JUMLAH TITIK PROGRES

BLOK
RENCANA AKTUAL %
B1 131 131 100.00
B2 109 0 0.00
B3 318 34 10.69
B5 326 0 0.00
B6 156 157 100.64
B7 86 0 0.00
B8 88 88 100.00
B9 44 44 100.00
1258 454 36.09
132 18
2 11 20
150 6
33 285
183
1075 14.55%
85.45%
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B1 Inspektor : ANGGA

Ukuran : 20x20 Jumlah Titik : 131 titik


Berat Hammer Head : 1.8 ton Terpancang : 131 titik

Nomor Tiang 1 Tiang 2 Tiang 3 Tiang 4 Tiang 5 Tiang 6 Jumlah Total Masuk Sisa
No Hari / Tanggal Final Set Keterangan
Titik mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl Tiang (meter) (meter)

1 14 September 2022 3 6 27 6 7 6 158 18 17.50 0.5 0.80


2 14 September 2022 1 6 23 6 11 6 155 18 17.00 1 0.60
3 14 September 2022 2 6 24 6 12 6 161 18 17.00 1 0.70
4 14 September 2022 4 6 24 6 9 6 197 18 17.00 1 0.70
5 14 September 2022 7 6 26 6 12 6 159 18 16.50 1.5 0.80
6 14 September 2022 5 6 26 6 8 6 157 18 17.30 0.7 0.50
7 14 September 2022 6 6 21 6 13 6 163 18 17.50 0.5 0.70
8 14 September 2022 11 6 23 6 11 6 160 18 16.30 1.7 0.50
9 15 September 2022 9 6 21 6 11 6 163 18 16.50 1.5 0.70
10 15 September 2022 10 6 23 6 9 6 165 18 16.50 1.5 0.70
11 15 September 2022 8 6 26 6 12 6 158 18 16.50 1.5 0.70
12 15 September 2022 15 6 24 6 13 6 150 18 16.50 1.5 0.80
13 15 September 2022 12 6 26 6 13 6 163 18 16.50 1.5 0.60
14 15 September 2022 13 6 27 6 11 6 161 18 16.90 1.1 0.80
15 15 September 2022 14 6 24 6 13 6 163 18 16.80 1.2 0.70
16 15 September 2022 16 6 21 6 14 6 170 18 16.80 1.2 0.80
17 15 September 2022 18 6 24 6 13 6 168 18 17.00 1 0.60
18 15 September 2022 17 6 26 6 11 6 173 18 16.85 1.15 0.50
19 15 September 2022 19 6 27 6 12 6 168 18 17.40 0.6 0.70
20 15 September 2022 22 6 24 6 13 6 160 18 17.50 0.5 0.70
21 15 September 2022 20 6 27 6 12 6 168 18 17.00 1 0.60
22 15 September 2022 21 6 24 6 13 6 170 18 17.10 0.9 0.60
23 15 September 2022 26 6 27 6 13 6 162 18 17.30 0.7 0.60
24 15 September 2022 23 6 21 6 14 6 165 18 17.00 1 0.70
25 15 September 2022 25 6 25 6 13 6 173 18 17.40 0.6 0.70
26 15 September 2022 24 6 26 6 13 6 172 18 17.50 0.5 0.60
27 15 September 2022 27 6 27 6 13 6 174 18 16.60 1.4 0.50
28 15 September 2022 28 6 13 6 17 6 176 18 17.20 0.8 0.50
29 15 September 2022 30 6 22 6 13 6 178 18 17.40 0.6 0.70
30 15 September 2022 29 6 18 6 13 6 169 18 17.50 0.5 0.60
31 16 September 2022 34 6 17 6 16 6 160 18 17.50 0.5 0.80
32 16 September 2022 31 6 18 6 11 6 173 18 17.60 0.4 0.60
33 16 September 2022 33 6 21 6 11 6 181 18 17.00 1 0.50
34 16 September 2022 32 6 23 6 13 6 181 18 16.50 1.5 0.60
35 16 September 2022 37 6 22 6 12 6 176 18 17.30 0.7 0.60
36 16 September 2022 35 6 21 6 12 6 181 18 16.60 1.4 0.70
37 16 September 2022 36 6 23 6 12 6 176 18 17.60 0.4 0.60
38 16 September 2022 41 6 24 6 12 6 178 18 16.00 2 0.70
39 16 September 2022 38 6 26 6 11 6 180 18 17.00 1 0.70
40 16 September 2022 40 6 22 6 13 6 176 18 17.00 1 0.60
41 16 September 2022 39 6 24 6 13 6 177 18 17.10 0.9 0.50
42 16 September 2022 42 6 23 6 13 6 181 18 17.30 0.7 0.60
43 16 September 2022 45 6 26 6 11 6 181 18 17.50 0.5 0.50
44 16 September 2022 43 6 23 6 14 6 178 18 17.00 1 0.70
45 16 September 2022 44 6 17 6 12 6 177 18 16.70 1.3 0.70
46 16 September 2022 46 6 21 6 12 6 178 18 17.60 0.4 0.60
47 16 September 2022 48 6 26 6 13 6 180 18 16.90 1.1 0.70
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B1 Inspektor : ANGGA

Ukuran : 20x20 Jumlah Titik : 131 titik


Berat Hammer Head : 1.8 ton Terpancang : 131 titik

48 16 September 2022 47 6 23 6 13 6 181 18 17.00 1 0.60


49 16 September 2022 49 6 26 6 12 6 181 18 17.50 0.5 0.60
50 17 September 2022 52 6 23 6 12 6 181 18 17.50 0.5 0.70
51 17 September 2022 50 6 21 6 11 6 180 18 16.80 1.2 0.50
52 17 September 2022 51 6 26 6 9 6 183 18 16.50 1.5 0.60
53 17 September 2022 56 6 20 6 11 6 182 18 15.00 3 0.60 Kepala Tiang Rusak
54 17 September 2022 53 6 26 6 9 6 184 18 16.80 1.2 0.70
55 17 September 2022 54 6 18 6 13 6 181 18 16.50 1.5 0.70
56 17 September 2022 55 6 19 6 8 6 181 18 16.00 2 0.70
57 17 September 2022 57 6 20 6 10 6 186 18 16.00 2 0.80
58 17 September 2022 60 6 22 6 9 6 184 18 16.50 1.5 0.50
59 17 September 2022 59 6 23 6 13 6 184 18 15.50 2.5 0.70
60 17 September 2022 58 6 19 6 9 6 184 18 16.50 1.5 0.60
61 17 September 2022 63 6 19 6 12 6 183 18 16.50 1.5 0.80
62 17 September 2022 62 6 19 6 11 6 183 18 16.00 2 0.80
63 17 September 2022 61 6 18 6 9 6 185 18 18.00 0 0.80
64 17 September 2022 64 6 17 6 9 6 186 18 16.00 2 0.60
65 17 September 2022 67 6 19 6 10 6 184 18 15.50 2.5 0.60 1,129 total tertanam m'
66 17 September 2022 65 6 18 6 12 6 187 18 16.50 1.5 0.60 1,206 total tiang m'
67 17 September 2022 66 6 19 6 9 6 188 18 16.50 1.5 0.60 cut off progress
68 18 September 2022 71 6 18 6 12 6 184 18 16.50 1.5 0.60
69 18 September 2022 68 6 19 6 11 6 183 18 15.80 2.2 0.60
70 18 September 2022 70 6 19 6 10 6 187 18 16.00 2 0.60
71 18 September 2022 69 6 18 6 9 6 187 18 16.00 2 0.70
72 18 September 2022 72 6 18 6 12 6 188 18 16.00 2 0.70
73 18 September 2022 75 6 18 6 9 6 186 18 16.00 2 0.70
74 18 September 2022 74 6 17 6 8 6 186 18 15.00 3 0.50
75 18 September 2022 73 6 18 6 8 6 184 18 15.50 2.5 0.70
76 18 September 2022 76 6 17 6 12 6 184 18 15.50 2.5 0.50
77 18 September 2022 78 6 18 6 9 6 181 18 15.30 2.7 0.80
78 18 September 2022 77 6 17 6 8 6 187 18 15.50 2.5 0.70
79 18 September 2022 79 6 19 6 12 6 188 18 16.30 1.7 0.80
80 18 September 2022 82 6 21 6 10 6 186 18 15.50 2.5 0.60
81 18 September 2022 80 6 16 6 8 6 189 18 15.50 2.5 0.70
82 18 September 2022 81 6 18 6 8 6 187 18 16.00 2 0.70
83 19 September 2022 86 6 11 6 16 6 183 18 15.00 3 0.70
84 19 September 2022 83 6 10 6 17 6 184 18 15.30 2.7 0.80
85 19 September 2022 85 6 16 6 12 6 189 18 14.00 4 0.50
86 19 September 2022 84 4 9 6 13 6 187 16 14.50 1.5 0.70 Potongan dari titik no. 85
87 19 September 2022 87 6 17 6 43 3 157 15 14.00 1 0.80
88 19 September 2022 90 6 12 6 47 3 160 15 14.00 1 0.60
89 19 September 2022 88 6 11 6 51 3 161 15 14.50 0.5 0.60
20 September 2022 Alat mesin las rusak
21 September 2022 Alat mesin las rusak
22 September 2022 Alat mesin las rusak
90 23 September 2022 89 6 11 6 13 3 163 15 14.50 0.5 0.60
91 23 September 2022 91 6 11 6 13 3 171 15 14.50 0.5 0.70
92 23 September 2022 94 6 61 6 163 12 10.50 1.5 0.70
93 23 September 2022 92 6 57 6 147 12 11.50 0.5 0.50
94 23 September 2022 93 6 57 6 161 12 11.50 0.5 0.70
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B1 Inspektor : ANGGA

Ukuran : 20x20 Jumlah Titik : 131 titik


Berat Hammer Head : 1.8 ton Terpancang : 131 titik

95 24 September 2022 97 6 53 6 153 12 11.50 0.5 0.60


96 24 September 2022 96 6 61 6 150 12 11.50 0.5 0.70
97 24 September 2022 95 6 57 6 151 12 11.50 0.5 0.70
98 24 September 2022 101 6 54 6 161 12 9.80 2.2 0.60
99 24 September 2022 98 6 53 6 161 12 11.00 1 0.50
100 24 September 2022 99 6 36 6 168 12 11.50 0.5 0.80
101 24 September 2022 100 6 54 6 162 12 11.00 1 0.60
102 24 September 2022 102 6 54 6 161 12 8.00 4 0.60
103 24 September 2022 105 4 63 6 154 10 7.00 3 0.70 Potongan dari titik 102
104 24 September 2022 104 6 67 3 144 9 7.00 2 0.70
105 24 September 2022 103 6 61 3 137 9 7.50 1.5 0.60
106 24 September 2022 106 6 62 3 134 9 7.00 2 0.60
107 24 September 2022 108 6 63 3 134 9 6.30 2.7 0.60
108 24 September 2022 107 6 67 3 134 9 7.00 2 0.60
109 24 September 2022 112 6 64 3 133 9 7.50 1.5 0.50
110 24 September 2022 109 6 66 3 131 9 7.50 1.5 0.70
111 24 September 2022 111 6 64 3 151 9 7.00 2 0.60
112 24 September 2022 110 6 53 3 134 9 7.00 2 0.60
113 24 September 2022 128 6 55 3 135 9 7.50 1.5 0.70
114 25 September 2022 131 6 57 3 132 9 7.00 2 0.70
115 25 September 2022 130 6 58 3 134 9 7.00 2 0.70
116 25 September 2022 129 6 57 3 138 9 7.00 2 0.70
117 25 September 2022 127 6 58 3 135 9 7.00 2 0.60
118 25 September 2022 124 6 59 3 139 9 7.00 2 0.50
119 25 September 2022 126 6 53 3 139 9 7.00 2 0.70
120 25 September 2022 125 6 53 3 138 9 7.00 2 0.50
121 25 September 2022 121 6 61 3 134 9 7.00 2 0.50
122 25 September 2022 120 6 57 3 134 9 7.00 2 0.50
123 25 September 2022 113 6 68 3 131 9 6.90 2.1 0.80
124 25 September 2022 122 6 66 3 133 9 7.00 2 0.60
125 25 September 2022 114 6 61 3 134 9 7.00 2 0.50
126 25 September 2022 119 6 62 3 134 9 7.00 2 0.70
127 25 September 2022 123 6 64 3 134 9 7.00 2 0.60
128 25 September 2022 115 6 65 3 132 9 7.00 2 0.70
129 25 September 2022 118 6 60 3 138 9 7.00 2 0.70
130 25 September 2022 116 6 61 3 135 9 7.00 2 0.50
131 25 September 2022 117 6 162 6 6.00 0 0.60
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B1 Inspektor : ANGGA

Ukuran : 20x20 Jumlah Titik : 131 titik


Berat Hammer Head : 1.8 ton Terpancang : 131 titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B1 Inspektor : ANGGA

Ukuran : 20x20 Jumlah Titik : 131 titik


Berat Hammer Head : 1.8 ton Terpancang : 131 titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B1 Inspektor : ANGGA

Ukuran : 20x20 Jumlah Titik : 131 titik


Berat Hammer Head : 1.8 ton Terpancang : 131 titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B1 Inspektor : ANGGA

Ukuran : 20x20 Jumlah Titik : 131 titik


Berat Hammer Head : 1.8 ton Terpancang : 131 titik

TERPANCANG #REF! #REF! #REF! -


TOTAL TERPANCANG #REF! M1
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ANTON

Ukuran : 20x20 Jumlah Titik : 109 titik


Berat Hammer Head : 1.8 ton Terpancang : - titik

Nomor Tiang 1 Tiang 2 Tiang 3 Tiang 4 Tiang 5 Tiang 6 Jumlah Total Masuk Sisa
No Hari / Tanggal Final Set Keterangan
Titik mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl Tiang (meter) (meter)
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ANTON

Ukuran : 20x20 Jumlah Titik : 109 titik


Berat Hammer Head : 1.8 ton Terpancang : - titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ANTON

Ukuran : 20x20 Jumlah Titik : 109 titik


Berat Hammer Head : 1.8 ton Terpancang : - titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ANTON

Ukuran : 20x20 Jumlah Titik : 109 titik


Berat Hammer Head : 1.8 ton Terpancang : - titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ANTON

Ukuran : 20x20 Jumlah Titik : 109 titik


Berat Hammer Head : 1.8 ton Terpancang : - titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ANTON

Ukuran : 20x20 Jumlah Titik : 109 titik


Berat Hammer Head : 1.8 ton Terpancang : - titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ANTON

Ukuran : 20x20 Jumlah Titik : 109 titik


Berat Hammer Head : 1.8 ton Terpancang : - titik

TERPANCANG #REF! #REF! #REF! -


TOTAL TERPANCANG #REF! M1
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ANTON

Ukuran : 20x20 Jumlah Titik : 318 titik


Berat Hammer Head : 1.8 ton Terpancang : 34 titik

Nomor Tiang 1 Tiang 2 Tiang 3 Tiang 4 Tiang 5 Tiang 6 Jumlah Total Masuk Sisa
No Hari / Tanggal Final Set Keterangan
Titik mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl Tiang (meter) (meter)

1 04 September 2022 176 6 30 6 71 6 115 6 197 24 19.00 5.00 0.60 TIANG KE-4 POTONG 5M
2 04 September 2022 177 5 37 6 76 6 123 6 176 23 19.00 4.00 0.50 POT. 176

3 05 September 2022 178 6 32 6 70 3 98 6 172 21 18.70 2.30 0.60


4 05 September 2022 181 6 35 6 68 6 129 3 123 21 20.20 0.80 0.60
5 05 September 2022 183 6 31 6 60 3 110 6 173 21 19.00 2.00 0.50
6 05 September 2022 182 6 31 6 59 3 98 6 167 21 20.30 0.70 0.50
7 05 September 2022 184 6 29 6 60 3 97 6 165 21 20.00 1.00 0.60
8 05 September 2022 185 6 32 6 60 3 91 6 160 21 20.70 0.30 0.50
9 05 September 2022 186 6 31 6 54 3 107 6 160 21 18.50 2.50 0.60
10 05 September 2022 190 6 30 6 59 3 84 6 160 21 18.20 2.80 0.50
11 05 September 2022 189 6 29 6 64 3 87 6 170 21 20.80 0.20 0.60
12 05 September 2022 188 6 31 6 58 3 80 6 159 21 16.50 4.50 0.60 TIANG KE-4 POTONG 4M
13 05 September 2022 192 4 21 6 52 6 83 3 161 19 18.00 1.00 0.60 POT. 188

14 06 September 2022 193 6 35 6 76 3 106 6 254 21 20.00 1.00 0.60


15 06 September 2022 191 6 59 6 109 6 263 18 17.80 0.20 0.50
16 06 September 2022 196 6 57 6 119 6 259 18 17.20 0.80 0.50
17 06 September 2022 197 6 59 6 117 6 265 18 17.20 0.80 0.40
18 06 September 2022 198 6 55 6 112 6 249 18 16.70 1.30 0.50
19 06 September 2022 201 6 52 6 115 6 257 18 16.70 1.30 0.50
20 06 September 2022 200 6 50 6 108 6 255 18 17.00 1.00 0.50
21 06 September 2022 199 6 62 6 120 6 261 18 16.80 1.20 0.60
22 06 September 2022 205 6 57 6 114 6 248 18 16.70 1.30 0.50
23 06 September 2022 203 6 63 6 119 6 257 18 16.70 1.30 0.50
24 06 September 2022 204 6 59 6 127 6 266 18 16.90 1.10 0.40
25 06 September 2022 216 6 65 6 130 6 270 18 17.80 0.20 0.60
26 06 September 2022 215 6 57 6 120 6 267 18 17.80 0.20 0.50
27 06 September 2022 218 6 64 6 121 6 267 18 17.80 0.20 0.50
28 06 September 2022 220 6 57 6 119 6 265 18 17.70 0.30 0.60
29 06 September 2022 219 6 63 6 124 6 261 18 17.80 0.20 0.60
30 06 September 2022 223 6 67 6 121 6 269 18 17.80 0.20 0.50
31 06 September 2022 221 6 67 6 126 6 263 18 17.70 0.30 0.50
32 06 September 2022 222 6 62 6 125 6 259 18 17.70 0.30 0.60
33 06 September 2022 228 6 68 6 127 6 260 18 17.70 0.30 0.50

34 10 September 2022 317 6 45 6 96 6 257 18 15.70 2.30 0.50


10 September 2022 318 6 33 6 87 6 225 18 15.00 3.00 0.50
10 September 2022 313 6 38 6 47 6 239 18 15.60 2.40 0.60
10 September 2022 312 6 42 6 90 6 245 18 15.70 2.30 0.60
10 September 2022 311 6 39 6 105 6 359 18 16.00 2.00 0.60
10 September 2022 308 6 27 6 64 6 251 18 16.00 2.00 0.50
10 September 2022 309 6 29 6 46 6 256 18 16.00 2.00 0.50
10 September 2022 310 6 33 6 65 6 247 18 15.80 2.20 0.50
10 September 2022 296 6 36 6 70 6 260 18 16.00 2.00 0.50
10 September 2022 297 6 41 6 102 6 258 18 16.00 2.00 0.60
10 September 2022 298 6 33 6 80 6 249 18 16.40 1.60 0.50
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ANTON

Ukuran : 20x20 Jumlah Titik : 318 titik


Berat Hammer Head : 1.8 ton Terpancang : 34 titik

10 September 2022 303 6 16 6 89 6 257 18 16.50 1.50 0.60


10 September 2022 304 6 21 6 93 6 245 18 15.80 2.20 0.60
10 September 2022 305 6 40 6 95 6 254 18 15.90 2.10 0.50
10 September 2022 302 6 45 6 104 6 259 18 16.00 2.00 0.50
10 September 2022 301 6 40 6 95 6 243 18 15.80 2.20 0.50
10 September 2022 306 6 39 6 98 6 247 18 15.80 2.20 0.50
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ANTON

Ukuran : 20x20 Jumlah Titik : 318 titik


Berat Hammer Head : 1.8 ton Terpancang : 34 titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ANTON

Ukuran : 20x20 Jumlah Titik : 318 titik


Berat Hammer Head : 1.8 ton Terpancang : 34 titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ANTON

Ukuran : 20x20 Jumlah Titik : 318 titik


Berat Hammer Head : 1.8 ton Terpancang : 34 titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ANTON

Ukuran : 20x20 Jumlah Titik : 318 titik


Berat Hammer Head : 1.8 ton Terpancang : 34 titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ANTON

Ukuran : 20x20 Jumlah Titik : 318 titik


Berat Hammer Head : 1.8 ton Terpancang : 34 titik

TERPANCANG #REF! #REF! #REF! 6


TOTAL TERPANCANG #REF! M1
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ALAN

Ukuran : 20x20 Jumlah Titik : 326 titik


Berat Hammer Head : 1.8 ton Terpancang : - titik

Nomor Tiang 1 Tiang 2 Tiang 3 Tiang 4 Tiang 5 Tiang 6 Jumlah Total Masuk Sisa
No Hari / Tanggal Final Set Keterangan
Titik mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl Tiang (meter) (meter)

10 September 2022 980 6 21 6 68 6 249 18 17.80 0.20 0.70


10 September 2022 981 6 19 6 61 6 251 18 17.80 0.20 0.70
10 September 2022 982 6 19 6 68 6 263 18 17.90 0.10 0.60
10 September 2022 983 6 21 6 69 6 255 18 17.80 0.20 0.80
10 September 2022 984 6 20 6 66 6 260 18 17.80 0.20 0.60
10 September 2022 985 6 20 6 69 6 249 18 17.80 0.20 0.90
10 September 2022 986 6 23 6 60 6 263 18 17.00 1.00 0.70
10 September 2022 987 6 23 6 68 6 266 18 17.90 0.10 0.70
10 September 2022 988 6 21 6 69 6 253 18 17.80 0.20 0.80
10 September 2022 989 6 23 6 70 6 259 18 17.80 0.20 0.90
10 September 2022 990 6 22 6 68 6 251 18 17.80 0.20 0.80
10 September 2022 991 6 23 6 67 6 256 18 16.70 1.30 0.80
10 September 2022 992 6 21 6 60 6 255 18 17.00 1.00 0.70
10 September 2022 993 6 23 6 60 6 268 18 17.80 0.20 0.70

11 September 2022 994 6 20 6 56 6 246 18 17.80 0.20 0.70


11 September 2022 995 6 20 6 56 6 249 18 17.00 1.00 0.80
11 September 2022 996 6 21 6 60 6 251 18 17.80 0.20 0.60
11 September 2022 997 6 18 6 62 6 247 18 17.20 0.80 0.70
11 September 2022 998 6 17 6 55 6 255 18 17.80 0.20 0.80
11 September 2022 999 6 19 6 59 6 260 18 17.80 0.20 0.60
11 September 2022 1,000 6 21 6 49 6 246 18 17.80 0.20 0.70
11 September 2022 1,001 6 22 6 60 6 253 18 17.70 0.30 0.70
11 September 2022 1,002 6 19 6 53 6 254 18 17.70 0.30 0.70
11 September 2022 1,003 6 21 6 59 6 248 18 17.70 0.30 0.70
11 September 2022 1,004 6 23 6 61 6 266 18 17.80 0.20 0.70
11 September 2022 1,005 6 21 6 51 6 249 18 16.60 1.40 0.70
11 September 2022 1,006 6 23 6 59 6 253 18 16.30 1.70 0.60
11 September 2022 1,007 6 20 6 53 6 256 18 16.50 1.50 0.70
11 September 2022 1,008 6 23 6 56 6 259 18 16.50 1.50 0.90
11 September 2022 1,009 6 20 6 53 6 249 18 17.80 0.20 0.80
11 September 2022 1,010 6 20 6 51 6 255 18 17.80 0.20 0.80
11 September 2022 1,011 6 23 6 61 6 256 18 16.30 1.70 0.80
11 September 2022 1,012 6 23 6 62 6 261 18 17.80 0.20 0.80
11 September 2022 1,013 6 24 6 63 6 260 18 17.80 0.20 0.90
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ALAN

Ukuran : 20x20 Jumlah Titik : 326 titik


Berat Hammer Head : 1.8 ton Terpancang : - titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ALAN

Ukuran : 20x20 Jumlah Titik : 326 titik


Berat Hammer Head : 1.8 ton Terpancang : - titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ALAN

Ukuran : 20x20 Jumlah Titik : 326 titik


Berat Hammer Head : 1.8 ton Terpancang : - titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ALAN

Ukuran : 20x20 Jumlah Titik : 326 titik


Berat Hammer Head : 1.8 ton Terpancang : - titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ALAN

Ukuran : 20x20 Jumlah Titik : 326 titik


Berat Hammer Head : 1.8 ton Terpancang : - titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ALAN

Ukuran : 20x20 Jumlah Titik : 326 titik


Berat Hammer Head : 1.8 ton Terpancang : - titik

TERPANCANG #REF! #REF! #REF! -


TOTAL TERPANCANG #REF! M1
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B6 Inspektor : ALAN

Ukuran : 20x20 Jumlah Titik : 156 titik


Berat Hammer Head : 1.8 ton Terpancang : 157 titik

Nomor Tiang 1 Tiang 2 Tiang 3 Tiang 4 Tiang 5 Tiang 6 Jumlah Total Masuk Sisa
No Hari / Tanggal Final Set Keterangan
Titik mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl Tiang (meter) (meter)

1 27 Agustus 2022 1,250 6 7 6 43 12 10.50 1.50 0.40


2 27 Agustus 2022 1,249 6 4 6 38 12 10.50 1.50 0.40
3 27 Agustus 2022 1,248 6 6 6 40 12 10.60 1.40 0.40
4 27 Agustus 2022 1,247 6 8 6 44 12 10.40 1.60 0.30
5 27 Agustus 2022 1,246 6 7 6 41 12 10.50 1.50 0.40
6 27 Agustus 2022 1,245 6 9 6 49 12 10.40 1.60 0.40
7 27 Agustus 2022 1,244 6 11 6 47 12 10.60 1.40 0.30
8 27 Agustus 2022 1,243 6 8 6 45 12 10.60 1.40 0.30
9 27 Agustus 2022 1,242 6 10 6 50 12 10.70 1.30 0.30
10 27 Agustus 2022 1,241 6 13 6 57 12 10.80 1.20 0.30
11 27 Agustus 2022 1,240 6 12 6 54 12 10.90 1.10 0.40
12 27 Agustus 2022 1,239 6 9 6 49 12 10.90 1.10 0.30
13 27 Agustus 2022 1,238 6 10 6 51 12 10.20 1.80 0.40
14 27 Agustus 2022 1,237 6 13 6 46 12 10.80 1.20 0.40
15 27 Agustus 2022 1,236 6 12 6 42 12 10.20 1.80 0.40
16 27 Agustus 2022 1,235 6 9 6 46 12 11.00 1.00 0.30
17 27 Agustus 2022 1,234 6 13 6 49 12 11.10 0.90 0.40
18 27 Agustus 2022 1,233 6 12 6 53 12 11.30 0.70 0.30
19 27 Agustus 2022 1,232 6 15 6 59 12 11.30 0.70 0.50
20 27 Agustus 2022 1,231 6 12 6 49 12 11.20 0.80 0.40
21 27 Agustus 2022 1,230 6 10 6 133 12 7.10 4.90 0.40
22 27 Agustus 2022 1,229 6 12 6 41 12 9.90 2.10 0.50

23 28 Agustus 2022 1,228 6 13 6 121 12 11.30 0.70 0.60


24 28 Agustus 2022 1,227 6 12 6 115 12 11.20 0.80 0.50
25 28 Agustus 2022 1,224 6 13 6 110 12 10.00 2.00 0.50
26 28 Agustus 2022 1,225 6 15 6 122 12 11.00 1.00 0.50
27 28 Agustus 2022 1,226 6 14 6 124 6 198 18 17.10 0.90 0.50
28 28 Agustus 2022 1,221 6 13 6 123 3 168 15 14.80 0.20 0.50
29 28 Agustus 2022 1,223 6 17 6 126 12 10.00 2.00 0.50
30 28 Agustus 2022 1,222 6 16 6 128 6 209 18 16.80 1.20 0.50
31 28 Agustus 2022 1,218 6 15 6 117 12 10.40 1.60 0.50
32 28 Agustus 2022 1,220 6 18 6 125 6 209 18 15.40 2.60 0.60
33 28 Agustus 2022 1,219 6 16 6 124 3 172 6 231 21 17.50 3.50 0.50
34 28 Agustus 2022 1,217 6 9 6 271 12 10.50 1.50 0.60
35 28 Agustus 2022 1,216 6 13 6 127 12 10.00 2.00 0.60
36 28 Agustus 2022 1,215 6 10 6 125 6 221 18 17.20 0.80 0.50
37 28 Agustus 2022 1,214 6 16 6 129 6 218 18 17.00 1.00 0.60
38 28 Agustus 2022 1,212 6 15 6 128 6 220 18 17.00 1.00 0.60
39 28 Agustus 2022 1,213 6 12 6 131 6 208 18 13.50 4.50 0.40
40 28 Agustus 2022 1,209 6 17 6 133 6 231 18 17.10 0.90 0.40

41 29 Agustus 2022 1,210 6 16 6 128 6 226 18 14.00 4.00 0.60


42 29 Agustus 2022 1,211 6 12 6 87 6 209 18 17.10 0.90 0.60
43 29 Agustus 2022 1,206 6 12 6 48 6 185 18 17.00 1.00 0.50
44 29 Agustus 2022 1,207 6 10 6 115 6 265 18 17.50 0.50 0.50
45 29 Agustus 2022 1,208 6 7 6 125 6 259 18 17.60 0.40 0.50
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B6 Inspektor : ALAN

Ukuran : 20x20 Jumlah Titik : 156 titik


Berat Hammer Head : 1.8 ton Terpancang : 157 titik

46 29 Agustus 2022 1,203 6 10 6 45 6 245 18 17.60 0.40 0.60


47 29 Agustus 2022 1,204 3.5 8 6 89 6 202 15.5 15.50 - 0.60
48 29 Agustus 2022 1,205 4 13 6 90 6 210 16 14.50 1.50 0.60
49 29 Agustus 2022 1,200 4.5 12 6 86 6 201 16.5 15.00 1.50 0.60
50 29 Agustus 2022 1,201 6 18 6 101 6 243 18 17.30 0.70 0.60
51 29 Agustus 2022 1,202 6 13 6 101 12 11.50 0.50 0.60
52 29 Agustus 2022 1,199 6 15 6 107 6 244 18 17.20 0.80 0.50
53 29 Agustus 2022 1,198 6 18 6 210 6 251 18 17.50 0.50 0.60
54 29 Agustus 2022 1,197 6 6 6 36 6 210 18 17.50 0.50 0.60

55 30 Agustus 2022 1,194 6 17 6 92 6 238 18 17.60 0.40 0.60


56 30 Agustus 2022 1,195 6 16 6 87 6 227 18 17.30 0.70 0.60
57 30 Agustus 2022 1,196 6 19 6 98 6 239 18 17.60 0.40 0.50
58 30 Agustus 2022 1,191 6 19 6 91 6 241 18 17.70 0.30 0.60
59 30 Agustus 2022 1,193 6 17 6 89 6 239 18 17.60 0.40 0.60
60 30 Agustus 2022 1,192 6 19 6 96 6 240 18 17.60 0.40 0.50
61 30 Agustus 2022 1,190 6 16 6 87 6 230 18 17.00 1.00 0.50
62 30 Agustus 2022 1,188 6 18 6 90 6 238 18 17.20 0.80 0.50
63 30 Agustus 2022 1,189 6 18 6 91 6 249 18 17.50 0.50 0.50
64 30 Agustus 2022 1,187 6 19 6 83 6 237 18 17.10 0.90 0.50
65 30 Agustus 2022 1,186 6 16 6 81 6 236 18 17.00 1.00 0.50
66 30 Agustus 2022 1,185 6 19 6 91 6 242 18 17.10 0.90 0.60
67 30 Agustus 2022 1,184 6 21 6 88 6 232 18 17.00 1.00 0.50
68 30 Agustus 2022 1,183 6 21 6 91 6 228 18 16.80 1.20 0.60
69 30 Agustus 2022 1,181 6 23 6 85 6 237 18 16.80 1.20 0.40
70 30 Agustus 2022 1,180 6 20 6 89 6 239 18 16.80 1.20 0.40
71 30 Agustus 2022 1,179 6 23 6 90 6 236 18 16.80 1.20 0.40
72 30 Agustus 2022 1,182 6 22 6 93 6 245 18 17.10 0.90 0.50

73 30 Agustus 2022 1,176 6 19 6 85 6 239 18 17.50 0.50 0.60


74 30 Agustus 2022 1,177 6 17 6 81 6 233 18 17.20 0.80 0.50
75 30 Agustus 2022 1,178 6 20 6 81 6 238 18 17.10 0.90 0.60
76 30 Agustus 2022 1,173 6 21 6 90 6 239 18 17.10 0.90 0.60
77 30 Agustus 2022 1,174 6 16 6 78 6 235 18 17.00 1.00 0.60
78 30 Agustus 2022 1,175 6 23 6 79 6 240 18 17.00 1.00 0.70
79 30 Agustus 2022 1,170 6 22 6 77 6 239 18 17.00 1.00 0.60
80 30 Agustus 2022 1,171 6 23 6 80 6 241 18 17.10 0.90 0.50
81 30 Agustus 2022 1,172 6 24 6 82 6 249 18 17.50 0.50 0.60
82 30 Agustus 2022 1,167 6 26 6 86 6 246 18 17.00 1.00 0.60
83 30 Agustus 2022 1,168 6 21 6 83 6 239 18 17.00 1.00 0.70
84 30 Agustus 2022 1,169 6 27 6 84 6 248 18 17.00 1.00 0.60
85 30 Agustus 2022 1,164 6 19 6 86 6 241 18 17.00 1.00 0.50
86 30 Agustus 2022 1,165 6 20 6 88 6 247 18 17.00 1.00 0.60
87 30 Agustus 2022 1,166 6 23 6 89 6 247 18 17.20 0.80 0.60
88 30 Agustus 2022 1,161 6 24 6 89 6 251 18 17.00 1.00 0.50
89 30 Agustus 2022 1,162 6 26 6 99 12 11.80 0.20 0.50
90 30 Agustus 2022 1,165 6 23 6 90 6 238 18 16.20 1.80 0.50

91 01 September 2022 1,160 6 26 6 89 12 12.00 - 0.50


92 01 September 2022 1,159 6 28 6 90 12 12.00 - 0.50
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B6 Inspektor : ALAN

Ukuran : 20x20 Jumlah Titik : 156 titik


Berat Hammer Head : 1.8 ton Terpancang : 157 titik

93 01 September 2022 1,158 6 27 6 92 12 12.00 - 0.40


94 01 September 2022 1,157 6 30 6 91 12 12.00 - 0.60
95 01 September 2022 1,156 6 30 6 89 12 12.00 - 0.50
96 01 September 2022 1,155 6 33 6 93 12 12.00 - 0.60

97 02 September 2022 1,154 6 29 6 91 12 12.00 - 0.50


98 02 September 2022 1,152 6 26 6 93 3 201 15 14.50 0.50 0.60
99 02 September 2022 1,153 6 28 3 47 6 210 15 15.00 - 0.50
100 02 September 2022 1,151 6 30 6 43 6 213 18 15.70 2.30 0.60
101 02 September 2022 1,150 6 31 6 46 6 206 18 15.70 2.30 0.60
102 02 September 2022 1,149 6 28 3 50 6 199 15 12.80 2.20 0.40
103 02 September 2022 1,146 6 33 3 59 6 218 3 249 18 17.60 0.40 0.50
104 02 September 2022 1,147 6 35 6 89 6 188 18 13.00 5.00 0.60
105 02 September 2022 1,148 5 4 3 56 6 178 14 14.00 - 0.60
106 02 September 2022 1,143 6 31 3 55 6 233 15 15.00 - 0.60
107 02 September 2022 1,144 6 28 3 52 6 238 15 15.00 - 0.60

108 03 September 2022 1,145 6 17 6 88 6 241 18 16.50 1.50 0.90


109 03 September 2022 1,140 6 19 6 79 6 238 18 16.00 2.00 0.80
110 03 September 2022 1,141 6 21 6 89 6 248 18 16.80 1.20 0.60
111 03 September 2022 1,142 6 16 6 83 6 245 18 16.30 1.70 0.80
112 03 September 2022 1,137 6 22 6 89 6 252 18 16.60 1.40 0.90
113 03 September 2022 1,138 6 23 6 86 6 261 18 17.00 1.00 0.70
114 03 September 2022 1,139 6 19 6 79 6 249 18 16.50 1.50 0.60
115 03 September 2022 1,134 6 20 6 74 6 233 18 16.30 1.70 0.90
116 03 September 2022 1,136 6 18 6 79 6 244 18 16.40 1.60 0.70
117 03 September 2022 1,135 6 22 6 73 6 239 18 16.70 1.30 0.90
118 03 September 2022 1,133 6 24 6 83 6 247 18 16.50 1.50 0.70
119 03 September 2022 1,132 6 28 6 78 6 236 18 16.20 1.80 0.70
120 03 September 2022 1,131 6 17 6 75 6 233 18 16.00 2.00 0.90
121 03 September 2022 1,128 6 23 6 79 6 238 18 16.40 1.60 0.80
122 03 September 2022 1,129 6 19 6 80 6 244 18 16.50 1.50 0.90
123 03 September 2022 1,130 6 26 6 83 6 249 18 16.50 1.50 0.80
124 03 September 2022 1,127 6 22 6 79 6 239 18 16.00 2.00 0.90
125 03 September 2022 1,126 6 25 6 86 6 248 18 16.60 1.40 0.90

126 04 September 2022 1,101 6 23 6 87 6 248 18 18.00 - 0.90


127 04 September 2022 1,100 6 21 6 76 6 240 18 17.00 1.00 0.90
128 04 September 2022 1,099 6 18 6 77 6 233 18 16.00 2.00 0.90
129 04 September 2022 1,098 6 22 6 88 6 243 18 18.00 - 0.90
130 04 September 2022 1,096 6 21 6 86 6 246 18 18.00 - 1.00
131 04 September 2022 1,097 6 19 6 79 6 239 18 18.00 - 0.90
132 04 September 2022 1,095 6 16 6 83 6 242 18 18.00 - 1.00

133 05 September 2022 1,102 6 24 6 82 6 252 18 18.00 - 1.00


134 05 September 2022 1,103 6 18 6 80 6 240 18 17.00 1.00 0.90
135 05 September 2022 1,104 6 18 6 78 6 238 18 17.50 0.50 0.90
136 05 September 2022 1,106 6 26 6 73 6 239 18 17.50 0.50 0.90
137 05 September 2022 1,105 6 23 6 81 6 249 18 17.40 0.60 1.00
138 05 September 2022 1,109 6 19 6 76 6 236 18 17.00 1.00 0.80
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B6 Inspektor : ALAN

Ukuran : 20x20 Jumlah Titik : 156 titik


Berat Hammer Head : 1.8 ton Terpancang : 157 titik

139 05 September 2022 1,108 6 21 6 79 6 238 18 17.00 1.00 0.90


140 05 September 2022 1,107 6 23 6 83 6 251 18 17.10 0.90 0.80
141 05 September 2022 1,110 6 17 6 82 6 233 18 16.60 1.40 0.80
142 05 September 2022 1,111 6 19 6 79 6 239 18 16.50 1.50 0.90
143 05 September 2022 1,115 6 18 6 78 6 236 18 16.30 1.70 0.90
144 05 September 2022 1,112 6 21 6 81 6 240 18 17.00 1.00 0.90
145 05 September 2022 1,113 6 19 6 76 6 238 18 17.00 1.00 1.00
146 05 September 2022 1,114 6 23 6 85 6 249 18 16.60 1.40 1.00
147 05 September 2022 1,125 6 21 6 80 6 246 18 17.00 1.00 1.00
148 05 September 2022 1,124 6 16 6 77 6 238 18 16.50 1.50 1.00
149 05 September 2022 1,118 6 18 6 83 6 241 18 16.00 2.00 1.00

150 08 September 2022 1,123 6 21 6 83 6 252 18 16.20 1.80 0.70


151 08 September 2022 1,117 6 19 6 81 6 126 18 12.20 5.80 0.90
152 08 September 2022 1,120 5.8 17 6 79 6 233 17.8 15.80 2.00 0.70
152 08 September 2022 1,121 6 19 6 81 6 129 18 12.40 5.60 0.90
152 08 September 2022 1,222 5.8 20 6 86 6 246 17.8 16.80 1.00 0.90

152 10 September 2022 1,095 6 16 6 83 6 242 18 18.00 - 1.00


152 08 September 2022 1,095 6 16 6 83 6 242 18 18.00 - 1.00
152 08 September 2022 1,095 6 16 6 83 6 242 18 18.00 - 1.00
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B6 Inspektor : ALAN

Ukuran : 20x20 Jumlah Titik : 156 titik


Berat Hammer Head : 1.8 ton Terpancang : 157 titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B6 Inspektor : ALAN

Ukuran : 20x20 Jumlah Titik : 156 titik


Berat Hammer Head : 1.8 ton Terpancang : 157 titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B6 Inspektor : ALAN

Ukuran : 20x20 Jumlah Titik : 156 titik


Berat Hammer Head : 1.8 ton Terpancang : 157 titik

TERPANCANG #REF! #REF! #REF! -


TOTAL TERPANCANG #REF! M1
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ANTON

Ukuran : 20x20 Jumlah Titik : 86 titik


Berat Hammer Head : 1.8 ton Terpancang : - titik

Nomor Tiang 1 Tiang 2 Tiang 3 Tiang 4 Tiang 5 Tiang 6 Jumlah Total Masuk Sisa
No Hari / Tanggal Final Set Keterangan
Titik mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl Tiang (meter) (meter)
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ANTON

Ukuran : 20x20 Jumlah Titik : 86 titik


Berat Hammer Head : 1.8 ton Terpancang : - titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ANTON

Ukuran : 20x20 Jumlah Titik : 86 titik


Berat Hammer Head : 1.8 ton Terpancang : - titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ANTON

Ukuran : 20x20 Jumlah Titik : 86 titik


Berat Hammer Head : 1.8 ton Terpancang : - titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ANTON

Ukuran : 20x20 Jumlah Titik : 86 titik


Berat Hammer Head : 1.8 ton Terpancang : - titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ANTON

Ukuran : 20x20 Jumlah Titik : 86 titik


Berat Hammer Head : 1.8 ton Terpancang : - titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B3 Inspektor : ANTON

Ukuran : 20x20 Jumlah Titik : 86 titik


Berat Hammer Head : 1.8 ton Terpancang : - titik

TERPANCANG #REF! #REF! #REF! -


TOTAL TERPANCANG #REF! M1
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B8 Inspektor : ANGGA

Ukuran : 20x20 Jumlah Titik : 88.0 titik


Berat Hammer Head : 1.8 ton Terpancang : 88.0 titik

Nomor Tiang 1 Tiang 2 Tiang 3 Tiang 4 Tiang 5 Tiang 6 Jumlah Total Masuk Sisa
No Hari / Tanggal Final Set Keterangan
Titik mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl Tiang (meter) (meter)
177 28 September 2022 374 6 64 3 122 9 5.90 3.10 0.6 KEPALA TIANG RUSAK
178 28 September 2022 377 6 93 6 5.50 0.50 0.7
179 28 September 2022 376 6 98 6 6.00 - 0.7
180 28 September 2022 375 6 104 6 6.00 - 0.5
181 28 September 2022 373 6 104 6 6.00 - 0.6
182 28 September 2022 370 6 87 3 121 9 7.00 2.00 0.6
183 28 September 2022 371 6 94 3 104 9 7.00 2.00 0.6
184 28 September 2022 372 6 83 3 101 9 6.10 2.90 0.6
185 28 September 2022 367 6 104 6 6.00 - 0.6
186 28 September 2022 369 6 108 6 6.00 - 0.7
187 28 September 2022 368 6 102 6 6.00 - 0.7
188 28 September 2022 366 6 107 6 6.00 - 0.6
189 28 September 2022 363 6 111 6 6.00 - 0.7
190 28 September 2022 364 6 106 6 5.90 0.10 0.6
191 28 September 2022 365 6 103 6 6.00 - 0.7
192 28 September 2022 362 6 87 3 101 9 7.30 1.70 0.6
193 28 September 2022 359 6 91 3 101 9 7.80 1.20 0.6
194 28 September 2022 361 6 78 3 104 9 7.70 1.30 0.5
195 28 September 2022 360 6 78 3 104 9 8.00 1.00 0.5
196 29 September 2022 355 6 74 3 121 9 7.70 1.30 0.6
197 29 September 2022 358 6 81 3 103 9 7.70 1.30 0.6
198 29 September 2022 356 6 78 3 110 9 7.80 1.20 0.5
199 29 September 2022 357 6 84 3 102 9 7.70 1.30 0.5
200 29 September 2022 352 6 81 3 103 9 7.50 1.50 0.6
201 29 September 2022 354 6 86 3 101 9 7.70 1.30 0.7
202 29 September 2022 353 6 87 3 103 9 7.50 1.50 0.7
203 29 September 2022 348 6 81 3 107 9 7.50 1.50 0.5
204 29 September 2022 351 6 83 3 103 9 6.00 3.00 0.6 KEPALA TIANG RUSAK
205 29 September 2022 349 6 87 3 101 9 7.00 2.00 0.6
206 29 September 2022 350 6 88 3 101 9 7.00 2.00 0.5
207 29 September 2022 347 6 88 3 110 9 7.50 1.50 0.6
208 29 September 2022 344 6 91 3 101 9 9.00 - 0.5
209 29 September 2022 346 6 81 3 102 9 8.10 0.90 0.6
210 29 September 2022 345 6 83 3 103 9 9.00 - 0.5
211 29 September 2022 378 6 87 3 101 9 7.50 1.50 0.6
212 29 September 2022 343 6 91 3 104 9 7.20 1.80 0.5
213 29 September 2022 341 6 91 3 102 9 7.00 2.00 0.6
214 29 September 2022 342 6 87 3 102 9 7.00 2.00 0.6
215 29 September 2022 338 6 87 3 104 9 7.10 1.90 0.6
216 29 September 2022 330 6 93 3 102 9 7.00 2.00 0.7
217 29 September 2022 337 6 91 3 103 9 7.20 1.80 0.6
218 29 September 2022 339 6 91 3 107 9 7.50 1.50 0.6
219 29 September 2022 340 6 92 3 103 9 6.00 3.00 0.5 KEPALA TIANG RUSAK
220 29 September 2022 336 6 90 3 107 9 7.00 2.00 0.5
221 29 September 2022 331 6 92 3 107 9 7.10 1.90 0.6
222 30 September 2022 335 6 92 3 104 9 7.00 2.00 0.6
223 30 September 2022 332 6 91 3 102 9 7.00 2.00 0.5
224 30 September 2022 333 6 87 3 107 9 7.00 2.00 0.6
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B8 Inspektor : ANGGA

Ukuran : 20x20 Jumlah Titik : 88.0 titik


Berat Hammer Head : 1.8 ton Terpancang : 88.0 titik

225 30 September 2022 334 6 87 3 101 9 7.00 2.00 0.6


226 30 September 2022 541 6 90 3 101 9 7.00 2.00 0.6
227 30 September 2022 543 6 91 3 101 9 6.80 2.20 0.5
228 30 September 2022 542 6 86 3 102 9 6.50 2.50 0.6
229 30 September 2022 544 6 83 3 101 9 6.90 2.10 0.6
230 30 September 2022 546 6 83 3 108 9 7.30 1.70 0.6
231 30 September 2022 545 6 82 3 101 9 7.00 2.00 0.5
232 30 September 2022 549 6 91 3 98 9 7.20 1.80 0.5
233 30 September 2022 847 6 87 3 91 9 7.40 1.60 0.6
234 30 September 2022 548 6 87 3 102 9 7.50 1.50 0.5
235 30 September 2022 550 6 97 3 84 9 7.20 1.80 0.6
236 30 September 2022 552 6 87 3 91 9 7.20 1.80 0.6
237 30 September 2022 551 6 91 3 83 9 7.80 1.20 0.6
238 30 September 2022 555 6 89 3 97 9 7.80 1.20 0.6
239 30 September 2022 553 6 97 3 90 9 7.70 1.30 0.7
240 30 September 2022 554 6 97 3 88 9 8.00 1.00 0.7
241 01 Oktober 2022 556 6 94 3 87 9 7.70 1.30 0.5
242 01 Oktober 2022 557 6 93 3 91 9 7.80 1.20 0.6
243 01 Oktober 2022 558 6 94 3 88 9 8.00 1.00 0.5
244 01 Oktober 2022 561 6 95 3 86 9 8.20 0.80 0.6
245 01 Oktober 2022 559 6 87 6 2.60 3.40 0.7 KEPALA TIANG RUSAK
246 01 Oktober 2022 560 6 97 3 90 9 7.80 1.20 0.6
247 01 Oktober 2022 562 6 91 3 88 9 8.00 1.00 0.7
248 01 Oktober 2022 563 6 98 3 93 9 7.80 1.20 0.6
249 01 Oktober 2022 564 6 98 3 86 9 7.50 1.50 0.6
250 01 Oktober 2022 579 6 91 6 5.00 1.00 0.6
251 01 Oktober 2022 577 6 95 6 4.00 2.00 0.8
252 01 Oktober 2022 578 6 112 6 4.70 1.30 0.7
253 01 Oktober 2022 574 6 118 6 6.00 - 0.6
254 01 Oktober 2022 576 6 114 6 4.70 1.30 0.6
255 01 Oktober 2022 575 6 117 6 5.50 0.50 0.5
256 01 Oktober 2022 573 6 115 6 6.00 - 0.6
257 01 Oktober 2022 567 6 61 3 90 9 7.50 1.50 0.6
258 01 Oktober 2022 571 6 121 6 5.60 0.40 0.7
259 01 Oktober 2022 565 6 97 3 101 9 8.00 1.00 0.5
260 01 Oktober 2022 570 6 114 6 6.00 - 0.6
261 02 Oktober 2022 566 6 106 6 6.00 - 0.5
262 02 Oktober 2022 572 6 107 6 6.00 - 0.7
263 02 Oktober 2022 569 6 96 6 6.00 - 0.6
264 02 Oktober 2022 568 6 107 6 6.00 - 0.5
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B8 Inspektor : ANGGA

Ukuran : 20x20 Jumlah Titik : 88.0 titik


Berat Hammer Head : 1.8 ton Terpancang : 88.0 titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B8 Inspektor : ANGGA

Ukuran : 20x20 Jumlah Titik : 88.0 titik


Berat Hammer Head : 1.8 ton Terpancang : 88.0 titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B8 Inspektor : ANGGA

Ukuran : 20x20 Jumlah Titik : 88.0 titik


Berat Hammer Head : 1.8 ton Terpancang : 88.0 titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B8 Inspektor : ANGGA

Ukuran : 20x20 Jumlah Titik : 88.0 titik


Berat Hammer Head : 1.8 ton Terpancang : 88.0 titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B8 Inspektor : ANGGA

Ukuran : 20x20 Jumlah Titik : 88.0 titik


Berat Hammer Head : 1.8 ton Terpancang : 88.0 titik

TERPANCANG #REF! #REF! #REF! -


TOTAL TERPANCANG #REF! M1
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B9 Inspektor : ANGGA

Ukuran : 20x20 Jumlah Titik : 44 titik


Berat Hammer Head : 1.8 ton Terpancang : 44 titik

Nomor Tiang 1 Tiang 2 Tiang 3 Tiang 4 Tiang 5 Tiang 6 Jumlah Total Masuk Sisa
No Hari / Tanggal Final Set Keterangan
Titik mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl Tiang (meter) (meter)

132 26 September 2022 135 6 53 3 133 9 7.00 2.0 0.5


133 26 September 2022 132 6 60 3 157 9 8.90 0.1 0.50
134 26 September 2022 134 6 61 3 147 9 7.20 1.8 0.50
135 26 September 2022 133 6 63 3 143 9 6.10 2.9 0.70
136 26 September 2022 136 6 63 3 134 9 7.00 2.0 0.70
137 26 September 2022 139 6 62 3 137 9 7.40 1.6 0.60
138 26 September 2022 137 6 64 3 137 9 6.80 2.2 0.60
139 26 September 2022 138 6 62 3 134 9 7.30 1.7 0.60
140 26 September 2022 140 6 63 3 134 9 7.40 1.6 0.50
141 26 September 2022 142 6 64 3 131 9 7.50 1.5 0.60
142 26 September 2022 141 6 64 3 131 9 7.30 1.7 0.60
143 26 September 2022 143 6 67 3 130 9 7.20 1.8 0.50
144 26 September 2022 146 6 64 3 132 9 7.50 1.5 0.70
145 26 September 2022 144 6 64 3 130 9 7.50 1.5 0.50
146 26 September 2022 145 6 54 3 134 9 8.00 1.0 0.50
147 27 September 2022 150 6 64 3 133 9 7.10 1.9 0.70
148 27 September 2022 147 6 65 3 130 9 7.50 1.5 0.60
149 27 September 2022 149 6 66 3 128 9 7.20 1.8 0.60
150 27 September 2022 148 6 62 3 124 9 7.50 1.5 0.50
151 27 September 2022 151 6 62 3 127 9 6.10 2.9 0.70 Kepala tiang rusak
152 27 September 2022 154 6 63 3 124 9 7.80 1.2 0.70
153 27 September 2022 152 6 64 3 127 9 7.50 1.5 0.70
154 27 September 2022 153 6 65 3 127 9 7.60 1.4 0.50
155 27 September 2022 155 6 66 3 122 9 7.70 1.3 O,7
156 27 September 2022 157 6 66 3 123 9 7.70 1.3 0.70
157 27 September 2022 156 6 62 3 127 9 7.90 1.1 0.50
158 27 September 2022 158 6 66 3 121 9 7.70 1.3 0.60
159 27 September 2022 161 6 64 3 123 9 8.20 0.8 0.60
160 27 September 2022 159 6 66 3 127 9 7.80 1.2 0.70
161 27 September 2022 160 6 67 3 127 9 7.80 1.2 0.50
162 27 September 2022 172 6 65 3 126 9 7.80 1.2 0.60
163 27 September 2022 162 6 64 3 127 9 8.30 0.7 0.70
164 27 September 2022 171 6 67 3 121 9 8.00 1.0 O,6
165 27 September 2022 163 6 61 3 128 9 8.30 0.7 0.60
166 27 September 2022 164 6 66 3 127 9 8.10 0.9 0.70
167 27 September 2022 173 6 76 3 121 9 7.80 1.2 0.60
168 27 September 2022 170 6 69 3 126 9 8.30 0.7 0.60
169 27 September 2022 165 6 64 3 127 9 8.00 1.0 0.70
170 27 September 2022 166 6 61 3 127 9 8.00 1.0 0.70
171 28 September 2022 174 6 64 3 121 9 8.50 0.5 0.60
172 28 September 2022 169 6 68 3 121 9 8.50 0.5 0.50
173 28 September 2022 167 6 66 3 122 9 6.00 3.0 0.50 Kepala tiang rusak
174 28 September 2022 168 6 69 3 120 9 7.80 1.2 0.70
175 28 September 2022 175 6 71 3 129 9 8.00 1.0 0.60
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B9 Inspektor : ANGGA

Ukuran : 20x20 Jumlah Titik : 44 titik


Berat Hammer Head : 1.8 ton Terpancang : 44 titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B9 Inspektor : ANGGA

Ukuran : 20x20 Jumlah Titik : 44 titik


Berat Hammer Head : 1.8 ton Terpancang : 44 titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B9 Inspektor : ANGGA

Ukuran : 20x20 Jumlah Titik : 44 titik


Berat Hammer Head : 1.8 ton Terpancang : 44 titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B9 Inspektor : ANGGA

Ukuran : 20x20 Jumlah Titik : 44 titik


Berat Hammer Head : 1.8 ton Terpancang : 44 titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B9 Inspektor : ANGGA

Ukuran : 20x20 Jumlah Titik : 44 titik


Berat Hammer Head : 1.8 ton Terpancang : 44 titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B9 Inspektor : ANGGA

Ukuran : 20x20 Jumlah Titik : 44 titik


Berat Hammer Head : 1.8 ton Terpancang : 44 titik

TERPANCANG #REF! #REF! #REF! -


TOTAL TERPANCANG #REF! M1
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B6 Inspektor : ALAN

Ukuran : 20x20 Jumlah Titik : 156 titik


Berat Hammer Head : 1.8 ton Terpancang : 132 titik

Nomor Tiang 1 Tiang 2 Tiang 3 Tiang 4 Tiang 5 Tiang 6 Jumlah Total Masuk Sisa
No Hari / Tanggal Final Set Keterangan
Titik mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl mtr ∑ Pkl Tiang (meter) (meter)

1 1,095
2 1,096
3 1,097
4 1,098
5 1,099
6 1,100
7 1,101
8 1,102
9 1,103
10 1,104
11 1,105
12 1,106
13 1,107
14 1,108
15 1,109
16 1,110
17 1,111
18 1,112
19 1,113
20 1,114
21 1,115
22 1,116
23 1,117
24 1,118
25 1,119
26 1,120
27 1,121
28 1,122
29 1,123
30 1,124
31 1,125
32 1,126
33 1,127
34 1,128
35 1,129
36 1,130
37 1,131
38 1,132
39 1,133
40 1,134
41 1,135
42 1,136
43 1,137
44 1,138
45 1,139
46 1,140
47 1,141
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B6 Inspektor : ALAN

Ukuran : 20x20 Jumlah Titik : 156 titik


Berat Hammer Head : 1.8 ton Terpancang : 132 titik

48 1,142
49 1,143
50 1,144
51 1,145
52 1,146
53 1,147
54 1,148
1,149
55 1,150
56 1,151
57 1,152
58 1,153
59 1,154
60 1,155
61 1,156
62 1,157
63 1,158
64 1,159
65 1,160
66 1,161
67 1,162
68 1,163
69 1,164
70 1,165
71 1,166
72 1,167
73 1,168
74 1,169
75 1,170
76 1,171
77 1,172
78 1,173
79 1,174
80 1,175
81 1,176
82 1,177
83 1,178
84 1,179
85 1,180
86 1,181
87 1,182
88 1,183
89 1,184
90 1,185
91 1,186
92 1,187
93 1,188
94 1,189
95 1,190
96 1,191
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B6 Inspektor : ALAN

Ukuran : 20x20 Jumlah Titik : 156 titik


Berat Hammer Head : 1.8 ton Terpancang : 132 titik

97 1,192
98 1,193
99 1,194
100 1,195
101 1,196
102 1,197
103 1,198
104 1,199
105 1,200
106 1,201
107 1,202
108 1,203
109 1,204
110 1,205
111 1,206
112 1,207
113 1,208
114 1,209
115 1,210
116 1,211
117 1,212
118 1,213
119 1,214
120 1,215
121 1,216
122 1,217
123 1,218
124 1,219
125 1,220
126 1,221
127 1,222
128 1,223
129 1,224
130 1,225
131 1,226
132 1,227
1,228
1,229
1,230
1,231
1,232
1,233
1,234
1,235
1,236
1,237
1,238
1,239
1,240
1,241
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B6 Inspektor : ALAN

Ukuran : 20x20 Jumlah Titik : 156 titik


Berat Hammer Head : 1.8 ton Terpancang : 132 titik

1,242
1,243
1,244
1,245
1,246
1,247
1,248
1,249
1,250
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B6 Inspektor : ALAN

Ukuran : 20x20 Jumlah Titik : 156 titik


Berat Hammer Head : 1.8 ton Terpancang : 132 titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B6 Inspektor : ALAN

Ukuran : 20x20 Jumlah Titik : 156 titik


Berat Hammer Head : 1.8 ton Terpancang : 132 titik
MONITORING PEKERJAAN PANCANG
Cluster : TONDANO Kontraktor : PT. BANGUN BETON PRATAMA
Blok : B6 Inspektor : ALAN

Ukuran : 20x20 Jumlah Titik : 156 titik


Berat Hammer Head : 1.8 ton Terpancang : 132 titik

TERPANCANG #REF! #REF! #REF! -


TOTAL TERPANCANG #REF! M1