Contractor Engineer Activity completed on dated 09/05/2022 Status DEWA Remarks
Witness
TCD Activity
2 no's of LV CB Link minor
1. IDT FAT MOM review. impressions, DEWA need
SUDARSHAN 2. IDT Site Note Review Witness INPROGRESS Mr. Gunashekaran clarification from OEM
3. IDT LV Cable Box Link Inspection
TPD Activity
MUZAMMIL 11kV BUSBAR PROTECTION DC SCEME Witness COMPLETED Mr. Murtaza
Contractor Engineer Plan for 10/05/2022 Internal / DEWA Remark
Witness
TCD Activity
SUDARSHAN IDT 1,2,3 Visual Inspection & IR Checks with DEWA Witness --
TPD Activity
MUZAMMIL 132 kv Relay panel DC Scheme checks Witness --
Internal /
Contractor Engineer Activity completed on dated 10/05/2022 Status DEWA Remarks
Witness
TCD Activity
SUDARSHAN IDT 1,2,3 Visual Inspection Witness COMPLETED Mr. Gunashekaran
TPD Activity
MUZAMMIL 132 kv Relay panel DC Scheme checks Internal COMPLETED
Internal /
Contractor Engineer Activity completed on dated 11/05/2022 Status DEWA Remarks
Witness
TCD Activity
SUDARSHAN Visual inspection comments- Site note preparation. Witness COMPLETED Mr. Gunashekaran
TPD Activity
MUZAMMIL 132 kv Relay panel DC Scheme checks (E06 & E03) Internal COMPLETED
PATRIS 11 kV Swgr DC Scheme checks Internal COMPLETED
Internal /
Contractor Engineer Activity completed on dated 12/05/2022 Status DEWA Remarks
Witness
TCD Activity
ET - 2,3MK Wiring checks Internal COMPLETED
SUDARSHAN
IDT - 1 MK Wiring checks Internal INPROGRESS
TPD Activity
MUZAMMIL 132 kv M1BBP DC Scheme checks Internal INPROGRESS
PATRIS 11 kV Swgr DC/TCS Scheme checks Internal INPROGRESS
Internal /
Contractor Engineer Activity completed on dated 13/05/2022 Status DEWA Remarks
Witness
TCD Activity
ET - 1 MK Wiring checks Internal COMPLETED
SUDARSHAN
IDT - 1 MK Wiring checks Internal INPROGRESS
TPD Activity
MUZAMMIL 132 kV M1BBP DC Scheme checks Internal INPROGRESS
PATRIS 11 kV Swgr DC/TCS Scheme checks Internal INPROGRESS
Internal /
Contractor Engineer Activity completed on dated 17/05/2022 Status DEWA Remarks
Witness
TCD Activity
SUDARSHAN ET - 1,2,3 MK Wiring checks, Ferrule replacement Internal INPROGRESS
TPD Activity
MUZAMMIL 11 kV IDT - 1 Incomer DC scheme checks Witness COMPLETED Mr. Venkatesh
Internal /
Contractor Engineer Activity completed on dated 18/05/2022 Status DEWA Remarks
Witness
TCD Activity
IDT - 1,2,3 HV BUSHING IR Checks Witness COMPLETED Mr. Anas
SUDARSHAN
IDT -1,2,3 HV BUSHING TANDELTA checks Witness COMPLETED Mr. Anas
TPD Activity
MUZAMMIL 11 kV DC Scheme Checks Witness COMPLETED Mr. Venkatesh Total 8 Nos. Feeder
Completed
PATRIS 11 kV DC Scheme Checks Witness COMPLETED Mr. Venkatesh
Internal /
Contractor Engineer Activity completed on dated 19/05/2022 Status DEWA Remarks
Witness
TCD Activity
IDT 1,2,3 Tan delta Test report, IR Report preparation Internal COMPLETED
SUDARSHAN
IDT - 1 Ferrule checks Internal INPROGRESS
TPD Activity
MUZAMMIL 11 kV DC Scheme Checks Witness COMPLETED Mr. Venkatesh Total 5 Nos. Feeder
Completed
PATRIS 11 kV DC Scheme Checks Witness COMPLETED Mr. Venkatesh
Internal /
Contractor Engineer Activity completed on dated 20/05/2022 Status DEWA Remarks
Witness
TCD Activity
SUDARSHAN Shunt Reactor documents preparation Internal INPROGRESS
TPD Activity
MUZAMMIL 11 kV DC Scheme Checks Witness COMPLETED Mr. Venkatesh Total 2 Nos. Feeder
Completed
PATRIS 11 kV DC Scheme Checks Witness COMPLETED Mr. Venkatesh
Internal /
Contractor Engineer Activity completed on dated 22/05/2022 Status DEWA Remarks
Witness
TCD Activity
SUDARSHAN Documents preparation Internal INPROGRESS
TPD Activity
PATRIS 11 kV FAT MOM,Site Note Verification Internal INPROGRESS
Internal /
Contractor Engineer Activity completed on dated 23/05/2022 Status DEWA Remarks
Witness
TCD Activity
SUDARSHAN IDT - 1 MK Wiring modification Internal INPROGRESS
TPD Activity
PATRIS 11 kV TCS Scheme Witness COMPLETED Venkatesh 7 Nos. Feeders
132kV E06 BusbarCoupler and E03 MRNAHRBR Feeder DC
MUZAMMIL Scheme Witness COMPLETED Venkatesh
Internal /
Contractor Engineer Activity completed on dated 24/05/2022 Status DEWA Remarks
Witness
TCD Activity
SHX - 1 & 2 Shock recorder Installation
SUDARSHAN SHX - 1 & 2 Core Clamp IR Checks Witness COMPLETED Mr. Sunil
TPD Activity
PATRIS 11 kV TCS Scheme Witness COMPLETED Mr. Venkatesh 6 Nos. Feeder
SHINE 132 kV M1/ M2 BBP DC Scheme Witness COMPLETED Mr. Venkatesh 2 Panel
Internal / DEWA
Contractor Engineer Plan for 25/05/2022 Remark
Witness
TCD Activity
SUDARSHAN ----- -- --
TPD Activity
MUZAMMIL LVAC DC Scheme Witness --
SHINE 11 kV TCS Scheme Witness --
Internal /
Contractor Engineer Activity completed on dated 25/05/2022 Status DEWA Remarks
Witness
TCD Activity
----- ----- ----- ----- -----
TPD Activity
SHINE 11 kV TCS Scheme Witness COMPLETED Mr. Venkatesh 6 Nos. Feeder
INCOMER-1 & BUS SECTION-2
MUZAMMIL LVAC DC Scheme Witness COMPLETED Mr. Venkatesh
Internal / DEWA
Contractor Engineer Plan for 26/05/2022 Remark
Witness
TCD Activity
SUDARSHAN IDT-1 OTI/WTI Calibration Witness --
TPD Activity
MUZAMMIL/PATRIS/ --
SHINE 11 kV TCS Scheme Witness
--
Internal /
Contractor Engineer Activity completed on dated 26/05/2022 Status DEWA Remarks
Witness
TCD Activity
SUDARSHAN IDT-1 OTI/WTI Calibration Witness Mr.Sunil -----
TPD Activity
SHINE Bacup relay communication/testing Internal INPROGRESS
PATRIS 11 kV TCS Scheme Witness COMPLETED Mr. Venkatesh 7 Nos. Feeder
MUZAMMIL 132KV IDT-1 & 2 DC Scheme Witness COMPLETED Mr. Venkatesh
Internal / DEWA
Contractor Engineer Plan for 27/05/2022 Remark
Witness
TCD Activity
SUDARSHAN IDT-2 OTI/WTI Calibration Witness --
TPD Activity
MUZAMMIL/PATRIS/ --
SHINE 132kV E04, E05 & E07 DC Scheme Witness
--
Internal /
Contractor Engineer Activity completed on dated 27/05/2022 Status DEWA Remarks
Witness
TCD Activity
SUDARSHAN IDT-2 OTI/WTI Calibration Witness COMPLETED Mr.Sunil
TPD Activity
SHINE
PATRIS 132kV Relay panel E04, E05, E05A , E07 & E07A DC Scheme Witness COMPLETED Mr. Venkatesh
MUZAMMIL
Internal /
Contractor Engineer Activity completed on dated 29/05/2022 Status DEWA Remarks
Witness
TCD Activity
SUDARSHAN IDT-3 OTI/WTI Calibration Internal COMPLETED
TPD Activity
SHINE LVAC relay final setting/ CEWE elite 440
calibration(manufacute coordination) Internal COMPLETED
PATRIS
Internal /
Contractor Engineer Activity completed on dated 30/05/2022 Status DEWA Remarks
Witness
TCD Activity
SUDARSHAN IDT-3 OTI/WTI Calibration Witness COMPLETED Mr. ANAS
TPD Activity
SHINE Bacup relay communication/testing Internal INPROGRESS
PATRIS
11 kV TCS Scheme Witness COMPLETED Mr. Venkatesh 13 Nos. Feeder
MUZAMMIL
Internal /
Contractor Engineer Activity completed on dated 31/05/2022 Status DEWA Remarks
TCD ActivityWitness
SHX- 1&2 Installation
SUDARSHAN SHX - 1 & 2 Core and Clamp IR Checks Witness COMPLETED Mr. ANAS
SHX - 1 & 2 Shock recorder removed and Data send to
Manufacturer
TPD Activity
SHINE 11kV Bus section fdrs vsr relay final setting WITNESS 1 no relay
PATRIS COMPLETED Mr. Venkatesh
11 kV TCS Scheme Witness 09 Nos. Feeder
MUZAMMIL
Internal /
Contractor Engineer Activity completed on dated 01/06/2022 Status DEWA Remarks
TCD ActivityWitness
SUDARSHAN IDT -3,2 WTI/RWTI Gradient test Witness COMPLETED Mr. ANAS
TPD Activity
SHINE 11kV Bus section fdrs vsr relay final setting WITNESS 1 no relay
PATRIS COMPLETED Mr. Venkatesh
11 kV TCS Scheme Witness 09 Nos. Feeder
MUZAMMIL
Internal /
Contractor Engineer Activity completed on dated 01/06/2022 Status DEWA Remarks
Witness
TCD Activity
SUDARSHAN IDT -3,2 WTI/RWTI Gradient test Witness COMPLETED Mr. ANAS
TPD Activity
SHINE 11kV Bus section fdrs vsr relay final setting WITNESS 2 no's relay
PATRIS COMPLETED Mr. Venkatesh
11 kV TCS Scheme Witness 08 Nos. Feeder
MUZAMMIL
Internal /
Contractor Engineer Activity completed on dated 02/06/2022 Status DEWA Remarks
Witness
TCD Activity
SUDARSHAN ------ ----- --- ----
TPD Activity
SHINE 11kV Bus section fdrs vsr relay final setting WITNESS 3 no's relay
PATRIS COMPLETED Mr. Venkatesh
11 kV TCS Scheme WITNESS 05 Nos. Feeder
MUZAMMIL
Internal /
Contractor Engineer Activity completed on dated 03/06/2022 Status DEWA Remarks
Witness
TCD Activity
IDT - 1 WTI/RWTI GRADIENT CHECKS
SUDARSHAN ET - 2 HV & LV Bushing fixing support modification done by Witness COMPLETED Mr. ANAS
OEM
TPD Activity
SHINE Relay documentation INTERNAL
Energy meter calibration(site note verification with
PATRIS manufacturer
INTERNAL
MUZAMMIL 132 kV TCS Scheme INTERNAL
Internal / DEWA
Contractor Engineer Plan for 05/06/2022 Remark
Witness
TCD Activity
SUDARSHAN ------ ----- --
TPD Activity
SHINE LVAC Relay checks INTERNAL --
PATRIS 132/11kV MCAG/MVTP31 Relay Testing INTERNAL --
Internal /
Contractor Engineer Activity completed on dated 06/06/2022 Status DEWA Remarks
Witness
TCD Activity
Murali O&M Manual Preparation Internal
TPD Activity
SHINE LVAC Backup Relay Communication/Testing INTERNAL
PATRIS 132/11kV MCAG/MVTP31 Relay Testing INTERNAL
MUZAMMIL 132 kV TCS Scheme INTERNAL
Internal /
Contractor Engineer Activity completed on dated 07/06/2022 Status DEWA Remarks
Witness
TCD Activity
Murali 1. 'LVAC O & M submitted to verification Internal 1. Completed
2. Capacitor Bank O & M Manual preparation 2. Inprogress
ET - 1,2,3 MOLG minimum oil level contact verified with
SUDARSHAN DEWA and OEM Witness COMPLETED Mr. Anas
ET- 2,3 Inspection cover gasket replaced and ET - 3 Core
clamp Bushing end gasket replaced.
TPD Activity
SHINE LVAC Relay checks INTERNAL
PATRIS 11 kV BBP relay final setting INTERNAL
Internal / DEWA
Contractor Engineer Plan for 08/06/2022 Remark
Witness
TCD Activity
1. 'IDT - 1 WTI/RWTICalibration checks
SUDARSHAN 2. 'WTI CT ratio Checks Witness --
Murali O&M Manual Preparation -- --
TPD Activity
SHINE LVAC Relay checks -- --
PATRIS 132/11kV MCAG/MVTP31 Relay Testing witness --
MUZAMMIL 132 kV TCS Scheme -- --
Internal /
Contractor Engineer Activity completed on dated 08/06/2022 Status DEWA Remarks
Witness
TCD Activity
Murali O&M Manual Preparation Internal --
SUDARSHAN IDT-1 - WTI Gradient checks Witness Mr. Anas
TPD Activity
SHINE LVAC Relay checks INTERNAL
PATRIS 11 kV BBP relay final setting/Primary Injection Preparation INTERNAL
Muzammil TPD Master Data Preparation INTERNAL
Internal / DEWA
Contractor Engineer Plan for 09/06/2022 Remark
Witness
TCD Activity
SUDARSHAN 'WTI CT ratio Checks Witness --
Murali O&M Manual Preparation -- --
TPD Activity
SHINE LVAC Relay checks -- --
PATRIS 132/11kV MCAG/MVTP31 Relay Testing -- --
MUZAMMIL 132 kV TCS Scheme -- --
Internal /
Contractor Engineer Activity completed on dated 09/06/2022 Status DEWA Remarks
Witness
TCD Activity
Murali O&M Manual Preparation Internal --
SUDARSHAN IDT-1,2,3 - WTI CT Ratio and Resitance checks Witness COMPLETED Mr. Anas
TPD Activity
SHINE LVAC Relay checks Witness COMPLETED Mr.Vasudevan 2 relays completed
PATRIS 132Kv BBP MCAG Relay Testing Witness COMPLETED Mr.Vasudevan
Muzammil 132 kV TCS Scheme - E06 Bus coupler Witness COMPLETED Mr.Vasudevan
Internal / DEWA
Contractor Engineer Plan for 10/06/2022 Remark
Witness
TCD Activity
SUDARSHAN IDT Device Wiring checks Internal --
Murali O&M Manual Preparation -- --
TPD Activity
SHINE LVAC Relay checks -- --
PATRIS 132kV MVTP31 Relay Testing -- --
MUZAMMIL 132 kV TCS Scheme -- --
Internal /
Contractor Engineer Activity completed on dated 10/06/2022 Status DEWA Remarks
Witness
TCD Activity
Murali O&M Manual Preparation Internal --
SUDARSHAN -- -- -- --
TPD Activity
SHINE LVAC Relay checks Witness COMPLETED Mr.Vasudevan 1 relay completed
PATRIS 132Kv BBP MVTP Relay Testing Witness COMPLETED Mr.Vasudevan
Muzammil 132 kV TCS Scheme - E06 Bus coupler Internal -- --
Internal / DEWA
Contractor Engineer Plan for 13/06/2022 Remark
Witness
TCD Activity
SUDARSHAN IDT Device Wiring checks Internal --
Murali O&M Manual Preparation -- --
TPD Activity
SHINE 11kV Backup Relay checks -- --
PATRIS 11kV MCAG/MVTP31 Relay Testing -- --
MUZAMMIL 132 kV TCS Scheme -- --
Internal /
Contractor Engineer Activity completed on dated 13/06/2022 Status DEWA Remarks
Witness
TCD Activity
Murali Documents preparation Internal --
SUDARSHAN ET-2 OTI/WTI Calibration Internal -- --
TPD Activity
PATRIS 11Kv BBP MCAG Relay Testing WITNESS COMPLETED Mr.Venkatesh
Muzammil 132 kV TCS Scheme - E03 MRNAHRBR FEEDER WITNESS COMPLETED Mr.Venkatesh
Internal / DEWA
Contractor Engineer Plan for 14/06/2022 Remark
Witness
TCD Activity
SUDARSHAN ET-2 OTI/WTI Calibration Internal --
Murali Documents preparation Internal --
TPD Activity
SHINE 11kV Backup Relay checks -- --
MUZAMMIL 132 kV TCS Scheme -- --
Internal /
Contractor Engineer Activity completed on dated 14/06/2022 Status DEWA Remarks
Witness
TCD Activity
Murali Documents preparation Internal --
SUDARSHAN ET-3 OTI/WTI Calibration Internal -- --
TPD Activity
SHINE 11kV Backup Relay checks INTERNAL -- --
Muzammil 132 kV TCS Scheme - E02 IDT-1 FEEDER WITNESS COMPLETED Mr.Venkatesh
Internal / DEWA
Contractor Engineer Plan for 15/06/2022 Remark
Witness
TCD Activity
SUDARSHAN ET-3 Gradient checks Internal --
Murali 11KV & GIS FAT mom Verification Internal --
TPD Activity
SHINE 11Kv BBP MVTP Relay Testing -- --
MUZAMMIL 132 kV TCS Scheme -- --
Internal /
Contractor Engineer Activity completed on dated 15/06/2022 Status DEWA Remarks
Witness
TCD Activity
Murali 11kV Cable documentation & ET O&M manual Internal --
preparation
SUDARSHAN ET-1 Gradient checks & WTI CT ratio checks Internal -- --
TPD Activity
SHINE INTERNAL -- --
132 kV Protection panel MMS data preparation
11kV Backup relay documents preparation
Muzammil E05 relay installation - Old relay P543 replaced with new INTERNAL -- --
relay P544
Internal / DEWA
Contractor Engineer Plan for 16/06/2022 Remark
Witness
TCD Activity
SUDARSHAN ET-2 Gradient checks & WTI CT ratio checks Internal --
Murali FAT mom Verification Internal --
TPD Activity
SHINE 11Kv BBP MVTP Relay Testing -- --
MUZAMMIL 132 kV TCS Scheme -- --
Internal /
Contractor Engineer Activity completed on dated 16/06/2022 Status DEWA Remarks
Witness
TCD Activity
Murali LVAC FAT report Document preparation Internal --
SUDARSHAN ET-1,2,3 WTI CT ratio and resistance checks Internal -- --
TPD Activity
SHINE 11Kv BBP MVTP Relay Testing Witness COMPLETED Venkatesh
Muzammil 132 kV TCS Scheme -E04 IDT2 Witness COMPLETED Venkatesh
Internal / DEWA
Contractor Engineer Plan for 17/06/2022 Remark
Witness
TCD Activity
SUDARSHAN -- -- --
Murali Documents preparation Internal --
TPD Activity
SHINE LVAC POWER FLOW CHECKS -- --
MUZAMMIL 132 kV TCS Scheme -E08 IDT3 -- --
Internal /
Contractor Engineer Activity completed on dated 17/06/2022 Status DEWA Remarks
Witness
TCD Activity
Murali Capacitor bank FAT report Preparation Internal --
SUDARSHAN -- -- -- --
TPD Activity
Muzammil 132 kV TCS Scheme -E08 IDT3 Witness COMPLETED Venkatesh
Internal /
Contractor Engineer Activity completed on dated 19/06/2022 Status DEWA Remarks
Witness
TCD Activity
ready to submit Dewa
1. 'Capacitor bank FAT report completed 1. Completed
Murali 2. GIS FAT Doument Verification in progress Internal 2. Inprogress
SUDARSHAN IDT - 1,2 Mk ferrule checks and ferrule replcement -- INPROGRESS --
TPD Activity
PATRIS 1. LVAC primary injection ferrule checks, power Flow checks. Internal COMPLETED
SHINE 11kV Backup Relay checks Internal COMPLETED
Internal /
Contractor Engineer Activity completed on dated 20/06/2022 Status DEWA Remarks
Witness
TCD Activity
1. '132kv FAT report completed 1. Completed ready to submit Dewa
Murali/Sigin 2. 11KV FAT in progress Internal 2. Inprogress
Annamalai/prakash ET check list verification witness Inprogress rodeo
TPD Activity
PATRIS 1. LVAC primary injection WITNESS COMPLETED 2 NOS FDRS
VENKATESH
SHINE 11kV TCS/TSS checks WITNESS COMPLETED 5 NOS FDRS
Internal /
Contractor Engineer Activity completed on dated 21/06/2022 Status DEWA Remarks
Witness
TCD Activity
1. '132kv FAT report completed 1. Completed ready to submit Dewa
Murali/Sigin Internal
2. 11KV FAT in progress 2. Inprogress
Annamalai/prakash ET check list verification witness Inprogress rodeo
TPD Activity
1.11 KV PRIMARY INJECTION, F04
PATRIS 2.LVAC POWER FLOW CHECKS WITNESS/INTERNAL IN PROGRESS
VENKATESH
SHINE/JAMAM 11kV BACKUP RELAY FINAL SETTING INTERNAL IN PROGRESS
Internal /
Contractor Engineer Activity completed on dated 22/06/2022 Status DEWA Remarks
Witness
TCD Activity
1. 11KV SWGR SAT REPORT VERFICATION
Murali/Srijith Internal In progress
2. 11KV FAT in progress
Sudarshan/Prakash 1.IDT-2FERRULE CHECKS Internal Inprogress
TPD Activity
1.LVAC PRIMARY INJECTION 2.LVAC
Patris/Binukumar POWER FLOW CHECKS Witness Completed VENKATESH
Shine/Jamam 11kV BACKUP RELAY FINAL SETTING Internal In progress
Internal / DEWA
Contractor Engineer Plan for 23/06/2022 Remark
Witness
TCD Activity
Sudarshan/prakash 1.IDT-3 FERRULE CHECKS Internal -- -- --
Murali/Srijith 1. 11KV SWGR SAT REPORT VERFICATION Internal In progress -- --
TPD Activity
Patris/Binukumar 11 KV PRIMARY INJECTION Witness In progress VENKATESH --
Shine/Jamam 11kV Backup Relay checks Internal -- -- --
Internal /
Contractor Engineer Activity completed on dated 23/06/2022 Status DEWA Remarks
Witness
TCD Activity
1. 11KV SWGR SAT REPORT VERFICATION 1. Completed
Murali/Sigin 2. 11KV FAT in progress Internal 2. Inprogress
3. 11kV SWGR MMS Data 3. Inprogress
TPD Activity
1.11KV PRIMARY INJECTION - F05 To F09 Completed
Patris Witness In progress 5 NOS
VENKATESH
Shine/Jamam 11kV BACKUP RELAY FINAL SETTING - F02 Completed Witness In progress 1 NO
Internal /
Contractor Engineer Activity completed on dated 24/06/2022 Status DEWA Remarks
Witness
TCD Activity
1. 11KV FAT Report works 1. Inprogress
Murali/Sigin 2. 11kV SWGR MMS Data Internal 2. Completed
TPD Activity
Jamam 11kV Backup relay final setting - F04 Completed Witness Completed VENKATESH 1 NO
Patris/Shine 11kV CT Primary injection - F10 Completed Witness Completed VENKATESH 1 NO
TPD Activity
Jamam 11kV Backup relay final setting - F05, F06, F07 Completed Witness Completed VENKATESH 3 NOS
Shine 11kV CT Primary injection - F11,F13,F14,F15 Completed Witness Completed VENKATESH 4 NOS
Internal /
Contractor Engineer Activity completed on dated 29/06/2022 Status DEWA Remarks
Witness
TCD Activity
TPD Activity
Jamam 11kV Backup relay final setting Internal In Progress
Shine 11kV CT Primary injection Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 30/06/2022 Status DEWA Remarks
Witness
TCD Activity
Shine 11kV CT Primary injection - F16,F17,F18,F19, F20 Completed Witness In Progress VENKATESH 5 NOS
Internal /
Contractor Engineer Activity completed on dated 01/07/2022 Status DEWA Remarks
Witness
TCD Activity
Binukumar 11kV CT Primary injection - F28,F29,F30 Completed Witness In Progress VENKATESH 3 NOS
Internal /
Contractor Engineer Activity completed on dated 03/07/2022 Status DEWA Remarks
Witness
TCD Activity
TPD Activity
Jamam 11kV Backup relay final setting Internal Completed
Shine 11kV CT Primary injection Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 05/07/2022 Status DEWA Remarks
Witness
TCD Activity
TPD Activity
Jamam 11kV CZ relay final setting Internal Completed
Shine 11kV CT Primary injection Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 06/07/2022 Status DEWA Remarks
Witness
TCD Activity
Sudarshan/
Nagarjuna IDT2- Fan motor operation checks completed Witness Completed Umar
Sudarshan/ IDT Site note related works with OEM Internal In Progress
Nagarjuna
Shagul ET2 and ET3 HV and LV NCT Testing Witness Completed Umar 6 NOS
TPD Activity
11kV Backup relay final setting - F21, F22, F27,F28,F29
Jamam Completed Witness In Progress VENKATESH 5 NOS
TPD Activity
Jamam 11kV Backup relay final setting - F30, F31, F32,F33 Completed Witness In Progress Ishan Abbas 4 NOS
Nagarjuna ET-1 and 2 WTI Hot spot grdietnt and WTI Testing Witness Completed Gunasekar
TPD Activity
11kV Backup relay final setting ferrule checks and 11KV FAT
Jamam MOM Verification related with TPD Internal In Progress
Shine 11kV CT Primary injection - Without metring Internal In Progress
Patrix 11kV CT Primary injection - With metring Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 14/07/2022 Status DEWA Remarks
Witness
TCD Activity
TPD Activity
Jamam Capacitor bank F23 Relay Internal completed and all Cap. Internal In Progress
Bank Relays ferrule checks completed
11kV CT Primary injection - 6 Capacitor feeder and Incomer -1
Shine Completed Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 15/07/2022 Status DEWA Remarks
Witness
TCD Activity
TPD Activity
Jamam F36 CZ Relay test completed Internal Completed
Shine 11kV Backup Relay testing internal preparation Internal In Progress
11kV with metering primary injection test internal
Patrix preparation Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 17/07/2022 Status DEWA Remarks
Witness
TCD Activity
TPD Activity
11kV Backup relay final setting - F34, F35, F37,F38,F39,F44
Jamam Completed
Witness In Progress NELSON 6 NOS
Murali/Sigin 11KV SWGR Capacitor bank panels Interlock and L3 Internal In Progress
Ferrule checks
TPD Activity
Shine 11kV CT Primary injection - F36, F60, F24, F48 Internal Completed 4 Nos
Internal /
Contractor Engineer Activity completed on dated 19/07/2022 Status DEWA Remarks
Witness
TCD Activity
11KV SWGR Capacitor bank Installation check list and
Murali/Sigin Witness Completed Abdulla
Capacitor Drawing Verification (in progress)
Nagarjuna IDT-2,3 Protective Device IR Test and wiring and Witness Completed Gunasekar
Operation checks and small wiring checks
TPD Activity
Jamam 132 KV synch relay Internal in progress
Shine 11kV busbar Full circuit checks Internal in progress
Internal /
Contractor Engineer Activity completed on dated 20/07/2022 Status DEWA Remarks
Witness
TCD Activity
11KV SWGR Capacitor bank Installation Drawing
Murali/Sigin Verification Internal Completed -
Sudarshan/Nagarjuna ET-1,2,3 SFRA Test report works and RMD Drawing Internal Completed
works
TPD Activity
Jamam 11kV Backup relay final setting - F46, F67, F68,F69,F70 Witness In Progress VIMAL 5 NOS
Completed
Shagul 11kV CT Primary injection - F53,F54,F55,F56, F57 Completed Witness In Progress VIMAL 5 NOS
Shine 11kV Backup relay final setting - F62, F63, F64,F65,F66 Witness In Progress VIMAL 5 NOS
Completed
Internal /
Contractor Engineer Activity completed on dated 25/07/2022 Status DEWA Remarks
Witness
TCD Activity
Murali/Sigin Capacitor bank - 1 To 6 Interlock Tesrting(Rack-in, Earth Witness Completed Abdulla
switch and Closing)
Jamam 11kV Capacitor bank -1 and 2 Back-up Relay test completed Witness In Progress VIMAL 2 NOS
Shine 11kV Incomer -1,2 and 3 CZ Relay test completed Witness In Progress VIMAL 3 NOS
Binukumar 11kV Mauells Relays testing with respect to site notes Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 29/07/2022 Status DEWA Remarks
Witness
TCD Activity
Capacitor bank - 1 To 6 Inductanxce measurement Re-
Murali/Sigin Internal Completed
test
Asbuilt drawing and Quality
ET O & M Manual verification witness and RMD Works document balance
Sudarshan/Nagarjuna Witness In Progress Imthiyas
Internal
TPD Activity
Patrix VT Secondary Injection SAT Works Internal In Progress
Shahul 11kV CT Primary injection Internal In Progress
Jamam 11kV Backup relays IFS works Internal In Progress
Shine 11kV Backup relays SAT Works Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 31/07/2022 Status DEWA Remarks
Witness
TCD Activity
TPD Activity
Patrix VT Secondary Injection SAT Works Internal Completed
Shahul 11kV CT Primary injection Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 01/08/2022 Status DEWA Remarks
Witness
TCD Activity
Sigin Capacitor bank Documents works Internal
TPD Activity
Patrix VT Secondary Injection wiring changes Internal
Jamam 11kV Backup Relays IFS Works Internal In Progress
Shine 11kV Capacitor bank Relays Internal
Internal /
Contractor Engineer Activity completed on dated 02/08/2022 Status DEWA Remarks
Witness
TCD Activity
Sigin Capacitor bank Documents works Internal
TPD Activity
Patrix 11kV CT Primary injection - BS1 and BS2 Internal
Jamam 11kV Backup Relays IFS Works Internal In Progress
Shine 11kV SWGR Trip coil current measurement Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 03/08/2022 Status DEWA Remarks
Witness
TCD Activity
Sigin Capacitor bank Documents works Internal
IDT and ET Redmarkup works and FAT MOM Related
Nagarjuna Internal
works
TPD Activity
Patrix 11kV CT Primary injection Internal
Jamam 11kV Backup Relays IFS Works Internal In Progress
Shine 11kV SWGR Trip coil current measurement Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 04/08/2022 Status DEWA Remarks
Witness
TCD Activity
Murali/Sigin Capacitor bank and LVAC Label works Internal
IDT and ET Redmarkup Drawing verification - 10
Nagarjuna Witness In Progress Mosab 10 Nos
Drawings Completed
TPD Activity
Shagul 11kV CT Primary injection - F63 - F68 Completed Witness In Progress VENKATESH 6 Nos
11kV Energy meter power flow checks -
Jamam F02,F21,F22,F27,F46,F50,F51,F70 Completed Witness In Progress VENKATESH 16 Nos
Shine 11KV Capacitor Bank Relays - F25,F47,F49 Completed Witness In Progress VENKATESH 3 Nos
Internal /
Contractor Engineer Activity completed on dated 05/08/2022 Status DEWA Remarks
Witness
TCD Activity
Murali/Sigin Capacitor bank and 11kV Label works Internal
IDT Redmarkup Drawing verification - 4 Drawings
Nagarjuna Completed Witness In Progress Mosab 4 Nos
TPD Activity
Shagul 11kV CT Primary injection - F69 and F24 Completed Witness In Progress VENKATESH 2 Nos
11kV Energy meter power flow checks - F69 and VT
Jamam Secondary injection - BUS1 Completed Witness In Progress VENKATESH 2 Nos
Shine 11KV Capacitor Bank Relays - F71 Completed Witness Completed VENKATESH 1 No
Internal /
Contractor Engineer Activity completed on dated 06/08/2022 Status DEWA Remarks
Witness
TCD Activity
TPD Activity
Patrix 11kV CT Primary injection - F48 Completed Witness In Progress VENKATESH 1 No
Jamam VT Secondary injection - BUS2 and BUS3 Completed Witness In Progress VENKATESH 2 Nos
Shine 11KV Trip Coil Current measurements Without Witness Completed VENKATESH 24 Nos
metering(Room1) Completed
Internal /
Contractor Engineer Activity completed on dated 07/08/2022 Status DEWA Remarks
Witness
TCD Activity
TPD Activity
Internal /
Contractor Engineer Activity completed on dated 08/08/2022 Status DEWA Remarks
Witness
TCD Activity
Murali/Sigin LVAC and 132KV SWGR O & M Manual verification Witness In Progress Kamil Comments given
TPD Activity
11KV Trip Coil Current measurements Incomer and
Patrix Bussection Internal Completed
Shine 132kV Siemens CID File works Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 09/08/2022 Status DEWA Remarks
Witness
TCD Activity
TPD Activity
Patrix 11KV Trip Coil Current measurements SAT Works Internal
Shine 132kV Siemens CID File works Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 10/08/2022 Status DEWA Remarks
Witness
TCD Activity
TPD Activity
Patrix 11KV TPD SAT Works Internal
Internal /
Contractor Engineer Activity completed on dated 11/08/2022 Status DEWA Remarks
Witness
TCD Activity
TPD Activity
Shine 132kV Siemens CID File works Internal
Patrix 11KV TPD SAT Works Internal
Internal /
Contractor Engineer Activity completed on dated 12/08/2022 Status DEWA Remarks
Witness
TCD Activity
TPD Activity
Internal /
Contractor Engineer Activity completed on dated 14/08/2022 Status DEWA Remarks
Witness
TCD Activity
TPD Activity
Shine 11KV Protection O & M Manual soft copy preparation Internal In Progress
Patrix 11KV Protection MMS Data works Internal In Progress
Binukumar Remote end Drawing works Internal
Internal /
Contractor Engineer Activity completed on dated 15/08/2022 Status DEWA Remarks
Witness
TCD Activity
132kV SWGR O&M Manual verification completed
except AS BUILT Drawing and 132kV SWGR FAT Report
Murali verification completed and 11kV SWGR FAT Report in Witness In Progress Kamil
progress
TPD Activity
11KV Trip Coil Current measurements Without
Shine metering(Room2) Completed Witness In Progress Thanush
Sudarshan OEM Co-ordination for site note comments Witness In Progress Anas
TPD Activity
Shine 132KV TCS and TSS Checks - E05 and E07 Internal Completed
Internal /
Contractor Engineer Activity completed on dated 17/08/2022 Status DEWA Remarks
Witness
TCD Activity
LVAC and HLDB Outgoing cables verification and RMD
Murali Drawing Scaning works Internal In Progress
Sudarshan OEM Co-ordination for site note comments Witness In Progress Anas
TPD Activity
Shine 132KV TCS and TSS Checks - E05 Witness Completed Shaw Mohamed 1No
Binukumar 11kV and DFR Panels Mauells Relays testing as per site notes Internal Completed
Internal /
Contractor Engineer Activity completed on dated 18/08/2022 Status DEWA Remarks
Witness
TCD Activity
TPD Activity
Shine 132KV TCS and TSS Checks - E07 Witness Completed Shaw Mohamed 1No
Internal /
Contractor Engineer Activity completed on dated 19/08/2022 Status DEWA Remarks
Witness
TCD Activity
Murali Pad lock and key list works Internal
TPD Activity
Shine 11kV DC Scheme checks - F26 Completed Witness Completed Shaw Mohamed 1No
Patix 11kV DC Scheme checks - F03 Completed Witness Completed Shaw Mohamed 1No
Internal /
Contractor Engineer Activity completed on dated 21/08/2022 Status DEWA Remarks
Witness
TCD Activity
Murali Pad lock works and project meeting Internal
Sudarshan Project Meeting and Site note, FAT MOM Works Internal
TPD Activity
Binukumar Project Meeting and protection documents works Internal
Shine 132kV Final setting preparation works Internal
Patix DFR DC Scheme-Internal Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 22/08/2022 Status DEWA Remarks
Witness
TCD Activity
11kV SWGR FAT Report verification completed and
Murali LVAC FAT Report verification completed. Witness In Progress Kamil
Capacitor bank FAT Report verification in progress
Capacitor bank drawing - 2 Drawings completed
TPD Activity
11kV DC Scheme checks - F45 Completed
Shine 11kV TCS - F03,F26,F45 Completed Witness Completed Shaw Mohamed
TPD Activity
1No
Patix/Hariharan Witness Completed Jayaram
Shine/Khalid 132kV E08-M2IDTP Relay Final setting Witness Completed Jayaram 1No
Internal /
Contractor Engineer Activity completed on dated 02/09/2022 Status DEWA Remarks
Witness
TCD Activity
Murali RMD Works - 11kV SWGR and LVAC Internal Completed
Nagarjuna IDT3 OLTC Operation Checks, Tap position indication Witness Completed Mosab
Checks completed and Winding Resistance Completed
TPD Activity
Shine/Khalid 132kV E05A-M2RP Relay Final setting Witness Completed Shaw Mohamed 1No
Internal /
Contractor Engineer Activity completed on dated 04/09/2022 Status DEWA Remarks
Witness
TCD Activity
Murali LVAC level3 works Internal
Nagarjuna IDT Pressure test related works and SAT Works Internal
TPD Activity
Shine 132kV Synch relay testing Internal Completed
Patrix 11kV BBP Full circuit checks Internal Completed
Internal /
Contractor Engineer Activity completed on dated 05/09/2022 Status DEWA Remarks
Witness
TCD Activity
11KV SWGR MMS Data Completed and CTVT In
Murali progress Witness In Progress Abdulla
Nagarjuna ET -1 Protective device wiring, operation and IR Test Witness Completed Abusalih
and small wiring checks
Shagul OBCT Testing Internal In Progress
TPD Activity
Patrix 11kV BBP Full circuit checks Witness Completed Shaw Mohamed 3Nos
Shine 11KV Incomer-3 VT Secondary injection Witness Completed Shaw Mohamed 1No
Internal /
Contractor Engineer Activity completed on dated 08/09/2022 Status DEWA Remarks
Witness
TCD Activity
Murali Capacitor bank unbalance internal preparation Internal
Nagarjuna ET, IDT Test Report works Internal
TPD Activity
Patrix 11kV BBP Sensitivity test Witness Completed Shaw Mohamed 3Nos
Shine/Karthigai selvan 132kV E07-M2FP Relay Final setting Witness Completed Shaw Mohamed 1No
Internal /
Contractor Engineer Activity completed on dated 09/09/2022 Status DEWA Remarks
Witness
TCD Activity
Murali 11kV Cable Label works Internal
IDT Red markup drawing - 1No and FAT MOM
Nagarjuna Verification Witness In Progress Abusalih
TPD Activity
Patrix 11kV BBP Stability test - F01- F11 Completed Witness Completed Shaw Mohamed 11Nos
Shagul/Karthigai selvan 132kV E07A-M2RP Relay Final setting Witness Completed Shaw Mohamed 1No
Internal /
Contractor Engineer Activity completed on dated 11/09/2022 Status DEWA Remarks
Witness
TCD Activity
TPD Activity
Patrix 11kV BBP Stability test Internal
Shine 11kV Trip logic test Internal
Shagul OBCT Testing Internal Completed
Internal /
Contractor Engineer Activity completed on dated 12/09/2022 Status DEWA Remarks
Witness
TCD Activity
Nagarjuna ET3 SAT Works and site note verification Witness In Progress Gunasekar
TPD Activity
Patrix 11kV BBP Stability test - F12- F37 Completed Witness Completed Cosmie 24 Nos
Shine 11kV Trip logic test Without metering Room1 Completed Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 13/09/2022 Status DEWA Remarks
Witness
TCD Activity
Murali SCMS Common Alarm signals Internal In Progress
TPD Activity
Patrix 11kV BBP Stability test - F38- F61 Completed Witness Completed Cosmie 22 Nos
11kV Trip logic test With metring, Incomer and Bus section -
Shine Room1 Completed Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 14/09/2022 Status DEWA Remarks
Witness
TCD Activity
Murali SCMS Common Alarm signals Internal In Progress
Sudarshan RTCC Panel wiring checks and Component verification Internal In Progress
TPD Activity
Patrix 11kV BBP Stability test - F62- F71, F24, F48 Completed Witness Completed Cosmie 12 Nos
Shine 132kV Synch Relay Testing Internal Completed
Shahul 132kV CT Primary injection Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 15/09/2022 Status DEWA Remarks
Witness
TCD Activity
Murali SCMS Common Alarm signals Internal In Progress
Sudarshan RTCC Panel wiring checks and Component verification Internal In Progress
TPD Activity
Patrix 11kV Trip logic Test - F04 To F11, F13 Completed Witness Completed Cosmie 9 Nos
Shine 132kV Synch Relay Testing Witness Completed Cosmie 1No
Shahul OBCT Testing Witness Completed Rasheed 6Nos
Internal /
Contractor Engineer Activity completed on dated 16/09/2022 Status DEWA Remarks
Witness
TCD Activity
Murali SCMS Common Alarm signals Internal In Progress
Sudarshan RTCC Panel wiring checks and Component verification Internal In Progress
TPD Activity
Patrix 11kV Trip logic Test - F14 To F18 Completed Witness Completed Cosmie 5 Nos
Shahul 132kV CT Primary Injection Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 18/09/2022 Status DEWA Remarks
Witness
TCD Activity
Murali SCMS Common Alarm signals Internal In Progress
Nagarjuna SAT Works IDT and ET and site note related works Internal In Progress
Sudarshan RTCC Panel wiring checks and Component verification Internal In Progress
TPD Activity
Patrix DCDB SAT and Label works Internal
Shine 11kV Trip logic test Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 19/09/2022 Status DEWA Remarks
Witness
TCD Activity
Murali SCMS Common Alarm signals Internal In Progress
TPD Activity
Shine 11kV Trip logic Test - F19,F20 F28 To F33 Completed Witness Completed Cosmie 8 Nos
Internal /
Contractor Engineer Activity completed on dated 20/09/2022 Status DEWA Remarks
Witness
TCD Activity
Murali SCMS Common Alarm signals Internal In Progress
Nagarjuna IDT, ET RMD Drawing works Internal
TPD Activity
Shine 11kV Trip logic Test - F34,F35 F63 To F68 Completed Witness Completed Cosmie 8 Nos
Raja 11kV Trip logic Test - F37 To F41 Completed Witness Completed Cosmie 5 Nos
Shagul 132kV CT Primary Injection Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 21/09/2022 Status DEWA Remarks
Witness
TCD Activity
Murali SCMS L3 - 11kV SWGR Internal In Progress
ET-2,3 -
1. Protective device wiring, operation and IR Checks
Nagarjuna 2. Small wiring checks Witness Completed Sunil
3. ET - 1,2,3 N2 Injection
TPD Activity
Shine 11kV Trip logic Test - F61,F62 F54 To F59 Completed Witness Completed Cosmie 8 Nos
Raja/Khalid 132kV M2BBP Final setting Witness In Progress Cosmie
Shagul 132kV CT Primary Injection Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 22/09/2022 Status DEWA Remarks
Witness
TCD Activity
Murali SCMS L3 - 11kV SWGR Internal In Progress
AVR-panel GA verification completed
Sudarshan and scheme checks in progress Witness In Progress Sunil
TPD Activity
Shagul 11kV Trip logic Test - F42,F43 F44,F52,F53 Completed Witness Completed Cosmie 5 Nos
Raja/Khalid 132kV M2BBP Final setting Witness In Progress Cosmie
Internal /
Contractor Engineer Activity completed on dated 23/09/2022 Status DEWA Remarks
Witness
TCD Activity
Murali SCMS L3 - 11kV SWGR Internal In Progress
AVR-panel GA verification completed
Sudarshan and scheme checks in progress Witness In Progress Sunil
TPD Activity
Shine 11kV Trip logic Test - F21,F22,F26,F27 Completed Witness Completed Cosmie 4 Nos
Shagul 11kV Trip logic Test - F02,F03,F69,F70 Completed Witness Completed Cosmie 4 Nos
Raja/Khalid 132kV M2BBP Final setting Witness Completed Cosmie 3 Nos
Internal /
Contractor Engineer Activity completed on dated 23/09/2022 Status DEWA Remarks
Witness
TCD Activity
Murali SCMS L3 - 11kV SWGR Internal In Progress
TPD Activity
Internal /
Contractor Engineer Activity completed on dated 25/09/2022 Status DEWA Remarks
Witness
TCD Activity
Shagul SCMS L3 - 11kV SWGR Internal In Progress
Sudarshan Reactor Installation Internal In Progress
TPD Activity
Shine 11kV Trip logic Test Internal In Progress
Raja 11kV Trip logic Test Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 26/09/2022 Status DEWA Remarks
Witness
TCD Activity
Murali SCMS L3 - 11kV SWGR Internal In Progress
Sudarshan Reactor Installation Witness In Progress Gunasekar
TPD Activity
Shine 11kV Trip logic Test - F45,F46,F50,F51,F12 Completed Witness Completed Cosmie 5 Nos
Raja 11kV Trip logic Test - F01,F23,F25,F47,F49,F71 Completed Witness Completed Cosmie 6 Nos
Internal /
Contractor Engineer Activity completed on dated 27/09/2022 Status DEWA Remarks
Witness
TCD Activity
Murali SCMS L3 - 11kV SWGR Internal In Progress
SHX HV Cable Box with bushing, Main Tank PRD, and
Sudarshan Witness In Progress Gunasekar
main tank Pipe installation completed
TPD Activity
Shine 11kV CBF logic Test Internal In Progress
Raja 11kV Trip logic Test - F36, F60 Completed Witness In Progress Cosmie 2 Nos
Internal /
Contractor Engineer Activity completed on dated 28/09/2022 Status DEWA Remarks
Witness
TCD Activity
Murali SCMS L3 - 11kV SWGR Internal In Progress
Sudarshan SHX Installation Witness In Progress Gunasekar
TPD Activity
Shine 11kV CBF logic Test - Incomer-1,2,3 Completed Witness In Progress Cosmie 3 Nos
Raja 11kV Trip logic Test - F24 Completed Witness In Progress Cosmie 1 No
Shagul 132kV CT Primary Injection test Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 29/09/2022 Status DEWA Remarks
Witness
TCD Activity
Murali SCMS L3 - 132kV SWGR Internal In Progress
TPD Activity
Shine 11kV CBF logic Test - BS-1,2 Internal In Progress
Raja 11kV BBP Trip logic Test Internal In Progress
Shagul 132kV CT Primary Injection test Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 30/09/2022 Status DEWA Remarks
Witness
TCD Activity
Reactor balance piping works and SHX-2 Vacume
Sudarshan Witness In Progress Gunasekar
started
TPD Activity
Shine 11kV CBF logic Test - BS-1,2 Witness Completed Cosmie 2 Nos
Raja 11kV BS2 Trip logic Test Witness Completed Cosmie 1 No
Raja DC Outgoing Cables checks, DMZ Panel Witness Completed Cosmie 2 Nos
Shagul 132kV CT Primary Injection test Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 02/10/2022 Status DEWA Remarks
Witness
TCD Activity
Sudarshan SHX-2 Vacume break and oil filling completed Witness In Progress Abusalih
SHX-1 Vacume started
Sudarshan SHX-1 and SHX-2 Rubber bag normalization and RTCC Internal Completed
Panel wiring checks
Sudarshan SHX-1,2 Main tank oil sample and SHX-1,2 MOLG Witness Completed Anas
Operation checks
Murali 11kV SWGR and LVAC, Common signal L3 Signal list Internal Completed
source updation
TPD Activity
Shagul 132kV M1BBP Full Circuit checks Witness Completed Cosmie 3 Nos
Shine 132kV VT Secondary Injection Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 18/10/2022 Status DEWA Remarks
Witness
TCD Activity
TPD Activity
Shagul 132kV M1BBP Sensitivity checks Witness Completed Cosmie 3 Nos
Shine 132kV VT Secondary Injection Internal In Progress
Dhatchanamoorthy Remote end MOS Works Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 19/10/2022 Status DEWA Remarks
Witness
TCD Activity
Sudarshan AVR Testing Witness Completed Sunil
Kannan 11kV SWGR L3 Testing completed except Incomers and Witness In Progress Rahathullah
site note feeders
TPD Activity
Shagul 132kV M1BBP Stability checks Witness In Progress Cosmie 6 Nos
Shine 132kV VT Secondary Injection Internal Completed
Dhatchanamoorthy IDT, ET, SHX MMS Data Internal Completed
Internal /
Contractor Engineer Activity completed on dated 20/10/2022 Status DEWA Remarks
Witness
TCD Activity
Sudarshan AVR ICD File works and IDT, ET, SHX MMS Data works Internal Completed
TPD Activity
132kV M1BBP Stability test
Shagul/Shine 132kV M1BBP Load Transfer Checks
Witness Completed Jayaram 7 Nos
TPD Activity
Shine 132KV CBF Logic Checks Internal In Progress
Dhatchanamoorthy Remote end MOS Works Internal In Progress
Shagul M1BBP Functional Test Internal Completed
Internal /
Contractor Engineer Activity completed on dated 24/10/2022 Status DEWA Remarks
Witness
TCD Activity
Sudarshan ET - 3 OTI, WTI Calibration Witness Completed Sunil
TPD Activity
Shine 132KV VT Secondary Injection - E05 Completed Witness Completed Rithesh 1No
TPD Activity
Shine 132KV IDT-1, 2, 3 Trip Logic Test Internal In Progress
132kV SWGR L3 Testing - Interlock Test E03, E04, E05, 5Nos
Dhatchanamoorthy E07, E08 Completed Witness In Progress Rahathullah
Internal /
Contractor Engineer Activity completed on dated 26/10/2022 Status DEWA Remarks
Witness
TCD Activity
Dhatchanamoorthy 132kV SWGR L3 Testing - Interlock Test E06 Completed Witness In Progress Rahathullah 3Nos
and E02, E04 Alaram checks completed
Internal /
Contractor Engineer Activity completed on dated 27/10/2022 Status DEWA Remarks
Witness
TCD Activity
TPD Activity
Shahul 132KV IDT-1, 2, 3 Trip Logic Test Completed Witness In Progress Vimal 3 Nos
Shine Remote End Method Statemet works Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 28/10/2022 Status DEWA Remarks
Witness
TCD Activity
Sudarshan ET-3 RMD Drawing verification Witness In Progress Anas
TPD Activity
Shahul ET NCT Primary Injection Internal Completed
Arun OBCT Primary Injection Internal In Progress
Shine Remote End Method Statemet works Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 31/10/2022 Status DEWA Remarks
Witness
TCD Activity
Sudarshan SHX OTI, WTI Calibration Internal In Progress
TPD Activity
Vasand TPD Snag Works Internal
Arun PFC Internal Internal
Shine M2BBP Stability Test Witness Completed Vimal 7 Nos
Internal /
Contractor Engineer Activity completed on dated 04/11/2022 Status DEWA Remarks
Witness
TCD Activity
Sudarshan SHX O & M Manual Verification - Hard Copy Witness In Progress Mosab
TPD Activity
Vasand 11kV PFC Wiring verification Internal In Progress
Shine SHX NCT Test Witness Completed Rahathullah 4Nos
Internal /
Contractor Engineer Activity completed on dated 15/11/2022 Status DEWA Remarks
Witness
TCD Activity
IDT-1 SFRA Test
Sudarshan Witness In Progress Anas
TPD Activity
Vasand LVAC Trip Logic Test Witness Completed Shaw Mohamed
Shine SHX BCT Test Witness Rahathullah Holded
Internal /
Contractor Engineer Activity completed on dated 16/11/2022 Status DEWA Remarks
Witness
TCD Activity
Sudarshan IDT-1,2,3 Main tank and cable box N2 Injection Witness Completed Anas
TPD Activity
Vasand 132kV RMD Drawing works Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 22/11/2022 Status DEWA Remarks
Witness
TCD Activity
Sudarshan IDT -1 Winding Resistance Witness Completed Anas
TPD Activity
Vasand LCC Protection Part Redmarkup Drawing Verification Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 24/11/2022 Status DEWA Remarks
Witness
TCD Activity
Sudarshan IDT-1,2 Level3 test Completed and IDT-3 In Progress Witness In Progress Mosab
TPD Activity
Patrix/Vasand SHX-1,2 CT Test Witness In Progress Sunil
Internal /
Contractor Engineer Activity completed on dated 25/11/2022 Status DEWA Remarks
Witness
TCD Activity
Sudarshan SHX Installation check list verification and oil sample - Witness In Progress Mosab
cable boxes
TPD Activity
Vasand Redmarkup Drawing works Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 28/11/2022 Status DEWA Remarks
Witness
TCD Activity
Sudarshan IDT Documents works Internal In Progress
Murali LVAC and HLDB Outgoing Cables Checks Witness In Progress Amel
TPD Activity
Sijin Redmarkup Drawing works Witness In Progress Venkadesh
Internal /
Contractor Engineer Activity completed on dated 29/11/2022 Status DEWA Remarks
Witness
TCD Activity
Sudarshan FAT MOM Works Internal In Progress
TPD Activity
Internal /
Contractor Engineer Activity completed on dated 04/12/2022 Status DEWA Remarks
Witness
TCD Activity
Sudarshan IDT-1,2,3 Cable box oil drain works Internal Completed
TPD Activity
Internal /
Contractor Engineer Activity completed on dated 05/12/2022 Status DEWA Remarks
Witness
TCD Activity
Sudarshan IDT-1,2,3 HV Cable Box Link Fixing Witness Completed Gunasekar
Murali 11kV Cable F01 and F23 Sheath Test Completed Witness In Progress Silvester
TPD Activity
Hari Record Room Documents works Internal
Internal /
Contractor Engineer Activity completed on dated 06/12/2022 Status DEWA Remarks
Witness
TCD Activity
HV Cable Box Storage Tank Sample Completed
Sudarshan IDT-1 HV Cable Box vacume Completed and Oil Filling Witness In Progress Gunasekar
In Progress
Murali 11kV Cable HV Test - Capacitor Bank 1 To 6 Completed Witness In Progress Silvester 18 Nos
TPD Activity
Hari Record Room Documents works Internal
Internal /
Contractor Engineer Activity completed on dated 07/12/2022 Status DEWA Remarks
Witness
TCD Activity
Murali 11kV Cable HV Test - Incomer-1,2,3 Completed Witness In Progress Silvester 63 Nos
TPD Activity
Record Room Documents works and 11kV BBP Panels Final
Hari checks Internal
Internal /
Contractor Engineer Activity completed on dated 08/12/2022 Status DEWA Remarks
Witness
TCD Activity
Sudarshan IDT-1, 2,3 HV Cable Box sample completed Witness Completed Gunasekar
TPD Activity
Record Room Documents works and 11kV BBP Panels Final
Hari checks Internal In Progress
Internal /
Contractor Engineer Activity completed on dated 09/12/2022 Status DEWA Remarks
Witness
TCD Activity
Sudarshan IDT-1,2,3 LV Cable box link fixing works Witness In Progress Gunasekar
TPD Activity
Internal /
Contractor Engineer Activity completed on dated11/12/2022 Status DEWA Remarks
Witness
TCD Activity
TPD Activity
Hari Record Room Document works Internal In Progress
Patrix SHX-1,2 Bushing CT and NCT Primary Injection Internal In Progress
Internal / DEWA
Contractor Engineer Plan for 12/12/2022 Remark
Witness
TCD Activity
Sudarshan IDT-1,2,3 LV Cable box link fixing works Witness
TPD Activity
Record Room Document works and Final checks Prepration
Hari works Internal
11KV SWGR L3 SAT STATUS 11KV TRIP LOGIC
F01 F01
F02 F02
F03 F03
F04 F04
F05 F05
F06 F06
F07 F07
F08 F08
F09 F09
F10 F10
F11 F11
F12 F12
F13 F13
F14 F14
F15 F15
F16 F16
F17 F17
F18 F18
F19 F19
F20 F20
F21 F21
F22 F22
F23 F23
F24 F24
F25 F25
F26 F26
F27 F27
F28 F28
F29 F29
F30 F30
F31 F31
F32 F32
F33 F33
F34 F34
F35 F35
F36 F36
F37 F37
F38 F38
F39 F39
F40 F40
F41 F41
F42 F42
F43 F43
F44 F44
F45 F45
F46 F46
F47 F47
F48 F48
F49 F49
F50 F50
F51 F51
F52 F52
F53 F53
F54 F54
F55 F55
F56 F56
F57 F57
F58 F58
F59 F59
F60 F60
F61 F61
F62 F62
F63 F63
F64 F64
F65 F65
F66 F66
F67 F67
F68 F68
F69 F69
F70 F70
F71 F71
OK F44
OK 29.08.2022 F44
OK 17.07.2022 F46
OK 23.07.2022 F47
OK 06.08.2022 F48
OK 23.07.2022 F49
OK F50
17.07.2022
OK F51
OK 07.07.2022 F52
OK F53
OK F54
OK 24.07.2022 F55
OK F56
OK F57
OK F58
28.07.2022
OK F59
OK 30.08.2022 F60
OK F61
28.07.2022
OK F62
OK F63
OK F64
OK F65
04.08.2022
OK F66
OK F67
OK F68
OK 05.08.2022 F69
OK 17.07.2022 F70
OK 23.07.2022 F71
OK
OK 30.08.2022 NOT READY
OK 24.07.2022
OK 04.08.2022
NA
OK 04.08.2022
OK
OK
OK 23.07.2022
OK
OK
OK 17.07.2022
OK
OK
23.07.2022
OK
OK
OK 28.07.2022
OK 23.07.2022
OK
OK
OK 24.07.2022
OK
OK
OK
OK
24.07.2022
OK
OK
OK 05.08.2022
66 66 BAL 3
Bal - 6