Professional Documents
Culture Documents
Location of work:
Source strength :
Permission is granted.
(Signature of Lead Contractor’s person authorized for RT works) (Signature of permit issuing authority of RFCL)
Name:
Designation:
Date:
(Signature)
Name & Signature of site contractor: