Professional Documents
Culture Documents
Sub: Site visit- Pambar Project Scheme – Reconstruction of Pattissery dam and canal
Chief Engineer
Copy to:
1. The Director (Designs), IDRB
2. The Finance Officer, IDRB
3. The Administrative Assistant, IDRB
4. The individuals.