Ongoing Project Payment Status
Ongoing Project Payment Status
Ongoing Project Payment Status
104 2930 NOEL PALM DALE VILLA - CLUB HOUSE 40000 7200 47200
105 2973 Witnessign of Initial Pile load test and rep 40000 7200 47200
107 2 2950 Proposed Commercial building fro Mr.Corn 25000 4500 29500
10 1965 NEST NANO - not working in this project 1201500 175612 1377112
11 2587 INKEL CCRC - not working in this project n 2025000 364500 2389500
12 2920 KGA Mall Thiruvalla - project not yet start 1430000 257400 1687400
36 2926 CASPIAN PEB STRUCTURE - OVER HEAD TANK 35000 6300 41300
37 2072 ASSET KASAVU - not working in this proje 40000 7200 47200
PROJECT DROPPED
63 2971 Siddhi apartment at Thiruvankulam 354308 63775 418083
% of bill raised Payment reBalance re NEXT BILL STAGE
awaiting wo 796933
302280 RECEIVED
10% can be raised 487340 10% Advance 20% on issue of Foundatio
41300 82600
20% 144821 579278 10% Advance 20% on issue of Foundatio
61364 122729
90% 649526 72169 20% Advance 10% On issue of Footing dr
122321 61161
75% on progress of
different stages of the
95% 672600 35400 20% commitment feeproject
120000 450000
0 704139
119346 59673
20% 0 702860 20% Advance 10% on issue of pile drawin
119129 59564
Vytila Commercial
Vytila Terminal Building
100% 252461 440225 (6.26%) (16.97%)
36748 99618
36748 received 59769 received
50% 446784 226425 10% Advance 20% On issue of foundation
57052 114103
100% 120000 365145 30%Along with work 20% foundation layout & de
123342 82228
3342 receivable
40% 193888 290834 30% Advance 20% on issue of Foundation
123234 82156
20% 96312 385247 20% Advance 10% on issue of pile drawin
81620 40810
50% 179000 278898 50% as advance amo25% on providing comment
194025 97012
60% 173897 260842 20% Advance 10% on issue of pile drawin
73685 36842
100% 412380 21703 30% Advance 20% on issue of Foundation
110360 73573
90% 390110 43346 10% Advance 20% on issue of Foundatio
36734 73467
85% 314372 116800 10% On submission o5% On submission of pile d
36540 18270
15% on issue of Basement floor det15% on issu15% on issue of Firs10% on issue of Typical floor details.
289164 289164 289164 192776
10% Concept Design 10% Schema 5% Statutory appro15% Detailed Design (2EMIS)
185343 185343 92672 278015
40% upon receipt of other construc40% upon re10% upon receipt of completion & structural stability certificate.
363387 726774 181693
30% On submission of all drawings10% On sub30% amount will be paid at equal intervals depending on the progress at site - (20
206018 68673 206018
137345 Received
10% on issue of Basement floor D 10% on iss 20% on issue of Typ20% on issue of Terrace Drawing (LMR & O
41300 41300 82600 82600
10% on issue of Basement floor D 10% on iss 10% on issue of Typ10% on issue of 17th floor Drawings
61364 61364 61364 61364
10% On issue of column grade bea20% On issu 20% On issue of Firs15% On issue of Typical Floor details
61161 122321 122321 91741
30580 receivable
5% on successful completion of
defects liability period of
12 months
30000
59673 119346 119346 89509
10% on issue of column Grade bea20% on issu20% on issue of Firs15% on issue of Typical floor (2nd to 14th f
59564 119129 119129 89347
Highcourt
Kakkanad Terminal Terminal Mattancherry Terminal
(5.05%) (41.21%) Bolgatty Terminal (23.43%)
29645 241912 41502 137539
29645 received 72577 rece12452 received 41270 received
20% On issue of basement floor, gr20% On iss25% as work progre5% on issue of Terrace, LMR & OHWT drawings
114103 114103 142629 28526
74462 receivable
10% on issue of Basement floor D 10% on iss 10% on issue of 17t20% on issue of Terrace Drawing (LMR & O
40547 40547 40547 81094
10% on issue of column Grade bea20% on issu20% on issue of Firs15% on issue of Typical floor details
50564 101127 101127 75845
20% on issue of Ground floor draw20% on issu20% on issue of Te 10% completion of Structure.
96856 96856 96856 48428
10% on basement drawings 10% on iss 20% on issue of typ20% on issue of Terrace floor drawings (L
48286 48286 96571 96571
10% on issue of Upper basement 15% on iss 15% on issue of Typ20% on issue of Terrace Drawing (LMR & O
47712 71568 71568 95424
10% on issue of Basement Floor D 10% on iss 10% on issue of Fir 10% on issue of Typical Floor Drawings
47499 47499 47499 47499
10% on issue of Basement floor d 10% on iss 20% on issue of Typ20% on issue of Terrace Drawing (LMR & O
46568 46568 93136 93136
10% on basement drawings 10% on iss 20% on issue of typ20% on issue of Terrace floor drawings (L
45594 45594 91188 91188
30% on issue of Typical floor detail15% on issu5% on completion of Civil Works
136698 68349 22783
10% on issue of Ground floor draw40% on issu10% on issue of Terrace, LMR & OHT drawings
45160 180641 45160
20% on issue of Ground Floor dra 15% on issu15% on issue of Typ5% on issue of remaining structural drawings
90244 67683 67683 22561
20%
Typical
floor
20% basement & Ground floor layo(1 to 12) 10% remaining drawings
20% on issue of Ground floor Draw20% on issu20% on issue of Te 10% completion of Structure.
59752 59752 59752 29876
, remaining 10% - PC,GB to be given
20% on issue of Ground floor draw20% on issu20% on issue of Te 10% completion of Structure.
59170 59170 59170 29585
20% On Completion of ground floo20% On Com 20% On Completion of whole
55266 55266 55266
55% on issue of different stages of5% on completion of structural system or 1year from signing the work order whichever com
137500 12500
15% on issue of Ground floor detai30% on issu15% on issue of Roo5% on completion of civil works
34798 69596 34798 11599
10% on issue of column Grade bea20% on issu20% on issue of Firs15% on issue of Typical floor details
15136 30272 30272 22704
10% on issue of column Grade bea20% on issu20% on issue of Firs15% on issue of Typical floor details
13661 27321 27321 20491
15%on issue of Basement drawing15% on Issu15% on Issue of 1st5% on Issue of rest of drawings
18858 18858 18858 6286
20% on issue of Ground floor detai15% on issu15% on issued of 3rd & 4th floor details
19580 14685 14685
10% on issue of Ground floor detai20% on issu20% on issue of 3rd & 4th floor
8509 17017 17017
20% on submission of Ground floo20% on sub10% on submission of full set drawings.
16000 16000 8000
35% on submission of full set drawings
26250
15% on issue of ground floor draw15% on issu20% on issue of Full set drawings
11250 11250 15000
7500 received
35% on submission of full set drawings
26250
10% on issue of Ground floor draw20% on issu20% on issue of 3rd10% on issue of Terrace, LMR & OHT drawings
7170 14339 14339 7170
20% on issue of Ground & First flo20% on issue of Second & Third floor drawings
14000 14000
work done so far)
Remaining deawings
15% on completion of concept sta15% on com 20% on submission15% on completion of construction docume
0 1121370 1495160 1121370
50% On issue of full set drawings
535328
20% on issue of Basement & Groun10% on issu20% on issue of 2n 10% on issue of Final Drawings
195238 97619 195238 97619
10% on issue of Parking floor deta15% on issu40% on equal month 10% on completion of structure
54648 81972 218592 54648
20% on Ground floor drawings 15% on issu15% on issue of Typ10% on issue of final drawings
98629 73972 73972 49315
10% on Basement of drawings 10% on iss 20% on issue of Typ20% on issue of Terrace Drawing (LMR & O
48557 48557 97114 97114
10% on Issue of Ground floor draw10% on issu20% on issue of Typ10% on issue of 8th & 9th floor drawings
36000 36000 72000 36000
20% on issue of Basement floor det15% on issu15% on issue of 1st10% on issue of Typical Floor details
240300 180225 180225 120150
30% Upon receipt of drawings for a20% Upon 10%re Upon receipt of isue of completion & stability certificate
607500 405000 202500
20% on Schematic Design 35% on Det25% on Construction Orientation & Documentation
286000 500500 357500
10% on issue of Parking floor deta15% on issu40% on equal month 10% on completion of structure
108772 163157 435086 108772
40% upon receipt of other construc10% upon receipt of completion & structural stability certificate.
409362 102341
15% Issuing of drawings of founda15% Issuing45% Equal monthly5% Completion of full structure
125258 125258 375775 41753
20% on issue of Ground Floor dra 20% on issu15% on issue of Te 5% on issue of structural Stability Certificate
133068 133068 99801 33267
20% on issue of pile, pile cap, pl 25% on issu25% On issue of typ10% on issue of Terrace, LMR & OHWT drawings
130088 162611 162611 65044
note - 11326 extra received
20% upon receipt of construction 40% upon re 10% upon receipt of completion & structural stability certificate
70000 140000 35000
10% Receivable
10% on issue of Basement & Ground 15% on issu40% on equal monthl10% on completion of structure
48371 72556 193482 48371
15% received -
rs.29022/-,
25% receivable
45% On approval of super structure
5% After submission of final report
156765
tural work completion or after 1 year whichever comes first
25% Issue of First & Second floor 20% Issue o5% Completion of work
62500 50000 12500
15%received
15% on issue of Basement floor det15% on issu20% on issue of Typi
5% on issue of Completion of structure.
35265 35265 47020 11755
65% upon submission of final struc5% upon completion of work
115397 8877
Rs.796/- received
30% Upon receipt of drawings for a20% Upon 10%
re Upon receipt of isue of completion & stability certificate
39930 26620 13310
25% on issue of Ground Floor Floo25% on iss 10% on issue of Final Drawings
30213 30213 12085
10% on issue of fullset
7500
10% on issue of column Grade bea20% on issu20% on issue of Firs15% on issue of Typical floor details
78482 156965 156965 117723
10% on issue of Ground floor draw10% on issu20% on issue of Typi
10% on issue of 10th floor drawings
35431 35431 70862 35431
orks & on submission of final stability certificate
lity certificate.
Design Alteration for reinforcement works (for grade change), payment to be made after submitting complete GFC drawings
210558
40% on during construction sta10% on virtual completion of all works & on submission of final stability certificate
400000 100000
5% on Roof & Remaining structural details
49700
f) Item no:7 Anganawadis and
public schools
Higher secondary block
improvement, Central
calvathy GHSS, Fortkochi g) Item no:8 Additional new projects of CSML (Subject to approval)
106985 8595
5% on Roof & Remaining structural details
44936
5% on issue of Rest of drawings
41030
5% on Roof & Remaining structural details
40307
5% on Roof & Remaining structural details
40280
5% on Roof & Remaining structural details
40005
OHWT drawings
ural drawings
ty Certificate
lity certificate
5% on Roof & Remaining structural details
39241
10% on issue of Terrace, LMR & OHT drawings
35431
itting complete GFC drawings
stability certificate