You are on page 1of 3

Quotation

Quotation reference No:Q-GRK20211202A

Buyer : Mr Bassam Obeid Seller: Shenzhen Gereke Machinery Co.Ltd

Address: No.19,JiaDe Maluan Industry Park,


Pingshan New District,Shenzhen
Tel: (+86) 0755-89906421

Fax:(+86) 0755-89906385

No Product Name Description Unit Price Qty Amount


(USD) (Set) (USD)
Ballpen Assembly Machine Voltage:380V,50Hz,3 phases
1 ( 2 up) Power:2.0Kw
GRK-L340-YZB Operating Speed:80pcs/min
Weight:1700kg
Compressed Air:5-6 bar
Dimensions:L3.4mXW1.4mXH1.8m

40,000 1 40,000

*This photo for display purpose


only

*Machine come with hot stamping


station

Note: Machine delivery in FOB Total(USD): 40,000


Validity: 30 days according quotation issued date
*Sample parts clearance charges in China shall be borne by buyer
1) Machine Characteristics:
Machine structural made from steel S45C.

Intelligent system: High quality PLC system integrated with touch screen and inverter.
It is easy operate and energy saving.

Machine transmission:Adopted high performance electronic cam trasmission system, stabilize and durable.

Feeding system: Material feed by high performance vibrating bowl feeder and parts assemble by precison
robotic finger/holder.

Components used: Solenoid valve(SMC,Japan),Photo sensor/Fiber optic(Riko,Taiwan/Keyence,Japan),Motor (Taiwan),


PLC(Mitsubishi Japan),Relay(Schneider,France),Proximity sensor(Autonics,Korea),Air filter(Taiwan),Cylinder(SMC,Japan /
Air tag,Taiwan),Electronic cam(Koyo,Japan),Inverter(Shihlin,Taiwan),stroke and other standard parts(Iko,Misumi,
Japan)

2) Machine assembly sequence: Horizontal Assembly


>1 barrel supply >2 barrel check >3 barrel direction fix >>4 barrel hot stamping >>5 back plug insertion >6 back plug check
>7 barrel direction fix >8 refill insertion >9 refill check >10 cap insertion >11 cap check
>12 defect part ejection >13 finished good discharge

3) Delivery time
120 working days after receiving PO

4) Port of delivery
According client requisition

5) Payment term
50% advance along with PO, 50% before shipment
(TT)

6) Seller responsibilities
i) Responsible on machine quality and efficiency are meet client requirements
ii) Responsible provide machine operating training to client during machine inspection in seller factory
iii) Responsible machine delivery in good condition to port requested by client
iv) Responsible return raw materials or tested assemble parts to client

7) Client responsibilities
Deliver 5000 sets of unselected plastic parts to seller after aknowledge of sales and purchase agreement.
If machine performance is interrupted due to plastic parts problem, client has responsible to change or
modify problematic plastic parts in order to suite for machine processes.
After completion of machice fabrication, client has responsible to deliver 10000 sets of unselected plastic parts
for machine trial run.
8) Machine quality Anssurance (Seller)
i)Responsible to ensure machine design and fabrication is according client requisitions.
ii)Responsible to ensure machine parts and components use are all in new and origin from manufacturer.
iii)Provide two years warranty of wear and tear mechanical parts,design and assembly problem.
(count from machine receiving date).
iv)Provide technical support to client in anytime when necessary( all charges to be responsible by client after
warrantly period).
v) In case of natural disaster such as earthquake,fire and other nature disaster, the cost is due to the buyer.

9) Machine major component origin list:


No. Product Producer Origin Country
1 Solenoid valve SMC Japan
2 Photo sensor/fiber optic Keyence/Riko Japan/Taiwan
3 Main motor Taiwan Taiwan
4 PLC Mitsubishi Japan
5 Relay Schneider France
6 Proximity sensor Autonics Korea
7 Air filter Taiwan/SMC Taiwan/Japan
8 Cylinder SMC /Air tag Japan/Taiwan
9 Electronic cam koyo Japan
10 Inverter Shihlin Taiwan
11 Stroke/rod eye Iko,Misumi Japan

廖建霖
(YEO KIAN LIN)
Overseas Business Development - Managing Partner
Shenzhen Gereke Machinery Co.,Ltd

You might also like