TIME  SHEET FOR THE  MONTH OF NOVEMBER 2022
CUSTOMER: AG PCS SITE CO‐ORDINATOR:  Mr.Binu
PROJECT    : 132/11kV   MRINACMNS/S  ENGINEER NAME:   Muralidharan.s
Date Time-In Time-Out Normal Hrs O.T Hrs SpecialO.T Hrs Job Details

1-Nov-22 07. 30 05. 30 10 ‐ ‐ Asbuilt drawing works ‐ 132kV SWGR  Internal


2-Nov-22 07. 30 05. 30 10 ‐ ‐ Asbuilt drawing works ‐ 132kV SWGR   Internal
3-Nov-22 07. 30 05. 30 10 ‐ ‐ Asbuilt drawing works ‐ 132kV SWGR & FAT MOM  ‐ 11KV SWGR
4-Nov-22 07. 30 05. 30 10 ‐ ‐ Asbuilt drawing works ‐ 132kV SWGR & FAT MOM  ‐ 11KV SWGR
5-Nov-22 ‐ ‐ ‐ ‐ ‐ ‐‐‐‐‐‐‐‐HOLIDAY‐‐‐‐‐‐‐‐‐‐
6-Nov-22 07. 30 05. 30 10 ‐ ‐ SANAD SS ‐ LVAC Installation checks
7-Nov-22 07. 30 05. 30 10 ‐ ‐ SANAD SS ‐ LVAC Installation checks
8-Nov-22 07. 30 05. 30 10 ‐ ‐ SANAD SS ‐ LVAC Installation checks
9-Nov-22 07. 30 05. 30 10 ‐ ‐ LVAC Energization works   Internal
10-Nov-22 07. 30 05. 30 10 ‐ ‐ LVAC Energization works   Internal
11-Nov-22 07. 30 05. 30 10 ‐ ‐ LVAC Energization works ‐ Witness
12-Nov-22 ‐ ‐ ‐ ‐ ‐ ‐‐‐‐‐‐‐‐HOLIDAY‐‐‐‐‐‐‐‐‐‐
13-Nov-22 07. 30 05. 30 10 ‐ ‐ As built drawing works  Internal
14-Nov-22 07. 30 05. 30 10 ‐ ‐ SANAD SS ‐ LVAC Installation checks
15-Nov-22 07. 30 05. 30 10 ‐ ‐ As built drawing works   Internal
16-Nov-22 07. 30 05. 30 10 ‐ ‐ As built drawing works   Internal
17-Nov-22 07. 30 05. 30 10 ‐ ‐ As built drawing works  Internal
18-Nov-22 07. 30 05. 30 10 ‐ ‐ As built drawing works   Internal
19-Nov-22 ‐ ‐ ‐ ‐ ‐
‐‐‐‐‐‐‐‐HOLIDAY‐‐‐‐‐‐‐‐‐‐

20-Nov-22 07. 30 05. 30 10 ‐ ‐


As built drawing works ‐ 132kV SWGR
And Record Room File works
As built drawing works ‐ 132kV SWGR
21-Nov-22 07. 30 05. 30 10 ‐ ‐
And Record Room File works
As built drawing works ‐ ET
22-Nov-22 07. 30 05. 30 10 ‐ ‐
And 132KV Cable HV Test MOS Preparation
23-Nov-22 07. 30 05. 30 10 ‐ ‐ LVAC Outgoing Cables Checks    Witness
24-Nov-22 07. 30 05. 30 10 ‐ ‐ HLDB Outgoing Cables Checks   Witness
25-Nov-22 07. 30 05. 30 10 ‐ ‐ LVAC Outgoing Cables Checks    Witness
26-Nov-22 ‐ ‐ ‐ ‐ ‐ ‐‐‐‐‐‐‐‐HOLIDAY‐‐‐‐‐‐‐‐‐‐
27-Nov-22 07. 30 05. 30 10 ‐ ‐ LVAC and HLDB Outgoing Cables Checks
28-Nov-22 07. 30 05. 30 10 ‐ ‐ LVAC and HLDB Outgoing Cables Checks Witness
29-Nov-22 07. 30 05. 30 10 ‐ ‐ HLDB Outgoing Cables Checks Witness
30-Nov-22 07. 30 05. 30 10 ‐ ‐ HLDB Outgoing Cables Checks Witness