Proceedings of the Chief Engineer, Investigation & Design (IDRB),

Vikas Bhavan, Thiruvananthapuram.


(Present: Biju D)

Sub: Site visit- Pambar Project Scheme – Reconstruction of Pattissery dam and canal

system under Chengalar Scheme -Reg

Ref: 1) Letter No WP2-5901/13/D4-Vol.VI dated 06.12.2021 of the Chief Engineer,


Project-II, Thiruvananthapuram.
2) Letter No-D2-3669/2021 dtd 14.12.2021 of the Superintending Engineer, Project
Circle, Moovattupuzha

Order No: CS-AD6/4736/2022/IDRB dated .01.2022

The construction of Pattissery dam at Kanthalloor Panchayath is nearing completion.


Being one of the major ongoing project of the department, a site visit to the construction site
at this stage would be useful to the design team. Also vide ref, site investigation report for
design of canal network under Pattissery dam was received in this office.
Sanction is hereby accorded for the following officers to visit the site of “Pattissery
dam” from 10.01.2022 to 12.01.2022 by hiring a vehicle and the expenditure for the same may be
met from the head of account 2701-80-800-92(P).

1. Smt. Subhalekshmi. R, Joint Director (Canal), IDRB.


2. Sri. Ajitkumar.T, Deputy Director, PBD Canal.
3. Smt. Nidhi S. Deputy Director, Canal Structures, Canal.
4. Smt. Parvathy M.M. Assistant Director, PBD, Canal.
5. Sri. Rahul Madhu, Assistant Director, PBD, Canal.
6. Smt. Beena S, Assistant Director, MFA, Canal.
7. Smt. Anugeetha B, Assistant Director, MFA, Canal.
8. Sri. Binu T, Assistant Director, MFA, Canal.
9. Sri. Navaneeth A, Assistant Director, Canal Structures, Canal.
10. Smt. Jasmin I, Assistant Director, Canal Structures, Canal.
11. Smt. Sruthi T M, Assistant Director, DAW, Dams.
12. Smt. Krishnendu R, Assistant Engineer, Investigation.

The above officers are entitled to claim necessary DA as admissible.

Chief Engineer