Professional Documents
Culture Documents
Acceptance check-ist for new ln-Building Solution (IBS) mabite site gdd ufg tÍ ifo
rovisional Acceptance
Acceptanc check-listfor new In-Building Solution (IBS) miobile ite
Testing
Site ID: DaB O2A Date of Visit: 12|22023
Site Name: Gobo Ksidalces fTVC
Site Coordinates:
Recont acCount and
Power Authority: DEWA SEWA FEWA ADDC AADC "Private/ landlord Ieter #s and take
clear photo:
du-ND
Pan
I2.2.202
ND-Vendor
kA.Siba
*Important: This checkllst is for the purpose of guidance during acceptance site isit. Teams doing the visit are free to raise/record any
concern/snag which might require higher level alignment or decision regardless if existing in this checklist or not.
d Provisional Acceptance l esting
Telecomn Works Checklist
Name:
Signature:
07