You are on page 1of 115

WBS

Div.A
Div. A1
Taksir 1
Taksir 2
Taksir 3
Taksir 4

Div. A2
1
Taksir
Taksir
2
Taksir
Taksir
Taksir
Taksir
Taksir
3
Taksir
4
Taksir

Div. B

AHSP PU A.2.3.1.1 1
AHSP PU A.2.3.1.9 2
AHSP PU A.2.3.1.11 3
AHSP PU A.4.1.1.2 4
Supl. PS.1 5
Supl. PS.2 6
AHSP PU A.3.2.1.10 7
AHSP PU A.4.1.1.8 8
Supl. TP.1 9
Supl. TP.2 10
Supl. PDL.KL2 11
Supl. PDL.KL2 12

AHSP PU A.2.3.1.1 1
AHSP PU A.2.3.1.9 2
AHSP PU A.2.3.1.11 3
AHSP PU A.3.2.1.9 4
AHSP PU A.3.2.1.2 5

A.2.3.1.3 1
AHSP PU A.2.3.1.9 2
AHSP PU A.2.3.1.11 3
AHSP PU A.4.1.1.2 4
AHSP PU A.3.2.1.9 5
AHSP PU A.4.4.1.7 6
AHSP PU A.4.4.2.2 7

Div. C
Div. C1
Supl. SL.1 1
Supl. SL.2 2
Supl. KL.1. Lantai-1 3
Supl. KL.2. Lantai-1 4
Supl. KP.1 5
Supl. BL.1 6
Supl. BL.2 7
Supl.BLT.1 8
Supl. BLT,2 9
Supl. PB.1 10
Supl. PB.2 11
Supl. PB.2 12
Supl. BL.6
Supl. PB.4 Div.C2
1
2
AHSP PU A.4.4.1.7 3
AHSP PU A.4.4.1.9 4
AHSP PU A.4.4.2.2
AHSP PU A.4.4.2.4 Div. C3
1
2
AHSP PU A.2.3.1.11a 3
AHSP PU A.2.3.1.11
AHSP PU A.4.1.1.2 Div. C4

1
2
Taksir 3
Taksir
Taksir Div. C6
1
2

AHSP PU A.6.1.13 Div. C7


AHSP PU A,4.6.1.15 1

AHSP PU A.4.5.2.32a

AHSP PU A.4.6.1.22

Taksir 4
Taksir

6
Taksir
Taksir

Taksir Div. C8

Taksir 1
2
Taksir 3
Taksir
Taksir Div. C9
Taksir 1
2
Taksir

Div. D

Div. D1
AHSP PU A.5.1.1.26
AHSP PU A.5.1.1.31 1
AHSP PU A.5.1.1.5 2
3
4
AHSP PU A.4.7.1.10 5
AHSP PU A.4.7.1.4 6

Div. D2
1
Supl. KL1. Lantai-2 2
Supl. KL2. Lantai-2
Supl. KP.1 Div. D3
Supl. RB,1 1
Supl. BLT,1 2
Supl. BLT,1 4

Div. C4
AHSP PU A.4.4.1.9

AHSP PU A.4.4.2.4 1
2
3
AHSP PUA.4.4.3.9
AHSP PU A.4.4.3.9a Div. D5
Taksir

1
2
Taksir 3
Taksir 4
Taksir
1
2
3
4
Taksir
AHSP PU A.4.5.2.32a Div. C6
AHSP PU A.4.5.2.37 1
AHSP PU A.4.6.1.22 2

AHSP PU A.4.6.1.13 Div. D7


AHSP PU A.4.6.1.15 1

AHSP PU A.4.6.1.32a

AHSP PU A.4.6.1.22

Taksir 4
Taksir

Taksir Div. D8

Taksir 1

Taksir 2

Taksir
Div. E
Taksir 4
Taksir 7
Taksir

AHSP PU A.4.7.1.10
AHSP PU A.4.7.1.4

Taksir
Taksir
URAIAN PEKERJAAN VOLUME

PEK. PERSIAPAN
PEK. PERSIPAN UMUM
Pengukuran daan Pemasangan Bouwplank 1.00
Biaya Administrasi Pelaporan & Dokumentasi 1.00
Pembongkaran/Penebangan Pohon Existing dan Pembuangan 1.00
Pembongkaran dan Pembuangan Hasil Bongkaran Bangunan Rumah Existing 1.00

PEK. KESELAMATAN DAN KESEHATAN KERJA KONSTRUKSI (RK3K)


Pekerjaan Persiapan
a. Perizinan, ID, poster, Pelatihan DLL 1.00
b. BPJS Ketenagakerjaan dan Kesehatan Kerja 1.00
Alat Pelindung Diri
a. Helm Pelindung (Safety Helmet) 8.00
b. Sarung Tangan (Safety Glove) 8.00
c. Sepatu Keselamatan (Safety Shoes/Boot) 8.00
d. Pelindung Pernafasan dan Mulut (Masker) 16.00
e. Rompi Keselamatan Kerja (Safety Vest) 8.00
Alat Pelindung Kerja
a. Pembatas Area/Papan Petunjuk/Rambu-Rambu 1.00
Fasilitas Sarana Kesehatan
a. Perlatan P3K (Kotak P3K, Obat Luka, Perban dll) 1.00

PEK. STRUKTUR BANGUNAN BAWAH/PONDASI


Pondasi Sumuran & Tapak
Galian Tanah Pondasi 148.17
Urug Bekas Galian 51.87
Pasir Alas Pondasi t-5 cm 2.47
Beton Cor Lantai Kerja t : 10 cm 4.94
Beton Bertulang Cincin Sumuran P1. k=250 t : 15 cm 27.82
Beton Bertulang Cincin Sumuran P2. k=250 t : 10 cm 4.95
Beton Cyclope isian sumuran P1 dan P2 t ; 135 cm 41.40
Beton Kedap Air K. 250 isian sumuran P1 dan P1 12.27
pondasi tapak uk. 140x140x40 cm 19.18
Poor pondasi tapak uk. 100x100x40 cm 3.68
Stik Kolom/Pedestal uk. 35x35 cm 2.15
Stik Kolom/Pedestal uk. 30x30 cm 0.58
Pondasi Batu Gunung
Galian Tanah Pondasi 45.58
Urug Bekas Galian 15.95
Pasir Alas Pondasi 4.31
Pasangan Batu Kosong 12.92
Pondasi Batu Gunung/Kali 39.99
Pondasi Sloof Gantung Trap Tangga, Ram
Galian Tanah Pondasi 4.97
Urug Bekas Galian 1.74
Pasir Alas Pondasi 1.34
Beton Cor Lantai Kerja t : 10 cm 2.67
Pasangan Batu Kosong 3.38
Paangan Batu Bata 1 : 2 8.15
Plesteran Batu Bata 1 : 2 16.31

PEKERJAAN LANTAI I
PEK. STRUKTUR BANGUNAN
Sloof Beton uk. 30 x 40 cm 21.67
Kolom beton K1 uk. 35x35 cm 15.05
Kolom beton K2 uk. 30x30 cm 4.10
Kolom Praktis Tangga uk. 13x13 cm 0.07
Balok Lantai BL1. uk. 25x40 cm 16.14
Balok Lantai BL2. uk. 30x60 cm 3.59
Balok latai BLT1 uk. 13x15 cm 1.18
Balok latai BLT2 uk. 13x20 cm 0.74
Plat lantai Beton Bertulang, t : 12 cm 25.05
Plat Kanopy Teras Beton Bertulang t : 10 cm 1.27
Balok Bordes BT1. uk. 20x30 cm 0.32
Plat Beton Bertulang Tangga 1.91

PEK. PASANGAN DINDING


Pasangan Bata 1 : 2 34.92
Pasangan Bata 1 : 4 253.75
Plesteran 1 : 2 69.84
Plesteran 1 : 4 507.51

PEK. PENUTUP LANTAI


Tanah Urug Dibawah Lantai, Ram dan Tangga 95.87
Pasir Urug Dibawah Lantai, Ram dan Tangga 25.36
Beton Cor Lantai, Ram dan Tangga t = 5 cm + Acian 12.68

PEK. KUSEN PINTU & JENDELA


Spesifikasi Kusen pintu/jendela/Ventilasi dan daun pintu/jendela rangka menggunakan UPVC 'dan
acsesories antara lain : kunci 2 slaag, engsel pintu/jendela, grendel, hak angin, kaca tebal 5 mm
biaya sudah termasuk material, mobilisasi serta pemasangan.

Pengad. kusen, daun pintu dan Ventilasi UPVC Type P1 + Acsesories Terpasang 6.09
Pengad. kusen, daun pintu dan Ventilasi UPVC Type P2 + Acsesories Terpasang 6.81
Pengad. kusen, daun pintu dan Ventilasi UPVC Type J1 + Acsesories Terpasang 43.90

PEK. PLAFOND
Plafond PVC t : 6 mm, Rangka furing dan List Profile Terpasang Ruangan 161.03
Plafond PVC t : 6 mm, Rangka furing dan List Profile Terpasang Luar Ruangan 87.72

PEK. INSTALASI LISTRIK


Armatur
Lampu TL 2 x 14 Watt LED, Kap Lampu Termasuk Bola Lampu, Setara RM Philips Accecories
12.00
Terpasang
Lampu LED Downlight 11 Watt, Power Saving, Stainless Steel, Tutup Cover Acrylic Putih Susu
7.00
Setara Philips Terpasang
Instalasi titik penerangan, instalasi termasuk kabel Pembagi NYA 1x1.5 mm dan Kable Power Utama
Lampu NYM 2x2.5 mm dlm pipa PVC fitting lampu dan kelengkapan instalasi terpasang 19.00

Instalasi titik kontak, instalasi termasuk kabelnya 2,5 mm dlm pipa conduit PVC Dan kelengkapan
12.00
instalasi terpasang
Saklar
- Saklar 1 Gang merk setara BROCO 5.00
- Saklar 2 Gang merk setara BROCO 2.00
- STOP Kontak Setara BROCO 12.00
Instalasi Panel Box Induk, Panel Distribusi & MCB Lengkap Terpasang 1.00
Penyambugan Arus Listrik dari dan Ke Gedung Biaya penyambungan Terpasanglaboratorium
1.00
Termasuk Kable dan

PEK. INSTALASI AIR BERSIH & AIR KOTOR


Instalasi Pipa Air Bersih PVC Ø 3/4" type AW + Konekting Ke Intalasi Pipa Induk Existing 48.00
Instalasi Pipa Air Kotor PVC Ø 3" type AW 60.00
Whestafel Keramik + Kran Air (Lengkap Acessories) Setara America Standart 6.00

PEK. PENGECATAN
Cat Dinding, Sloof, Kolom dan Balok Lantai 925.62
Cat Lisplank 19.26

PEKERJAAN LANTAI II

PEK. STRUKTUR BANGUNAN

Kolom beton K1 uk. 35x35 cm 11.17


Kolom beton K2 uk. 30x30 cm 3.42
Kolom Praktis Ikatan Angin uk. 13x13 cm 0.07
Ring Balok RB1. uk. 20x30 cm 6.53
Balok latai BLT1 uk. 13x15 cm 1.29
Balok Top gevel/Tombak Layar uk. 13x15 cm 0.32

PEK. PASANGAN DINDING


Pasangan Bata 1 : 4 271.88
Plesteran Bata 1 : 4 543.76

PEK. PENUTUP LANTAI


Pas. Keramik lantai ruangan uk. 40x40 cm Polished 178.32
Pas. Keramik lantai Teras uk. 40x40 cm Unpholised 52.51
Pas. Glass Block ruang tangga 1.76

PEK. KUSEN PINTU & JENDELA


Spesifikasi Kusen pintu/jendela/Ventilasi dan daun pintu/jendela rangka menggunakan UPVC 'dan
acsesories antara lain : kunci 2 slaag, engsel pintu/jendela, grendel, hak angin, kaca tebal 5 mm
biaya sudah termasuk material, mobilisasi serta pemasangan.

Pengad. kusen, daun pintu dan Ventilasi UPVC Type P1 + Acsesories Terpasang 9.13
Pengad. kusen, daun pintu dan Ventilasi UPVC Type J1+ Acsesories Terpasang 43.90
Peng. Ventilasi Lubang Angin UPVC + Accessories Terpasang 1.60

PEK. PENUTUP ATAP


ATAP UTAMA
Spesifikasi material rangka baja ringan C 100 dan C 75, penutup atap seng Spandek 0,30 mm dan
rabung seng Spandek pembiayaan meliputi biaya pengadaan material, mobilisasi dan
pemasangan/perakitan Terpasang
Rangka Kuda-Kuda Baja Ringan Smartruss 388.15
Atap Seng Spandex Gelombang Kecil 0,30 mm 388.15
Rabung Atap Seng Spandek 0.30 mm 30.30
Papan Lisplank Kayu Klas II uk. 2,5/30 cm 86.22
ATAP KANOPY
Rangka Kuda-kuda Kayu uk=5/10 cm Klas II 0.04
Gording Kayu uk=5/7 cm Klas II 0.05
Atap Seng Spandex Gelombang Kecil 0,30 mm 8.16
Papan Lisplank Kayu Klas II uk. 2,5/30 cm 9.57

PEK. PLAFOND
Plafond PVC t : 6 mm, Rangka furing dan List Profile Terpasang Ruangan 178.32
Plafond PVC t : 6 mm, Rangka furing dan List Profile Terpasang Luar Ruangan 138.38

PEK. INSTALASI LISTRIK


Armatur
Lampu TL 2 x 14 Watt LED, Kap Lampu Termasuk Bola Lampu, Setara RM Philips Accecories
Terpasang 18.00
Lampu LED Downlight 11 Watt, Power Saving, Stainless Steel, Tutup Cover Acrylic Putih Susu
Setara Philips Terpasang 5.00
Instalasi titik penerangan, instalasi termasuk kabel Pembagi NYA 1x1.5 mm dan Kable Power Utama
Lampu NYM 2x2.5 mm dlm pipa PVC fitting lampu dan kelengkapan instalasi terpasang 23.00

Instalasi titik kontak, instalasi termasuk kabelnya 2,5 mm dlm pipa conduit PVC Dan kelengkapan
instalasi terpasang 12.00

Saklar
- Saklar 2 gang merk Setara BROCO 4.00
- Stop Kontak Setatra BROCO 12.00
Box zekering MCB lengkap 1.00

PEK. PENGECATAN

Cat Dinding, Kolom, Balok Latey dan Reng Balok 739.16

Cat Lisplank 56.04

PEK. LAIN-LAIN
Realing Tangga & Selasar LT. 2 Besi steanliss Ø 2 Inchi Terpasang 4.56
Pembersihan Akhir 1.00
Produktivitas (OH) Koefisie
Asumsi
n Produktivit Durasi
SATUAN Tenaga
P T K M Terpaka as (hari)
Kerja
i

Pkt Taksir 1
Pkt Taksir 1
Pkt Taksir 1
Pkt Taksir 1

Taksir 1
Taksir 1
Ls Taksir 1
Ls Taksir 1
Taksir 1
Buah Taksir 1
Set Taksir 1
Set Taksir 1
Buah Taksir 1
Buah Taksir 1
Taksir 1
Ls Taksir 1
Taksir 1
Ls Taksir 1

M3 0.750 0.025 0.750 1.333 15 7.41


M3 0.250 0.008 0.250 4.000 5 2.59
M3 0.300 0.010 0.300 3.333 3 0.25
M3 1.650 0.275 0.028 0.083 0.275 3.636 3.000 0.45
M3 2.38 0.675 0.068 0.12 0.675 1.481 3 6.26
M3 2.38 0.675 0.068 0.12 0.675 1.481 3 1.11
M3 3.400 0.850 0.085 0.170 0.850 1.176 5.000 7.04
M3 1.650 0.275 0.028 0.083 0.275 3.636 4.000 0.84
M3 1.65 0.605 0.061 0.113 0.605 1.653 3.000 3.87
M3 1.65 0.605 0.061 0.113 0.605 1.653 2.000 1.11
M3 2.45 0.745 0.075 0.124 0.745 1.342 2.000 0.80
M3 2.45 0.745 0.075 0.124 0.745 1.342 2.000 0.22

M3 0.750 0.025 0.750 1.333 5.000 6.84


M3 0.250 0.008 0.250 4.000 3.000 1.33
M3 0.300 0.010 0.300 3.333 2.000 0.65
M3 0.780 0.390 0.039 0.039 0.390 2.564 3.000 1.68
M3 1.500 0.750 0.075 0.075 0.750 1.333 7.000 4.28

M3 1.050 0.067 1.050 0.952 2.000 2.61


M3 0.250 0.008 0.250 4.000 3.000 0.15
M3 0.300 0.010 0.300 3.333 1.000 0.40
M3 1.650 0.275 0.028 0.083 0.275 3.636 2.000 0.37
M3 0.780 0.390 0.039 0.039 0.390 2.564 2.000 0.66
M2 1.650 0.275 0.028 0.083 0.275 3.636 2.000 1.12
M2 0.300 0.150 0.015 0.015 0.150 6.667 2.000 1.22

M3 2.45 0.745 0.075 0.124 0.745 1.342 12 1.35


M3 2.45 0.745 0.075 0.124 0.745 1.342 5 2.24
M3 2.45 0.745 0.075 0.124 0.745 1.342 7 0.44
M3 2.45 0.745 0.075 0.124 0.745 1.342 5 0.01
M3 2.45 0.745 0.075 0.124 0.745 1.342 4 3.01
M3 2.45 0.745 0.075 0.124 0.745 1.342 6.000 0.45
M3 2.45 0.745 0.075 0.124 0.745 1.342 12.000 0.07
M3 2.45 0.745 0.075 0.124 0.745 1.342 3.000 0.18
M3 2.45 0.745 0.075 0.124 0.745 1.342 10.000 1.87
M3 2.45 0.745 0.075 0.124 0.745 1.342 2.000 0.47
M3 2.45 0.745 0.075 0.124 0.745 1.342 2.000 0.12
M3 2.45 0.745 0.075 0.124 0.745 1.342 3.000 0.47

M2 0.300 0.100 0.010 0.015 0.1 10.000 5.000 0.70


M2 0.300 0.100 0.010 0.015 0.1 10.000 10.000 2.54
M2 0.300 0.010 0.015 0.015 0.01 100.000 2.000 0.35
M2 0.300 0.010 0.015 0.015 0.01 100.000 8.000 0.63

M3 0.050 0.010 0.050 20.000 3.000 1.60


M3 0.050 0.010 0.050 20.000 2.000 0.63
M3 1.650 0.275 0.028 0.083 0.275 3.636 3.000 1.16

M2 Taksir 1
M2 Taksir 1
M2 Taksir 1

M2 Taksir 1
M2 Taksir 1
Bh
Taksir 1
Bh
Taksir 1

Bh Taksir
1
Bh
Taksir 1
Taksir 1
Bh Taksir 1
Bh Taksir 1
Bh Taksir 1
Unit Taksir 1
Ls
Taksir 1

M' 0.036 0.005 0.006 0.002 0.005 200.000 1.000 0.24


M' 0.036 0.005 0.006 0.002 0.005 200.000 1.000 0.3
Unit 1.200 0.005 0.150 0.060 0.005 200.000 2.000 0.015

M2 0.020 0.019 0.0063 0.003 0.019 54.054 10.000 1.71


M2 0.070 0.009 0.006 0.003 1.000
0.009 111.111 0.17

M3 2.45 0.745 0.075 0.124 0.745 1.342 12 0.69


M3 2.45 0.745 0.075 0.124 0.745 1.342 11 0.23
M3 2.45 0.745 0.075 0.124 0.745 1.342 3 0.02
M3 2.45 0.745 0.075 0.124 0.745 1.342 10 0.49
M3 2.45 0.745 0.075 0.124 0.745 1.342 5 0.19
M3 2.45 0.745 0.075 0.124 0.745 1.342 3 0.08

M2 0.300 0.020 0.010 0.015 0.020 50.000 5.000 1.09


M2 0.300 0.020 0.015 0.015 0.020 50.000 10.000 1.09

M2 0.700 0.035 0.035 0.035 0.035 28.571 6.000 1.04


M2 0.700 0.035 0.035 0.035 0.035 28.571 2.000 0.92
M2 Taksir 1
M2 Taksir 1
M2 Taksir 1
M2 Taksir 1

M2 Taksir 1
M3 0.200 0.100 0.010 0.001 0.100 10.000 15.000 2.59
M' 0.250 0.150 0.015 0.013 0.150 6.667 2.000 2.27
M' 0.100 0.047 0.020 0.005 0.047 21.277 3.000 1.35

M3 4.000 12.000 1.200 0.200 12.000 0.083 1.000 0.48


M3 6.700 12.000 2.010 0.335 12.000 0.083 2.000 0.30
M2 0.200 0.100 0.010 0.001 0.100 10.000 2.000 0.41
M' 0.100 0.200 0.020 0.005 0.200 5.000 2.000 0.96

M2 Taksir 1
M2 Taksir 1

Bh
Taksir 1
Bh
Taksir 1

Ttk
Taksir 1
Ttk
Taksir 1

Bh Taksir 1
Bh Taksir 1
Unit Taksir 1

M2 0.020 0.033 0.0063 0.003


0.033 30.303 9 2.71

M2 0.070 0.009 0.006 0.003 2.000


0.009 111.111 0.25
M2 Taksir 1
Pkt Taksir 1
Pembula T.kerja (Orang)
tan
Durasi P T K M

1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1

8 14 1
3 5 1
1 1 1
1 9 2 1 1
7 10 3 1 1 sloof beton uk. 30x40 cm
2 6 2 1 1 Kolom beton K1 uk. 35x35 cm
8 18 5 1 1 Kolom beton k2 uk. 30x30 cm
1 21 4 1 2 Balok Lantai BL1. uk. 25x40 cm
4 8 3 1 1 Balok latai BLT1 uk. 13x15 cm
2 4 2 1 1 Plat lantai beton bertulang t:12 cm
1 6 2 1 1 Pengad. Kusen, daun pintu dan ventilasi UPVC type P
1 2 1 1 1 Pengad. Kusen, daun pintu dan ventilasi UPVC type P
Pengad. Kusen, daun pintu dan ventilasi UPVC type J
7 5 1 Kolom beton K1 uk. 35x35 cm
2 2 1 Kolom beton k2. uk. 30x30 cm
1 2 1 Pasangan Bata 1:4
2 6 3 1 1 Plesteran Bata 1:4
5 12 6 1 1 Pas. Keramik Lantai ruangan uk. 40x40 cm Polished
Cat dinding, kolom, balok latey dan reng balok
3 2 1 Pembersihan Akhir.
1 1 1
1 1 1
1 5 1 1 1
1 3 2 1 1
2 7 2 1 1
2 3 2 1 1

2 27 9 1 2
3 13 4 1 1
10 2 1 1 1
10 1 1 1 1
7 6 2 1 1
7 2 1 1 1
8 1 1 1 1
7 1 1 1 1
5 13 4 1 1
4 1 1 1 1
3 1 1 1 1
4 2 1 1 1

6 2 1 1 1
8 10 4 1 1
1 21 1 2 2
1 153 6 8 8

2 3 1
1 2 1
2 11 2 1 1

1
1
1

Div. C5

1
1 1
2
3
4

1
1
1
1
1
1

1 2 1 1 1
1 3 1 1 1
1 8 1 1 1

2 10 9 3 2

1 2 1 1 1

9 4 1 1 1
9 1 1 1 1
5 1 1 1 1
7 3 1 1 1
5 1 1 1 1
3 1 1 1 1

4 21 2 1 2
2 82 6 5 5

2 63 4 4 4
1 37 2 2 2
1
1
1
1

1
3 26 13 2 1
3 3 2 1 1
2 5 3 1 1

5 1 1 1 1
2 1 1 1 1
1 2 1 1 1
1 1 2 1 1

1
1

1
1
1

3 5 9 2 1

1 4 1 1 1
1
1

281
k. 35x35 cm
. 30x30 cm
uk. 25x40 cm
k. 13x15 cm
rtulang t:12 cm
un pintu dan ventilasi UPVC type P1 + acsesories terpasang
un pintu dan ventilasi UPVC type P2 + acsesories terpasang
un pintu dan ventilasi UPVC type J1 + acsesories terpasang
k. 35x35 cm
k. 30x30 cm

ai ruangan uk. 40x40 cm Polished


, balok latey dan reng balok
PEKERJAAN ATAP KANOPY
Spesifikasi material penutup atap dan rabung seng
Spandek 0,30 mm meliputi biaya pengadaan,
pemasangan/perakitan Terpasang
Rangka Kuda-kuda Kayu uk=5/10 cm Klas II 0.13 M3 4.000 12.000 1.200
Gording Kayu uk=5/7 cm Klas II 0.20 M3 6.700 12.000 2.010
Atap Seng Spandex Gelombang Kecil 0,30 mm 31.47 M3 0.200 0.100 0.010
Papan Lisplank Kayu Klas II uk. 2,5/30 cm 30.57 M' 0.100 0.200 0.020
0.200 12.000 0.083 12.000 0.13 1 1 2 1 1
0.335 12.000 0.083 10.000 0.24 1 2 3 1 1
0.001 0.100 10.000 9.000 0.35 1 7 4 1 1
0.005 0.200 5.000 5.000 1.22 2 2 4 1 1
WBS
No
1 Div A

2 Div. A1

3 1

4 2

5 3

6 4

7 DIV. A2

8 1

9 1.a

10 1.b

11 2

12 2.a

13 2.b

14 2.c

15 2.d

16 2.e
17 3

18 3.a

19 4

20 4.a

21 DIV. B

22 2.1

23 1

24 2

25 3

26 4

27 5

28 6

29 7

30 8

31 9

32 10

33 11

34 12
35 2.2

36 1

37 2

38 3

39 4

40 5

41 2.3

42 1

43 2

44 3

45 4

46 5

47 6

48 7

49 DIV. C

50 DIV. C1

51 1

52 2

53 3

54 4

55 5
56 6

57 7

58 8

59 9

60 10

61 11

62 12

63 DIV. C2

64 1

65 2

66 3

67 4

68 DIV. C3

69 1

70 2

71 3

72 DIV. C4
73 1

74 1

75 2

76 3

77 DIV.C6

78 1

79 1

80 DIV.C7

81 1

82 2

83 3

84 4

85 5

86 6

87 7

88 8

89 9

90 10

91 DIV. C8
92 1

93 2

94 3

95 DIV. C9

96 1

97 2

5
1
6
2

7
3
8
4

9
5
10
6
DIV. D
7
7.1
8

7.2
9

7.3
10

7.4
11

7.5
12

7.6
13

DIV. D2
14

1
15
2

16

DIV. D3
17

1
18

19
3
20
DIV. D3
21

22

2
23

3
24

4
25

DIV. D5
26

1
27

28

2
29

3
30
4
31

5
32

6
33
7
34

8
35

36

10
37

DIV. C6
38

1
39
2
40

DIV. D7
41

1
42
2
43

3
44

4
45

5
46

6
47

7
50
DIV. D8
51

1
52
2
53

DIV. D9
54

55

2
56
Task Name Start Finish Total Slack

Mon Wed
Pek. Persiapan 0 days
22/03/21 12/05/21
Mon Wed
Pek. Persiapan umum 0 days
22/03/21 12/05/21
Fri Mon
Pengukuran dan pemasangan bouwplank 3,25 days
26/03/21 29/03/21
Tue Wed
Biaya Administrasi pelaporan & dokumentasi 0 days
23/03/21 12/05/21

Mon Tue
Pembongkaran/penebangan pohon existing dan pembuangan 1,25 days
22/03/21 23/03/21

Pembongkaran dan pembuangan hasil bongkaran bangunan rumah Wed Thu


3,25 days
existing 24/03/21 25/03/21

Mon Tue
PEK. KESELAMATAN DAN KESEHATAN KERJA KONSTRUKSI (RK3K) 1,25 days
22/03/21 11/05/21

Mon Tue
pekerjaan persiapan 1,25 days
22/03/21 11/05/21

Mon Tue
a. perizinan, ID, poster, Pelatihan DLL 1,25 days
22/03/21 11/05/21

Mon Tue
b. BPJS ketenagakerjaan dan Kesehatan kerja 1,25 days
22/03/21 11/05/21

Mon Tue
Alat pelindung diri 1,25 days
22/03/21 11/05/21

Mon Tue
a. Helm pelindung ( Safety Helmet) 1,25 days
22/03/21 11/05/21

b. Sarung Tangan (Safety Glove) Mon Tue 1,25 days


22/03/21 11/05/21
Mon Tue
c. Sepatu Keselamatan (Safety Shoes/boot) 1,25 days
22/03/21 11/05/21
Mon Tue
d. Pelindung pernafasan dan mulut (masker) 1,25 days
22/03/21 11/05/21
Mon Tue
e. Rompi keselamatan kerja (Safety vest) 1,25 days
22/03/21 11/05/21
Mon Tue
Alat pelindung kerja 1,25 days
22/03/21 11/05/21
Mon Tue
a. Pembatas area/ papan informasi/rambu - rambu 1,25 days
22/03/21 11/05/21
Mon Tue
Fasilitas sarana kesehatan 1,25 days
22/03/21 11/05/21
Mon Tue
a. Peralatan P3K (kotak P3K, obat luka,perban DLL) 1,25 days
22/03/21 11/05/21
Mon Sat
PEK. STRUKTUR BANGUNAN BAWAH/PONDASI 3,25 days
29/03/21 17/04/21
Mon Sat
Pondasi Sumuran & Tapak 3,25 days
29/03/21 17/04/21

Mon Wed
galian tanah pondasi 3,25 days
29/03/21 07/04/21

Fri Tue 30,25


Urug bekas galian
02/04/21 06/04/21 days

Wed Thu
Pasir alas Pondasi t- 5 cm 3,25 days
07/04/21 08/04/21

Fri Sun
Beton cor lantai kerja t:10 cm 21 days
09/04/21 11/04/21

Mon Tue 20,25


Beton bertulang cincin sumuran P1. k=250 t:15 cm
29/03/21 06/04/21 days

Mon Wed 27,25


Beton bertulang cincin sumuran P2. k=250 t:10 cm
29/03/21 31/03/21 days

Wed Fri 20,25


Beton cyclope isian sumuran P1 dan P2 t:135 cm
07/04/21 16/04/21 days

Beton kedap air K250 isian sumuran P1 dan P2 Fri Sat 20,25
16/04/21 17/04/21 days

Tue Fri
Pondasi tapak uk. 140x140x40 cm 21 days
13/04/21 16/04/21

poor pondasi tapak uk. 100x100x40 cm Tue Wed 23 days


13/04/21 14/04/21

Wed Thu 28,25


Stik kolom/pedestal uk. 35x35 cm
07/04/21 08/04/21 days
Thu Fri 30,25
Stik kolom/pedestal uk.30x30 cm
01/04/21 02/04/21 days
Mon Fri 27,25
Pondasi Batu Gunung
29/03/21 09/04/21 days
Mon Tue 29,25
Galian tanah pondasi
29/03/21 06/04/21 days
Wed Fri 27,25
Urug bekas galian
07/04/21 09/04/21 days
Tue Wed 29,25
pasir alas pondasi
06/04/21 07/04/21 days
Tue Thu 27,25
Pasangan batu kosong
30/03/21 01/04/21 days
Thu Wed 27,25
Pondasi batu gunung/kali
01/04/21 07/04/21 days
Mon Sat 13,25
Pondasi Sloof Gantung Trap Tangga, Ram
29/03/21 17/04/21 days
Mon Thu 28,25
Galian tanah pondasi 29/03/21 01/04/21 days
Fri Sat
Urug bekas galian 3,25 days
16/04/21 17/04/21
Thu Fri 28,25
Pasir Alas pondasi
01/04/21 02/04/21 days
Fri Sat
Beton cor lantai kerja t:10cm 09/04/21 10/04/21 3,25 days

Sat Mon
Pasangan batu kosong 10/04/21 12/04/21 3,25 days

Mon Wed
Pasangan batu bata 1:2 3,25 days
12/04/21 14/04/21
Wed Fri
Plesteran batu bata 1:2 3,25 days
14/04/21 16/04/21
Mon Fri
PEKERJAAN LANTAI 1 19/04/21 07/05/21 3,25 days

Mon Fri
Pek. Struktur bangunan 19/04/21 07/05/21 3,25 days

Mon Tue
sloof beton uk. 30x40 cm 3,25 days
19/04/21 20/04/21

Thu Thu
Kolom beton K1 uk. 35x35 cm 22/04/21 22/04/21 3,25 days

Fri Fri
Kolom beton k2 uk. 30x30 cm 3,25 days
23/04/21 23/04/21

Sat Mon 11,25


Kolom praktis tangga uk. 13x13 cm
24/04/21 26/04/21 days

Sat Tue
Balok Lantai BL1. uk. 25x40 cm 2,5 days
01/05/21 04/05/21
Sat Mon
Balok Lantai BL2. uk. 30x60 cm 3,5 days
01/05/21 03/05/21
Thu Thu
Balok latai BLT1 uk. 13x15 cm 2,5 days
29/04/21 29/04/21
Thu Thu
Balok latai BLT2. uk. 13x20 cm 3,5 days
29/04/21 29/04/21

Wed Fri
Plat lantai beton bertulang t:12 cm 2,5 days
05/05/21 07/05/21

Plat kanopy teras beton bertulang t:10 cm Fri Fri 9,5 days
30/04/21 30/04/21
Wed Thu 11,25
Balok bordes BT1 uk. 20x30 cm
28/04/21 29/04/21 days

Tue Wed 11,25


Plat beton bertulang tangga
27/04/21 28/04/21 days

Sat Fri
PEK. PASANGAN DINDING 3,25 days
24/04/21 30/04/21

Sat Mon
Pasangan bata 1:2 3,25 days
24/04/21 26/04/21

Pasangan Bata 1:4 Mon Thu 8,25 days


26/04/21 29/04/21

Mon Tue 11,25


Plesteran 1:2
26/04/21 27/04/21 days

Fri Fri
Plesteran 1:4 7,5 days
30/04/21 30/04/21

PEK. PENUTUP LANTAI Mon Fri 15,25


19/04/21 23/04/21 days

Mon Tue 15,25


Tanah urug dibawah lantai, ram dan tangga
19/04/21 20/04/21 days

Wed Wed 15,25


Pasir urug dibawah lantai, ram dan tangga
21/04/21 21/04/21 days
Thu Fri 15,25
Beton cor lantai, ram dan tangga t=5 cm + acian
22/04/21 23/04/21 days

PEK. KUSEN PINTU & JENDELA Tue Wed 2,5 days?


27/04/21 28/04/21
Spesifikasi kusen pintu/jendela/ventilasi dan daun pintu/jendela rangka
menggunakan UPVC dan Acsesories antara lain : kunci 2 slaag,engsel Tue Tue
4,5 days
pintu/jendela, grendel, hak angin,kaca tebal 5 mm biaya sudah termasuk 27/04/21 27/04/21
material, mobilisasi serta pemasangan

Pengad. Kusen, daun pintu dan ventilasi UPVC type P1 + acsesories Tue Wed
3,25 days
terpasang 27/04/21 28/04/21
Pengad. Kusen, daun pintu dan ventilasi UPVC type P2 + acsesories Tue Wed
3,25 days
terpasang 27/04/21 28/04/21

Pengad. Kusen, daun pintu dan ventilasi UPVC type J1 + acsesories Tue Wed
3,25 days
terpasang 27/04/21 28/04/21

Fri Sat
PEK. PLAFOND 07/05/21 08/05/21 2,5 days

plafond PVC t:6 mm, rangka furing dan list profil terpasang ruangan Fri Sat 2,5 days
07/05/21 08/05/21
Fri Sat
plafond PVC t:6 mm, rangka furing dan list profil terpasang luar ruangan 2,5 days
07/05/21 08/05/21
Sat Mon
PEK. INSTALASI LISTRIK 08/05/21 10/05/21 2,5 days

Sat Mon
Armatur 2,5 days
08/05/21 10/05/21

Lampu TL 2x14 watt LED, kap lampu termasuk bola lampu, setara RM Sat Mon
2,5 days
philips accecories terpasang 08/05/21 10/05/21
lampu LED downlight 11 watt, power saving, stainless steel, tutup cover Sat Mon
2,5 days
acrylic putih susu setara philips terpasang 08/05/21 10/05/21

Instalasi titik penerangan, instalasi termasuk kabel pembagi NYA 1x1,5


Sat Mon
mm dan kabel power utama lampu NYM 2x2,5 mm dalam pipa PVC fitting 2,5 days
08/05/21 10/05/21
lampu dan kelengakapan instalasi terpasang

Sat Mon
saklar 08/05/21 10/05/21 2,5 days

Sat Mon
saklar 1 gang merk setara BROCO 2,5 days
08/05/21 10/05/21

saklar 2 gang merk setara BROCO Sat Mon 2,5 days


08/05/21 10/05/21
Sat Mon
STOP kontak setara BROCO 08/05/21 10/05/21 2,5 days

Sat Mon
instalasi panel box induk, panel distribusi & MCB lengkap terpasang 2,5 days
08/05/21 10/05/21
Penyambungan arus listrik dari dan ke gedung biaya penyambungan Sat Mon
2,5 days
terpasang laboratorium termasuk kabel 08/05/21 10/05/21
Thu Fri 10,25
PEK. INSTALASI AIR BERSIH & AIR KOTOR
29/04/21 30/04/21 days
Instalasi pipa air bersih PVC 3/4" type AW + konekting ke Intalasi Pipa Thu Fri 10,25
induk existing 29/04/21 30/04/21 days
Thu Fri 10,25
Instalasi pipa air kotor 3" type AW
29/04/21 30/04/21 days
wastafel keramik + keran air (Lengkap accessories) setara America Thu Fri 10,25
Standart 29/04/21 30/04/21 days
Sat Tue
PEK. PENGECATAN 7,5 days
01/05/21 04/05/21
Sat Tue
Cat dinding sloof, kolom dan balok lantai 7,5 days
01/05/21 04/05/21
Sat Mon
Cat lisplank 8,5 days
01/05/21 03/05/21

Balok Lantai BL1. uk. 25x40 cm Tue Wed 0 days


04/05/21 05/05/21
Tue Tue
Balok Lantai BL2. uk. 13x60 cm 1 day
04/05/21 04/05/21

Fri Fri
Balok Latai BLT 1 uk. 13x15 cm 0 days
30/04/21 30/04/21

Fri Fri
Balok Latai BLT2 uk. 13x20 cm 1 day
30/04/21 30/04/21

Plat Lantai Beton Bertulang t : 12 cm Fri Mon 0 days


07/05/21 10/05/21

Mon Mon
Plat Kanopy Teras Beton Bertulang t : 10 cm 18 days
03/05/21 03/05/21

Pekerjaan Struktur Bangunan Lantai II Fri Thu 7 days


30/04/21 13/05/21
Fri Fri
Kolom beton K1 uk. 35x35 cm 7 days
30/04/21 30/04/21

Mon Mon
Kolom beton k2. uk. 30x30 cm 7 days
03/05/21 03/05/21

Tue Tue
Kolom praktis ikatan angin uk. 13x13 cm 7 days
04/05/21 04/05/21

Thu Thu
Ring Balok RB1. uk. 20x30 cm 7 days
06/05/21 06/05/21

Thu Thu
Balok Latai BLT1 uk. 13x15 cm 10 days
13/05/21 13/05/21
Mon Mon
Balok Top Gevel/ Tombak Layar uk. 13x15 cm 10/05/21 10/05/21 13 days

Tue Fri
Pek. Pasangan Dinding 5 days
11/05/21 14/05/21
Tue Wed
Pasangan Bata 1:4 5 days
11/05/21 12/05/21
Thu Fri
Plesteran Bata 1:4 5 days
13/05/21 14/05/21

Mon Wed
Pek. Penutup Lantai 0 days
17/05/21 19/05/21
Mon Tue
Pas. Keramik Lantai ruangan uk. 40x40 cm Polished 0 days
17/05/21 18/05/21

Mon Mon
Pas. Keramik Lantai Teras uk. 40x40 cm Unpholised 1 day
17/05/21 17/05/21

Wed Wed
Pas. Glass Block ruang tangga 0 days
19/05/21 19/05/21
Fri Wed
Pek. Kusen Pintu & Jendela 30/04/21 12/05/21 11 days?

Spesifikasi kusen pintu/jendela/ventilasi dan daun pintu/jendela rangka


menggunakan UPVC' dan acsesories antara lain : kunci 2 slaag, engsel Fri Fri
19 days?
pintu/jendela, grendel, hak angin, kaca tebal 5 mm biaya sudah termasuk 30/04/21 30/04/21
material, mobilisasi serta pemasangan

Pengad. Kusen, daun pintu dan ventilasi UPVC type P1 + Acsesories Wed Wed
10 days
Terpasang 12/05/21 12/05/21

Pengad. Kusen, daun pintu dan ventilasi UPVC type J1 + Acsesories Wed Wed
10 days
Terpasang 12/05/21 12/05/21

Wed Wed
Peng ventilasi lubang angin UPVC + Accessories Terpasang 10 days
12/05/21 12/05/21

Fri Mon
Pek. Penutup Atap 8 days?
30/04/21 17/05/21

Fri Mon
Atap Utama 8 days?
30/04/21 17/05/21

spesifikasi material rangka baja ringan C 100 dan C 75, penutup atap
seng spanduk 0,30 mm dan rabung seng spanduk pembiayaan meliputi Fri Fri
19 days?
biaya pengadaan material, mobilisasi dan pemasangan/perkaitan 30/04/21 30/04/21
terpasang

Mon Mon
Rangka kuda - kuda baja ringan smartruss 8 days
10/05/21 10/05/21

Tue Thu
Atap seng spandex gelombang kecil 0,30 mm 8 days
11/05/21 13/05/21
Tue Thu
Rabung atap seng spandek 0,30 mm 10 days
11/05/21 13/05/21

Fri Mon
Papan lisplankk kayu kelas II uk. 2,5/30 cm 14/05/21 17/05/21 8 days

Tue Fri
Atap Kanopy 9 days
11/05/21 14/05/21
Tue Tue
Rangka Kuda - kuda Kayu uk= 5/10 cm Kelas II 9 days
11/05/21 11/05/21
Wed Wed
Gording Kayu uk= 5/7 cm Kelas II 12/05/21 12/05/21 11 days

Atap Seng Spandex Gelombang Kecil 0,30 mm Thu Thu 9 days


13/05/21 13/05/21

Fri Fri
Papan Lisplank Kayu Kelas II uk. 2,5/30 cm 9 days
14/05/21 14/05/21
Mon Mon
Pek. Plafond 7 days
17/05/21 17/05/21

Plafond PVC t: 6 mm, rangka furing dan list profile terpasang ruangan Mon Mon 7 days
17/05/21 17/05/21

Mon Mon
Plafond PVC t : 6 mm, rangka furing dan list profile terpasang luar ruangan 7 days
17/05/21 17/05/21
Tue Tue
Pek. Instalasi Listrik 7 days
18/05/21 18/05/21

Tue Tue
armatur 7 days
18/05/21 18/05/21

Lampu TL 2 x 14 Watt LED, kap lampu termasuk bola lampu,setara RM Tue Tue
7 days
Philips Accecories terpasang 18/05/21 18/05/21
Lampu LED downlight 11 watt,Power Saving Stainless Steel, tutup cover Tue Tue
7 days
acrylic putih susu setara Philips Terpasang 18/05/21 18/05/21
Instalasi titik penerangan, instalasi termasuk kabel pembagi NYA 1x1,5
Tue Tue
mm dan kabel power utama lampu NYM 2x2,5 mm dalam pipa conduit PVC 18/05/21 18/05/21 7 days
dan kelengkapan instalasi terpasang
Instalasi titik kontak, instalasi termasuk kabelnya 2,5 mm dalam pipa Tue Tue
7 days
conduit PVC dan kelengkapan instalasi terpasang 18/05/21 18/05/21
Tue Tue
saklar 8 days
18/05/21 18/05/21
Tue Tue
Box zekering MCB lengkap 7 days
18/05/21 18/05/21

Pek. Pengecatan Fri Thu 5 days


14/05/21 20/05/21
Tue Thu
Cat dinding, kolom, balok latey dan reng balok 5 days
18/05/21 20/05/21
Fri Fri
Cat Lisplank 9 days
14/05/21 14/05/21
Mon Thu
Pek. Lain - lain 0 days
24/05/21 27/05/21

Mon Mon
realing tangga & selasar LT. 2 Besi stainless D 2 inchi Terpasang 0 days
24/05/21 24/05/21

Thu Thu
Pembersihan Akhir 0 days
27/05/21 27/05/21

Successors Late Start Late Finish

WBS Task Name Duration


Predecesso
Free Slack Critical Duration Successors Late Start Late Finish Early Start Early Finish
rs
43,25 Tue Wed Mon Wed
0 days Yes
days 23/03/21 12/05/21 22/03/21 12/05/21
43,25 Tue Wed Mon Wed
0 days Yes
days 23/03/21 12/05/21 22/03/21 12/05/21
Tue Thu Fri Mon
0 days No 2 days 6 23
30/03/21 01/04/21 26/03/21 29/03/21
Tue Wed Tue Wed
0 days Yes 42 days 5SS
23/03/21 12/05/21 23/03/21 12/05/21

6;4SS;8SS;
9SS;10SS;
11SS;12SS
;13SS;14S Tue Thu Mon Tue
0 days No 2 days
S;15SS;16 23/03/21 25/03/21 22/03/21 23/03/21
SS;17SS;1
8SS;19SS;
20SS

Sat Tue Wed Thu


0 days No 2 days 5 3
27/03/21 30/03/21 24/03/21 25/03/21

Tue Wed Mon Tue


1,25 days No 42 days
23/03/21 12/05/21 22/03/21 11/05/21

Tue Wed Mon Tue


1,25 days No 42 days 5SS
23/03/21 12/05/21 22/03/21 11/05/21

Tue Wed Mon Tue


1,25 days No 42 days 5SS
23/03/21 12/05/21 22/03/21 11/05/21

Tue Wed Mon Tue


1,25 days No 42 days 5SS
23/03/21 12/05/21 22/03/21 11/05/21

Tue Wed Mon Tue


1,25 days No 42 days 5SS
23/03/21 12/05/21 22/03/21 11/05/21

Tue Wed Mon Tue


1,25 days No 42 days 5SS
23/03/21 12/05/21 22/03/21 11/05/21

1,25 days No 42 days 5SS Tue Wed Mon Tue


23/03/21 12/05/21 22/03/21 11/05/21
Tue Wed Mon Tue
1,25 days No 42 days 5SS
23/03/21 12/05/21 22/03/21 11/05/21
Tue Wed Mon Tue
1,25 days No 42 days 5SS
23/03/21 12/05/21 22/03/21 11/05/21
Tue Wed Mon Tue
1,25 days No 42 days 5SS
23/03/21 12/05/21 22/03/21 11/05/21
Tue Wed Mon Tue
1,25 days No 42 days 5SS
23/03/21 12/05/21 22/03/21 11/05/21
Tue Wed Mon Tue
1,25 days No 42 days 5SS
23/03/21 12/05/21 22/03/21 11/05/21
Tue Wed Mon Tue
1,25 days No 42 days 5SS
23/03/21 12/05/21 22/03/21 11/05/21
Tue Wed Mon Tue
1,25 days No 42 days 5SS
23/03/21 12/05/21 22/03/21 11/05/21
Thu Wed Mon Sat
3,25 days No 17 days
01/04/21 12/05/21 29/03/21 17/04/21
Thu Wed Mon Sat
3,25 days No 17 days
01/04/21 12/05/21 29/03/21 17/04/21
28SS;27SS
Thu Sat Mon Wed
0 days No 8 days 3 ;25;36SS; 01/04/21 10/04/21 29/03/21 07/04/21
42SS

30,25 Mon Wed Fri Tue


No 3 days 34
days 10/05/21 12/05/21 02/04/21 06/04/21

26FS+1
Mon Mon Wed Thu
0 days No 1 day 23 day;45FS+ 12/04/21 12/04/21 07/04/21 08/04/21
1 day

25FS+1 31FS+1 Wed Thu Fri Sun


0 days No 1 day
day day 05/05/21 06/05/21 09/04/21 11/04/21

29FS+1
Thu Fri Mon Tue
0 days No 7 days 23SS day;33FS+
22/04/21 30/04/21 29/03/21 06/04/21
1 day

34FS+1 Fri Mon Mon Wed


0 days No 2 days 23SS day;39FS-
30/04/21 03/05/21 29/03/21 31/03/21
1 day
27FS+1 Sat Tue Wed Fri
0 days No 8 days 30
day 01/05/21 11/05/21 07/04/21 16/04/21
20,25 No 1 day 29 Wed Wed Fri Sat
days 12/05/21 12/05/21 16/04/21 17/04/21

26FS+1 Fri Wed Tue Fri


0 days No 4 days 32SS
day 07/05/21 12/05/21 13/04/21 16/04/21

23 days No 2 days 31SS Tue Wed Tue Wed


11/05/21 12/05/21 13/04/21 14/04/21

28,25 27FS+1 Wed Wed Wed Thu


No 1 day
days day 12/05/21 12/05/21 07/04/21 08/04/21
28FS+1 Fri Sat Thu Fri
0 days No 1 day 24 07/05/21 08/05/21 01/04/21 02/04/21
day
27,25 Sat Wed Mon Fri
No 10 days
days 01/05/21 12/05/21 29/03/21 09/04/21
Mon Tue Mon Tue
0 days No 7 days 23SS 38
03/05/21 11/05/21 29/03/21 06/04/21
27,25 Tue Wed Wed Fri
No 2 days 40
days 11/05/21 12/05/21 07/04/21 09/04/21
29,25 Wed Wed Tue Wed
No 1 day 36
days 12/05/21 12/05/21 06/04/21 07/04/21
28FS-1 Sat Tue Tue Thu
0 days No 2 days 40
day 01/05/21 04/05/21 30/03/21 01/04/21
Tue Mon Thu Wed
0 days No 5 days 39 37
04/05/21 10/05/21 01/04/21 07/04/21
Wed Thu Mon Sat
0 days No 17 days 69 14/04/21 06/05/21 29/03/21 17/04/21

Sat Wed Mon Thu


0 days No 3 days 23SS 44 01/05/21 05/05/21 29/03/21 01/04/21

Wed Thu Fri Sat


0 days No 1 day 48 51 21/04/21 22/04/21 16/04/21 17/04/21

28,25 Wed Thu Thu Fri


No 1 day 42
days 05/05/21 06/05/21 01/04/21 02/04/21
25FS+1 Wed Wed Fri Sat
0 days No 1 day day 46 14/04/21 14/04/21 09/04/21 10/04/21

Thu Thu Sat Mon


0 days No 1 day 45 47 15/04/21 15/04/21 10/04/21 12/04/21

Fri Mon Mon Wed


0 days No 2 days 46 48 16/04/21 19/04/21 12/04/21 14/04/21

Mon Wed Wed Fri


0 days No 2 days 47 43 19/04/21 21/04/21 14/04/21 16/04/21

15,75 Thu Wed Mon Fri


3,25 days No days 22/04/21 12/05/21 19/04/21 07/05/21
15,75 Thu Wed Mon Fri
3,25 days No days 22/04/21 12/05/21 19/04/21 07/05/21
52FS+1 Thu Sat Mon Tue
0 days No 2 days 43
day;64 22/04/21 24/04/21 19/04/21 20/04/21

53;57FS+
51FS+1 1 Mon Tue Thu Thu
0 days No 1 day day day;64;58 26/04/21 27/04/21 22/04/21 22/04/21
FS+1 day

Tue Wed Fri Fri


0 days No 1 day 52 54;64
27/04/21 28/04/21 23/04/21 23/04/21

62FS+1 Fri Sat Sat Mon


0 days No 1 day 53
day 07/05/21 08/05/21 24/04/21 26/04/21

57FS+1 59FS+1 Tue Thu Sat Tue


0 days No 2 days
day day 04/05/21 06/05/21 01/05/21 04/05/21
58FS+1 59FS+1 Wed Thu Sat Mon
1 day No 1 day
day day 05/05/21 06/05/21 01/05/21 03/05/21
52FS+1 55FS+1 Sat Mon Thu Thu
0 days No 1 day
day;72 day;60 01/05/21 03/05/21 29/04/21 29/04/21
52FS+1 56FS+1 Mon Tue Thu Thu
0 days No 1 day
day;72 day;60 03/05/21 04/05/21 29/04/21 29/04/21
55FS+1
Fri Mon Wed Fri
0 days No 2 days day;56FS+ 78
07/05/21 10/05/21 05/05/21 07/05/21
1 day

9,5 days No 1 day 57;58 Wed Wed Fri Fri


12/05/21 12/05/21 30/04/21 30/04/21
11,25 62SS+1 Wed Wed Wed Thu
No 1 day
days day 12/05/21 12/05/21 28/04/21 29/04/21

54FS+1 61SS+1 Tue Tue Tue Wed


0 days No 1 day
day day 11/05/21 11/05/21 27/04/21 28/04/21

Wed Mon Sat Fri


3,25 days No 5,75 days
28/04/21 10/05/21 24/04/21 30/04/21

65SS+1
day;66;74 Wed Thu Sat Mon
0 days No 1 day 51;52;53 FS+1
28/04/21 29/04/21 24/04/21 26/04/21
day;92

0 days No 3 days 64SS+1 67;92 Wed Sat Mon Thu


day 05/05/21 08/05/21 26/04/21 29/04/21

Mon Mon Mon Tue


3,75 days No 1 day 64 96
10/05/21 10/05/21 26/04/21 27/04/21

Mon Mon Fri Fri


0 days No 1 day 65 96
10/05/21 10/05/21 30/04/21 30/04/21

15,25 No 5 days Thu Wed Mon Fri


days 06/05/21 12/05/21 19/04/21 23/04/21

Thu Sat Mon Tue


0 days No 2 days 41 70
06/05/21 08/05/21 19/04/21 20/04/21

Mon Mon Wed Wed


0 days No 1 day 69 71 10/05/21 10/05/21 21/04/21 21/04/21

15,25 Tue Wed Thu Fri


No 2 days 70
days 11/05/21 12/05/21 22/04/21 23/04/21

0 days? No 2 days? 57;58 Fri Sat Tue Wed


30/04/21 01/05/21 27/04/21 28/04/21
Sat Sat Tue Tue
4,5 days No 0 days
01/05/21 01/05/21 27/04/21 27/04/21

64FS+1 Fri Sat Tue Wed


0 days No 1 day 75SS;76SS
day 30/04/21 01/05/21 27/04/21 28/04/21
Fri Sat Tue Wed
3,25 days No 1 day 74SS
30/04/21 01/05/21 27/04/21 28/04/21

Fri Sat Tue Wed


3,25 days No 1 day 74SS
30/04/21 01/05/21 27/04/21 28/04/21

Tue Tue Fri Sat


0 days No 1 day 80;81 11/05/21 11/05/21 07/05/21 08/05/21

0 days No 1 day 59 79SS Tue Tue Fri Sat


11/05/21 11/05/21 07/05/21 08/05/21
Tue Tue Fri Sat
2,5 days No 1 day 78SS
11/05/21 11/05/21 07/05/21 08/05/21
Wed Wed Sat Mon
2,5 days No 1 day 77 12/05/21 12/05/21 08/05/21 10/05/21

82SS;83SS
;84SS;85S
Wed Wed Sat Mon
0 days No 1 day 77 S;86SS;87
12/05/21 12/05/21 08/05/21 10/05/21
SS;88SS;8
9SS;90SS

Wed Wed Sat Mon


2,5 days No 1 day 81SS
12/05/21 12/05/21 08/05/21 10/05/21
Wed Wed Sat Mon
2,5 days No 1 day 81SS
12/05/21 12/05/21 08/05/21 10/05/21

Wed Wed Sat Mon


2,5 days No 1 day 81SS
12/05/21 12/05/21 08/05/21 10/05/21

Wed Wed Sat Mon


2,5 days No 1 day 81SS 12/05/21 12/05/21 08/05/21 10/05/21
Wed Wed Sat Mon
2,5 days No 1 day 81SS
12/05/21 12/05/21 08/05/21 10/05/21

2,5 days No 1 day 81SS Wed Wed Sat Mon


12/05/21 12/05/21 08/05/21 10/05/21
Wed Wed Sat Mon
2,5 days No 1 day 81SS 12/05/21 12/05/21 08/05/21 10/05/21
Wed Wed Sat Mon
2,5 days No 1 day 81SS
12/05/21 12/05/21 08/05/21 10/05/21
Wed Wed Sat Mon
2,5 days No 1 day 81SS
12/05/21 12/05/21 08/05/21 10/05/21
10,25 Wed Wed Thu Fri
No 1 day
days 12/05/21 12/05/21 29/04/21 30/04/21
Wed Wed Thu Fri
0 days No 1 day 64;65 93SS
12/05/21 12/05/21 29/04/21 30/04/21
Wed Wed Thu Fri
0 days No 1 day 92SS 94SS
12/05/21 12/05/21 29/04/21 30/04/21
10,25 Wed Wed Thu Fri
No 1 day 93SS
days 12/05/21 12/05/21 29/04/21 30/04/21
Tue Wed Sat Tue
7,5 days No 2 days
11/05/21 12/05/21 01/05/21 04/05/21
Tue Wed Sat Tue
0 days No 2 days 66;67 97SS
11/05/21 12/05/21 01/05/21 04/05/21
Wed Wed Sat Mon
8,5 days No 1 day 96SS
12/05/21 12/05/21 01/05/21 03/05/21

0 days Yes 2 days 3FS+1 day 5FS+1 day Tue Wed Tue Wed
04/05/21 05/05/21 04/05/21 05/05/21
Wed Wed Tue Tue
1 day No 1 day 4FS+1 day 5FS+1 day
05/05/21 05/05/21 04/05/21 04/05/21

1FS+1 Fri Fri Fri Fri


0 days Yes 1 day
day;6;4SS 30/04/21 30/04/21 30/04/21 30/04/21

2FS+1 Mon Mon Fri Fri


0 days No 1 day 3SS
day;6 03/05/21 03/05/21 30/04/21 30/04/21
1FS+1
0 days Yes 2 days day;2FS+1 15;18FS+ Fri Mon Fri Mon
4 days 07/05/21 10/05/21 07/05/21 10/05/21
day
Thu Thu Mon Mon
18 days No 1 day 3;4
27/05/21 27/05/21 03/05/21 03/05/21

7 days No 10 days Tue Thu Fri Thu


11/05/21 27/05/21 30/04/21 13/05/21
9;11FS+1 Tue Tue Fri Fri
0 days No 1 day
day;15 11/05/21 11/05/21 30/04/21 30/04/21

10;11FS+ Wed Wed Mon Mon


0 days No 1 day 8
1 day;15 12/05/21 12/05/21 03/05/21 03/05/21

11FS+1 Thu Thu Tue Tue


0 days No 1 day 9
day;15 13/05/21 13/05/21 04/05/21 04/05/21
8FS+1 13FS+1
day;9FS+1 day;29FS+ Mon Mon Thu Thu
0 days No 1 day
day;10FS+ 1 17/05/21 17/05/21 06/05/21 06/05/21
1 day day;39FS+
6 days
Thu Thu Thu Thu
10 days No 1 day 23;24;25
27/05/21 27/05/21 13/05/21 13/05/21
11FS+1 Thu Thu Mon Mon
13 days No 1 day day 27/05/21 27/05/21 10/05/21 10/05/21
Tue Fri Tue Fri
5 days No 4 days
18/05/21 21/05/21 11/05/21 14/05/21
16;23FS-1 Tue Wed Tue Wed
0 days No 2 days 5;8;9;10
day 18/05/21 19/05/21 11/05/21 12/05/21
52FS+1 Thu Fri Thu Fri
0 days No 2 days 15
day 20/05/21 21/05/21 13/05/21 14/05/21

Mon Wed Mon Wed


0 days Yes 3 days
17/05/21 19/05/21 17/05/21 19/05/21
5FS+4 Mon Tue Mon Tue
0 days Yes 2 days 19SS;20
days 17/05/21 18/05/21 17/05/21 18/05/21

Tue Tue Mon Mon


1 day No 1 day 18SS 20
18/05/21 18/05/21 17/05/21 17/05/21

55FS+2 Wed Wed Wed Wed


0 days Yes 1 day 18;19
days 19/05/21 19/05/21 19/05/21 19/05/21
Wed Thu Fri Wed
11 days? No 9 days? 26/05/21 27/05/21 30/04/21 12/05/21

Thu Thu Fri Fri


19 days? No 1 day?
27/05/21 27/05/21 30/04/21 30/04/21

15FS-1 24SS;12 Wed Wed Wed Wed


0 days No 1 day
day 26/05/21 26/05/21 12/05/21 12/05/21

Wed Wed Wed Wed


0 days No 1 day 23SS 25SS;12
26/05/21 26/05/21 12/05/21 12/05/21

Wed Wed Wed Wed


0 days No 1 day 24SS 12
26/05/21 26/05/21 12/05/21 12/05/21

Thu Thu Fri Mon


8 days? No 12 days?
20/05/21 27/05/21 30/04/21 17/05/21

Thu Thu Fri Mon


8 days? No 12 days?
20/05/21 27/05/21 30/04/21 17/05/21

Thu Thu Fri Fri


19 days? No 1 day?
27/05/21 27/05/21 30/04/21 30/04/21

11FS+1 Thu Thu Mon Mon


0 days No 1 day 30;34
day 20/05/21 20/05/21 10/05/21 10/05/21

31SS;32;5 Fri Tue Tue Thu


0 days No 3 days 29
3 21/05/21 25/05/21 11/05/21 13/05/21
Tue Thu Tue Thu
10 days No 3 days 30SS
25/05/21 27/05/21 11/05/21 13/05/21

Wed Thu Fri Mon


8 days No 2 days 30 26/05/21 27/05/21 14/05/21 17/05/21

Mon Thu Tue Fri


9 days No 4 days
24/05/21 27/05/21 11/05/21 14/05/21
35;36FS+ Mon Mon Tue Tue
0 days No 1 day 29
1 day 24/05/21 24/05/21 11/05/21 11/05/21
Thu Thu Wed Wed
11 days No 1 day 34 27/05/21 27/05/21 12/05/21 12/05/21

0 days No 1 day 34FS+1 37;53 Wed Wed Thu Thu


day 26/05/21 26/05/21 13/05/21 13/05/21

Thu Thu Fri Fri


9 days No 1 day 36
27/05/21 27/05/21 14/05/21 14/05/21
Wed Wed Mon Mon
7 days No 1 day
26/05/21 26/05/21 17/05/21 17/05/21

0 days No 1 day 11FS+6 40SS;42 Wed Wed Mon Mon


days 26/05/21 26/05/21 17/05/21 17/05/21

Wed Wed Mon Mon


0 days No 1 day 39SS 42
26/05/21 26/05/21 17/05/21 17/05/21
Thu Thu Tue Tue
7 days No 1 day
27/05/21 27/05/21 18/05/21 18/05/21
43SS;44SS
Thu Thu Tue Tue
0 days No 1 day 39;40 ;45SS;46S
S;50SS 27/05/21 27/05/21 18/05/21 18/05/21

Thu Thu Tue Tue


7 days No 1 day 42SS
27/05/21 27/05/21 18/05/21 18/05/21
Thu Thu Tue Tue
7 days No 1 day 42SS
27/05/21 27/05/21 18/05/21 18/05/21

Thu Thu Tue Tue


7 days No 1 day 42SS
27/05/21 27/05/21 18/05/21 18/05/21

Thu Thu Tue Tue


7 days No 1 day 42SS
27/05/21 27/05/21 18/05/21 18/05/21
Thu Thu Tue Tue
8 days No 0 days
27/05/21 27/05/21 18/05/21 18/05/21
Thu Thu Tue Tue
7 days No 1 day 42SS
27/05/21 27/05/21 18/05/21 18/05/21

5 days No 5 days Tue Thu Fri Thu


25/05/21 27/05/21 14/05/21 20/05/21
16FS+1 Tue Thu Tue Thu
5 days No 3 days
day 25/05/21 27/05/21 18/05/21 20/05/21
Thu Thu Fri Fri
9 days No 1 day 30;36
27/05/21 27/05/21 14/05/21 14/05/21
Mon Thu Mon Thu
0 days Yes 4 days
24/05/21 27/05/21 24/05/21 27/05/21

20FS+2 56FS+2 Mon Mon Mon Mon


0 days Yes 1 day
days days 24/05/21 24/05/21 24/05/21 24/05/21

55FS+2 Thu Thu Thu Thu


0 days Yes 1 day
days 27/05/21 27/05/21 27/05/21 27/05/21

Early Start Early Finish Free Slack Total Slack Critical Start Finish

Predecesso
rs
Predecesso
Successors NO WBS
rs

Div A
1

Div. A1
2

6 23 1
3

5SS 2
4

6;4SS;8SS;
9SS;10SS;
11SS;12SS
;13SS;14S
S;15SS;16 3
SS;17SS;1
8SS;19SS;
20SS
5

5 3 4
6

DIV. A2
7

5SS 1
8

5SS 1.a
9

5SS 1.b

10

5SS 2

11

5SS 2.a
12

5SS 2.b
13

5SS 2.c
14

5SS 2.d
15
5SS 2.e
16
5SS 3
17
5SS 3.a
18

5SS 4
19
5SS 4.a
20
DIV. B
21
2.1
22
28SS;27SS
3 ;25;36SS; 1
42SS 23

34 2

24

26FS+1
23 day;45FS+ 3
1 day
25

25FS+1 31FS+1
day day 4

26
29FS+1
23SS day;33FS+ 5
1 day 27
34FS+1
23SS day;39FS- 6
1 day 28
27FS+1
30 7
day 29

29 8
30

26FS+1
32SS 9
day
31

31SS 10
32
27FS+1
11
day 33
28FS+1
24 12
day 34
2.2
35
23SS 38 1
36
40 2
37
36 3
38
28FS-1
40 4
day 39
39 37 5
40
69 2.3
41
23SS 44 1
42
48 51 2
43

42 3
44
25FS+1
day 46 4
45

45 47 5
46

46 48 6
47

47 43 7
48

DIV. C
49

DIV. C1
50
52FS+1
43 1
day;64 51

53;57FS+
1
51FS+1 day;64;58
day FS+1 2
day;99FS+
1 day
52

54;64;100
52 3
FS+1 day
53
62FS+1
53 day;101FS 4
+1 day 54
57FS+1 59FS+1
day day;106 5
55
58FS+1 59FS+1
day day;106 6
56
52FS+1 55FS+1
day;72 day;60 7
57
52FS+1 56FS+1
8
day;72 day;60 58
55FS+1 78;106;10
day;56FS+ 9FS+4 9
1 day days 59

57;58 10
60
62SS+1
day 11
61

54FS+1 61SS+1
day day 12
62

DIV. C2
63

65SS+1
day;66;74
51;52;53 FS+1 1
day;92
64

64SS+1 67;92 2
day
65

64 96 3
66

65 96 4
67

DIV. C3
68

41 70 1
69

69 71 2
70
70 3
71

57;58 DIV. C4
72
1

73
64FS+1
75SS;76SS 1
day 74

74SS 2
75

74SS 3
76
80;81 DIV.C6
77

59 79SS 1
78

78SS 1
79
77 DIV.C7
80

82SS;83SS
;84SS;85S
77 S;86SS;87 1
SS;88SS;8
9SS;90SS
81

81SS 2
82

81SS 3
83

81SS 4

84

81SS 5
85
81SS 6
86

81SS 7
87
81SS 8
88

81SS 9
89
81SS 10
90

DIV. C8
91
64;65 93SS 1
92

92SS 94SS 2
93

93SS 3
94

DIV. C9
95

66;67 97SS 1
96

96SS 2
97

DIV. D
98
52FS+1
106 7.1
day 99

53FS+1
106 7.2
day
100
54FS+1
106 7.3
day 101

103 104;120F 7.4


S+1 day
102
106 102 7.5
103
102 7.6
104
DIV. D2
105
55;56;59; 107;103;1
99;100;10 14FS-1 1
1 day 106
141FS+7
106 2
days 107

DIV. D3
108
59FS+4 110SS;11
1
days 1 109

109SS 111 2
110
144FS+5
109;110 3
days 111

DIV. D3
112
1

113
106FS-1 115SS;11
2
day 6SS 114

114SS 3
115

114SS 4

116
DIV. D5
117
1
118

119
121;125;1
102FS+1 30FS+3
2
day
days 120
122SS;12
120 3 3
121

121SS 4
122

142FS+1
121 day 5
123

6
124

120 126 7

125

125 127 8
126

126 128 9
127
142FS+1
127 10
day 128

DIV. C6
129
120FS+3 131SS;13
1
days 3 130
130SS 133 2
131

DIV. D7
132
134SS;13
130;131 5SS;136SS 1
;137SS;13
9SS
133

133SS 2
134

133SS 3
135

133SS 4
136
133SS 5
137

6
138

133SS 7
139
DIV. D8
140
107FS+7 145FS+1
1
days day 141
123FS+1
day;128FS 2
+1 day 142

DIV. D9
143
111FS+5
1
days 144
141FS+1
2
day 145
Task Name Start

Mon
Pek. Persiapan
22/03/21
Mon
Pek. Persiapan umum
22/03/21
Fri
Pengukuran dan pemasangan bouwplank
26/03/21
Tue
Biaya Administrasi pelaporan & dokumentasi
23/03/21

Mon
Pembongkaran/penebangan pohon existing dan pembuangan
22/03/21

Wed
Pembongkaran dan pembuangan hasil bongkaran bangunan rumah existing
24/03/21

Tue
PEK. KESELAMATAN DAN KESEHATAN KERJA KONSTRUKSI (RK3K)
23/03/21

Tue
pekerjaan persiapan
23/03/21

Tue
a. perizinan, ID, poster, Pelatihan DLL
23/03/21

Tue
b. BPJS ketenagakerjaan dan Kesehatan kerja
23/03/21

Tue
Alat pelindung diri
23/03/21

Tue
a. Helm pelindung ( Safety Helmet)
23/03/21

b. Sarung Tangan (Safety Glove) Tue


23/03/21
Tue
c. Sepatu Keselamatan (Safety Shoes/boot)
23/03/21
Tue
d. Pelindung pernafasan dan mulut (masker)
23/03/21
Tue
e. Rompi keselamatan kerja (Safety vest)
23/03/21
Tue
Alat pelindung kerja
23/03/21
Tue
a. Pembatas area/ papan informasi/rambu - rambu
23/03/21
Tue
Fasilitas sarana kesehatan
23/03/21
Tue
a. Peralatan P3K (kotak P3K, obat luka,perban DLL)
23/03/21
Mon
PEK. STRUKTUR BANGUNAN BAWAH/PONDASI
29/03/21
Mon
Pondasi Sumuran & Tapak
29/03/21

Mon
galian tanah pondasi
29/03/21

Fri
Urug bekas galian
02/04/21

Wed
Pasir alas Pondasi t- 5 cm
07/04/21

Fri
Beton cor lantai kerja t:10 cm
09/04/21

Mon
Beton bertulang cincin sumuran P1. k=250 t:15 cm
29/03/21

Mon
Beton bertulang cincin sumuran P2. k=250 t:10 cm
29/03/21

Wed
Beton cyclope isian sumuran P1 dan P2 t:135 cm
07/04/21

Beton kedap air K250 isian sumuran P1 dan P2 Fri


16/04/21

Tue
Pondasi tapak uk. 140x140x40 cm
13/04/21

poor pondasi tapak uk. 100x100x40 cm Tue


13/04/21

Wed
Stik kolom/pedestal uk. 35x35 cm
07/04/21
Thu
Stik kolom/pedestal uk.30x30 cm
01/04/21
Mon
Pondasi Batu Gunung
29/03/21
Mon
Galian tanah pondasi
29/03/21
Wed
Urug bekas galian
07/04/21
Tue
pasir alas pondasi
06/04/21
Tue
Pasangan batu kosong
30/03/21
Thu
Pondasi batu gunung/kali
01/04/21
Mon
Pondasi Sloof Gantung Trap Tangga, Ram
29/03/21
Mon
Galian tanah pondasi 29/03/21
Fri
Urug bekas galian
16/04/21
Thu
Pasir Alas pondasi
01/04/21
Fri
Beton cor lantai kerja t:10cm 09/04/21
Sat
Pasangan batu kosong 10/04/21
Mon
Pasangan batu bata 1:2
12/04/21
Wed
Plesteran batu bata 1:2
14/04/21
Mon
PEKERJAAN LANTAI 1 19/04/21
Mon
Pek. Struktur bangunan 19/04/21
Mon
sloof beton uk. 30x40 cm
19/04/21

Thu
Kolom beton K1 uk. 35x35 cm 22/04/21

Fri
Kolom beton k2 uk. 30x30 cm
23/04/21

Sat
Kolom praktis tangga uk. 13x13 cm
24/04/21

Fri
Balok Lantai BL1. uk. 25x40 cm
30/04/21
Fri
Balok Lantai BL2. uk. 30x60 cm
30/04/21
Wed
Balok latai BLT1 uk. 13x15 cm
28/04/21
Wed
Balok latai BLT2. uk. 13x20 cm
28/04/21

Sat
Plat lantai beton bertulang t:12 cm
08/05/21

Plat kanopy teras beton bertulang t:10 cm Thu


29/04/21
Wed
Balok bordes BT1 uk. 20x30 cm
28/04/21

Tue
Plat beton bertulang tangga
27/04/21

Sat
PEK. PASANGAN DINDING
24/04/21

Sat
Pasangan bata 1:2
24/04/21

Pasangan Bata 1:4 Mon


26/04/21

Mon
Plesteran 1:2
26/04/21

Fri
Plesteran 1:4
30/04/21

PEK. PENUTUP LANTAI Mon


19/04/21

Mon
Tanah urug dibawah lantai, ram dan tangga
19/04/21

Wed
Pasir urug dibawah lantai, ram dan tangga
21/04/21
Thu
Beton cor lantai, ram dan tangga t=5 cm + acian
22/04/21

PEK. KUSEN PINTU & JENDELA Mon


22/03/21
Spesifikasi kusen pintu/jendela/ventilasi dan daun pintu/jendela rangka menggunakan UPVC
Mon
dan Acsesories antara lain : kunci 2 slaag,engsel pintu/jendela, grendel, hak angin,kaca tebal 5
22/03/21
mm biaya sudah termasuk material, mobilisasi serta pemasangan

Tue
Pengad. Kusen, daun pintu dan ventilasi UPVC type P1 + acsesories terpasang
27/04/21
Tue
Pengad. Kusen, daun pintu dan ventilasi UPVC type P2 + acsesories terpasang
27/04/21

Tue
Pengad. Kusen, daun pintu dan ventilasi UPVC type J1 + acsesories terpasang
27/04/21

Tue
PEK. PLAFOND 11/05/21

plafond PVC t:6 mm, rangka furing dan list profil terpasang ruangan Tue
11/05/21
Tue
plafond PVC t:6 mm, rangka furing dan list profil terpasang luar ruangan
11/05/21
Wed
PEK. INSTALASI LISTRIK 12/05/21

Wed
Armatur
12/05/21

Lampu TL 2x14 watt LED, kap lampu termasuk bola lampu, setara RM philips accecories Wed
terpasang 12/05/21
lampu LED downlight 11 watt, power saving, stainless steel, tutup cover acrylic putih susu Wed
setara philips terpasang 12/05/21

Instalasi titik penerangan, instalasi termasuk kabel pembagi NYA 1x1,5 mm dan kabel power Wed
utama lampu NYM 2x2,5 mm dalam pipa PVC fitting lampu dan kelengakapan instalasi terpasang 12/05/21

Wed
saklar 12/05/21
Wed
saklar 1 gang merk setara BROCO
12/05/21

saklar 2 gang merk setara BROCO Wed


12/05/21
Wed
STOP kontak setara BROCO 12/05/21
Wed
instalasi panel box induk, panel distribusi & MCB lengkap terpasang
12/05/21
Penyambungan arus listrik dari dan ke gedung biaya penyambungan terpasang laboratorium Wed
termasuk kabel 12/05/21
Thu
PEK. INSTALASI AIR BERSIH & AIR KOTOR
29/04/21
Thu
Instalasi pipa air bersih PVC 3/4" type AW + konekting ke Intalasi Pipa induk existing
29/04/21
Thu
Instalasi pipa air kotor 3" type AW
29/04/21
Thu
wastafel keramik + keran air (Lengkap accessories) setara America Standart
29/04/21
Sun
PEK. PENGECATAN
21/03/21
Sat
Cat dinding sloof, kolom dan balok lantai
01/05/21
Sat
Cat lisplank
01/05/21

Pekerjaan Struktur Bangunan Lantai II Sat


24/04/21
Sat
Kolom beton K1 uk. 35x35 cm
24/04/21

Mon
Kolom beton k2. uk. 30x30 cm
26/04/21

Tue
Kolom praktis ikatan angin uk. 13x13 cm
27/04/21

Ring Balok RB1. uk. 20x30 cm Fri


14/05/21

Thu
Balok Latai BLT1 uk. 13x15 cm
13/05/21

Balok Top Gevel/ Tombak Layar uk. 13x15 cm Sat


15/05/21
Tue
Pek. Pasangan Dinding
11/05/21

Tue
Pasangan Bata 1:4
11/05/21

Thu
Plesteran Bata 1:4
13/05/21

Sat
Pek. Penutup Lantai
15/05/21

Sat
Pas. Keramik Lantai ruangan uk. 40x40 cm Polished
15/05/21
Sat
Pas. Keramik Lantai Teras uk. 40x40 cm Unpholised 15/05/21
Tue
Pas. Glass Block ruang tangga
18/05/21
Mon
Pek. Kusen Pintu & Jendela
10/05/21
Spesifikasi kusen pintu/jendela/ventilasi dan daun pintu/jendela rangka menggunakan
Mon
UPVC' dan acsesories antara lain : kunci 2 slaag, engsel pintu/jendela, grendel, hak angin, kaca
10/05/21
tebal 5 mm biaya sudah termasuk material, mobilisasi serta pemasangan

Wed
Pengad. Kusen, daun pintu dan ventilasi UPVC type P1 + Acsesories Terpasang
12/05/21
Wed
Pengad. Kusen, daun pintu dan ventilasi UPVC type J1 + Acsesories Terpasang
12/05/21

Wed
Peng ventilasi lubang angin UPVC + Accessories Terpasang
12/05/21

Fri
Pek. Penutup Atap
14/05/21
Fri
Atap Utama 14/05/21

spesifikasi material rangka baja ringan C 100 dan C 75, penutup atap seng spanduk 0,30
mm dan rabung seng spanduk pembiayaan meliputi biaya pengadaan material, mobilisasi dan Fri
14/05/21
pemasangan/perkaitan terpasang

Mon
Rangka kuda - kuda baja ringan smartruss
17/05/21

Tue
Atap seng spandex gelombang kecil 0,30 mm
18/05/21

Tue
Rabung atap seng spandek 0,30 mm
18/05/21

Fri
Papan lisplankk kayu kelas II uk. 2,5/30 cm
21/05/21

Tue
Atap Kanopy
18/05/21

Tue
Rangka Kuda - kuda Kayu uk= 5/10 cm Kelas II
18/05/21

Wed
Gording Kayu uk= 5/7 cm Kelas II
19/05/21

Thu
Atap Seng Spandex Gelombang Kecil 0,30 mm
20/05/21
Fri
Papan Lisplank Kayu Kelas II uk. 2,5/30 cm
21/05/21

Fri
Pek. Plafond 21/05/21

Fri
Plafond PVC t: 6 mm, rangka furing dan list profile terpasang ruangan
21/05/21
Fri
Plafond PVC t : 6 mm, rangka furing dan list profile terpasang luar ruangan
21/05/21
Sun
Pek. Instalasi Listrik 21/03/21

armatur Sat
22/05/21

Lampu TL 2 x 14 Watt LED, kap lampu termasuk bola lampu,setara RM Philips Accecories Sat
terpasang 22/05/21
Lampu LED downlight 11 watt,Power Saving Stainless Steel, tutup cover acrylic putih susu Sat
setara Philips Terpasang 22/05/21

Instalasi titik penerangan, instalasi termasuk kabel pembagi NYA 1x1,5 mm dan kabel power Sat
utama lampu NYM 2x2,5 mm dalam pipa conduit PVC dan kelengkapan instalasi terpasang 22/05/21

Instalasi titik kontak, instalasi termasuk kabelnya 2,5 mm dalam pipa conduit PVC dan Sat
kelengkapan instalasi terpasang 22/05/21
Sun
saklar
21/03/21

Sat
Box zekering MCB lengkap
22/05/21

Mon
Pek. Pengecatan
24/05/21
Mon
Cat dinding, kolom, balok latey dan reng balok
24/05/21

Tue
Cat Lisplank
25/05/21

Tue
Pek. Lain - lain
25/05/21
Tue
realing tangga & selasar LT. 2 Besi stainless D 2 inchi Terpasang
25/05/21
Fri
Pembersihan Akhir
28/05/21
Finish Total Slack Free Slack Late Start Late Finish Early Start Early Finish Duration Critical

Thu Mon Sat Mon Thu 55,75


0 days 0 days Yes
27/05/21 22/03/21 29/05/21 22/03/21 27/05/21 days
Wed Mon Sat Mon Wed 43,25
0 days 0 days Yes
12/05/21 22/03/21 29/05/21 22/03/21 12/05/21 days
Mon Mon Fri Mon
0 days 0 days Fri 26/03/21 2 days Yes
29/03/21 29/03/21 26/03/21 29/03/21
Wed 14,25 14,25 Sat Tue Wed
Fri 09/04/21 42 days No
12/05/21 days days 29/05/21 23/03/21 12/05/21

Tue Mon Tue Mon Tue


0 days 0 days 2 days Yes
23/03/21 22/03/21 23/03/21 22/03/21 23/03/21

Thu Wed Thu Wed Thu


0 days 0 days 2 days Yes
25/03/21 24/03/21 25/03/21 24/03/21 25/03/21

Thu Wed Sat Tue Thu 54,75


1,75 days 1,75 days No
27/05/21 24/03/21 29/05/21 23/03/21 27/05/21 days

Thu Wed Sat Tue Thu 54,75


1,75 days 1,75 days No
27/05/21 24/03/21 29/05/21 23/03/21 27/05/21 days

Thu Wed Sat Tue Thu 54,75


1,75 days 1,75 days No
27/05/21 24/03/21 29/05/21 23/03/21 27/05/21 days

Thu Wed Sat Tue Thu 54,75


1,75 days 1,75 days No
27/05/21 24/03/21 29/05/21 23/03/21 27/05/21 days

Thu Wed Sat Tue Thu 54,75


1,75 days 1,75 days No
27/05/21 24/03/21 29/05/21 23/03/21 27/05/21 days

Thu Wed Sat Tue Thu 54,75


1,75 days 1,75 days No
27/05/21 24/03/21 29/05/21 23/03/21 27/05/21 days
Thu 1,75 days 1,75 days Wed Sat Tue Thu 54,75 No
27/05/21 24/03/21 29/05/21 23/03/21 27/05/21 days
Thu Wed Sat Tue Thu 54,75
1,75 days 1,75 days No
27/05/21 24/03/21 29/05/21 23/03/21 27/05/21 days
Thu Wed Sat Tue Thu 54,75
1,75 days 1,75 days No
27/05/21 24/03/21 29/05/21 23/03/21 27/05/21 days
Thu Wed Sat Tue Thu 54,75
1,75 days 1,75 days No
27/05/21 24/03/21 29/05/21 23/03/21 27/05/21 days
Thu Wed Sat Tue Thu 54,75
1,75 days 1,75 days No
27/05/21 24/03/21 29/05/21 23/03/21 27/05/21 days
Thu Wed Sat Tue Thu 54,75
1,75 days 1,75 days No
27/05/21 24/03/21 29/05/21 23/03/21 27/05/21 days
Thu Wed Sat Tue Thu 54,75
1,75 days 1,75 days No
27/05/21 24/03/21 29/05/21 23/03/21 27/05/21 days
Thu Wed Sat Tue Thu 54,75
1,75 days 1,75 days No
27/05/21 24/03/21 29/05/21 23/03/21 27/05/21 days
Sat Mon Sat Mon Sat
0 days 0 days 17 days Yes
17/04/21 29/03/21 29/05/21 29/03/21 17/04/21
Sat Mon Sat Mon Sat
0 days 0 days 17 days Yes
17/04/21 29/03/21 29/05/21 29/03/21 17/04/21

Wed Mon Wed Mon Wed


0 days 0 days
29/03/21 07/04/21 29/03/21 07/04/21 8 days
Yes
07/04/21

Tue Wed Sat Fri Tue


44,5 days 44,5 days 3 days No
06/04/21 26/05/21 29/05/21 02/04/21 06/04/21

Thu Wed Thu Wed Thu


0 days 0 days
07/04/21 08/04/21 07/04/21 08/04/21 1 day
Yes
08/04/21

Sun 35,25 Mon Fri Sun 1 day


0 days Sat 22/05/21 No
11/04/21 days 24/05/21 09/04/21 11/04/21

Tue Mon Tue Mon Tue


34,5 days 0 days 7 days No
06/04/21 10/05/21 18/05/21 29/03/21 06/04/21

Wed Tue Thu Mon Wed


41,5 days 0 days 2 days No
31/03/21 18/05/21 20/05/21 29/03/21 31/03/21

Fri Wed Fri Wed Fri 8 days


34,5 days 0 days No
16/04/21 19/05/21 28/05/21 07/04/21 16/04/21
Sat 34,5 days 34,5 days Fri 28/05/21 Sat Fri Sat 1 day No
17/04/21 29/05/21 16/04/21 17/04/21

Fri 35,25 Tue Sat Tue Fri


0 days 4 days No
16/04/21 days 25/05/21 29/05/21 13/04/21 16/04/21

Wed 37,25 37,25 Thu Sat Tue Wed 2 days No


14/04/21 days days 27/05/21 29/05/21 13/04/21 14/04/21

Thu Sat Wed Thu 1 day


42,5 days 42,5 days Fri 28/05/21 No
08/04/21 29/05/21 07/04/21 08/04/21
Fri Tue Wed Thu Fri
44,5 days 0 days
25/05/21 26/05/21 01/04/21 02/04/21 1 day
No
02/04/21
Fri Wed Sat Mon Fri
41,5 days 41,5 days 10 days No
09/04/21 19/05/21 29/05/21 29/03/21 09/04/21
Tue Thu Fri Mon Tue
43,5 days 0 days 7 days No
06/04/21 20/05/21 28/05/21 29/03/21 06/04/21
Fri Thu Sat Wed Fri
41,5 days 41,5 days 2 days No
09/04/21 27/05/21 29/05/21 07/04/21 09/04/21
Wed Sat Tue Wed
43,5 days 43,5 days Fri 28/05/21 1 day No
07/04/21 29/05/21 06/04/21 07/04/21
Thu Wed Fri Tue Thu
41,5 days 0 days 2 days No
01/04/21 19/05/21 21/05/21 30/03/21 01/04/21
Wed Thu Thu Wed
41,5 days 0 days Fri 21/05/21 5 days No
07/04/21 27/05/21 01/04/21 07/04/21
Sat Mon Mon Sat
10 days 0 days Fri 09/04/21 24/05/21 29/03/21 17/04/21 17 days No
17/04/21
Thu Wed Sat Mon Thu
01/04/21 42,5 days 0 days 19/05/21 22/05/21 29/03/21 01/04/21 3 days No

Sat Sat Fri Sat


0 days 0 days Fri 16/04/21 17/04/21 16/04/21 17/04/21 1 day Yes
17/04/21
Fri Mon Thu Fri
42,5 days 42,5 days Sat 22/05/21 1 day No
02/04/21 24/05/21 01/04/21 02/04/21
Sat Sat Fri Sat
10/04/21 0 days 0 days Fri 09/04/21 10/04/21 09/04/21 10/04/21 1 day Yes

Mon Mon Sat Mon


12/04/21 0 days 0 days Sat 10/04/21 12/04/21 10/04/21 12/04/21 1 day Yes

Wed Mon Wed Mon Wed


0 days 0 days
12/04/21 14/04/21 12/04/21 14/04/21 2 days
Yes
14/04/21
Fri Wed Fri Wed Fri
0 days 0 days
14/04/21 16/04/21 14/04/21 16/04/21 2 days
Yes
16/04/21
Tue Mon Sat Mon Tue
11/05/21 0 days 0 days 19/04/21 29/05/21 19/04/21 11/05/21 18,5 days Yes

Tue Mon Sat Mon Tue


11/05/21 0 days 0 days 19/04/21 29/05/21 19/04/21 11/05/21 18,5 days Yes

Tue Mon Tue Mon Tue


0 days 0 days 2 days Yes
20/04/21 19/04/21 20/04/21 19/04/21 20/04/21

Thu Thu Thu Thu Thu


22/04/21 0 days 0 days 22/04/21 22/04/21 22/04/21 22/04/21 1 day Yes

Fri Fri Fri Fri


0 days 0 days Fri 23/04/21 1 day Yes
23/04/21 23/04/21 23/04/21 23/04/21

Mon Fri Sat Mon


10,5 days 0 days Fri 07/05/21 07/05/21 24/04/21 26/04/21 1 day No
26/04/21

Thu Thu Fri Thu


0 days 0 days Fri 30/04/21 06/05/21 30/04/21 06/05/21 3,75 days Yes
06/05/21
Sat Thu Thu Fri Sat
4,5 days 4,5 days 1 day No
01/05/21 06/05/21 06/05/21 30/04/21 01/05/21
Thu Wed Thu Wed Thu
0 days 0 days 1 day Yes
29/04/21 28/04/21 29/04/21 28/04/21 29/04/21
Thu Tue Tue Wed Thu
4,5 days 0 days 1 day No
29/04/21 04/05/21 04/05/21 28/04/21 29/04/21

Tue Tue Sat Tue


0 days 0 days Sat 08/05/21 2 days Yes
11/05/21 11/05/21 08/05/21 11/05/21

Fri 24,5 days 24,5 days Fri 28/05/21 Sat Thu Fri 1 day No
30/04/21 29/05/21 29/04/21 30/04/21
Thu Sat Wed Thu
25,5 days 25,5 days Fri 28/05/21 1 day No
29/04/21 29/05/21 28/04/21 29/04/21

Wed Thu Fri Tue Wed


25,5 days 0 days 1 day No
28/04/21 27/05/21 28/05/21 27/04/21 28/04/21

Fri Sat Thu Sat Fri 5,75 days


0 days 0 days Yes
30/04/21 24/04/21 27/05/21 24/04/21 30/04/21

Mon Mon Sat Mon


0 days 0 days Sat 24/04/21 26/04/21 24/04/21 26/04/21 1 day Yes
26/04/21

Thu 22,5 days 0 days Sat 22/05/21 Wed Mon Thu 3 days No
29/04/21 26/05/21 26/04/21 29/04/21

Tue Wed Thu Mon Tue


25,5 days 3,75 days 1 day No
27/04/21 26/05/21 27/05/21 26/04/21 27/04/21

Fri 21,75 Wed Thu Fri Fri


0 days 1 day No
30/04/21 days 26/05/21 27/05/21 30/04/21 30/04/21

Fri 29,5 days 29,5 days Mon Sat Mon Fri 5 days No
23/04/21 24/05/21 29/05/21 19/04/21 23/04/21

Tue Mon Wed Mon Tue 2 days


29,5 days 0 days No
20/04/21 24/05/21 26/05/21 19/04/21 20/04/21

Wed Wed Thu Wed Wed


29,5 days 0 days
26/05/21 27/05/21 21/04/21 21/04/21 1 day
No
21/04/21
Fri Thu Sat Thu Fri 2 days
29,5 days 29,5 days No
23/04/21 27/05/21 29/05/21 22/04/21 23/04/21
Wed 0 days? 0 days? Tue Wed Mon Wed 31 days? Yes
28/04/21 27/04/21 28/04/21 22/03/21 28/04/21
Mon Tue Wed Mon Mon
30 days? 30 days? 1 day? No
22/03/21 27/04/21 28/04/21 22/03/21 22/03/21

Wed Tue Wed Tue Wed


0 days 0 days 1 day Yes
28/04/21 27/04/21 28/04/21 27/04/21 28/04/21
Wed Tue Wed Tue Wed
0 days 0 days 1 day Yes
28/04/21 27/04/21 28/04/21 27/04/21 28/04/21

Wed Tue Wed Tue Wed


0 days 0 days 1 day Yes
28/04/21 27/04/21 28/04/21 27/04/21 28/04/21

Wed Thu Fri Tue Wed


12/05/21 14 days 0 days 27/05/21 28/05/21 11/05/21 12/05/21 1 day No

Wed 14 days 0 days Thu Fri Tue Wed 1 day No


12/05/21 27/05/21 28/05/21 11/05/21 12/05/21
Wed Thu Fri Tue Wed
14 days 14 days 1 day No
12/05/21 27/05/21 28/05/21 11/05/21 12/05/21
Thu Sat Wed Thu
13/05/21 14 days 14 days Fri 28/05/21 29/05/21 12/05/21 13/05/21 1 day No

Thu Sat Wed Thu


14 days 0 days Fri 28/05/21 1 day No
13/05/21 29/05/21 12/05/21 13/05/21

Thu Sat Wed Thu


14 days 14 days Fri 28/05/21 1 day No
13/05/21 29/05/21 12/05/21 13/05/21
Thu Sat Wed Thu
14 days 14 days Fri 28/05/21 29/05/21 12/05/21 13/05/21 1 day No
13/05/21

Thu Sat Wed Thu 1 day


14 days 14 days Fri 28/05/21 No
13/05/21 29/05/21 12/05/21 13/05/21

Thu Sat Wed Thu


13/05/21 14 days 14 days Fri 28/05/21 29/05/21 12/05/21 13/05/21 1 day No

Thu Sat Wed Thu 1 day


14 days 14 days Fri 28/05/21 No
13/05/21 29/05/21 12/05/21 13/05/21
Thu 14 days 14 days Fri 28/05/21 Sat Wed Thu 1 day No
13/05/21 29/05/21 12/05/21 13/05/21
Thu Sat Wed Thu
13/05/21 14 days 14 days Fri 28/05/21 29/05/21 12/05/21 13/05/21 1 day No

Thu Sat Wed Thu 1 day


14 days 14 days Fri 28/05/21 No
13/05/21 29/05/21 12/05/21 13/05/21
Thu Sat Wed Thu
14 days 14 days Fri 28/05/21 29/05/21 12/05/21 13/05/21 1 day No
13/05/21
Fri Sat Thu Fri
24,5 days 24,5 days Fri 28/05/21 1 day No
30/04/21 29/05/21 29/04/21 30/04/21
Fri Sat Thu Fri
24,5 days 0 days Fri 28/05/21 1 day No
30/04/21 29/05/21 29/04/21 30/04/21
Fri Sat Thu Fri
24,5 days 0 days Fri 28/05/21 1 day No
30/04/21 29/05/21 29/04/21 30/04/21
Fri Sat Thu Fri
24,5 days 24,5 days Fri 28/05/21 1 day No
30/04/21 29/05/21 29/04/21 30/04/21
Sat Mon Sat Sun Sat 57,5
0 days? 0 days? Yes
29/05/21 10/05/21 29/05/21 21/03/21 29/05/21 days?
Tue 21,75 Thu Sat Sat Tue
0 days 2 days No
04/05/21 days 27/05/21 29/05/21 01/05/21 04/05/21
Mon 22,75 22,75 Sat Sat Mon
Fri 28/05/21 1 day No
03/05/21 days days 29/05/21 01/05/21 03/05/21
Mon 11 days 11 days Mon Sat Sat Mon 18,5 days No
17/05/21 10/05/21 29/05/21 24/04/21 17/05/21
Mon Mon Tue Sat Mon
12,5 days 12,5 days 1 day No
26/04/21 10/05/21 11/05/21 24/04/21 26/04/21

Tue Mon Tue Mon Tue


11,5 days 11,5 days
10/05/21 11/05/21 26/04/21 27/04/21 1 day
No
27/04/21

Wed Mon Tue Tue Wed


10,5 days 10,5 days
10/05/21 11/05/21 27/04/21 28/04/21 1 day
No
28/04/21

Sat 3 days 0 days Tue Wed Fri Sat 1 day No


15/05/21 18/05/21 19/05/21 14/05/21 15/05/21

Fri Mon Tue Thu Fri 1 day


3 days 0 days No
14/05/21 17/05/21 18/05/21 13/05/21 14/05/21
Mon 11 days 11 days Fri 28/05/21 Sat Sat Mon 1 day No
17/05/21 29/05/21 15/05/21 17/05/21
Sat Tue Sat Tue Sat 4 days
0 days 0 days Yes
15/05/21 11/05/21 15/05/21 11/05/21 15/05/21

Thu Tue Thu Tue Thu


0 days 0 days 2 days Yes
13/05/21 11/05/21 13/05/21 11/05/21 13/05/21

Sat Thu Sat Thu Sat


0 days 0 days 2 days Yes
15/05/21 13/05/21 15/05/21 13/05/21 15/05/21

Wed Wed Sat Sat Wed


3 days 3 days
19/05/21 22/05/21 15/05/21 19/05/21 3 days
No
19/05/21

Tue Wed Fri Sat Tue


3 days 0 days 2 days No
18/05/21 19/05/21 21/05/21 15/05/21 18/05/21
Mon Thu Fri Sat Mon
17/05/21 4 days 1 day 20/05/21 21/05/21 15/05/21 17/05/21 1 day No

Wed Sat Tue Wed 1 day


3 days 0 days Fri 21/05/21 No
19/05/21 22/05/21 18/05/21 19/05/21
Thu Sat Mon Thu 2,75
14 days? 14 days? Fri 28/05/21 No
13/05/21 29/05/21 10/05/21 13/05/21 days?
Tue 15,75 15,75 Sat Mon Tue
Fri 28/05/21 1 day? No
11/05/21 days? days? 29/05/21 10/05/21 11/05/21

Thu Sat Wed Thu


14 days 0 days Fri 28/05/21 1 day No
13/05/21 29/05/21 12/05/21 13/05/21
Thu Sat Wed Thu
14 days 14 days Fri 28/05/21 1 day No
13/05/21 29/05/21 12/05/21 13/05/21

Thu Sat Wed Thu


14 days 14 days Fri 28/05/21 1 day No
13/05/21 29/05/21 12/05/21 13/05/21

Mon 4,75 4,75 Thu Sat Fri Mon 7,75


No
24/05/21 days? days? 20/05/21 29/05/21 14/05/21 24/05/21 days?
Mon 4,75 4,75 Thu Sat Fri Mon 7,75
24/05/21 days? days? 20/05/21 29/05/21 14/05/21 24/05/21 days? No

Sat 11,75 11,75 Fri 28/05/21 Sat Fri Sat 1 day?


No
15/05/21 days? days? 29/05/21 14/05/21 15/05/21

Tue Thu Fri Mon Tue 1 day


3 days 0 days No
18/05/21 20/05/21 21/05/21 17/05/21 18/05/21

Fri Tue Tue Fri


3 days 0 days Fri 21/05/21 25/05/21 18/05/21 21/05/21 3 days No
21/05/21

Fri Wed Sat Tue Fri 3 days


7 days 7 days No
21/05/21 26/05/21 29/05/21 18/05/21 21/05/21

Mon Tue Thu Fri Mon


3 days 0 days
25/05/21 27/05/21 21/05/21 24/05/21 2 days
No
24/05/21

Sat Sat Thu Tue Sat


4 days 4 days
22/05/21 27/05/21 18/05/21 22/05/21 4 days
No
22/05/21

Wed Mon Tue Wed


4 days 0 days Sat 22/05/21 1 day No
19/05/21 24/05/21 18/05/21 19/05/21

Thu Mon Tue Wed Thu


4 days 0 days 1 day No
20/05/21 24/05/21 25/05/21 19/05/21 20/05/21

Fri Tue Wed Thu Fri 1 day


4 days 0 days No
21/05/21 25/05/21 26/05/21 20/05/21 21/05/21
Sat Wed Thu Fri Sat
4 days 1 day 1 day No
22/05/21 26/05/21 27/05/21 21/05/21 22/05/21

Sat Thu Fri Fri Sat


22/05/21 5 days 5 days 27/05/21 28/05/21 21/05/21 22/05/21 1 day No

Sat Thu Fri Fri Sat


5 days 0 days 1 day No
22/05/21 27/05/21 28/05/21 21/05/21 22/05/21
Sat Thu Fri Fri Sat
5 days 0 days 1 day No
22/05/21 27/05/21 28/05/21 21/05/21 22/05/21
Mon Sat Sun Mon
24/05/21 5 days 5 days Fri 28/05/21 29/05/21 21/03/21 24/05/21 52,5 days No

Mon 5 days 0 days Fri 28/05/21 Sat Sat Mon 1 day No


24/05/21 29/05/21 22/05/21 24/05/21

Mon Sat Sat Mon


5 days 5 days Fri 28/05/21 29/05/21 22/05/21 24/05/21 1 day No
24/05/21
Mon Sat Sat Mon
5 days 5 days Fri 28/05/21 29/05/21 22/05/21 24/05/21 1 day No
24/05/21

Mon 5 days 5 days Fri 28/05/21 Sat Sat Mon 1 day No


24/05/21 29/05/21 22/05/21 24/05/21

Mon Sat Sat Mon 1 day


5 days 5 days Fri 28/05/21 No
24/05/21 29/05/21 22/05/21 24/05/21
Sun Sat Sun Sun
57,5 days 57,5 days Sat 29/05/21 0 days No
21/03/21 29/05/21 21/03/21 21/03/21

Mon Sat Sat Mon


5 days 5 days Fri 28/05/21 1 day No
24/05/21 29/05/21 22/05/21 24/05/21

Thu Mon Sat Mon Thu


0 days 0 days 3 days Yes
27/05/21 24/05/21 29/05/21 24/05/21 27/05/21
Thu Mon Thu Mon Thu 3 days
0 days 0 days Yes
27/05/21 24/05/21 27/05/21 24/05/21 27/05/21

Wed Sat Tue Wed


3 days 3 days Fri 28/05/21 29/05/21 25/05/21 26/05/21 1 day No
26/05/21

Sat Sat Tue Sat 4 days


0 days 0 days Fri 28/05/21 Yes
29/05/21 29/05/21 25/05/21 29/05/21
Wed Sat Tue Wed
3 days 3 days Fri 28/05/21 1 day No
26/05/21 29/05/21 25/05/21 26/05/21
Sat Sat Fri Sat
0 days 0 days Fri 28/05/21 29/05/21 28/05/21 29/05/21 1 day Yes
29/05/21
WBS Task Name Start Finish
DIV. Pengukuran dan Fri Mon
A1(1) pemasangan bouwplank 26/03/21 29/03/21

DIV. Pembongkaran/penebangan Mon Tue


A1(3) pohon existing dan 22/03/21 23/03/21
pembuangan

Pembongkaran dan
pembuangan hasil bongkaran Wed
DIV. Thu
A1(4) 24/03/21 25/03/21
bangunan rumah existing

Mon Wed
DIV. B galian tanah pondasi
29/03/21 07/04/21

3 Pasir alas Pondasi t- 5 cm Wed Thu


07/04/21 08/04/21
Beton cor lantai kerja Fri Sat
4
t:10cm 09/04/21 10/04/21
Sat Mon
5 Pasangan batu kosong
10/04/21 12/04/21
Mon Wed
6 Pasangan batu bata 1:2
12/04/21 14/04/21
Wed Fri
7 Plesteran batu bata 1:2
14/04/21 16/04/21
Mon Tue
DIV. C (1) sloof beton uk. 30x40 cm
19/04/21 20/04/21
Kolom beton K1 uk. 35x35 Thu Thu
2 cm 22/04/21 22/04/21
Kolom beton k2 uk. 30x30 Fri Fri
3
cm 23/04/21 23/04/21
Balok Lantai BL1. uk. Fri Thu
5 25x40 cm 30/04/21 06/05/21
Balok latai BLT1 uk. 13x15 Wed Thu
7 cm 28/04/21 29/04/21

Plat lantai beton bertulang Sat Tue


9 t:12 cm 08/05/21 11/05/21

Pengad. Kusen, daun pintu Tue


Wed
DIV. C4(1) dan ventilasi UPVC type P1 +
27/04/21 28/04/21
acsesories terpasang

Pengad. Kusen, daun pintu


Tue Wed
2 dan ventilasi UPVC type P2 + 27/04/21 28/04/21
acsesories terpasang

Pengad. Kusen, daun pintu


Tue Wed
3 dan ventilasi UPVC type J1 +
27/04/21 28/04/21
acsesories terpasang

DIV D. Kolom beton K1 uk. 35x35 Sat Mon


(7.1) cm 24/04/21 26/04/21

Kolom beton k2. uk. 30x30 Mon Tue


7.2
cm 26/04/21 27/04/21

Tue Thu
DIV. D2(1) Pasangan Bata 1:4
11/05/21 13/05/21

2 Plesteran Bata 1:4 Thu Sat


13/05/21 15/05/21
Pas. Keramik Lantai
Sat Tue
DIV. D3(1) ruangan uk. 40x40 cm
15/05/21 18/05/21
Polished

DIV. D8(1) Cat dinding, kolom, balok Mon Thu


latey dan reng balok 24/05/21 27/05/21

Fri Sat
DIV. D9(2) Pembersihan Akhir
28/05/21 29/05/21
Resource Name Work

6.916
Mandor
hrs
Pengukuran dan pemasangan
16 hrs
bouwplank
Biaya Administrasi pelaporan &
336 hrs
dokumentasi

Pembongkaran/penebangan
16 hrs
pohon existing dan pembuangan

Pembongkaran dan pembuangan


hasil bongkaran bangunan rumah 16 hrs
existing

pekerjaan persiapan 438 hrs

a. perizinan, ID, poster, Pelatihan


438 hrs
DLL
b. BPJS ketenagakerjaan dan
438 hrs
Kesehatan kerja

Alat pelindung diri 438 hrs

a. Helm pelindung ( Safety


438 hrs
Helmet)

b. Sarung Tangan (Safety Glove) 438 hrs

c. Sepatu Keselamatan (Safety


438 hrs
Shoes/boot)
d. Pelindung pernafasan dan
438 hrs
mulut (masker)
e. Rompi keselamatan kerja
438 hrs
(Safety vest)

Alat pelindung kerja 438 hrs


a. Pembatas area/ papan
438 hrs
informasi/rambu - rambu

Fasilitas sarana kesehatan 438 hrs

a. Peralatan P3K (kotak P3K,


438 hrs
obat luka,perban DLL)

galian tanah pondasi 64 hrs

Urug bekas galian 24 hrs

Pasir alas Pondasi t- 5 cm 8 hrs

Beton cor lantai kerja t:10 cm 8 hrs

Beton bertulang cincin sumuran


56 hrs
P1. k=250 t:15 cm

Beton bertulang cincin sumuran


16 hrs
P2. k=250 t:10 cm

Beton cyclope isian sumuran P1


64 hrs
dan P2 t:135 cm

Beton kedap air K250 isian


8 hrs
sumuran P1 dan P2

Pondasi tapak uk. 140x140x40


32 hrs
cm

poor pondasi tapak uk.


16 hrs
100x100x40 cm
Stik kolom/pedestal uk. 35x35
8 hrs
cm

Stik kolom/pedestal uk.30x30


8 hrs
cm

Galian tanah pondasi 56 hrs

Urug bekas galian 16 hrs

Pasangan batu kosong 16 hrs


Pondasi batu gunung/kali 40 hrs

Galian tanah pondasi 24 hrs

Urug bekas galian 8 hrs

Pasir Alas pondasi 8 hrs

Beton cor lantai kerja t:10cm 8 hrs

Pasangan batu kosong 8 hrs

Pasangan batu bata 1:2 16 hrs

Plesteran batu bata 1:2 16 hrs

sloof beton uk. 30x40 cm 16 hrs

Kolom beton K1 uk. 35x35 cm 8 hrs

Kolom beton k2 uk. 30x30 cm 8 hrs

Kolom praktis tangga uk. 13x13


8 hrs
cm

Balok Lantai BL1. uk. 25x40 cm 30 hrs

Balok Lantai BL2. uk. 30x60 cm 8 hrs

Balok latai BLT1 uk. 13x15 cm 8 hrs

Balok latai BLT2. uk. 13x20 cm 8 hrs

Plat lantai beton bertulang t:12


16 hrs
cm

Plat kanopy teras beton bertulang


8 hrs
t:10 cm

Balok bordes BT1 uk. 20x30 cm 8 hrs

Plat beton bertulang tangga 8 hrs

Pasangan bata 1:2 8 hrs


Pasangan Bata 1:4 24 hrs

Plesteran 1:2 8 hrs

Plesteran 1:4 8 hrs

Tanah urug dibawah lantai, ram


16 hrs
dan tangga

Pasir urug dibawah lantai, ram


8 hrs
dan tangga
Beton cor lantai, ram dan tangga
16 hrs
t=5 cm + acian
Pengad. Kusen, daun pintu dan
ventilasi UPVC type P1 + 8 hrs
acsesories terpasang
Pengad. Kusen, daun pintu dan
ventilasi UPVC type P2 + 8 hrs
acsesories terpasang

Pengad. Kusen, daun pintu dan


ventilasi UPVC type J1 + 8 hrs
acsesories terpasang

plafond PVC t:6 mm, rangka


furing dan list profil terpasang 8 hrs
ruangan
plafond PVC t:6 mm, rangka
furing dan list profil terpasang luar 8 hrs
ruangan
Instalasi pipa air bersih PVC
3/4" type AW + konekting ke 8 hrs
Intalasi Pipa induk existing
Instalasi pipa air kotor 3" type
8 hrs
AW
wastafel keramik + keran air
(Lengkap accessories) setara 8 hrs
America Standart
Cat dinding sloof, kolom dan
16 hrs
balok lantai

Cat lisplank 8 hrs

6.684
Kepala Tukang
hrs
Pengukuran dan pemasangan
16 hrs
bouwplank

Biaya Administrasi pelaporan &


336 hrs
dokumentasi
Pembongkaran/penebangan
16 hrs
pohon existing dan pembuangan
Pembongkaran dan pembuangan
hasil bongkaran bangunan rumah 16 hrs
existing

pekerjaan persiapan 438 hrs

a. perizinan, ID, poster, Pelatihan


438 hrs
DLL
b. BPJS ketenagakerjaan dan
438 hrs
Kesehatan kerja

Alat pelindung diri 438 hrs

a. Helm pelindung ( Safety


438 hrs
Helmet)

b. Sarung Tangan (Safety Glove) 438 hrs

c. Sepatu Keselamatan (Safety


438 hrs
Shoes/boot)

d. Pelindung pernafasan dan


438 hrs
mulut (masker)

e. Rompi keselamatan kerja


438 hrs
(Safety vest)

Alat pelindung kerja 438 hrs

a. Pembatas area/ papan


438 hrs
informasi/rambu - rambu

Fasilitas sarana kesehatan 438 hrs

a. Peralatan P3K (kotak P3K,


438 hrs
obat luka,perban DLL)

Beton cor lantai kerja t:10 cm 8 hrs


Beton bertulang cincin sumuran
56 hrs
P1. k=250 t:15 cm
Beton bertulang cincin sumuran
16 hrs
P2. k=250 t:10 cm
Beton cyclope isian sumuran P1
64 hrs
dan P2 t:135 cm
Beton kedap air K250 isian
8 hrs
sumuran P1 dan P2
Pondasi tapak uk. 140x140x40
32 hrs
cm
poor pondasi tapak uk.
16 hrs
100x100x40 cm
Stik kolom/pedestal uk. 35x35
8 hrs
cm
Stik kolom/pedestal uk.30x30
8 hrs
cm

Pasangan batu kosong 16 hrs

Pondasi batu gunung/kali 40 hrs

Beton cor lantai kerja t:10cm 8 hrs

Pasangan batu kosong 8 hrs

Pasangan batu bata 1:2 16 hrs

Plesteran batu bata 1:2 16 hrs

sloof beton uk. 30x40 cm 16 hrs

Kolom beton K1 uk. 35x35 cm 8 hrs

Kolom beton k2 uk. 30x30 cm 8 hrs

Kolom praktis tangga uk. 13x13


8 hrs
cm

Balok Lantai BL1. uk. 25x40 cm 30 hrs

Balok Lantai BL2. uk. 30x60 cm 8 hrs

Balok latai BLT1 uk. 13x15 cm 8 hrs

Balok latai BLT2. uk. 13x20 cm 8 hrs


Plat lantai beton bertulang t:12
16 hrs
cm

Plat kanopy teras beton bertulang


8 hrs
t:10 cm

Balok bordes BT1 uk. 20x30 cm 8 hrs

Plat beton bertulang tangga 8 hrs

Pasangan bata 1:2 8 hrs

Pasangan Bata 1:4 24 hrs

Plesteran 1:2 8 hrs

Plesteran 1:4 8 hrs

Beton cor lantai, ram dan tangga


16 hrs
t=5 cm + acian
Pengad. Kusen, daun pintu dan
ventilasi UPVC type P1 + 8 hrs
acsesories terpasang
Pengad. Kusen, daun pintu dan
ventilasi UPVC type P2 + 8 hrs
acsesories terpasang
Pengad. Kusen, daun pintu dan
ventilasi UPVC type J1 + 8 hrs
acsesories terpasang

plafond PVC t:6 mm, rangka


furing dan list profil terpasang 8 hrs
ruangan

plafond PVC t:6 mm, rangka


furing dan list profil terpasang luar 8 hrs
ruangan
Instalasi pipa air bersih PVC
3/4" type AW + konekting ke 8 hrs
Intalasi Pipa induk existing
Instalasi pipa air kotor 3" type
8 hrs
AW
wastafel keramik + keran air
(Lengkap accessories) setara 8 hrs
America Standart
Cat dinding sloof, kolom dan
16 hrs
balok lantai

Cat lisplank 8 hrs

6.764
Tukang
hrs

Pengukuran dan pemasangan


16 hrs
bouwplank

Biaya Administrasi pelaporan &


336 hrs
dokumentasi
Pembongkaran/penebangan
16 hrs
pohon existing dan pembuangan
Pembongkaran dan pembuangan
hasil bongkaran bangunan rumah 16 hrs
existing

pekerjaan persiapan 438 hrs

a. perizinan, ID, poster, Pelatihan


438 hrs
DLL

b. BPJS ketenagakerjaan dan


438 hrs
Kesehatan kerja

Alat pelindung diri 438 hrs

a. Helm pelindung ( Safety


438 hrs
Helmet)

b. Sarung Tangan (Safety Glove) 438 hrs

c. Sepatu Keselamatan (Safety


438 hrs
Shoes/boot)
d. Pelindung pernafasan dan
438 hrs
mulut (masker)
e. Rompi keselamatan kerja
438 hrs
(Safety vest)

Alat pelindung kerja 438 hrs

a. Pembatas area/ papan


438 hrs
informasi/rambu - rambu
Fasilitas sarana kesehatan 438 hrs

a. Peralatan P3K (kotak P3K,


438 hrs
obat luka,perban DLL)

Beton cor lantai kerja t:10 cm 8 hrs

Beton bertulang cincin sumuran


56 hrs
P1. k=250 t:15 cm
Beton bertulang cincin sumuran
16 hrs
P2. k=250 t:10 cm

Beton cyclope isian sumuran P1


64 hrs
dan P2 t:135 cm

Beton kedap air K250 isian


8 hrs
sumuran P1 dan P2
Pondasi tapak uk. 140x140x40
32 hrs
cm
poor pondasi tapak uk.
16 hrs
100x100x40 cm
Stik kolom/pedestal uk. 35x35
8 hrs
cm
Stik kolom/pedestal uk.30x30
8 hrs
cm

Pasangan batu kosong 16 hrs

Pondasi batu gunung/kali 40 hrs


Beton cor lantai kerja t:10cm 8 hrs
Pasangan batu kosong 8 hrs
Pasangan batu bata 1:2 16 hrs
Plesteran batu bata 1:2 16 hrs
sloof beton uk. 30x40 cm 16 hrs
Kolom beton K1 uk. 35x35 cm 8 hrs

Kolom beton k2 uk. 30x30 cm 8 hrs

Kolom praktis tangga uk. 13x13


8 hrs
cm

Balok Lantai BL1. uk. 25x40 cm 30 hrs

Balok Lantai BL2. uk. 30x60 cm 8 hrs

Balok latai BLT1 uk. 13x15 cm 8 hrs


Balok latai BLT2. uk. 13x20 cm 8 hrs

Plat lantai beton bertulang t:12


16 hrs
cm
Plat kanopy teras beton bertulang
8 hrs
t:10 cm

Balok bordes BT1 uk. 20x30 cm 8 hrs


Plat beton bertulang tangga 8 hrs
Pasangan bata 1:2 8 hrs
Pasangan Bata 1:4 24 hrs

Plesteran 1:2 8 hrs


Plesteran 1:4 8 hrs
Beton cor lantai, ram dan tangga
16 hrs
t=5 cm + acian
Pengad. Kusen, daun pintu dan
ventilasi UPVC type P1 + 8 hrs
acsesories terpasang
Pengad. Kusen, daun pintu dan
ventilasi UPVC type P2 + 8 hrs
acsesories terpasang
Pengad. Kusen, daun pintu dan
ventilasi UPVC type J1 + 8 hrs
acsesories terpasang
plafond PVC t:6 mm, rangka
furing dan list profil terpasang 8 hrs
ruangan
plafond PVC t:6 mm, rangka
furing dan list profil terpasang luar 8 hrs
ruangan
Armatur 8 hrs

Lampu TL 2x14 watt LED, kap


lampu termasuk bola lampu, setara 8 hrs
RM philips accecories terpasang

lampu LED downlight 11 watt,


power saving, stainless steel, tutup
8 hrs
cover acrylic putih susu setara
philips terpasang
Instalasi titik penerangan,
instalasi termasuk kabel pembagi
NYA 1x1,5 mm dan kabel power
8 hrs
utama lampu NYM 2x2,5 mm
dalam pipa PVC fitting lampu dan
kelengakapan instalasi terpasang

saklar 8 hrs
saklar 1 gang merk setara
8 hrs
BROCO
saklar 2 gang merk setara
8 hrs
BROCO

STOP kontak setara BROCO 8 hrs

instalasi panel box induk, panel


distribusi & MCB lengkap 8 hrs
terpasang
Penyambungan arus listrik dari
dan ke gedung biaya
8 hrs
penyambungan terpasang
laboratorium termasuk kabel
Instalasi pipa air bersih PVC
3/4" type AW + konekting ke 8 hrs
Intalasi Pipa induk existing
Instalasi pipa air kotor 3" type
8 hrs
AW
wastafel keramik + keran air
(Lengkap accessories) setara 8 hrs
America Standart
Cat dinding sloof, kolom dan
16 hrs
balok lantai
Cat lisplank 8 hrs
6.996
Pekerja
hrs
Pengukuran dan pemasangan
16 hrs
bouwplank
Biaya Administrasi pelaporan &
336 hrs
dokumentasi
Pembongkaran/penebangan
16 hrs
pohon existing dan pembuangan
Pembongkaran dan pembuangan
hasil bongkaran bangunan rumah 16 hrs
existing
pekerjaan persiapan 438 hrs
a. perizinan, ID, poster, Pelatihan
438 hrs
DLL
b. BPJS ketenagakerjaan dan
438 hrs
Kesehatan kerja
Alat pelindung diri 438 hrs
a. Helm pelindung ( Safety
438 hrs
Helmet)

b. Sarung Tangan (Safety Glove) 438 hrs

c. Sepatu Keselamatan (Safety


438 hrs
Shoes/boot)
d. Pelindung pernafasan dan
438 hrs
mulut (masker)
e. Rompi keselamatan kerja
438 hrs
(Safety vest)

Alat pelindung kerja 438 hrs

a. Pembatas area/ papan


438 hrs
informasi/rambu - rambu
Fasilitas sarana kesehatan 438 hrs
a. Peralatan P3K (kotak P3K,
438 hrs
obat luka,perban DLL)
galian tanah pondasi 64 hrs
Urug bekas galian 24 hrs
Pasir alas Pondasi t- 5 cm 8 hrs
Beton cor lantai kerja t:10 cm 8 hrs
Beton bertulang cincin sumuran
56 hrs
P1. k=250 t:15 cm
Beton bertulang cincin sumuran
16 hrs
P2. k=250 t:10 cm
Beton cyclope isian sumuran P1
64 hrs
dan P2 t:135 cm
Beton kedap air K250 isian
8 hrs
sumuran P1 dan P2
Pondasi tapak uk. 140x140x40
32 hrs
cm
poor pondasi tapak uk.
16 hrs
100x100x40 cm
Stik kolom/pedestal uk. 35x35
8 hrs
cm
Stik kolom/pedestal uk.30x30
8 hrs
cm
Galian tanah pondasi 56 hrs
Urug bekas galian 16 hrs
Pasangan batu kosong 16 hrs
Pondasi batu gunung/kali 40 hrs
Galian tanah pondasi 24 hrs
Urug bekas galian 8 hrs
Pasir Alas pondasi 8 hrs
Beton cor lantai kerja t:10cm 8 hrs
Pasangan batu kosong 8 hrs
Pasangan batu bata 1:2 16 hrs
Plesteran batu bata 1:2 16 hrs
sloof beton uk. 30x40 cm 16 hrs
Kolom beton K1 uk. 35x35 cm 8 hrs

Kolom beton k2 uk. 30x30 cm 8 hrs

Kolom praktis tangga uk. 13x13


8 hrs
cm

Balok Lantai BL1. uk. 25x40 cm 30 hrs

Balok Lantai BL2. uk. 30x60 cm 8 hrs

Balok latai BLT1 uk. 13x15 cm 8 hrs

Balok latai BLT2. uk. 13x20 cm 8 hrs

Plat lantai beton bertulang t:12


16 hrs
cm
Plat kanopy teras beton bertulang
8 hrs
t:10 cm

Balok bordes BT1 uk. 20x30 cm 8 hrs


Plat beton bertulang tangga 8 hrs
Pasangan bata 1:2 8 hrs
Pasangan Bata 1:4 24 hrs
Plesteran 1:2 8 hrs
Plesteran 1:4 8 hrs
Tanah urug dibawah lantai, ram
16 hrs
dan tangga
Pasir urug dibawah lantai, ram
8 hrs
dan tangga
Beton cor lantai, ram dan tangga
16 hrs
t=5 cm + acian
Pengad. Kusen, daun pintu dan
ventilasi UPVC type P1 + 8 hrs
acsesories terpasang
Pengad. Kusen, daun pintu dan
ventilasi UPVC type P2 + 8 hrs
acsesories terpasang
Pengad. Kusen, daun pintu dan
ventilasi UPVC type J1 + 8 hrs
acsesories terpasang
plafond PVC t:6 mm, rangka
furing dan list profil terpasang 8 hrs
ruangan
plafond PVC t:6 mm, rangka
furing dan list profil terpasang luar 8 hrs
ruangan
Armatur 8 hrs

Lampu TL 2x14 watt LED, kap


lampu termasuk bola lampu, setara 8 hrs
RM philips accecories terpasang

lampu LED downlight 11 watt,


power saving, stainless steel, tutup
8 hrs
cover acrylic putih susu setara
philips terpasang

Instalasi titik penerangan,


instalasi termasuk kabel pembagi
NYA 1x1,5 mm dan kabel power
8 hrs
utama lampu NYM 2x2,5 mm
dalam pipa PVC fitting lampu dan
kelengakapan instalasi terpasang

saklar 8 hrs
saklar 1 gang merk setara
8 hrs
BROCO
saklar 2 gang merk setara
8 hrs
BROCO

STOP kontak setara BROCO 8 hrs

instalasi panel box induk, panel


distribusi & MCB lengkap 8 hrs
terpasang
Penyambungan arus listrik dari
dan ke gedung biaya
8 hrs
penyambungan terpasang
laboratorium termasuk kabel
Instalasi pipa air bersih PVC
3/4" type AW + konekting ke 8 hrs
Intalasi Pipa induk existing
Instalasi pipa air kotor 3" type
8 hrs
AW
wastafel keramik + keran air
(Lengkap accessories) setara 8 hrs
America Standart
Cat dinding sloof, kolom dan
16 hrs
balok lantai
Cat lisplank 8 hrs
Resource Name Work

Air 2

Beton cyclope isian sumuran P1 dan P2 t:135 cm 1

Beton cor lantai, ram dan tangga t=5 cm + acian 1

Batu Bata 4

Pasangan batu bata 1:2 1

Pasangan bata 1:2 1

Pasangan Bata 1:4 1

wastafel keramik + keran air (Lengkap accessories)


1
setara America Standart

Batu Kali / Batu Belah ( Sungai / Gunung ) 4

Beton cyclope isian sumuran P1 dan P2 t:135 cm 1

Pasangan batu kosong 1

Pondasi batu gunung/kali 1

Pasangan batu kosong 1

Batu Pecah 2-3 cm 0

Besi Beton Polos 1


Beton cyclope isian sumuran P1 dan P2 t:135 cm 1

Besi Beton Ulir 0

Besi Baut (Kuda-kuda) 5/8 -10" 0

Besi Plat strip 0

Cat Dasar 1

pasir alas pondasi 1

Cat Kayu/Minyak 0

Cat Menie 0

Cat Tembok Setara Nippon Paint 2

Cat dinding sloof, kolom dan balok lantai 1

Cat lisplank 1

Dempul Kayu 0

Floor Drain Steanlis Steel 0

Gip Sum ( 120 x 240 cm )Tebal 9 mm 0

Kawat Beton 0

Kaca Bening Uk. 5 mm 3

Pengad. Kusen, daun pintu dan ventilasi UPVC type


1
P1 + acsesories terpasang
Pengad. Kusen, daun pintu dan ventilasi UPVC type
1
P2 + acsesories terpasang
Pengad. Kusen, daun pintu dan ventilasi UPVC type
1
J1 + acsesories terpasang

Kait Angin 0

Kloset Jongkok Merk American Standart 0

Kerikil Beton 3.57

Beton cor lantai kerja t:10 cm 0.57

Beton cyclope isian sumuran P1 dan P2 t:135 cm 1

Beton cor lantai kerja t:10cm 1

Beton cor lantai, ram dan tangga t=5 cm + acian 1

Kerikil Beton 0

Kayu Dolken 8-10 cm, panjang 4 m 0

Kayu Klas I 0

Kayu Klas II 3

Pengad. Kusen, daun pintu dan ventilasi UPVC type


1
P1 + acsesories terpasang
Pengad. Kusen, daun pintu dan ventilasi UPVC type
1
P2 + acsesories terpasang
Pengad. Kusen, daun pintu dan ventilasi UPVC type
J1 + acsesories terpasang 1

Kayu Klas III 0

Kayu Untuk Perancah 0

Kayu Sembarang 0

Kran Air 0

Keramik Uk. 30 x 30 cm Polyshed 0

Keramik Uk. 30 x 30 cm Unpolyshed 0


Keramik Uk. 40 x 40 cm Polyshed 0

Keramik Unpolshed 40 x 40 cm 0

Kertas Amplas 0

Kuas 0

Lem Kayu 3

Pengad. Kusen, daun pintu dan ventilasi UPVC type


1
P1 + acsesories terpasang

Pengad. Kusen, daun pintu dan ventilasi UPVC type


1
P2 + acsesories terpasang

Pengad. Kusen, daun pintu dan ventilasi UPVC type


1
J1 + acsesories terpasang

Lampu HE 18 Watt 2

Lampu TL 2x14 watt LED, kap lampu termasuk bola 1


lampu, setara RM philips accecories terpasang

lampu LED downlight 11 watt, power saving,


stainless steel, tutup cover acrylic putih susu setara 1
philips terpasang

Lampu HE 24 Watt 0

List kayu Profil 0

Multipleks 9 mm 0

Multipleks 12 mm 0

Multipleks 4 mm 2

plafond PVC t:6 mm, rangka furing dan list profil 1


terpasang ruangan
plafond PVC t:6 mm, rangka furing dan list profil
1
terpasang luar ruangan

Minyak Cat 0

Minyak Bekisting 0

Pasir Pasang 8

Pondasi batu gunung/kali 1

Pasangan batu bata 1:2 1

Plesteran batu bata 1:2 1

Pasangan bata 1:2 1

Pasangan Bata 1:4 1

Plesteran 1:2 1

Plesteran 1:4 1

wastafel keramik + keran air (Lengkap accessories)


1
setara America Standart

Pasir Urug 8

Urug bekas galian 1

Urug bekas galian 1

Pasangan batu kosong 1

Urug bekas galian 1

Pasir Alas pondasi 1

Pasangan batu kosong 1


Tanah urug dibawah lantai, ram dan tangga 1

Pasir urug dibawah lantai, ram dan tangga 1

Pasir Beton 4.57

Pasir alas Pondasi t- 5 cm 1

Beton cor lantai kerja t:10 cm 0.57

Beton cyclope isian sumuran P1 dan P2 t:135 cm 1

Beton cor lantai kerja t:10cm 1

Beton cor lantai, ram dan tangga t=5 cm + acian 1

Papan Kayu Kelas III 0

Papan Lisplank Kayu Kelas I 0

Plamur 2

Cat dinding sloof, kolom dan balok lantai 1

Cat lisplank 1

Paku Kayu 5

Pengad. Kusen, daun pintu dan ventilasi UPVC type


1
P1 + acsesories terpasang

Pengad. Kusen, daun pintu dan ventilasi UPVC type


1
P2 + acsesories terpasang

Pengad. Kusen, daun pintu dan ventilasi UPVC type


1
J1 + acsesories terpasang

plafond PVC t:6 mm, rangka furing dan list profil


1
terpasang ruangan
plafond PVC t:6 mm, rangka furing dan list profil
terpasang luar ruangan 1

Paku Seng 0

Paku Skrup 0
Pipa PVC Ø 3 " 1

Instalasi pipa air kotor 3" type AW 1

Pipa PVC Ø 3/4 " 2

Instalasi titik penerangan, instalasi termasuk kabel


pembagi NYA 1x1,5 mm dan kabel power utama
1
lampu NYM 2x2,5 mm dalam pipa PVC fitting lampu
dan kelengakapan instalasi terpasang

Instalasi pipa air bersih PVC 3/4" type AW +


1
konekting ke Intalasi Pipa induk existing

Paving Block 0

Rabung Spandex 0,30 mm 0

Residu 0

Atap Seng Spandek Gelombang Kecil 0,30 mm 0

Saklar Tunggal 2

saklar 1

saklar 2 gang merk setara BROCO 1

Saklar Ganda 2

saklar 1

saklar 1 gang merk setara BROCO 1


Semen @ 40 Kg 0

Semen portland 11.57

Beton cor lantai kerja t:10 cm 0.57

Beton cyclope isian sumuran P1 dan P2 t:135 cm 1

Pondasi batu gunung/kali 1

Beton cor lantai kerja t:10cm 1

Pasangan batu bata 1:2 1

Plesteran batu bata 1:2 1

Pasangan bata 1:2 1

Pasangan Bata 1:4 1

Plesteran 1:2 1

Plesteran 1:4 1

Beton cor lantai, ram dan tangga t=5 cm + acian 1

wastafel keramik + keran air (Lengkap accessories)


1
setara America Standart

Semen Warna @ 50 Kg 0

Semen warna 0

Semen Putih @ 50 Kg 1

Beton kedap air K250 isian sumuran P1 dan P2 1

Semen Putih @ 50 Kg 0

Tanah Timbun 1
Tanah urug dibawah lantai, ram dan tangga 1

Titik Lampu + Instalasi 4

Instalasi titik penerangan, instalasi termasuk kabel


pembagi NYA 1x1,5 mm dan kabel power utama
1
lampu NYM 2x2,5 mm dalam pipa PVC fitting lampu
dan kelengakapan instalasi terpasang

STOP kontak setara BROCO 1

instalasi panel box induk, panel distribusi & MCB 1


lengkap terpasang
Penyambungan arus listrik dari dan ke gedung
biaya penyambungan terpasang laboratorium 1
termasuk kabel

Thinner 0

Wastafel Merk American Standard 1

wastafel keramik + keran air (Lengkap accessories)


1
setara America Standart

Beton K-250 19.88

Beton bertulang cincin sumuran P1. k=250 t:15 cm 1

Beton bertulang cincin sumuran P2. k=250 t:10 cm 1

Beton kedap air K250 isian sumuran P1 dan P2 1

Pondasi tapak uk. 140x140x40 cm 1


poor pondasi tapak uk. 100x100x40 cm 1
Stik kolom/pedestal uk. 35x35 cm 1
Stik kolom/pedestal uk.30x30 cm 1
sloof beton uk. 30x40 cm 1

Kolom beton K1 uk. 35x35 cm 1

Kolom beton k2 uk. 30x30 cm 1

Kolom praktis tangga uk. 13x13 cm 1

Balok Lantai BL1. uk. 25x40 cm 1.88

Balok Lantai BL2. uk. 30x60 cm 1

Balok latai BLT1 uk. 13x15 cm 1


Balok latai BLT2. uk. 13x20 cm 1

Plat lantai beton bertulang t:12 cm 1

Plat kanopy teras beton bertulang t:10 cm 1

Balok bordes BT1 uk. 20x30 cm 1

Plat beton bertulang tangga 1


Tulangan Ulir 18.88

Beton bertulang cincin sumuran P1. k=250 t:15 cm 1

Beton bertulang cincin sumuran P2. k=250 t:10 cm 1

Pondasi tapak uk. 140x140x40 cm 1

poor pondasi tapak uk. 100x100x40 cm 1

Stik kolom/pedestal uk. 35x35 cm 1

Stik kolom/pedestal uk.30x30 cm 1

sloof beton uk. 30x40 cm 1

Kolom beton K1 uk. 35x35 cm 1

Kolom beton k2 uk. 30x30 cm 1

Kolom praktis tangga uk. 13x13 cm 1

Balok Lantai BL1. uk. 25x40 cm 1.88

Balok Lantai BL2. uk. 30x60 cm 1


Balok latai BLT1 uk. 13x15 cm 1

Balok latai BLT2. uk. 13x20 cm 1

Plat lantai beton bertulang t:12 cm 1

Plat kanopy teras beton bertulang t:10 cm 1

Balok bordes BT1 uk. 20x30 cm 1

Plat beton bertulang tangga 1

Tulangan Polos 18.88

Beton bertulang cincin sumuran P1. k=250 t:15 cm 1

Beton bertulang cincin sumuran P2. k=250 t:10 cm 1

Pondasi tapak uk. 140x140x40 cm 1

poor pondasi tapak uk. 100x100x40 cm 1

Stik kolom/pedestal uk. 35x35 cm 1

Stik kolom/pedestal uk.30x30 cm 1

sloof beton uk. 30x40 cm 1

Kolom beton K1 uk. 35x35 cm 1

Kolom beton k2 uk. 30x30 cm 1

Kolom praktis tangga uk. 13x13 cm 1

Balok Lantai BL1. uk. 25x40 cm 1.88

Balok Lantai BL2. uk. 30x60 cm 1


Balok latai BLT1 uk. 13x15 cm 1

Balok latai BLT2. uk. 13x20 cm 1

Plat lantai beton bertulang t:12 cm 1

Plat kanopy teras beton bertulang t:10 cm 1

Balok bordes BT1 uk. 20x30 cm 1

Plat beton bertulang tangga 1

Bekisting & Perawatan 18.88

Beton bertulang cincin sumuran P1. k=250 t:15 cm 1

Beton bertulang cincin sumuran P2. k=250 t:10 cm 1

Pondasi tapak uk. 140x140x40 cm 1

poor pondasi tapak uk. 100x100x40 cm 1

Stik kolom/pedestal uk. 35x35 cm 1


Stik kolom/pedestal uk.30x30 cm 1
sloof beton uk. 30x40 cm 1
Kolom beton K1 uk. 35x35 cm 1

Kolom beton k2 uk. 30x30 cm 1

Kolom praktis tangga uk. 13x13 cm 1

Balok Lantai BL1. uk. 25x40 cm 1.88

Balok Lantai BL2. uk. 30x60 cm 1

Balok latai BLT1 uk. 13x15 cm 1

Balok latai BLT2. uk. 13x20 cm 1

Plat lantai beton bertulang t:12 cm 1

Plat kanopy teras beton bertulang t:10 cm 1

Balok bordes BT1 uk. 20x30 cm 1


Plat beton bertulang tangga 1
Bulan Maret April
WBS Uraian Pekerjaan Durasi Biaya Bobot 22 23 24 25 26 27 29 30 31 1 2 3 5 6 7 8 9 10 12 13 14 15 16 17 19 20 21 22 23 24 26 27
(Hari) (Rp) (%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Div.A PEK. PERSIAPAN
Div. A1 PEK. PERSIPAN UMUM
1 Pengukuran daan Pemasangan Bouwplank 1 Rp 3,500,000 0.164584 0.164584
2 Biaya Administrasi Pelaporan & Dokumentasi 42 Rp 5,000,000 0.235119 0.005598 0.0055981 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598
3 Pembongkaran/Penebangan Pohon Existing dan Pembuangan
2 Rp 5,000,000 0.235119 0.11756 0.11756
Pembongkaran dan Pembuangan Hasil Bongkaran Bangunan
4
Rumah Existing 2 Rp 12,000,000 0.564286 0.2821432 0.282143

PEK. KESELAMATAN DAN KESEHATAN KERJA


Div. A2
KONSTRUKSI (RK3K) 1
1 Pekerjaan Persiapan 84
a. Perizinan, ID, poster, Pelatihan DLL 84 Rp 500,000 0.023512 0.00028 0.00028 0.0002799 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028
b. BPJS Ketenagakerjaan dan Kesehatan Kerja 84 Rp 1,500,000 0.070536 0.00084 0.00084 0.0008397 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084
2 Alat Pelindung Diri 84
a. Helm Pelindung (Safety Helmet) 84 Rp 600,000 0.028214 0.000336 0.000336 0.0003359 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336
b. Sarung Tangan (Safety Glove) 84 Rp 280,000 0.013167 0.000157 0.000157 0.0001567 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157
c. Sepatu Keselamatan (Safety Shoes/Boot) 84 Rp 960,000 0.045143 0.000537 0.000537 0.0005374 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537
d. Pelindung Pernafasan dan Mulut (Masker) 84 Rp 80,000 0.003762 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05
e. Rompi Keselamatan Kerja (Safety Vest) 84 Rp 320,000 0.015048 0.000179 0.000179 0.0001791 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 2.3900 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179
3 Alat Pelindung Kerja 84
a. Pembatas Area/Papan Petunjuk/Rambu-Rambu 84 Rp 500,000 0.023512 0.00028 0.00028 0.0002799 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028
4 Fasilitas Sarana Kesehatan 84
a. Perlatan P3K (Kotak P3K, Obat Luka, Perban dll) 84 Rp 500,000 0.023512 0.00028 0.00028 0.0002799 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028

Div. B PEK. STRUKTUR BANGUNAN BAWAH/PONDASI


Pondasi Sumuran & Tapak
1 Galian Tanah Pondasi 8 Rp 12,692,613 0.596856 0.074607 0.074607 0.074607 0.074607 0.074607 0.074607 0.074607 0.074607
2 Urug Bekas Galian 3 Rp 1,478,917 0.069544 0.023181 0.023181 0.023181
3 Pasir Alas Pondasi t-5 cm 1 Rp 573,695 0.026977 0.026977
4 Beton Cor Lantai Kerja t : 10 cm 1 Rp 4,693,865 0.220724 0.220724
5 Beton Bertulang Cincin Sumuran P1. k=250 t : 15 cm 7 Rp 164,455,041 7.733311 1.104759 1.104759 1.104759 1.104759 1.104759 1.104759 1.104759

6 Beton Bertulang Cincin Sumuran P2. k=250 t : 10 cm


2 Rp 26,129,435 1.228707 0.614353 0.614353
7 Beton Cyclope isian sumuran P1 dan P2 t ; 135 cm 8 Rp 44,318,390 2.084022 0.260503 0.260503 0.260503 0.260503 0.260503 0.260503 0.260503 0.260503
8 Beton Kedap Air K. 250 isian sumuran P1 dan P1 1 Rp 13,566,641 0.637956 0.637956
9 pondasi tapak uk. 140x140x40 cm 4 Rp 95,391,629 4.485683 1.121421 1.121421 1.121421 1.121421
10 Poor pondasi tapak uk. 100x100x40 cm 2 Rp 15,423,183 0.725258 0.362629 0.362629
11 Stik Kolom/Pedestal uk. 35x35 cm 1 Rp 13,770,427 0.647539 0.647539
12 Stik Kolom/Pedestal uk. 30x30 cm 1 Rp 3,999,012 0.188049 0.188049
Pondasi Batu Gunung
1 Galian Tanah Pondasi 7 Rp 3,904,497 0.183605 0.026229 0.026229 0.026229 0.026229 0.026229 0.026229 0.026229
2 Urug Bekas Galian 2 Rp 454,766 0.021385 0.010692 0.010692
3 Pasir Alas Pondasi 1 Rp 1,001,062 0.047074 0.047074
4 Pasangan Batu Kosong 2 Rp 5,866,927 0.275886 0.137943 0.137943
5 Pondasi Batu Gunung/Kali 5 Rp 35,093,874 1.650249 0.33005 0.33005 0.33005 0.33005 0.33005

Pondasi Sloof Gantung Trap Tangga, Ram

1 Galian Tanah Pondasi 3 Rp 616,158 0.028974 0.009658 0.009658 0.009658


2 Urug Bekas Galian 1 Rp 49,611 0.002333 0.002333
3 Pasir Alas Pondasi 1 Rp 311,235 0.014635 0.014635
4 Beton Cor Lantai Kerja t : 10 cm 1 Rp 2,536,967 0.119298 0.119298
5 Pasangan Batu Kosong 1 Rp 1,534,846 0.072174 0.072174
6 Paangan Batu Bata 1 : 2 2 Rp 1,174,465 0.055228 0.027614 0.027614
7 Plesteran Batu Bata 1 : 2 2 Rp 1,239,221 0.058273 0.029136 0.029136

Div. C PEKERJAAN LANTAI I


Div. C1 PEK. STRUKTUR BANGUNAN
1 Sloof Beton uk. 30 x 40 cm 2 Rp 110,573,889 5.199611 2.599806 2.599806
2 Kolom beton K1 uk. 35x35 cm 3 Rp 96,659,957 4.545324 1.515108 1.515108 1.515108
3 Kolom beton K2 uk. 30x30 cm 10 Rp 24,903,882 1.171077 0.117108 0.117108
4 Kolom Praktis Tangga uk. 13x13 cm 10 Rp 545,728 0.025662
5 Balok Lantai BL1. uk. 25x40 cm 7 Rp 109,692,253 5.158153
6 Balok Lantai BL2. uk. 30x60 cm 7 Rp 21,316,758 1.002396
7 Balok latai BLT1 uk. 13x15 cm 8 Rp 9,240,410 0.43452
8 Balok latai BLT2 uk. 13x20 cm 7 Rp 5,394,685 0.253679
9 Plat lantai Beton Bertulang, t : 12 cm 5 Rp 153,911,693 7.237522
10 Plat Kanopy Teras Beton Bertulang t : 10 cm 4 Rp 6,987,004 0.328556
11 Balok Bordes BT1. uk. 20x30 cm 3 Rp 2,040,410 0.095948
12 Plat Beton Bertulang Tangga 4 Rp 10,175,888 0.47851 0.119627

Div.C2 PEK. PASANGAN DINDING


1 Pasangan Bata 1 : 2 6 Rp 5,032,188 0.236633 0.039439
2 Pasangan Bata 1 : 4 8 Rp 33,828,903 1.590766 0.198846 0.198846
3 Plesteran 1 : 2 1 Rp 5,306,387 0.249527 0.249527
4 Plesteran 1 : 4 1 Rp 35,764,991 1.681808

Div. C3 PEK. PENUTUP LANTAI


1 Tanah Urug Dibawah Lantai, Ram dan Tangga 2 Rp 8,346,922 0.392504 0.196252 0.196252
2 Pasir Urug Dibawah Lantai, Ram dan Tangga 1 Rp 5,890,240 0.276982 0.276982
3 Beton Cor Lantai, Ram dan Tangga t = 5 cm + Acian 2 Rp 12,048,219 0.566554 0.283277 0.283277

Div. C4 PEK. KUSEN PINTU & JENDELA


Spesifikasi Kusen pintu/jendela/Ventilasi dan daun
pintu/jendela rangka menggunakan UPVC 'dan acsesories
antara lain : kunci 2 slaag, engsel pintu/jendela, grendel,
hak angin, kaca tebal 5 mm biaya sudah termasuk
material, mobilisasi serta pemasangan.

Pengad. kusen, daun pintu dan Ventilasi UPVC Type P1 +


1
Acsesories Terpasang
1 Rp 10,048,500 0.472519 0.472519
Pengad. kusen, daun pintu dan Ventilasi UPVC Type P2 +
2
Acsesories Terpasang
1 Rp 11,236,500 0.528384 0.528384
Pengad. kusen, daun pintu dan Ventilasi UPVC Type J1 +
3
Acsesories Terpasang 1 Rp 63,655,000 2.993304 2.993304

Div. C6 PEK. PLAFOND


Plafond PVC t : 6 mm, Rangka furing dan List Profile
1
Terpasang Ruangan 1 Rp 28,985,400 1.363005
Plafond PVC t : 6 mm, Rangka furing dan List Profile
2
Terpasang Luar Ruangan
1 Rp 15,789,600 0.742488

Div. C7 PEK. INSTALASI LISTRIK


1 Armatur

Lampu TL 2 x 14 Watt LED, Kap Lampu Termasuk Bola


Lampu, Setara RM Philips Accecories Terpasang
1 Rp 5,160,000 0.242643

Lampu LED Downlight 11 Watt, Power Saving, Stainless


Steel, Tutup Cover Acrylic Putih Susu Setara Philips
Terpasang
1 Rp 1,610,000 0.075708
Instalasi titik penerangan, instalasi termasuk kabel Pembagi
NYA 1x1.5 mm dan Kable Power Utama Lampu NYM
2x2.5 mm dlm pipa PVC fitting lampu dan kelengkapan
instalasi terpasang
1 Rp 3,040,000 0.142953

Instalasi titik kontak, instalasi termasuk kabelnya 2,5 mm


dlm pipa conduit PVC Dan kelengkapan instalasi terpasang
1 Rp 1,920,000 0.090286
4 Saklar -
- Saklar 1 Gang merk setara BROCO 1 Rp 90,000 0.004232
- Saklar 2 Gang merk setara BROCO 1 Rp 56,000 0.002633
- STOP Kontak Setara BROCO 1 Rp 360,000 0.016929
Instalasi Panel Box Induk, Panel Distribusi & MCB
5
Lengkap Terpasang 1 Rp 4,300,000 0.202203
Penyambugan Arus Listrik dari dan Ke Gedung Biaya
6
penyambungan Terpasanglaboratorium Termasuk Kable dan
1 Rp 2,800,000 0.131667

Div. C8 PEK. INSTALASI AIR BERSIH & AIR KOTOR

Instalasi Pipa Air Bersih PVC Ø 3/4" type AW + Konekting


1
Ke Intalasi Pipa Induk Existing 1 Rp 1,136,520 0.053444

2 Instalasi Pipa Air Kotor PVC Ø 3" type AW


1 Rp 5,154,600 0.242389
Whestafel Keramik + Kran Air (Lengkap Acessories) Setara
3
America Standart 1 Rp 4,140,345 0.194695

Div. C9 PEK. PENGECATAN


1 Cat Dinding, Sloof, Kolom dan Balok Lantai 2 Rp 30,795,933 1.448144
2 Cat Lisplank 1 Rp 950,404 0.044692

Div. D PEKERJAAN LANTAI II


Div. D1 PEK. STRUKTUR BANGUNAN
1 Kolom beton K1 uk. 35x35 cm 9 Rp 60,145,589 2.828278 0.314253
2 Kolom beton K2 uk. 30x30 cm 9 Rp 20,781,081 0.977207 0.108579
3 Kolom Praktis Ikatan Angin uk. 13x13 cm 5 Rp 545,728 0.025662 0.005132
4 Ring Balok RB1. uk. 20x30 cm 7 Rp 42,697,156 2.007785
5 Balok latai BLT1 uk. 13x15 cm 5 Rp 10,101,804 0.475026
6 Balok Top gevel/Tombak Layar uk. 13x15 cm
3 Rp 2,505,874 0.117836

Div. D2 PEK. PASANGAN DINDING


1 Pasangan Bata 1 : 4 4 Rp 36,245,920 1.704423
2 Plesteran Bata 1 : 4 2 Rp 38,319,583 1.801935

Div. D3 PEK. PENUTUP LANTAI


1 Pas. Keramik lantai ruangan uk. 40x40 cm Polished 2 Rp 42,972,686 2.020742
2 Pas. Keramik lantai Teras uk. 40x40 cm Unpholised 1 Rp 13,144,376 0.618099
4 Pas. Glass Block ruang tangga 1 Rp 440,000 0.02069

Div. C4 PEK. KUSEN PINTU & JENDELA


Spesifikasi Kusen pintu/jendela/Ventilasi dan daun
pintu/jendela rangka menggunakan UPVC 'dan acsesories
antara lain : kunci 2 slaag, engsel pintu/jendela, grendel,
hak angin, kaca tebal 5 mm biaya sudah termasuk
material, mobilisasi serta pemasangan.

Pengad. kusen, daun pintu dan Ventilasi UPVC Type P1 +


1
Acsesories Terpasang 1 Rp 15,064,500 0.708391
Pengad. kusen, daun pintu dan Ventilasi UPVC Type J1+
2
Acsesories Terpasang 1 Rp 72,435,000 3.406173
Peng. Ventilasi Lubang Angin UPVC + Accessories
3
Terpasang 1 Rp 2,320,000 0.109095

Div. D5 PEK. PENUTUP ATAP


ATAP UTAMA
Spesifikasi material rangka baja ringan C 100 dan C 75,

penutup atap seng Spandek 0,30 mm dan rabung seng


Spandek pembiayaan meliputi biaya pengadaan material,

mobilisasi dan pemasangan/perakitan Terpasang


1 Rangka Kuda-Kuda Baja Ringan Smartruss 1 Rp 56,281,750 2.646585
2 Atap Seng Spandex Gelombang Kecil 0,30 mm 3 Rp 49,448,951 2.325281
3 Rabung Atap Seng Spandek 0.30 mm 3 Rp 8,767,290 0.412272
4 Papan Lisplank Kayu Klas II uk. 2,5/30 cm 2 Rp 8,718,351 0.409971
ATAP KANOPY
1 Rangka Kuda-kuda Kayu uk=5/10 cm Klas II 2 Rp 345,550 0.016249
2 Gording Kayu uk=5/7 cm Klas II 2 Rp 436,487 0.020525
3 Atap Seng Spandex Gelombang Kecil 0,30 mm 1 Rp 1,039,555 0.048884
4 Papan Lisplank Kayu Klas II uk. 2,5/30 cm 1 Rp 967,694 0.045505

Div. C6 PEK. PLAFOND


Plafond PVC t : 6 mm, Rangka furing dan List Profile
1
Terpasang Ruangan 1 Rp 32,097,600 1.509353
Plafond PVC t : 6 mm, Rangka furing dan List Profile
2
Terpasang Luar Ruangan 1 Rp 24,908,400 1.171289

Div. D7 PEK. INSTALASI LISTRIK


1 Armatur
Lampu TL 2 x 14 Watt LED, Kap Lampu Termasuk Bola
Lampu, Setara RM Philips Accecories Terpasang
1 Rp 7,740,000 0.363965
Lampu LED Downlight 11 Watt, Power Saving, Stainless
Steel, Tutup Cover Acrylic Putih Susu Setara Philips
Terpasang
1 Rp 1,150,000 0.054077
Instalasi titik penerangan, instalasi termasuk kabel Pembagi
NYA 1x1.5 mm dan Kable Power Utama Lampu NYM
2 2x2.5 mm dlm pipa PVC fitting lampu dan kelengkapan
instalasi terpasang
1 Rp 3,680,000 0.173048
Instalasi titik kontak, instalasi termasuk kabelnya 2,5 mm
dlm pipa conduit PVC Dan kelengkapan instalasi terpasang
3
1 Rp 1,920,000 0.090286
4 Saklar
- Saklar 2 gang merk Setara BROCO 1 Rp 72,000 0.003386
- Stop Kontak Setatra BROCO 1 Rp 336,000 0.0158
5 Box zekering MCB lengkap 1 Rp 450,000 0.021161

Div. D8 PEK. PENGECATAN


1 Cat Dinding, Kolom, Balok Latey dan Reng Balok 3 Rp 24,592,297 1.156425
2 Cat Lisplank 2 Rp 2,765,350 0.130037

Div. E PEK. LAIN-LAIN


Realing Tangga & Selasar LT. 2 Besi steanliss Ø 2 Inchi
4
Terpasang 1 Rp 4,332,000 0.203707
7 Pembersihan Akhir 1 Rp 1,000,000 0.047024
Jumlah Harga Rp 2,126,579,979 100
Jumlah Bobot Pekerjaan
Rencana Kemajuan Pekerjaan Mingguan 0.120493 0.126091 0.2906746 0.290675 0.173115 0.008531 1.838138 1.976081 1.361727 1.746861 1.567358 1.567358 1.567358 0.460262 1.592198 0.279727 0.609056 2.731029 0.296648 1.780698 1.78222 1.419591 1.132285 0.008531 2.804589 2.804589 0.285513 1.806916 1.806916 1.877331 0.68259 4.443451
Rencana Kemajuan Pekerjaan Kumulatif 0.120493 0.246584 0.5372588 0.827933 1.001048 1.00958 2.847718 4.823798 6.185525 7.932386 9.499744 11.0671 12.63446 13.09472 14.68692 14.96665 15.5757 18.30673 18.60338 20.38408 22.1663 23.58589 24.71817 24.72671 27.53129 30.33588 30.6214 32.42831 34.23523 36.11256 36.79515 41.2386
Mei Juni
28 29 30 1 3 4 5 6 7 8 10 11 12 13 14 15 17 18 19 20 21 22 24 25 26 27 28 29 31 1 2 3 4 5 7 8 9 10 11 12 13 14 15
33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75

0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598 0.005598

0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.0002799 0.00028 0.0002799 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028
0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.0008397 0.00084 0.00083971 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084

0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.4000 0.000336 0.000336 0.000336 0.000336 0.000336 0.0003359 0.000336 0.00033588 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336
0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.0001567 0.000157 0.00015675 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 3.291 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157
0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.0005374 0.000537 0.00053742 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537
4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 2.4000 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.47846E-05 0.4000 4.478E-05 4.478E-05 4.478E-05 4.478E-05 5.0000 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.0000 4.478E-05 4.478E-05 4.478E-05 4.478E-05
0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.0001791 0.000179 0.00017914 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179

0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.0002799 0.00028 0.0002799 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028

0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.0002799 0.00028 0.0002799 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028

0.117108 0.117108 0.117108 0.117108 0.117108 0.117108 0.117108 0.117108


0.002566 0.002566 0.002566 0.002566 0.002566 0.002566 0.002566 0.002566 0.002566 0.002566
0.736879 0.736879 0.736879 0.736879 0.736879 0.736879 0.736879
0.143199 0.14319946 0.143199 0.143199 0.143199 0.143199 0.143199
0.054315 0.054315 0.054315 0.054315 0.054315 0.054315 0.054315 0.054315
0.03624 0.03624 0.03624

0.082139
0.031983

0.198846

1.681808
1.363005

0.742488

0.242643

0.075708

0.142953

0.090286

0.004232
0.002633
0.016929

0.202203

0.131667

0.053444

0.242389

0.194695

0.724072 0.724072
0.044692

0.286826
0.095005

0.039279

0.426106 0.426106
0.900967 0.900967

1.010371 1.010371
0.618099
0.02069

0.708391

3.406173
0.109095

2.646585

0.775094 0.775094 0.775094


0.137424 0.137424 0.137424
0.204985 0.204985

0.008125 0.008125
0.010263

0.048884
0.045505

1.509353

1.171289

0.363965

0.054077

0.173048

0.090286

0.003386
0.0158
0.021161

0.385475 0.385475 0.3854749


0.065019 0.065019

0.2037074
0.04702386

0.356467 0.698306 1.807447 0.894403 0.849711 0.125639 0.125639 0.125639 0.011098 0.011098 0.011098 2.537099 5.564518 1.001472 3.593249 1.673248 3.662456 0.946832 2.070381 1.701214 3.670945 1.66652 1.190306 1.190306 1.3289947 0.146133 0.19315672 0.546088 0.146133 0.146133 0.146133 0.146133 5.057204 0.057248 0.057248 0.057248 3.348092 0.057248 4.057204 0.057248 0.039173 0.039173 0.039173
41.59507 42.29338 44.10082 44.99523 45.84494 45.97058 46.09622 46.22185 46.23295 46.24405 46.25515 48.79225 54.35676 55.35824 58.95149 60.62473 64.28719 65.23402 67.3044 69.00562 72.67656 74.34308 75.53339 76.72369 78.052688 78.19882 78.3920 78.9381 79.0842 79.2303 79.3765 79.5226 84.5798 84.6370 84.6943 84.7515 88.0996 88.1569 92.2141 92.2713 92.3105 92.3497 92.3889
Juni
16 17 18 19 21 22 23 24 25
76 77 78 79 80 81 82 83 84

0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.000279904


0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.00084 0.000839712

0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000336 0.000335885


0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.000157 0.2023
0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537 0.000537416
4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.478E-05 4.47846E-05
0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179 0.000179139

0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.000279904

0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.00028 0.000279904

0.03624 0.03624 0.03624 0.03624


1.447504 1.447504 1.447504 1.447504 1.447504389
0.039173 0.039173 0.039173 0.039173 1.450438 1.450438 1.450438 1.450438 1.652581036
92.4280 92.4672 92.5064 92.5456 93.9960 95.4464 96.8969 98.3473 100.000
Uraian Pekerjaan Days Critical
Pengukuran dan Pemasangan Bouwplank 1 Yes
Pembongkaran/penebangan pohon existing dan pembuangan 1 Yes
Pembongkaran dan pembuangan hasil bongkaran bangunan rumah existing 1 Yes
galian tanah pondasi 8 Yes
Pasir alas Pondasi t- 5 cm 1 Yes
Beton cor lantai kerja t:10cm 1 Yes
Pasangan batu kosong 2 Yes
Pasangan batu bata 1:2 2 Yes
Plesteran batu bata 1:2 2 Yes
sloof beton uk. 30x40 cm 2 Yes
Kolom beton K1 uk. 35x35 cm 3 Yes
Kolom beton k2 uk. 30x30 cm 10 Yes
Balok Lantai BL1. uk. 25x40 cm 7 Yes
Balok latai BLT1 uk. 13x15 cm 8 Yes
Plat lantai beton bertulang t:12 cm 5 Yes
Pengad. Kusen, daun pintu dan ventilasi UPVC type P1 + acsesories terpasang 1 Yes
Pengad. Kusen, daun pintu dan ventilasi UPVC type P2 + acsesories terpasang 1 Yes
Pengad. Kusen, daun pintu dan ventilasi UPVC type J1 + acsesories terpasang 1 Yes
Kolom beton K1 uk. 35x35 cm 9 Yes
Kolom beton k2. uk. 30x30 cm 9 Yes
Pasangan Bata 1:4 4 Yes
Plesteran Bata 1:4 2 Yes
Pas. Keramik Lantai ruangan uk. 40x40 cm Polished 2 Yes
Cat dinding, kolom, balok latey dan reng balok 3 Yes
Pembersihan Akhir. 1 Yes
87