HULS GROUP OF COMPANIES

MONTHLY TIME ATTENDANCE


NAME : Safwan Izzaty Saharuddin
POSITION : Surveyor
MONTH : Nov 2020

MORNING AFTERNOON
DATE REMARKS
IN OUT IN OUT
26 - 10 - 20 8.30 5.00 Drawing K.Kangsar Shop Drawing Rock Barrier

27 - 10 - 20 8.30 5.30 Asbuilt Ijok

28 - 10 - 20 8.30 5.00 Asbuilt Ijok

29 - 10 - 20 - - Maulidur Rasul

30 - 10 - 20 8.30 5.00 Drawing Ijok - Drawing Aswara

31 - 10 - 20 8.57 6.00 Drawing Ijok - Setting Out Lot 1125 & IRC

1 - 11 - 20 - - Sunday

2 - 11 - 20 8.30 5.00 Drawing Ijok - Drawing IRC

3 - 11 - 20 8.30 6.00 Shop Drawing Bahau - Setting Out & Aerial Photo IRC

4 - 11 - 20 8.40 6.00 Drawing IRC - Setting Out IRC

5 - 11 - 20 8.30 5.00 Asbuilt Progress REM DASH - Shop Drawing Bahau

6 - 11 - 20 9.10 5.00 Drawing Asbuilt Progress REM DASH

7 - 11 - 20 8.30 1.00 Setting Out Slope EKVE - Settlement Marker Aswara

8 - 11 - 20 - - Sunday

9 - 11 - 20 8.35 5.00 Settlement Marker Aswara Analysis - Drawing Landfill Johor

10 - 11 - 20 8.43 5.00 Revised Settlement Marker Aswara - Drawing IRC

11 - 11 - 20 8.30 5.00 Asbuilt Soil Cover EKVE and Drawing

12 - 11 - 20 - - AL

13 - 11 - 20 - - AL

14 - 11 - 20 - - Deepavali

15 - 11 - 20 - - Sunday

16 - 11 - 20 8.30 5.00 Drawing EKVE

17 - 11 - 20 8.30 5.00 Setting Out Slope EKVE

18 - 11 - 20 8.30 5.30 Drawing EKVE - Setting Out Jeram Pipeline

19 - 11 - 20 8.30 5.00 Drawing EKVE - Asbuilt Progress REM DASH

20 - 11 - 20 8.30 5.00 Setting Out IRC - Meeting Uniti Consultant

21 - 11 - 20 - - 3rd Saturday

22 - 11 - 20 - - Sunday

23 - 11 - 20 8.31 5.00 Drawing Asbuilt Progress REM DASH

24 11 20 8.40 7.00 Settlement Marker Aswara - Setting Out IRC

25 11 20 8.30 5.00 Review EKVE Geogridwall Proposed Drawing

Prepared by, Verified by,

Safwan Izzaty
Name : Safwan Izzaty Name :
Date : 26/11/2020 Date :