approach slab corbel 0.300 0.300 2.500 2.700 3.750 10.125 0.324 1.215 0.486 3.591 1.458 10.773 1
8 12.00 m Approach slab corbel 0.300 0.300 2.500 1.350 3.700 4.995 0.162 0.599 0.243 1.735 0.729 5.204 1
9 12.30 m Heel of pilecap 2.550 1.800 2.500 141.143 3.975 561.041 16.937 67.325 25.406 22.865 76.217 68.595 1
10 12.30 m Toe of pile cap 2.550 1.800 2.500 141.143 0.975 137.614 16.937 16.514 25.406 22.865 76.217 68.595 1
11 12.30 m Soil Fill on heel 0.750 2.579 2.000 47.583 3.225 153.454 5.710 18.414 8.565 26.461 25.6946 79.383 1
12 12.30 m Soil Fill on heel 0.750 0.600 2.000 5.535 3.100 17.159 0.664 2.059 0.996 4.562 2.9889 13.686 1
13 12.30 m Soil Fill on heel 1.500 6.039 2.000 222.839 3.975 885.785 26.741 106.294 40.111 193.315 120.333 579.945 1
14 12.30 m soil fill on toe 1.950 0.500 2.000 23.985 0.975 23.385 2.878 2.806 4.317 8.850 12.9519 26.551 1
15 12.30 m Reduce area 7 & 8 2.000 -3.240 - -12.096 -0.389 -1.452 -0.583 -1.7496 - 1
16 12.30 m VC normal of EP 97.941 2.850 279.133 - - - - 1
17 12.30 m VC seismic of EP 97.941 2.850 279.133 11.753 33.496 - - 1
18 0.50 m Retaining wall Load 2.250 6.039 2.500 16.985 3.525 59.871 2.038 7.185 3.057 14.734 9.17173 44.203 1
Total Stabilising Loads Normal 817.55 2448.13
1 12.00 m Vertical Wall up to HFL 0.600 1.218 2.500 21.924 2.550 55.906
1 12.00 m Vertical Wall below HFL 0.600 2.361 1.500 25.499 2.550 65.022
1a 12.00 m Vertical Wall up to HFL 0.300 0.218 2.500 0.981 2.150 2.109
1a 12.00 m Vertical Wall below HFL 0.300 2.361 1.500 6.375 2.150 13.704
2 12.00 m Dirtwall Haunch 0.750 0.600 2.500 13.500 3.100 41.850
3 12.00 m Dirtwall Haunch 0.750 0.400 2.500 9.000 3.225 29.025
4 12.00 m Corbel for bearing 0.270 0.400 2.500 1.620 2.115 3.426
5 12.00 m Corbel for bearing 0.270 0.600 2.500 4.860 2.160 10.498
6 12.00 m Dirtwall 0.300 2.460 2.500 22.140 3.450 76.383
7 12.00 m Approach slab corbel 0.300 0.300 2.500 1.350 3.750 5.063
8 12.00 m Approach slab corbel 0.300 0.300 2.500 2.700 3.700 9.990
9 12.30 m Heel of pilecap 2.550 1.800 1.500 84.686 3.975 336.625
10 12.30 m Toe of pile cap 2.550 1.800 1.500 84.686 0.975 82.568
11 12.30 m Soil Fill on heel above HFL 0.750 0.218 2.000 2.011 3.225 6.486
11 12.30 m Soil Fill on heel below HFL 0.750 2.361 1.000 21.780 3.225 70.241
11 12.30 m Soil Fill on heel 0.750 0.600 2.000 11.070 3.225 35.701
11 12.30 m Soil Fill on heel above HFL 1.500 1.218 2.000 44.944 3.975 178.653
11 12.30 m Soil Fill on heel below HFL 1.500 2.361 1.000 43.560 3.975 173.153
14 12.30 m soil fill on toe 1.950 0.500 2.000 23.985 0.975 23.385
15 12.30 m Reduce area 7 & 8 2.000 -3.240 - -12.042
16 12.30 m VC normal of EP 87.378 2.850 249.027
18 0.50 m Retaining wall Load above HFL2.250 1.218 2.500 3.426 3.525 12.075
18 0.50 m Retaining wall Load below HFL2.250 2.361 1.500 3.984 3.525 14.044
Normal 518.22 1482.89
Total Stabilising Loads
Seismic N-Seismic Part 518.22 1482.89
Normal Case:
Final Loads and Bending Moments at the centre of base are as below
Total Vertical Load = 817.550 T
Total Moment = -1520.5 t-m Against OTM
SUMMARY OF LOADS AT CENTRE OF BASE FOR ENTIRE WIDTH OF ABUTMENTS SKEW ANGLE= 0.00 m
Vertical Horizontal Horizontal Transverse
Sl. No. Description Long. Moment
Load load-long. load-trans. moment
1 Overturning & stabilsing loads 817.55 269.09 0.00
2 Dead loads from superstructure
Girder 201.59 0.00
Slab loads 0.00 0.00
SIDL 40.29 0.00
Live loads (Max load) 119.61 0.00 113.63
(Max Long Moment) 115.55 0.00 86.66
(Max Trans Moment) 75.68 0.00 223.26
Braking loads 3.87 29.26 0.00 157.37 0.00
Totals 1182.91 298.35 0.00 157.37 223.26
Seismic Case:
Final Loads and Bending Moments at the centre of base are as below
Total Vertical Load = 817.550 T
Total Moment = -1520.5 t-m Against OTM
SUMMARY OF LOADS AT CENTRE OF BASE FOR ENTIRE WIDTH OF ABUTMENTS SKEW ANGLE= 0
Vertical Horizontal Horizontal Transverse
Sl. No. Description Long. Moment
Load load-long. load-trans. moment
1 Overturning & stabilsing loads 817.55 269.09 0.00
2 Dead loads from superstructure
Girder 201.59 0.00
Slab loads 0.00 0.00
SIDL 40.29 0.00
Live loads (Max load) 4.78 0.00 22.73
(Max Long Moment) 4.78 0.00 22.73
(Max Trans Moment) 3.03 0.00 44.65
Braking loads 0.46 3.49 31.47 Considering 20% of live load and braking
0.2 for design of foundation as per irc 6
4 Seismic (Horizontal-long) 37.64 43.32 178.40 (increase in seismic force)
5 Seismic (Horizontal-trans) 112.93 103.84 385.55
Long+0.3*Trans+0.3*vertical 37.64 43.32 31.15 178.40 115.66
Totals Comb
0.3*Long+Trans+0.3*vertical 33.88 13.00 103.84 53.52 385.55
0.3*Long+0.3*Trans+vertical 33.88 13.00 31.15 53.52 115.66
HFl Case:
Final Loads and Bending Moments at the centre of base are as below
Total Vertical Load = 518.218 T
Total Moment = -92.8 t-m Against OTM
SUMMARY OF LOADS AT CENTRE OF BASE FOR ENTIRE WIDTH OF ABUTMENTS SKEW ANGLE= 0.00 m
Vertical Horizontal Horizontal Transverse
Sl. No. Description Long. Moment
Load load-long. load-trans. moment
1 Overturning & stabilsing loads 518.22 269.09 0.00
2 Dead loads from superstructure
Girder 201.59 0.00
Slab loads 0.00 0.00
SIDL 40.29 0.00
Live loads (Max load) 119.61 0.00 113.63
(Max Long Moment) 115.55 0.00 86.66
(Max Trans Moment) 115.55 0.00 223.26
Braking loads 3.87 29.26 157.37
Totals 883.58 298.35 157.37 223.26
Horizontal
Moment in Vertical Load Case Load Load Case
Case load per Load Case 1 Load Case 2
pile load
3 Case 4 5
pile
Normal 37.29 145.42 168.09 Total load in row 1 548 398 526 493 526
HFL 37.29 145.42 130.68 Total load in row 2 635 486 573 609 573
Seismic 1 35.91 140.02 Total load in row 3 0 0 0 0 0
Seismic 2 39.68 154.72 Total load in row 4
Seismic3 37.98 148.11
SECTION A
Y (TRANSVERSE)
Origin
X (LONGITUDINAL)
ROW 1
ROW 2 ROW 3
SECTION A
Materials
Grade of Concrete, fck = M 35
Grade of Steel, fyk = Fe500
0.90
1.72
0.00
1.80
5.10
Width of cap = 12
Depth of Pile Cap = 1.80 m
Pile shall be embeded in Pile cap = 50 mm
Eff. cover for Reinforcement = 75 mm As per amendment 2015 to IRC 112
Dia of Rebar Long. Direction = 20 mm Density of Concrete 2.5 t/m2
Dia of Rebar Transverse Direction = 20 mm Density of Soil 2 t/m2
Effe. Depth of pile cap, deff = 1715 mm
Height of soil over cap = 0.50 m
Length of Heel = 1.95 m
Length of Toe = 2.25 m
Design of Pile Cap in Longitudinal Direction Rare Quasi
Weight of Pile cap+earth over it+ RE wall = 176.5 t DL Backfill
Bending Moment due to weight of pile cap & soil at pier face = 214.6 tm 214.6 tm 1.00 1.0
Total Load on Pile in one col, Max of = 744.0 t 635.2 t
Lever arm for bending moment due to Pile = 1.80 0 m
Bending Moment in Long. Dir. due to Pile = 1339.2 tm 1143.3 tm
Net Bending moment at the face = 1124.7 tm 928.7 tm
Net Bending moment at the face Short term = 195.9 tm
Case 1-ML
Depth of Neutral axis, mm, ytop x =(A sl f yd )/( l η b f cd ) 68.3
Compression Reinforcement No. of bars 160
Dia. of Rebars, mm f 16
Area of Steel, mm2 Asc 32153.6
Effective cover, mm d' 83.0
Depth of Extreme Fibre Tension Reinforcement, mm, ybot Ybot 1646.7 `
Moment of inertia of Uncracked section, mm4 I uncracked 5.98E+12
Tensile Stress in concrete fctm 1.693
Permissible tensile stress of concrete fctm, n 2.77 Eq. A2-2
Uncraked
Check of Stresses in Rare Case Creep and Elastic Modulus
Depth of concrete compression
dc = (( - AsEs) + sqrt((AsEs)^2 + 2 b As Es Eceff d )) / b Eceff 254.6
Icr (cracked) = As (d- dc)^2 +Eceff b dc^3/3 Es 5.61E+10
Section Modulus, mm3 Ztop 2.2E+08
Section Modulus, mm3 Zbot 3.8E+07
Compressive Stresses at top s c top 4.52
Permissible stress 0.48*fck 16.80
safe
Tensile Stress at level of Steel 292.8
Permissible stress 0.6*fyk 300.0
safe `
Quasipermanent Combinations
Case 1-ML
Factored design Moment, tm Mu 928.7
Check of Stresses Quasi case Creep and Elastic Modulus
Depth of concrete compression
dc = (( - AsEs) + sqrt((AsEs)^2 + 2 b As Es Eceff d )) / b Eceff 265.5
Icr (cracked) = As (d- dc)^2 +Eceff b dc^3/3 Es 5.56E+10
Section Modulus, mm3 Ztop 2.1E+08
Section Modulus, mm3 Zbot 3.8E+07
Compressive Stresses at top s c top 3.58
Permissible stress 0.48*fck 16.80
safe
Tensile Stress at level of Steel 242.20
Permissible stress 0.6*fyk 300.0
safe
Design for Crack Width, Check - SLS Case 1-ML Crack width as per Cl. 12.3.4
Cracked Status Uncraked
Factor depending on duration of load Kt 0.50
h 1800
hc,eff 212.5
Ac,eff 2550000.0
r P,eff 0.009
fct, eff 2.77
[ s sc -K t *f ct,eff / r p,eff (1+ a e r p , eff )] / E s >=[0.6* s sc / E S ] 0.0004 Eq .12.6
[0.6* s sc /E S ] 0.0007 Eq .12.6
(esm-ecm) 0.0007 Eq .12.6
Spacing of tension Reinforcement S 160
For Bonded Reinforcement within tension zone If S < CP
Cover Parameter for SR,Max, mm CP 425.0
k1 0.80
k2 0.50
Max crack spacing S r,Max 622.97 Eq .12.8
For Deformed Bara associated with pure bending If S > CP
Max crack spacing Sr,Max 622.97 Eq .12.8
Crack width WK = Sr,max*(ξ sm –ξ cm) 0.294
Crack width permissible WK,PER 0.30
safe
Moment in Stem
ULS CASE SLS CASE
Design Axial Longi. Transv. Design Axial Longi. Transv.
Sr.No Combinati Load Load Moment Moment Load Moment Moment
. ons Case
NED ML MT NED ML MT
QUASI CASE
NED = 380.690 T
2
Ac = 1.131 m ACC
fck = 35 N/mm2
r f
wd =
w yd
f cd
ωwd = Confining reinforcement expressed as ratio
fyd = 434.7826 Mpa
fcd = 15.61 Mpa
ρw = Volumetric ratio of tranverse reinforcement defined as
4 A sp
r w =
D sp .S L
Dsp = 1.050 m
The Minimum confining reinforcement is as given by
wd.c Max(1.4.req;0.18)
Required confining reinforcement is given by
AC f
w.req = 0.37 hk + 0.13 yd (r L − .01)
ACC f cd
ACC = Confined (core) concrete area of the section within the outside
dia of the hoop
= 0.866 m2
wwreq = 0.09178
1.4ww.req = 0.1285
wwd.c = Max
0.18
wwd.c = 0.18
ρw = 0.006463
A sp r D sp = 0.00170 m2/m
=
w
S L 4 = 1696.42 mm2/m
1.20
DESIGN OF ABUTMENTS
The GA of abutment is as below (All Dimensions in mm) Total Width of Abutment = 12.00 m
300 Cut out for span = 25.00 m
Surcharge load 300 Exp. Joint RL 64.700
Approach Slab 300
300
Tr. Moment from Superstructure
300
8
height
2110
6
P = In table below
300 CL of Bearing
300 750 570
1560
Hzl. Force = In table below
Bearing and
350
Pedestal RL 62.240
400
400
270
5539 mm
RL 61.840 3 1620 4
600
1 5
600
2
RL 61.240
Formation Level
12
3079 mm
Overall Height
600
above GL to
750
HFL RL 61.022
7715 mm
11
1a RL 59.161 Ground Level
13
500
14
2.25 1.95
900 RL 58.661
1800 mm 1800 mm
10 1800
9
0 mm RL 56.86
A
Pile diameter 1399.8
1.20 m Φ 1.20 m Φ 3554 mm
1.80 m 1.80 m RL 53.307 SCOUR
0.75 m 0.75 m
5.1
DESIGN DATA
a) SOIL DATA
Normal Case:
7.839 m
Seismic Case:
P1 = 0.000 T
P1 = 18.735 T 7.839 m
3.020 m
2.536 m GL
6.205t/m
Scour Level
Vertical
Area No. Width Description Length Height Density
Load (T)
Normal Case:
Final Loads and Bending Moments at the centre of top of pile cap are as below
Total Vertical Load = 123.638 T
Dry Case ULS VERTICAL LOAD RARE VERTICAL LOAD ULS FACTOR FOR SEISMIC
Long Horizontal Trans Horizontal
Fctored Factor for Fctored
Area No. Description Vertical Load Factor for ULS Horizontal seismic Horizontal seismic
Forces (T) Rare Forces (T)
seismic moment seismic moment
1 Vertical Wall 76.028 1.35 102.64 1 76.03 18.47 33.06 55.42 99.18
2 Dirtwall Haunch 6.750 1.35 9.11 1 6.75 1.64 4.89 4.92 14.66
3 Dirtwall Haunch 9.000 1.35 12.15 1 9.00 2.19 7.39 6.56 22.17
4 Corbel for bearing 3.240 1.35 4.37 1 3.24 0.79 2.66 2.36 7.98
5 Corbel for bearing 2.430 1.35 3.28 1 2.43 0.59 1.76 1.77 5.28
6 Dirtwall 22.140 1.35 29.89 1 22.14 5.38 25.07 16.14 75.20
7 Approach slab corbel 2.700 1.35 3.65 1 2.70 0.66 3.67 1.97 11.00
8 Approach slab corbel 1.350 1.35 1.82 1 1.35 0.33 1.75 0.98 5.25
9 Total 166.91 123.64
10 Erath Pressure Moment (T-m) 456.84 t-m 1.5 685.26 t-m 1 456.84 t-m
ULTIMATE Limit State Eccentricity due to distance between bearing center and abutment stem center = -150 mm
SUMMARY OF LOADS AT CENTRE OF PILE CAP TOP FOR ENTIRE WIDTH OF ABUTMENTS Dry Case SKEW ANGLE= 0 º
Vertical Horizontal Horizontal Transverse
Sl. No. Description Long. Moment Factor for ULS
Load load-long. load-trans. moment
1 Overturning & stabilsing loads 166.91 256.29 685.26 1.5
2 Dead loads from superstructure
Girder+Deck slab 272.15 -40.82 0.00 1.35
SIDL 27.84 -4.18 0.00 1.35
WC 34.41 -5.16 0.00 1.75
Live loads (Max load) 179.42 0.00 170.44 1.5
(Max Long Moment) 173.33 0.00 129.99 1.5
(Max Trans Moment) 113.52 0.00 334.88 1.5
Braking loads 5.81 43.88 0.00 157.06 0.00
Totals 686.54 300.17 0.00 792.16 334.88
TRAFFIC DIRECTION
Θ
Combi-1 DL + SIDL + WC + LL (Case1) +EP+SUR+ BF 686.54 300.17 0.00 792.16 170.44
SUMMARY OF LOADS AT CENTRE OF PILE CAP TOP FOR ENTIRE WIDTH OF ABUTMENTS HFL Case SKEW ANGLE= 0 º
Vertical Horizontal Horizontal Transverse
Sl. No. Description Long. Moment
Load load-long. load-trans. moment
1 Overturning & stabilsing loads 137.69 242.27 599.92
2 Dead loads from superstructure
Girder+Deck slab 272.15 -40.82 0.00
SIDL 27.84 -4.18 0.00
WC 34.41 -5.16 0.00
Live loads (Max load) 179.42 0.00 170.44
(Max Long Moment) 173.33 0.00 129.99
(Max Trans Moment) 113.52 0.00 334.88
Braking loads 5.81 43.88 0.00 157.06 0.00
Totals 944.16 286.16 0.00 706.83 334.88
Seismic Case:
Final Loads and Bending Moments at the centre of base are as below
Total Vertical Load = 123.638 T
Total Moment = -1452.6 t-m Against OTM
SUMMARY OF LOADS AT CENTRE OF BASE FOR ENTIRE WIDTH OF ABUTMENTS SKEW ANGLE= 0 º
Vertical Horizontal Horizontal Transverse
Sl. No. Description Long. Moment
Load load-long. load-trans. moment
1 Overturning & stabilsing loads 166.91 170.86 456.84
2 Dead loads from superstructure
Girder+Deck slab 272.15 -40.82 0.00 TRAFFIC
SIDL 27.84 -4.18 0.00 Θ
WC 34.41 -5.16 0.00
Live loads (Max load) 23.92 0.00 34.09
(Max Long Moment) 34.67 0.00 26.00
(Max Trans Moment) 22.70 0.00 66.98
Braking loads 0.46 3.49 12.49 0.00 Considering 20% of live load and braking as ULS Case
Rare Limit State Eccentricity due to distance between bearing center and abutment stem center = -150 mm
SUMMARY OF LOADS AT CENTRE OF PILE CAP TOP FOR ENTIRE WIDTH OF ABUTMENTS Dry Case SKEW ANGLE= 0 º
SUMMARY OF LOADS AT CENTRE OF PILE CAP TOP FOR ENTIRE WIDTH OF ABUTMENTS HFL Case SKEW ANGLE= 0.00 m
Vertical Horizontal Horizontal Transverse
Sl. No. Description Long. Moment
Load load-long. load-trans. moment
1 Overturning & stabilsing loads 100.65 161.51 399.95
2 Dead loads from superstructure
Girder+Deck slab 201.59 -30.24 0.00
SIDL 20.63 -3.09 0.00
WC 19.66 -2.95 0.00
Live loads (Max load) 119.61 0.00 170.44
(Max Long Moment) 115.55 0.00 129.99
(Max Trans Moment) 75.68 0.00 334.88
Braking loads 3.87 29.26 0.00 104.71 0.00
Totals 657.24 190.77 0.00 468.38 635.32
Quasi Limit State Eccentricity due to distance between bearing center and abutment stem center = -150.00 mm
SUMMARY OF LOADS AT CENTRE OF PILE CAP TOP FOR ENTIRE WIDTH OF ABUTMENTS Dry Case SKEW ANGLE= 0.00 m
SUMMARY OF LOADS AT CENTRE OF PILE CAP TOP FOR ENTIRE WIDTH OF ABUTMENTS HFL Case SKEW ANGLE= 0.00 m
Vertical Horizontal Horizontal Transverse
Sl. No. Description Long. Moment
Load load-long. load-trans. moment
1 Overturning & stabilsing loads 100.65 161.51 399.95
2 Dead loads from superstructure
Girder+Deck slab 201.59 -30.24 0.00
SIDL 20.63 -3.09 0.00
WC 19.66 -2.95 0.00
Live loads (Max load) 0.00 0.00 0.00
(Max Long Moment) 0.00 0.00 0.00
(Max Trans Moment) 0.00 0.00 0.00
Braking loads 0.00 0.00 0.00
Totals 342.52 161.51 363.67 0.00
900
354.5 Section dimensions of pier shaft
As1 Length, B = 12000 mm ( equivalent length of pier shaft)
Thickness,D = 900 mm DESIGN AS WALL, NEGLECT AXIAL VALUE
0.1*fcd*Ac = 1688.4 Ton As clause 7.6.4.1 IRC 112,2011
Material properties
fck = 35 Mpa
fyk = 500 Mpa
12000 As3 As4 11855 Es = 200000 Mpa
fctm = 2.8 Mpa
Design axial resistance of section
NRd = Ac * fcd + As * fyd
fcd = acc xfck /gm acc = 0.67
= 15.633 Mpa gm = 1.5
As2 fyd = fyk/gs gs = 1.15
NA = 434.783 Mpa
Xu NRd = 19373.3 ton
Reinforcement Details
Spacing From Actual
Reinf. Dia.(mm) (mm) Cover (mm) (mm) To (mm) YCG (mm) Nos. Spacing Remarks
As1 16 200 50 208 562.5 281.25 3.00 177.25
As2 16 200 50 208 562.5 281.25 3.00 177.25
As3 25 150 75 87.5 11942 5971.00 81.00 148.18
As4 16 150 50 58 11913 5956.25 81.00 148.18
Total reinforcement
As3 (Along length Tension face) = 39760.8 mm2
As4 (Along length Compression face) = 16286.02 mm2
As2 (Along width Tension face) = 603.19 mm2
As1 (Along width Compression face) = 603.19 mm2 Horizontal reinforcement = 1168 mm2
As clause 16.3.2
Total As = 57253.2 mm2 900 mm2
Maximum neutral axis depth = 0.53 %
0.0035 Provide 12 dia 150 c/c as horizontal
x u,max =
0.87 . f y = 0.617 Actual Reinforcement = 4750.1 mm2 OK
0.0035 +
d ES
x u,max = 0.617 d
Effective depth at transverse direction = 8854.5 mm
Overall Check
Depth of Depth of Ast
Clear Clear Depth Effective for Ast prov
Moment ,Mu(Long) X ulim NA as NA as Ast min Bar dia spacing prov
Cover Cover Provide Depth overrei (Trans)
(with Partial Safety Mu(Trans) per Ast per Ast (Long)
Load case (Earth (NonEart d nforced
factor)
face) h face)
Long Trans
Reinfor. Rein.
(t-m) (t-m) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm 2 ) (mm) (mm) (mm 2 ) (mm 2 )
under
Pmax 792.16 170.44 75 50 900 813 501 114 1098 14218 25 150 39761 28627
reinforc
under
Basic MLmax 792.16 129.99 75 50 900 813 501 114 1098 reinforc 14218 25 150 39761 28627
ed
under
Mtmax 792.16 334.88 75 50 900 813 501 114 1098 14218 25 150 39761 28627
reinforc
under
Pmax 706.83 170.44 75 50 900 813 501 114 1098 14218 25 150 39761 28627
reinforc
under
HFL CASE MLmax 706.83 129.99 75 50 900 813 501 114 1098 14218 25 150 39761 28627
reinforc
under
Mtmax 706.83 334.88 75 50 900 813 501 114 1098 14218 25 150 39761 28627
reinforc
under
Pmax 806.51 381.19 75 50 900 813 501 114 1098 14218 25 150 39761 28627
reinforc
under
Seismic MLmax 1228.15 381.19 75 50 900 813 501 114 1098 14218 25 150 39761 28627
reinforc
under
Mtmax 806.51 1114.37 75 50 900 813 501 114 1098 14218 25 150 39761 28627
reinforc
Reinforcement Check
Moment Check Moment Check
Area of Area of
of for of for
steel steel
Section Moment to be resisted (t-m) resistanc Moment resistance Moment
provided provided
e long of trans of
(t-m) mm2 Long (t-m) mm2 Trans
Pmax 792.16 170.44 1322.20 39760.8 OK 4938.74 28626.58 OK
Normal Case
Force in abutment stem = 148.21 Ton Including surcharge and Earth pressure
Shear Check
fck = 35 Fe = 500
Shear
N ED Design
Design K= V min = Min. Resistan
Shear β = αv/ 2d Shear , Ast prov d provided deff 0 (axial σ cp ρ1 V Rd.c
V Rdc
Shear
ce
1+(200/d) 0.031K 3/2 Resist.
Section force)
βV ED .5
x fck 1/2 Check
(t/m) (t/m) (mm 2 ) (mm) (mm) (mm) Mpa (t) Mpa (t) (t) (t/m)
No
Bottom of
148.21 1.00 148.21 39760.78 900 800.5 1.500 0.337 0.00 0.00 0.004 395.59 329.87 395.59 Shear
STEM
Reinforc
Depth of Moment of
Eceff= Stress in
Modular concrete Inertia for Stress in
Load case Mqp Ecm/ Concrete,
ratio compressio cracked Steel, MPa
(1+ f ) MPa
n dc section Icr
> = 0.6 σ sc
Pmax 218750 0.182 0.00048 25 278 0.133 Okay
Es
Provide 6 bar of 16 mm dia bar as longitudinal steel on top face of abutment cap. ( Provided steel = 1206.37 mm^2
Provide 5 bar of 16 mm dia bar as longitudinal steel on bottom face of abutment cap. ( Provided steel = 1005.31 mm^2
Provide 5 bar of 16 mm dia bar as longitudinal steel onside face of abutment cap. ( Provided steel = 1005.31 mm^2
Total Steel = 3216.99 mm^2 OK
Surcharge Pressure
0.279 x 2.00 x 1.20 = 0.67 t/m^2
0.67
2.460 m
1.37 kN/m^2
Total moment at the base of dirt wall ULS = 679.63 + 219.60 KN-m
Design of Dirtwall
Grade of concrete = M 35
Grade of Steel = Fe 500
2
Youngs modulus of Concrete, Ec = 32308 N/mm
Youngs modulus of Steel, Es = 200000 Mpa
n Neutral axis depth = 0.0035/(0.0035+(0.87*500/200000+0.002)) = 0.456
j Lever arm = 1-(0.42*0.456) = 0.808
Q Moment of resistance = 0.36*35*0.456*0.808 = 4.640
soil properties
density 20.00
F fill soil 30.00
delta 20.00
earth pressure coeff ka 0.279
equivalent fluid density 5.59
density as per IRC 6-2017
cl. 217.1 4.80
concrete
grade of conc 35
density 24.00
rectangular part
(slab fixed at two adjacent edges)table 26/11a free
width a 2.25
depth b 6.04
thickness 0.500
b/2= 3.020 <a
loads
earth pressure at bottom 33.744 b free
ll surcharge 6.705
analysis (ref. Roark & Young)
a/b 0.373
rectangular loading a
beta1 0.348
beta2 0.393
max. stress (along b) 340.016
max. stress (along a) 384.866
moment about a mz1 31.877
moment about b mx1 96.842
triangular loading
beta1 0.210
beta2 0.147
max. stress (along b) 1032.51
max. stress (along a) 723.57
moment about a mz2 96.798
moment about b mx2 182.069
total moment
SLS moment about a mz1+mz2 128.674
SLS moment about b mx1+mx2 278.911
Coeffic to consider the influence of concrete strength α = 0.67 A2.10 Page : 244 of 112
Section Under/Over Reinforced Check Moment Offered by Steel Reinforcement at Comp. Face
Neutral Axis Moment of
Max Neutral
Depth as per Ast Moment to resistance
Ast prov Axis Depth Moment of Min steel Bar dia Spacing Ast prov
Prov
Section be resisted offered by resistance Ast
Section Xumax = Section
xu= Check steel offered by Check
0.617d
steel check
(0.87fy*Ast)/
(mm2) (mm) (t-m) (t-m) mm2 mm mm mm2
(0.36*fck*b)
10 150 3162
under Wall
Wall vertical 1590 258.4 24.40 18.34 28.28 OK 318
reinforced vertical
0 150
10 150 1178
under Wall_Horiz
Wall_Horizontal 5049 255.9 28.86 38.93 88.48 OK 1010
reinforced ontal
0 150
Minimum Reinforcement as per IRC:78-2014 Cl. 707.2.8 Tranverse Reinforcement (As per Cl. 16.6.1.1 of IRC 112-2011)
Minimum Reinforcement as per IRC:78-2014 Cl. 707.2.8 Minimum Reinforcement as per IRC:78-2014 Cl. 707.2.8
Section 2 Provided, Section
250mm per Provided 20% of Main Provided Steel Area
Bar dia, mm Check Bar dia, mm Check
metre Spacing, mm mm2 Reinf. Spacing, Provided,
12 160 10 150
Wall vertical 563 1590 OK Wall vertical 563 1178 OK
0 160 0 150
20 140 10 150
Wall_Horizontal 563 5049 OK Wall_Horizontal 563 3162 OK
0 140 0 150
2
- AsEs + (AsEs) + 2bAsEsEceff d
Depth of concrete compression: dc =
b Eceff
Wall vertical 56.59 230633722 5.05 OK 202.20 OK 16000 77.67 260734722 2.31 OK 126.72 OK
Wall_Horizontal 60.84 705816118 3.85 OK 139.95 OK 16000 83.27 590256847 2.05 OK 102.32 OK
Design of pedestal