You are on page 1of 4

G.

VENKATASWAMY NAIDU COLLEGE


(AUTONOMOUS)
(Reaccredited by NAAC with 'A' Grade | DBT - STAR College scheme)

MINI PROJECT WORK DIARY

Student’s Name : S.Senna Kesava Perumal


Course Name : II M.Sc Information Technology
Register No : 214IT508
Mini Project Working Period: From 22.07.2022 to 15.11.2022
MINI PROJECT WORK TIME LOG

This sheet tracks the mini project work days for the semester. The student is required to
complete a minimum of 15 days at the mini project work over the course of the semester.
The mini project coordinator will need to sign off each day verifying completion of the listed
hours. Students should provide a copy this time log to the Head of the Department/Mini
project Coordinator at the end of the mini project work.

S.Senna Kesava Perumal Library Management System


Student’s Name Title of the Project

Head of the Department

Semester: ODD Start Date: 22.07.2022

Day.No Date Hours Project Coordinator’s Remarks


Completed Signature

Day 1 22.07.2022 2 Hour

Day 2 29.07.2022 2 Hour

Day 3 05.08.2022 2 Hour

Day 4 16.08.2022 2 Hour

Day 5 25.08.2022 2 Hour

Day 6 02.09.2022 2 Hour

Day 7 09.09.2022 2 Hour

Day 8 17.09.2022 2 Hour

Day 9 26.09.2022 2 Hour

Day 10 06.10.2022 2 Hour

Day 11 13.10.2022 2 Hour

Day 12 20.10.2022 2 Hour

Day 13 03.10.2022 2 Hour

Day 14 07.11.2022 2 Hour

Day 15 15.11.2022 2 Hour

Total 30 Hours
MINI PROJECT WORK TIME LOG

This sheet tracks the mini project work days for the semester. The student is required to
complete a minimum of 15 days at the mini project work over the course of the semester.
The mini project coordinator will need to sign off each day verifying completion of the listed
hours. Students should provide a copy this time log to the Head of the Department/Mini
project Coordinator at the end of the mini project work.

S.Senna Kesava Perumal Library Management System


Student’s Name Title of the Project

Head of the Department

Semester: ODD Start Date: 22.07.2022

Day. No Date Work Details


22.07.2022 1. First meeting with coordinator, get information of whatis
1 required for this mini project.
2. Then I have received more information for the mini
project proposed
2 29.07.2022 The following tasks are discussed.
1. Existing System
2. Proposed System requirements(working Environment)
3. Proposed System
3 05.08.2022 Done the preliminary work on Library Management System
project.
4 16.08.2022 Done the key features idea of our project.
5 25.08.2022 Think of constraint I will face in my projects.
6 02.09.2022 Update the key features to include additional features.

7 09.09.2022 Think of some non-function requirements.


8 17.09.2022 Finish of the project requirements.

9 26.09.2022 Done proposed mini project work requirements.


10 06.10.2022 Started working to implement functions on proposed.
11 13.10.2022 1. Code the function of Display the book details and borrow
abook.
2. Corrections are made in the code.
3. Run the module successfully.
12 20.10.2022 1. Code the function of return a book & Exit.
2. Corrections are made in the code.
3. Run the module successfully.
13 31.10.2022 Eliminate the projects highest risk elements.

14 07.11.2022 My project done the entire program executed successfully.


15 15.11.2022 Final check on all documents prior to final submission.
Head of the Department Remarks: